Section C - Description/Specifications/Statement of Work

GENERAL SPECIFICATIONS

Office Exterior Door Replacement

1.1 SCOPE OF CONTRACT

A. This project includes replacing the Natural Resources Door with a hollow metal door and frame of the same size and matching existing finishes and completing associated work to match existing finishes. Installing a new grate flooring insert on the interior side of the Southwest Door that is currently tiled. Along with removing existing escutcheon cylinder exit device trim on the Computer Room Door with a Night Latch Lock exit device trim.

1. New doors shall have Fire-Rated Safety Wire Glass to match existing glazing location and size.

2. Door and hardware color and finish to be approved by COR.

3. Contractor shall paint the exterior of the door to match existing exterior color and interior walls to match existing white if paint is damaged or wall area that is not painted is showing.

a. Government will provide paint.

4. Remove and salvage existing lock cylinders of the doors to be reinstalled in new doors.

5. Flooring Insert:

a. EM-650 Rol-Dek or approved equal

b. Color of tread insert shall be chosen from manufacturer’s color range and approved by COR.

6. Replace existing Hager 45CE Cylinder Escutcheon on computer room door with a new Hager 45NL Night Latch Lock or approved equal and associated accessories for proper installation. Remove existing lock cylinder and place within new exit device trim.

a. Removed exit device trim shall be salvaged and returned to government.

B. Optional Bid Items:

1. OBI-1: Public Services Door

2. OBI-2: Southwest Double Door

3. OBI-3: North Double Door

4. OBI-4: LEO Door

5. OBI-5: Breakroom Door

6. OBI-6: Utility Room Double Door

7. OBI-7: Fitness Room Exterior Door

8. OBI- 8: Fitness Room Interior Door

9. OBI- 9: Dispatch Door

Project #1

NOTE: All items not specifically mentioned in the Contract Documents necessary to complete the specified work shall be incidental to the cost of the project.

1.2 PROJECT LOCATION

A. The project is located at the Mark Twain National Forest Supervisor’s Office at:

401 Fairgrounds Rd. Rolla, MO 65401.

1.3 SITE INFORMATION AND LIMITATIONS

A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:

1. The Contractor is responsible for the security of the Contractor’s equipment and materials.

2. Utilities are available at the site for construction purposes.

3. The office will be open during construction. The Contractor will be responsible for signing and limiting access in work areas.

4. Driveways, Walkways, and Entrances: Keep driveways, parking garage, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

B. The Office structure will be occupied during construction, care will be exercised to adhere to the schedule and to secure the Government facility after hours. The Contractor will be responsible for signing, limiting access, and safety of public and/or government employees in the area.

C. Removal and replacement of doors shall occur within the same workday, so as to secure the building, conserve energy to heat or cool the building and minimize disturbances to government employees.

1.4 SAFETY

A. Contractor shall comply with all State and Federal safety regulations during the performance of the work.

1.5 STAGING AND STORAGE AREAS

A. Areas for staging operations and storage of materials shall be approved by the COR. The Contractor must request in writing for approval from the COR to stage trailers on site.

1.6 INSPECTION OF WORKSITE

A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.

1.7 FIELD VERIFICATION

A. Contractor shall field verify all new and existing dimensions affecting the work of this contract before ordering products.

1.8 GOVERNMENT-FURNISHED PROPERTY

A. Paint, as needed.

1.9 DISPOSAL OF MATRIAL

A. Contractor shall remove and dispose of all debris offsite, including materials removed from building.

1.10 START DATE

A. TBD

1.11 CONTRACT TIME

A. Base: 14 Calendar Days

B. Options: 3 Calendar Days per option

1.12 NOTICE TO PROCEED

A. Performance of the contract shall begin within ten (10) calendar days after receipt of the Notice to Proceed. The Notice to Proceed will be issued by the Contracting Officer at the pre-work conference.

