J5 Work Items.pdf

PDF 272 KB Posted

Attached to
CUSTER GALLATIN NATIONAL FOREST - Porcupine Ibex Trail #267 Relocation - Phase II
Solicitation number
12034320Q0085
Issued by

View the file

Other files

File Type Posted
AMENDMENT 002.pdf PDF
20Q0085 - AMEND 001.pdf PDF
AMENDMENT 001.pdf PDF
12034320Q0085.pdf PDF
StandardSpecs_forTrails.pdf PDF
J4 Standard Drawings.pdf PDF
J3 Signed Cover Sheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P o r c u p i n e I b e x T r a i l # 2 6 7 R e l o c a t i o n P r o j e c t - P h a s e 2

W o r k I t e m s

Custer Gallatin National Forest Page 1

Beg Sta End Sta Description of Work Drawing # Spec SPS Pay Item Unit Quantity

0+00 Begin work on Trail #267 at the Porcupine cabin in the Crazy Mountains.

0+00 616+00 Clear trail for duration of contract 911-1 982 982(01) MI 11.7

0+00 153+50 Restore 500 LF of eroded trail to specification as staked.

915-1 915 915(01)a LF 500

153+50 Intersection of trail 267 and Elk Creek trail 195.

Install post where staked.

952-1 952 952(01)

EA

153+50 616+00 Construct 46,550 LF of new stock trail. Includes clearing, grubbing and unclassified excavation.

Numerous sections of surface rock may need blasting or hammering, incidental.

911-1

912-1

912-2

911(02)

912(01)

LF

LF

46,550

46,550

153+50 616+00 500 LF of Trail Obliteration in sections where staked

954-1 954 954(02) LF 500

153+50 616+00 Construct Turnpike – Type II with log retainer and geotextile where staked following excavation

913-2 913 913(01)b

913(03)b

LF

SY

153+50 616+00 Construct 50 Drain Dips where staked and drained to daylight; Leadoff ditches incidental.

912-5 912 912(06) EA 50

153+50 616+00 Construct 20 pullouts where staked by COR.

Dimensions 3’x 15’, Incidental to 911(02) and

912(01)

911-1

912-1

912-2

153+50 616+00 Construct 5 Armored Drain Dips where staked and drained to daylight; Leadoff ditches incidental.

912-5 912 912(06)c EA 5

153+50 616+00 Install sections of Rock Retaining Wall where staked

935-1 935 935(01) SF 100

159+00 Shallow Stream Ford & Gully Crossing –

Rock Structure.

912-7 912 912(07)a EA 1

172+20 191+60 Construction on Private Property

209+00 236+40 Construction on Private Property

282+40 Shallow Stream Ford & Gully Crossing –

Rock Structure.

912-7 912 912(07)a EA 1

Custer Gallatin National Forest Page 2

353+50 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a

914-1 914 914(01)

914(06)a

EA 1

361+20 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a

914-1 914 914(01)

914(06)a

EA 1

378+60 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a

914-1 914 914(01)

914(06)a

EA 1

399+00 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a

914-1 914 914(01)

914(06)a

EA 1

406+20 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a

914-1 914 914(01)

914(06)a

EA 1

76+00 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to

921(01)a

921-2 921 921(01)b LF 15

427+40 Shallow Stream Ford & Gully Crossing –

Rock Structure.

912-7 912 912(07)a EA 1

457+50 466+40 Construction on Private Property

467+20 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to

921(01)a

921-2 921 921(01)b LF 15

514+60 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to

921(01)a

921-2 921 921(01)b LF 15

Custer Gallatin National Forest Page 3

530+40 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to

921(01)a

921-2 921 921(01)b LF 15

545+20 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to

921(01)a

921-2 921 921(01)b LF 15

558+60 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a

914-1 914 914(01)

914(06)a

EA 1

567+20 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a

914-1 914 914(01)

914(06)a

EA 1

469+00 503+40 Construction on Private Property

555+40 565+00 Construction on Private Property

569+20 584+80 Construction on Private Property

591+60 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to

921(01)a

921-2 921 921(01)b LF 15

610+80 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to

921(01)a

921-2 921 921(01)b LF 15

616+00 Intersection with old Trail #267.

Install post where staked. End of Project.

952-1 952 952(01)

EA