J150200007 NLON Inventory.pdf
PDF 200 KB Posted
- Attached to
- Boiler Maintenance & Repair
- Solicitation number
- ACQR6146079
About this file
This is a boiler and related equipment inventory document for facility J-1502000-09. The facility operates six boilers with varying specifications and capacities. Boilers #1, #2, and #3 are Babcock and Wilcox units built between 1960 and 1965, each with a capacity of 76,500 pounds per hour (pph) and design pressures of 775 psi. Boiler #1S and Boiler #4 are Cleaver Brooks firetube models built in 2011, each rated at 1200 BHP with 150 psi design pressure. Boiler #6 is an Energy Resources Inc. heat recovery steam generator with a maximum steam capacity of 50,000 pph and 200 psi average allowable working pressure, featuring 17,882 square feet of heating surface.
The facility also contains two deaerators manufactured by Chicago Heater Company (built 1990 and 1993) with identical capacities of 350,000 pph at 50 psig and steel construction. Supporting infrastructure includes a hot water production system with piping sizes ranging from 2 to 14 inches and approximately 8 linear miles of steam distribution piping. The steam distribution system utilizes multiple pressure levels (600 psig, 200 psig, 125 psig, and 5 psig) with piping sizes from 1 to 8 inches. This inventory represents a comprehensive steam generation and distribution system suitable for large-scale industrial or institutional operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J150200006 BLDG 29 Boiler Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-1502000-09
Boiler and Related Equipment Inventory
Boiler #1 Boiler #1S
Babcock and Wilcox Cleaver Brooks
National Board # 20583 National Board #17317
Built 1960 Built 2011
Capacity 76,500 pph Design Pressure 150 psi
Design Pressure 775 psi Rating 1200 BHP
Steam Temp 500ᵒF Type: Firetube
Heating Surface 7895 ft2 Model # CBL-200X-1200-150ST
Economizer heating surface
3030ft2
Economizer pressure 825 psi
Boiler #2 Boiler #3
Babcock and Wilcox Babcock and Wilcox
National Board # 20582 National Board # 21838
Built 1960 Built 1965
Capacity 76,500 pph Capacity 76,500 pph
Design Pressure 775 psi Design Pressure 775 psi
Steam Temp 500ᵒF Steam Temp SAT
Heating Surface 7895 ft2 Heating Surface 6934 ft2
Economizer heating surface
3030ft2 Economizer heating surface 3030ft2
Economizer pressure 825 psi Economizer pressure 825 psi
Boiler #4 Boiler #6
Cleaver Brooks Energy Resources Inc.
National Board #17454 Heat recovery Steam Generator
Built 2011 Model# S3-2616
Design Pressure 150 psi National Board # 3225
Rating 1200 BHP Average AWP 200 psi
Type: Firetube Heating Surface 17,882 ft2
Model # CBL-200X-1200-150ST Maximum Steam Capacity 50,000 pph
Deaerator #1 Deaerator #2
Chicago Heater CO. Chicago Heater CO.
Built: 1990 Built: 1993
Diameter: 7’5” Height 8’ Diameter: 7’8” Height 6’4”
Capacity: 350,000 PPH 50 psig Capacity: 350,000 PPH 50 psig
Steel Construction Steel Construction
Hot Water Production System Steam Distribution
Piping Sizes Vary From 2” TO
14”
Approximately 8 linear miles of piping
Piping sizes range from 1” to 8”
Nominal steam piping pressures are
600 psig, 200 psig, 125 psig, and 5 psig.
File details come from the government source that posted it. Updated .