1.13 ABBREVIATIONS AND TERMS

A. The following abbreviations and terms may be used in the contract documents:

1. COR (Contracting Officer’s Representative)

2. CO (Contracting Officer)

3. Owner: Government/Forest Service

4. USDA (United States Department of Agriculture)

END OF SECTION C

SECTION 011900 - MOBILIZATION

PART 1 - GENERAL

1.1 SUMMARY

A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

1.2 MEASUREMENT AND PAYMENT

A. The measurement shall be lump sum for mobilization. Payment shall be as follows:

1. Bond premiums will be reimbursed after receipt of the evidence of payment.

2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

5. Progress payments for mobilization and preparatory work shall be subject to retainage.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION 011900

SECTION 01325 – CONSTRUCTION PROGRESS SCHEDULE

1.1 SECTIONS INLCUDES

A. Preliminary Schedule

1.2 SUBMITTALS

A. Submit a comprehensive, fully developed schedule within 5 days of date of the Notice to Proceed.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 CONTENT

A. Preparation: Indicate each significant construction activity and the location within building separately. Identify first workday of each week.

B. Show complete sequence of construction by activity, with dates for beginning and completion of each element of construction.

C. Identify each item by specification section number.

D. Show accumulated percentage of completion of each item, and total percentage of Work completed, as of the first day of each week.

END OF SECTION 013250

SECTION 013300 - SUBMITTAL PROCEDURES

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.

See Table 013300-1 for a summary of required submittals.

B. See other specification sections within this package for additional requirements on submittals.

1.2 PROJECT MANAGEMENT AND COORDINATION

A. Coordinate construction to ensure efficient and orderly installation of each part of the Work.

B. Schedule and conduct progress meetings at Project site at weekly intervals. Notify COR of meeting dates and times. Require attendance of each subcontractor or other entity concerned with current progress or involved with planning or coordination of future activities.

1. The contractor will record minutes and distribute to everyone concerned, including the COR.

1.3 SUBMITTAL PROCEDURES

A. Coordinate each submittal with fabrications, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

1. No extensions of the Contact Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing., including resubmittals.

2. Email submittals to COR.

B. Identify deviation from the Contract Documents on submittals.

PART 2 - PRODUCTS

2.1 ACTION SUBMITTALS

A. Product Data: Mark each copy to show applicable products and options. Include the following:

1. Manufacturer's written recommendations, product specifications, and installation instructions.

2. Printed performance curves and operational range diagrams.

3. Testing by recognized testing agency.

4. Compliance with specified standards and requirements.

B. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance, and utility to that specified, he shall request substitution as provided below. The COR will approve or disapprove the request for substitution.

C. Samples: Submit Samples for each element of construction for review of kind, color, pattern, and texture and for a comparison of these characteristics between submittal and actual component as delivered and installed. Include name of manufacturer and product name on label.

2.2 INFORMATIONAL SUBMITTALS

A. Qualification Data: Include lists of completed projects with project names and addresses, names and addresses of owners, and other information specified.

B. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

1. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."

PART 3 - EXECUTION

3.1 SUBMITTAL REVIEW

A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions.

B. COR will review each action submittal, make marks to indicate corrections or modifications required, stamp and mark as appropriate to indicate action taken, and return copies less those retained.

3.2 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Distribute copies of approved schedule to COR, subcontractors, and parties identified by Contractor with a need-to-know schedule responsibility. When revisions are made, distribute updated schedules to the same parties.

B. Updating: At bi-weekly intervals, update schedule to reflect actual construction progress and activities. Issue revised schedule at each regularly scheduled progress meeting.

1. As the Work progresses, indicate Actual Completion percentage for each activity.

3.3 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project. The table is intended to assist the Contractor and may not be all inclusive. Additional submittals may be required by specific specifications:

TABLE 013000-1

Spec.

Section

Section Title Required Submittal

When Required

013300 Submittal Procedures Construction Schedule Preconstruction conference

014100 Quality Control Quality Control Plan Preconstruction conference

014100 Quality Control Certificates As needed per specifications

079200 Joint Sealants Product Data, Color Samples, Warranty Prior to work

081113 Hollow Metal Doors and Frames

Product Data, O&M Manual, Warranty Prior to work

0871100 Door Hardware

Product Data, Hardware Schedule, Keying Schedule, O&M Manual, Warranty

Prior to work

096800 Entrance Mats and Grates

Product Data, Color Samples, Warranty

Prior to work

END OF SECTION 013300

SECTION 014100 - QUALITY CONTROL

PART 4 - GENERAL

4.1 This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.

4.2 QUALITY CONTROL

A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.

B. Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.

4.3 SUBMITTALS

A. Contractor Quality Control Plan

B. Permits, Licenses, and Certificates

4.4 MEASUREMENT AND PAYMENT

A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.

PART 5 - PRODUCTS (NOT USED)

PART 6 - EXECUTION

6.1 QUALITY CONTROL SYSTEM

A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.

6.2 CONTRACTOR QUALITY CONTROL PLAN

A. At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.

1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 5 days.

2. The Government reserves the right to require changes in the plan during the contract period as necessary.

3. No change in the approved plan may be made without written concurrence by the Contracting Officer.

4. At a minimum, the plan shall include the following:

a. A list of personnel responsible for quality control and assigned duties.

Include each person's qualifications.

b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.

c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

d. Methods of performing, documenting, and enforcing quality control of all work.

e. Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.

6.3 PERMITS, LICENSES, AND CERTIFICATES

A. For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.

END OF SECTION 014100

SECTION 017320 - SELECTIVE DEMOLITION

1.1 SUMMARY

A. This Section includes demolition and removal of the following:

1. Selected portions of a building or structure.

2. Selected site elements.

3. Repair procedures for selective demolition operations.

1.2 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Salvage: Detach items from existing construction and deliver them to Government.

C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.

D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

1.3 MATERIALS OWNERSHIP

A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Government property, demolished materials shall become Contractor's property and shall be removed from Project site.

1.4 SUBMITTALS

A. Schedule of Selective Demolition Activities: Indicate detailed sequence of selective demolition and removal work, with starting and ending dates for each activity, interruption of utility services, use of elevator and stairs, and locations of temporary partitions and means of egress.

B. Predemolition Photographs or Videotape: Show existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by selective demolition operations. Submit before Work begins.

1.5 QUALITY ASSURANCE

A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.

B. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

C. Standards: Comply with ANSI A10.6 and NFPA 241.

D. Predemolition Conference: Conduct conference at Project site.

1.6 PROJECT CONDITIONS

A. Government will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Government operations will not be disrupted. Provide not less than 72 hours' notice to CO of activities that will affect Government operations.

B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

1. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from authorities having jurisdiction.

C. Government assumes no responsibility for condition of areas to be selectively demolished.

1. Conditions existing at time of inspection for bidding purpose will be maintained by Government as far as practical.

D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

1. Hazardous materials will be removed by Government before start of the Work.

2. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Contracting Officer (CO). Hazardous materials will be removed by Government under a separate contract.

E. Storage or sale of removed items or materials on-site will not be permitted.

F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

1.7 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials so as not to void existing warranties.

1. If possible, retain original Installer or fabricator to patch the exposed Work listed below that is damaged during selective demolition. If it is impossible to engage original Installer or fabricator, engage another recognized experienced and specialized firm.

PART 2 - PRODUCTS

2.1 REPAIR MATERIALS

A. Use repair materials identical to existing materials.

1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.

2. Use materials whose installed performance equals or surpasses that of existing materials.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped.

B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.

C. Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged.

D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to CO.

E. Engage a professional engineer to survey condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective demolition operations.

3.2 UTILITY SERVICES

A. Existing Utilities: Maintain services indicated to remain and protect them against damage during selective demolition operations.

B. Do not interrupt existing utilities serving occupied or operating facilities unless authorized in writing by CO and authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to CO and to authorities having jurisdiction.

1. Provide at least 72 hours notice to CO if shutdown of service is required during changeover.

C. Utility Requirements: Locate, identify, disconnect, and seal or cap off indicated utilities serving areas to be selectively demolished.

1. Arrange to shut off indicated utilities with utility companies.

2. If utility services are required to be removed, relocated, or abandoned, provide temporary utilities before proceeding with selective demolition that bypass area of selective demolition and that maintain continuity of service to other parts of building.

3. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing.

3.3 PREPARATION

A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from CO and authorities having jurisdiction.

Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.

2. Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction.

