This is a solicitation for a firm fixed price contract to conduct an evaluation of the Older Adult Home Modification Program. The Department of Housing and Urban Development requires a contractor to develop and manage a team of qualified researchers to expand the ability of HUD's Office of Policy Development and Research to obtain high-quality, quick response research. The contractor will conduct research to evaluate the Older Adult Home Modification Program. Quotes are due by August 27, 2020 and the acquisition is set aside for small businesses in NAICS code 541720 with a size standard of $22 million. The government intends to award a single firm fixed price contract without discussions and reserves the right not to make an award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendments and Changes 8-25-2020.docx | DOCX document | |
| Amended 86614620Q00009 - FY20 HOME MOD STUDY Solicitation.docx | DOCX document | |
| Final Consolidated QUESTIONS 8-25.docx | DOCX document | |
| J3 - Past Performance Chart for FY20 Home Mod Study.docx | DOCX document | |
| J1 - Non-Disclosure Agreement 86614620Q00009.docx | DOCX document | |
| 8-12-20 86614620Q00009 - FY20 HOME MOD STUDY Solicitation.docx | DOCX document | |
| J2 Price Abstract 86614620Q00009.xlsx | XLSX spreadsheet | |
| J5 - Labor Mix for FY20 Home Mod Study.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3 - Past Performance Survey
PAST PERFORMANCE SURVEY
SOLICITATION NUMBER: 86614620Q00009
This past performance survey is to be completed on the designated contractor or key personnel as designated below:
PAST PERFORMANCE PROJECT IDENTIFICATON (To be filled out by the Offeror):
| CONTRACTOR OR KEY PERSONNEL NAME: |
| Click here to enter text. |
| CONTRACT or ORDER NUMBER: |
| Click here to enter text. |
| PROJECT TITLE: |
| Click here to enter text. |
| TOTAL PERIOD OF PERFORMANCE, INCLUDING OPTIONS |
| Click here to enter text. |
PAST PERFORMANCE REFERENCE INFORMATION (To be filled out by the Reference):
| NAME: |
| Click here to enter text. |
| TITLE: |
| Click here to enter text. |
| AGENCY or CUSTOMER: |
| Click here to enter text. |
| PHONE: |
| Click here to enter text. |
| Click here to enter text. |
The Department of Housing and Urban Development (HUD) is procuring the services described in the box below. You have been selected by the contractor or key personnel identified above to provide past performance information to HUD to be used in evaluating the offeror’s proposal for this acquisition. Thank you for your input.
Summarize the services acquired here.
If this past performance survey is related to key personnel, please summarize the level of interface you had with the designated key personnel throughout the life of the project you oversaw.
For each of the Five (5) criteria listed below, the rater must choose One (1) Adjectival Rating by checking the box, as applicable. At a minimum, for any rating that is checked Exceptional, Very Good, Marginal or Unsatisfactory, please submit additional comments to substantiate the rating. If Cost Control is N/A, Please explain why.
1. QUALITY OF SERVICE
| RATING |
| Adjectival Rating |
| Definition |
Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor/Key Personnel were highly effective
Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor/Key Personnel were effective
Satisfactory Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor/Key Personnel appear or were satisfactory
Marginal Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor/Key Personnel has not yet identified corrective actions.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s/Key Personnel’s corrective actions appear or were ineffective.
ADDITIONAL COMMENTS:
Click here to enter text.
2. SCHEDULE
| RATING |
| Adjectival Rating |
| Definition |
Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor/Key Personnel were highly effective
Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor/Key Personnel were effective
Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor/Key Personnel appear or were satisfactory
Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor/Key Personnel has not yet identified corrective actions.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s/Key Personnel’s corrective actions appear or were ineffective.
Click here to enter text.
3. COST CONTROL
| RATING |
| Adjectival Rating |
| Definition |
Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor/Key Personnel were highly effective
Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor/Key Personnel were effective
Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor/Key Personnel appear or were satisfactory
Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor/Key Personnel has not yet identified corrective actions.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s/Key Personnel’s corrective actions appear or were ineffective.
Not Applicable
Click here to enter text.
4. BUSINESS RELATIONS
| RATING |
| Adjectival Rating |
| Definition |
Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor/Key Personnel were highly effective
Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor/Key Personnel were effective
Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor/Key Personnel appear or were satisfactory
Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor/Key Personnel has not yet identified corrective actions.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s/Key Personnel’s corrective actions appear or were ineffective.
Click here to enter text.
5. MANAGEMENT OF KEY PERSONNEL
| RATING |
| Adjectival Rating |
| Definition |
Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor/Key Personnel were highly effective
Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor/Key Personnel were effective
Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor/Key Personnel appear or were satisfactory
Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor/Key Personnel has not yet identified corrective actions.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s/Key Personnel’s corrective actions appear or were ineffective.