J5 Work Items.pdf
PDF 272 KB Posted
- Solicitation number
- 12034320Q0085
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 002.pdf | ||
| 20Q0085 - AMEND 001.pdf | ||
| AMENDMENT 001.pdf | ||
| 12034320Q0085.pdf | ||
| StandardSpecs_forTrails.pdf | ||
| J4 Standard Drawings.pdf | ||
| J3 Signed Cover Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P o r c u p i n e I b e x T r a i l # 2 6 7 R e l o c a t i o n P r o j e c t - P h a s e 2
W o r k I t e m s
Custer Gallatin National Forest Page 1
Beg Sta End Sta Description of Work Drawing # Spec SPS Pay Item Unit Quantity
0+00 Begin work on Trail #267 at the Porcupine cabin in the Crazy Mountains.
0+00 616+00 Clear trail for duration of contract 911-1 982 982(01) MI 11.7
0+00 153+50 Restore 500 LF of eroded trail to specification as staked.
915-1 915 915(01)a LF 500
153+50 Intersection of trail 267 and Elk Creek trail 195.
Install post where staked.
952-1 952 952(01)
EA
153+50 616+00 Construct 46,550 LF of new stock trail. Includes clearing, grubbing and unclassified excavation.
Numerous sections of surface rock may need blasting or hammering, incidental.
911-1
912-1
912-2
911(02)
912(01)
LF
LF
46,550
46,550
153+50 616+00 500 LF of Trail Obliteration in sections where staked
954-1 954 954(02) LF 500
153+50 616+00 Construct Turnpike – Type II with log retainer and geotextile where staked following excavation
913-2 913 913(01)b
913(03)b
LF
SY
153+50 616+00 Construct 50 Drain Dips where staked and drained to daylight; Leadoff ditches incidental.
912-5 912 912(06) EA 50
153+50 616+00 Construct 20 pullouts where staked by COR.
Dimensions 3’x 15’, Incidental to 911(02) and
912(01)
911-1
912-1
912-2
153+50 616+00 Construct 5 Armored Drain Dips where staked and drained to daylight; Leadoff ditches incidental.
912-5 912 912(06)c EA 5
153+50 616+00 Install sections of Rock Retaining Wall where staked
935-1 935 935(01) SF 100
159+00 Shallow Stream Ford & Gully Crossing –
Rock Structure.
912-7 912 912(07)a EA 1
172+20 191+60 Construction on Private Property
209+00 236+40 Construction on Private Property
282+40 Shallow Stream Ford & Gully Crossing –
Rock Structure.
912-7 912 912(07)a EA 1
Custer Gallatin National Forest Page 2
353+50 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a
914-1 914 914(01)
914(06)a
EA 1
361+20 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a
914-1 914 914(01)
914(06)a
EA 1
378+60 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a
914-1 914 914(01)
914(06)a
EA 1
399+00 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a
914-1 914 914(01)
914(06)a
EA 1
406+20 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a
914-1 914 914(01)
914(06)a
EA 1
76+00 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to
921(01)a
921-2 921 921(01)b LF 15
427+40 Shallow Stream Ford & Gully Crossing –
Rock Structure.
912-7 912 912(07)a EA 1
457+50 466+40 Construction on Private Property
467+20 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to
921(01)a
921-2 921 921(01)b LF 15
514+60 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to
921(01)a
921-2 921 921(01)b LF 15
Custer Gallatin National Forest Page 3
530+40 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to
921(01)a
921-2 921 921(01)b LF 15
545+20 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to
921(01)a
921-2 921 921(01)b LF 15
558+60 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a
914-1 914 914(01)
914(06)a
EA 1
567+20 Construct 8’ radius switchback, unclassified excavation, with max. 8% grade throughout, including 50’ long approaches. Rock Walls where staked lumped under 914(06)a
914-1 914 914(01)
914(06)a
EA 1
469+00 503+40 Construction on Private Property
555+40 565+00 Construction on Private Property
569+20 584+80 Construction on Private Property
591+60 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to
921(01)a
921-2 921 921(01)b LF 15
610+80 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to
921(01)a
921-2 921 921(01)b LF 15
616+00 Intersection with old Trail #267.
Install post where staked. End of Project.
952-1 952 952(01)
EA