3. Protect existing site improvements, appurtenances, and landscaping to remain.

B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

C. Temporary Enclosures: Provide temporary enclosures for protection of existing building and construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

D. Temporary Partitions: Erect and maintain dustproof partitions and temporary enclosures to limit dust and dirt migration and to separate areas from fumes and noise.

E. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent movement, settlement, or collapse of construction to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

3.4 POLLUTION CONTROLS

A. Dust Control: Use water mist, temporary enclosures, and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations.

1. Wet mop floors to eliminate trackable dirt and wipe down walls and doors of demolition enclosure. Vacuum carpeted areas.

B. Disposal: Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

1. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

C. Cleaning: Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

3.5 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations.

1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

B. Existing Facilities: Comply with CO’s requirements for using and protecting elevators, stairs, walkways, loading docks, building entries, and other building facilities during selective demolition operations.

C. Removed and Salvaged Items:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers.

3. Store items in a secure area until delivery to Government.

4. Transport items to Government storage area designated by CO.

5. Protect items from damage during transport and storage.

D. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new equipment.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by CO, items may be removed to a suitable, protected storage location during selective demolition [and cleaned] and reinstalled in their original locations after selective demolition operations are complete.

3.6 PATCHING AND REPAIRS

A. General: Promptly repair damage to adjacent construction caused by selective demolition operations.

B. Repairs: Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.

1. Completely fill holes and depressions in existing masonry walls that are to remain with an approved masonry patching material applied according to manufacturer's written recommendations.

C. Finishes: Restore exposed finishes of patched areas and extend restoration into adjoining construction in a manner that eliminates evidence of patching and refinishing.

D. Floors and Walls: Where walls or partitions that are demolished extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish color, texture, and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.

E. Ceilings: Patch, repair, or rehang existing ceilings as necessary to provide an even-plane surface of uniform appearance.

3.7 DISPOSAL OF DEMOLISHED MATERIALS

A. General: Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.

B. Burning: Do not burn demolished materials.

C. Disposal: Transport demolished materials off Government property and legally disposes of them.

END OF SECTION 017320

SECTION 079200 - JOINT SEALANTS

1.1 SECTION REQUIREMENTS

A. Submittals: Product Data and color Samples.

B. Environmental Limitations: Do not proceed with installation of joint sealants when ambient and substrate temperature conditions are outside limits permitted by joint sealant manufacturer or are below 40 deg F.

1.2 PERFORMANCE REQUIREMENTS

A. Provide elastomeric joint sealants that establish and maintain watertight and airtight continuous joint seals without staining or deteriorating joint substrates.

B. Provide joint sealants for interior applications that establish and maintain airtight and water-resistant continuous joint seals without staining or deteriorating joint substrates.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products listed in other Part 2 articles.

2.2 JOINT SEALANTS

A. Compatibility: Provide joint sealants. joint fillers. and other related materials that are compatible with one another and with joint substrates under service and application conditions.

B. Sealant for Use in Buildings Expansion Joints:

1. Single-component, neutral-curing silicone sealant, ASTM C 920. Type S; Grade NS; Class 25; Uses T, M, and 0, with the additional capability to withstand 50 percent movement in both extension and compression for a total of 100 percent movement.

C. Sealant for General Exterior Use Where Another Type Is Not Specified, One of the Following:

1. Single-component. nonsag polysulfide sealant. ASTM C 920, Type S; Grade NS;

Class 12-1/2; Uses NT, M, G, A, and 0.

2. Single-component, neutral-curing silicone sealant, ASTM C 920, Type S; Grade NS; Class 25; Uses T, NT, M, G, A, and 0.

a. Available Products:

1) Tremco; Spectrem 1 (Basic). Or approved equal.

b. Type and Grade: S (single component) and NS (non-sag).

c. Class: 100/50.

d. Use Related to Exposure: NT (non-traffic).

e. Uses Related to Joint Substrates: M, G, A, and, as applicable to joint substrates indicated, O.

1) Use O Joint Substrates: Coated glass, color anodic aluminum, aluminum coated with a high-performance coating, galvanized steel, brick, granite, limestone, marble, ceramic tile, and wood.

f. Stain-Test-Response Characteristics: Non-staining to porous substrates per

ASTM C 1248.

