CUSTER GALLATIN NATIONAL FOREST - Porcupine Ibex Trail #267 Relocation - Phase II
Solicitation number
12034320Q0085
Issued by

View the file

Other files

File Type Posted
AMENDMENT 002.pdf PDF
AMENDMENT 001.pdf PDF
12034320Q0085.pdf PDF
StandardSpecs_forTrails.pdf PDF
J4 Standard Drawings.pdf PDF
J3 Signed Cover Sheet.pdf PDF
J5 Work Items.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12034320Q0085 – AMENDMENT 001

Porcupine Ibex Trail #267 Relocation Project – Phase II Yellowstone Ranger District, Custer Gallatin National Forest

B – SUPPLIES OR SERVICES AND PRICES

PORCUPINE IBEX TRAIL #267 RELOCATION PROJECT – PHASE II

YELLOWSTONE RANGER DISTRICT, CUSTER GALLATIN NATIONAL FOREST

PARK COUNTY, MONTANA

B-1 SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

MTH

D of

MEA

S*

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

911(02) Clearing and Grubbing DQ LF 46,550 $ $

912(01) Excavation, unclassified, some bedrock that will require hammering or blasting, incidental

AQ LF 46,550

915(01)a Trail Restoration AQ LF 500 $ $

914(01) Switchbacks, Type 1, 8-ft Radius AQ EA 8 $ $

912(07)a Shallow Stream Ford & Gully

Crossing – Rock Structure.

AQ EA 3

982(01) Trail Logging out during Contract AQ MI 11.7 $ $

912(12) Grade Dip AQ EA 50 $ $

912(06)c Armored Drain Dip AQ EA 5 $ $

913(01)b Turnpike, Log retainer – Type II DQ LF 30 $ $

913(03)b Geosynthetics, Type – Non-Woven DQ SY 20 $ $

921(01)a 15” dia. Corrugated Pipe, Type PE AQ LF 105 $ $

951(01) Mobilization LSQ LS 1 $ XXXX $

952(03) Treated Posts, length 8', diameter

5"- 6" min.

AQ EA 2

954(02) Obliteration AQ LF 500 $ $

935(01) Rock Retaining Wall AQ SF 100 $ $

914(06)a Retaining Walls, Type Rock –

Switchbacks

AQ SF 100

990(01) Trail Excavator Rental, fully operated. Gov’t Directed work.

AQ HR 20

TOTAL $

B-2 NOTES TO QUOTER

*Method of Measurement

AQ - Actual Quantity DQ - Designed Quantity LSQ - Lump Sum Quantity

The pay items in the Schedule of Items have suffixes that do not appear on the pay items in the specifications.

They pertain only to sizes, classes, and/or types indicated in the item "Descriptions,” and are used by the

Government for computer tabulation of bid schedules. For the abbreviations in schedule descriptions see Special

Project Specification SPS 101 (7/7/97).

12034320Q0085 – AMENDMENT 001

Porcupine Ibex Trail #267 Relocation Project – Phase II Yellowstone Ranger District, Custer Gallatin National Forest

The quoter must quote all items. Quoter shall round to the nearest cent. Do NOT use fraction of cents in Unit

Price.

Payment for bond premiums in accordance with Clause 52.232-5, Payment under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151-01 Mobilization.

This is a Request for Quotation (RFQ); therefore, no public opening will be held. The results will not be made public prior to award. Quotes submitted in response to this RFQ will not be returned, but will be retained by the U.S. Forest Service for official record purposes. The RFQ does not commit the Government to pay any costs incurred in the preparation or the submission of this quote, or to make any award.

The Forest Service utilizes an electronic invoice system called Invoice Processing Platform (IPP). Awardee is required to set-up an account at www.ipp.gov in order to submit invoices.

Price Quotation furnished by:

Name: _______________________________ Phone: ____________________________

Address: ______________________________ Cell: ____________________________

______________________________ FAX: ____________________________

E-Mail: ________________________________ DUNS # ___________________________ http://www.ipp.gov/

File details come from the government source that posted it. Updated .