3. Single-component, nonsag urethane sealant, ASTM C 920, Type S; Grade NS;

CJass 25; and Uses NT. M, A, and 0.

a. Available Products:

1) Sika Corporation, Inc.; Sikaflex - 1a.

2) Sonneborn, Division of ChemRex Inc.; Ultra.

3) Sonneborn, Division of ChemRex Inc.; NP 1.

4) Tremco; Vulkem 116.

5) Or approved equal.

b. Type and Grade: S (single component) and NS (nonsag).

c. Class: 25.

d. Uses Related to Exposure: T (traffic) and NT (nontraffic).

D. Sealant for Interior Use at Perimeters of Door and Window Frames:

1. Latex sealant, single-component, nonsag, mildew-resistant, paintable, acrylic-emulsion sealant complying with ASTM C 834.

E. Acoustical Sealant for Exposed Interior Joints:

1. Nonsag, paintable, nonstaining, latex sealant complying with ASTM C 834.

F. Acoustical Sealant for Concealed Joints:

1. Nondrying, nonhardening, nonskinning, nonstaining, gunnable, synthetic-rubber sealant recommended for sealing interior concealed joints to reduce transmission of airborne sound.

G. Seismic Isolation Sealant:

1. Required at the following locations: Horizontal: floor slab to floor slab, roof to roof, and wall to roof. Vertical: wall to wan butt joint.

2. Product: EMSeal Joint systems www.emseal.com

H. Colors of Exposed Joint Sealants: As indicated by manufacturer's designations.

2.3 JOINT-SEALANT BACKING

A. General: Provide sealant backings of material and type that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fi11ers; and are approved for applications indicated by sealant manufacturer.

B. Cylindrical Sealant Backings: ASTM C 1330, of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance.

C. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint.

2.4 MISCELLANEOUS MATERIALS

A. Primer: Material recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests.

B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials, free of oily residues or other substances capable of staining or harming joint substrates and adjacent nonporous surfaces in any way, and formulated to promote optimum adhesion of sealants to joint substrates.

C. Masking Tape: Non-staining, nonabsorbent material compatible with joint sealants and surfaces adjacent to joints.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint-sealant performance.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements:

1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost.

2. Clean porous joint substrate surfaces by brushing, grinding, blast cleaning, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining after cleaning operations above by vacuuming or blowing out joints with oil-free compressed air. Porous joint substrates include the following:

a. Concrete.

b. Masonry.

c. Unglazed surfaces of ceramic tile.

3. Clean nonporous surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants. Nonporous joint substrates include the following:

a. Metal.

b. Glass.

c. Porcelain enamel.

d. Glazed surfaces of ceramic tile.

B. Joint Priming: Prime joint substrates based on preconstruction joint-sealant-substrate tests or prior experience. Apply primer to comply with joint-sealant manufacturer's written instructions. Confine primers to areas of joint-sealant bond; do not allow spillage or migration onto adjoining surfaces.

C. Masking Tape: Use masking tape where required to prevent contact of sealant with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal.

3.3 INSTALLATION OF JOINT SEALANTS

A. General: Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated, unless more stringent requirements apply.

B. Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions indicated.

C. Install sealant backings of type indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.

1. Do not leave gaps between ends of sealant backings.

2. Do not stretch, twist, puncture, or tear sealant backings.

3. Remove absorbent sealant backings that have become wet before sealant application and replace them with dry materials.

D. Install sealants using proven techniques that comply with the following and at the same time backings are installed:

1. Place sealants so they directly contact and fully wet joint substrates.

2. Completely fill recesses in each joint configuration.

3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability.

E. Tooling of Non-sag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified below to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint.

1. Remove excess sealant from surfaces adjacent to joints.

2. Use tooling agents that are approved in writing by sealant manufacturer and that do not discolor sealants or adjacent surfaces.

3. Provide concave joint configuration per Figure 5A in ASTM C 1193, unless otherwise indicated.

4. Provide flush joint configuration where indicated per Figure 5B in ASTM C 1193.

5. Provide recessed joint configuration of recess depth and at locations indicated per

Figure 5C in ASTM C 1193.

a. Use masking tape to protect surfaces adjacent to recessed tooled joints.

3.4 CLEANING

A. Clean off excess sealant or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved in writing by manufacturers of joint sealants and of products in which joints occur.

3.5 PROTECTION

A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately so installations with repaired areas are indistinguishable from original work.

END OF SECTION 079200

SECTION 081113 - HOLLOW METAL DOORS AND FRAMES

1.1 SUMMARY

A. Section includes: hollow-metal doors and frames.

1.2 DEFINITIONS

A. Minimum Thickness: Minimum thickness of base metal without coatings according to NAAMMHMMA 803 or SDI A250.8.

1.3 SUBMITTALS

A. Product Data: Include construction details, sizes, material descriptions, core descriptions, label compliance, fire-resistance rating, and finishes for each type of steel door and frame specified.

1.4 QUALITY ASSURANCE

A. Installer Qualifications: An employer of workers trained and approved by manufacturer.

B. Testing Agency Qualifications: An independent agency qualified according to ASTM E 329 for testing indicated, as documented according to ASTM E 548.

C. Source Limitations: Obtain standard steel doors and frames through one source from a single manufacturer.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver doors and frames palletized, wrapped, or crated to provide protection during transit and Project-site storage. Do not use non-vented plastic.

B. Store doors and frames under cover at Project site. Place units in a vertical position with heads up, spaced by blocking, on minimum 4-inch- (102-mm-) high wood blocking.

Avoid using non-vented plastic or canvas shelters that could create a humidity chamber.

1. If wrappers on doors become wet, remove cartons immediately. Provide minimum 1/4-inch (6-mm) space between each stacked door to permit air circulation.

PART 2 - PRODUCTS

2.1 AVAILABLE MANUFACTURERs

A. Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. Ceco Door Products; Product Grade III Imperial Series

2. Steelcraft; an Ingersoll-Rand Company

2.2 HOLLOW METAL DOORS AND FRAMES

A. General: Provide doors of design indicated, not less than thickness indicated; fabricated with smooth surfaces, without visible joints or seams on exposed faces, unless otherwise indicated. Comply with ANSI A250.8.

B. Requirements for All Doors and Frames:

1. Accessibility: Comply with ANSI/ICC A117.1.

2. Door Top Closures: Flush with top of faces and edges.

3. Door Texture: Smooth faces.

4. Glazed Lights: Nonremovable stops on non-secure side; sizes and configurations as indicated on drawings.

5. Hardware Preparation: In accordance with OHi A115 Series, with reinforcement welded in place, in addition to other requirements specified in door grade standard.

6. Finish: Factory primed, for field finishing.

C. Combined Requirements: If a particular door and frame unit is indicated to comply with more than one type of requirement, comply with all the specified requirements for each type; for instance, an exterior door that is also indicated as being sound-rated must comply with the requirements specified for exterior doors and for sound-rated doors; where two requirements conflict, comply with the most stringent.

2.3 DOORS

A. Exterior Doors Type FG and F:

1. Core: Polystyrene foam.

2. Top Closures for Outswinging Doors: Flush with top of faces and edges.

3. Galvanizing: All components hot-dipped zinc-iron alloy-coated (galvannealed) in accordance with ASTM A 653/A 653M, with manufacturer's standard coating thickness.

4. Texture: Smooth faces. ·

5. Insulating Value: U-value of .38, when tested in accordance with ASTM C 236.

2.4 FRAMES

A. General:

1. Comply with the requirements of grade specified for corresponding door, except:

a. ANSI A250.8 Level 3 Doors: 14 gage frames.

2. Finish: Factory primed, for field finishing.

3. Provide mortar guard boxes for hardware cut-outs in frames to be installed in masonry or to be grouted.

B. Exterior Door Frames: Face welded, seamless with joints filled., for masonry openings.

1. Galvanizing: AU components hot-dipped zinc-iron alloy coated (galvannealed) in accordance with ASTM A 653/A 653M, with manufacturer's standard coating thickness.

2. Weatherstripping and associated accessories

C. Interior Door Frames, Fire-Rated: Knock-down type.

1. Fire Rating: Same as door, labeled.

2.5 ACCESSORY MATERIALS

A. Glazing: as shown on door schedule on plans, factory installed.

B. Grout for Frames: Portland cement grout of maximum 4-inch slump for hand troweling;

thinner pumpable grout is prohibited.

2.6 FINISH MATERIALS

A. Primer: Rust-inhibiting, complying with ANSI A250.10, door manufacturer's standard.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify existing conditions before starting work.

B. Verify that opening sizes and tolerances are acceptable.

3.2 PREPARATION

A. Coat inside of frames to be installed in masonry or to be grouted, with bituminous coating, prior to installation.

3.3 INSTALLATION

A. Install in accordance with the requirements of the specified door grade standard and NAAMM HMMA840 and manufacturer’s instructions.

B. Coordinate frame anchor placement with wall construction.

C. Grout frames in masonry construction, using hand trowel methods; brace frames so that pressure of grout before setting will not deform frames.

D. Coordinate installation of hardware.

E. Coordinate installation of glazing.

F. Touch up damaged factory finishes.

3.4 ERECTION TOLERANCES

A. Maximum Diagonal Distortion: 1/16 in measured with straight edge, corner to corner.

3.5 ADJUSTING AND CLEANING

A. Adjust for smooth and balanced door movement.

B. Remove grout and other bonding material from hollow-metal work immediately after installation.

C. Prime-Coat Touchup: Immediately after erection, sand smooth rusted or damaged areas of prime coat and apply touchup of compatible air-drying, rust-inhibitive primer.

D. Metallic-Coated Surface Touchup: Clean abraded areas and repair with galvanizing repair paint according to manufacturer's written instructions.

E. Touchup Painting: Cleaning and touchup painting of abraded areas of paint are specified in painting Sections.

END OF SECTION 081113

SECTION 087100 - DOOR HARDWARE

1.1 SECTION INCLUDES

A. Hardware for wood and hollow steel doors.

B. Hardware for fire-rated doors.

C. Thresholds.

D. Weatherstripping, seals and door gaskets.

1.2 SUBMITTALS

A. Product Data, Hardware Schedule

B. Maintenance Data: Include data on operating hardware, lubrication requirements, and inspection procedures related to preventative maintenance.

C. Warranties: Submit manufacturer's warranty and ensure that forms have been completed in Government's name and registered with manufacturer.

1.3 DELIVERY, STORAGE, AND PROTECTION

A. Package hardware items individually; label and identify each package with door opening code to match hardware schedule.

1.4 COORDINATION

A. Coordinate the work with other directly affected sections involving manufacture or fabrication of internal reinforcement for door hardware.

B. Coordinate Government's keying requirements during the course of the Work.

1.5 MAINTENANCE PRODUCTS

A. Provide maintenance tools and accessories supplied by hardware component manufacturer.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Hinges:

1. Hager Companies

2. Stanley Hardware

B. Lock and Latch Sets:

1. Schlage Lock Co

2. Yale-Corbin U.S.

3. Hager

C. Exit Devices:

1. Yale-Corbin U.S. - Yale 7150(F) Rim SquareBolt or approved equal

2. Hager

D. Closers:

1. Norton

2. LCN

3. Hager

E. Protection Plates:

1. Hager Companies

2. Reese

3. Pemko

4. Hiawatha, Inc

5. Rockwood

2.2 GENERAL REQUIREMENTS FOR DOOR HARDWARE PRODUCTS

A. Provide products that comply with the following:

1. Applicable provisions of Federal, State, and local codes.

2. ANSI/ICC A117.1, American National Standard for Accessible and Usable

Buildings and Facilities.

3. Applicable provisions of NFPA 101, Life Safety Code.

4. Fire-Rated Doors: NFPA 80.

5. All Hardware on Fire-Rated Doors: Listed and classified by UL as suitable for the purpose specified and indicated.

6. Grade 1

B. Hinges:

1. Tamper resistant hinges.

2. Stainless-steel or brass/bronze hinges with stainless-steel pins for exterior.

3. Nonremovable hinge pins for exterior and public interior exposure.

4. Ball-bearing hinges for does with closers and entry doors.

5. Three hinges for 1-3/4inch thick doors 90 inches or less in height.

C. Closers:

1. Mount closers on interior side (room side) of door opening. Provide regular-arm, parallel-arm, or top jamb-mounted closers as necessary.

2. Adjust delayed opening (accessible to people with disabilities) feature on closers.

D. Provide wall stops or floors stops for doors without closers.

2.3 KEYING

A. Door Locks: Master Key System

1. Match to Existing System: Master key or grand master key locks to Owner's existing system.

PART 3 - EXECUTION

3.1 Verify that doors and frames are ready to receive work and dimensions are as indicated on shop drawings.

3.2 INSTALLATION

A. Install each door hardware item to comply with manufacturer's written instructions and applicable codes. Where cutting and fitting are required to install door hardware onto or into surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation of surface protective trim units with finishing work specified in Division 9 Sections. Do not install surface-mounted items until finishes have been completed on substrates involved.

1. Set units level, plumb, and true to line and location. Adjust and reinforce attachment substrates as necessary for proper installation and operation.

2. Drill and countersink units that are not factory prepared for anchorage fasteners.

Space fasteners and anchors according to industry standards.

B. Thresholds: Set thresholds for exterior and acoustical doors in full bed of sealant complying with requirements specified in Division 7 Section "Joint Sealants."

C. Use templates provided by hardware item manufacturer.

D. Install hardware on fire-rated doors and frames in accordance with code and NFPA 80.

E. Mounting heights for hardware from finished floor to center line of hardware item: As listed in Schedule, unless otherwise noted:

1. For steel doors and frames: Comply with OHi "Recommended Locations for Architectural Hardware for Steel Doors and Frames."

F. Swing of door to match existing.

3.3 HARDWARE SCHEDULE

A. Provide the same type of hardware to match existing.

B. Interior door shall have push/pull.

C. Finishes: US10 or to match finish of lockset/latchset

1. Hinges: Hager 4 ½ x 4 ½

2. Closers: Norton 7500 Series

3. Exit Devices: Yale 7150(F) Rim SquareBolt

4. Locksets, Latchsets, and Cylinders:Yale

5. Thereshold: Pemko 170 – Finish to be selected by COR.

6. Kickplate: Rockwood K1050

7. Stops/Holders: Rockwood

8. Weatherstrip : Pemko 316AV

9. Sweep: Pemko 315CN

10. Bumper : Rockwood 409

3.4 ADJUSTING

A. Adjust hardware for smooth operation.

3.5 PROTECTION OF FINISHED WORK

A. Do not permit adjacent work to damage hardware or finish.

3.6 EXAMINATION

A. Examine doors and frames, with Installer present, for compliance with requirements for installation tolerances, labeled fire door assembly construction, wall and floor construction, and other conditions affecting performance.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.7 CLEANING AND PROTECTION

A. Clean adjacent surfaces soiled by door hardware installation.

B. Clean operating items as necessary to restore proper function and finish.

C. Provide final protection and maintain conditions that ensure that door hardware is without damage or deterioration at time of Substantial Completion.

END OF SECTION 087100

SECTION 096800 – ENTRANCE MATS AND GRATES

1.1 SUMMARY

A. This Section includes the following types of flooring systems.

1. Entrance mats and grates.

1.2 SUBMITTALS

A. Product Data: For each type of entrance grate and frame.

1.3 QUALITY ASSURANCE

A. Slip resistance: Coefficient of friction 0.60 or greater, in accordance with ASTM E648.

1.4 PROJECT/SITE CONDITONS

A. Field measurements: Obtain field measurements of recessed areas to receive products of this section prior to order placement; include information on squareness and levelness of recess.

1.5 DELIVERY, STORAGE, AND HANDLING

A. To avoid damage do not stack other material on top of matting or frames.

1.6 MEASUREMENT AND PAYMENT

A. Payment will be for the actual number of square feet of flooring insert installed.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Basis of design: Pawling Corporation

1. EM-650 Rol-Dek flooring insert. OR APPROVED EQUAL.

2.2 MATERIALS

A. Aluminum: ASTM B221

B. Colors and Tread: As selected by COR.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verification of Conditions: Recesses to receive products of this section are correct size, are within…