This document is a Statement of Work (SOW) for the Nantahala National Forest Road Maintenance 2024 RFP. The contractor shall provide all equipment, labor, supervision, transportation, materials, tools, and other incidentals to perform road maintenance on National Forest roads in accordance with the Performance Work Statement (PWS) specifications, exhibits/attachments, and industry standards. Work will consist of a variety of road maintenance tasks, which will be itemized, described, quantified, and specified on individual task orders. The contract performance locations are the Nantahala, Cheoah, and Tusquitee Ranger Districts in North Carolina. The government will provide a key to the contractor for roads closed by Forest Service gates. The contractor shall submit a Quality Control Plan and maintain records of accomplishments using Daily Accomplishment Reports. The government will monitor progress and conduct inspections. Applicable Department of Labor Wage Rates are provided. Payment procedures and safety requirements are also detailed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF-1442_Solicitation 12445224B0006 (w_clauses).pdf | ||
| J2-Schedule of Items (SOI) Cheoah-Tusquitee.pdf | ||
| J3-Performance Base Contract Specs.pdf | ||
| J4-Performance Requirement Summary.pdf | ||
| J5-Road Maintenance Activity Schedule.pdf | ||
| J6-Detail Drawings_2024.03.19.pdf | ||
| J7-Daily Accomplishment Report-Cheoa RD.pdf | ||
| J8-Daily Accomplishment Report-Tusquitee RD.pdf | ||
| J10-Tusquitee RD Road Map - GeoRef_2024.03.pdf | ||
| J9-Cheoah RD Road Map - GeoRef_2024.03.19.pdf | ||
| J11-Wage Deternination DBA NC20240086 (01052024).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C
DESCRIPTON/STATEMENT OF WORK/SPECIFICATIONS
Nantahala NF Road Maintenance 2024 RFP � March 2024
C.1 SCOPE OF CONTRACT:
The contractor shall provide all equipment, labor, supervision, transportation, materials, tools, and other incidentals and execute all work necessary to perform road maintenance on National Forest roads in accordance with the PerformanceWork Statement (PWS) specifications, exhibits/attachments and industry standards. The contractor shall perform in accordance with the standards defined in this contract.
Services are to be performed on any of the Forest Service roads within the Ranger Districts for which this contract applies.
C.2 DESCRIPTION OF WORK
Work will consist of a variety of road maintenance tasks which will be itemized, described, quantified and or specified on individual task orders. Attachment 2 contains a road maintenance activities schedule of specific maintenance tasks that ordered by each task order. Other maintenance work items not listed may be ordered if mutually agreed by the Contracting Officer and Contractor.
Applicable Department of Labor Wage Rates for service work items are found in Attachment 1.
Task Order quantity adjustments may be mutually agreed upon without further competition depending on task order pricing and funding availability. All modifications will be finalized on a SF30.
Offerors are required to submit price quote and technical proposals as specified in Section L, Instructions to Offerors, of this solicitation.
C.3 LOCATION OF CONTRACT PERFORMANCE
This project includes road maintenance for all ranger districts as shown below, which are under jurisdiction of National Forest�s in North Carolina, Nantahala National Forest. Roads to receive maintenance operations are shown on the Vicinity Maps and Road Maintenance Activities Schedules, attached in Section J.
Project maps showing road locations will be included with individual task orders and can be found in Attachment 3. District visitor maps showing road locations, for the projects on awarded task orders may also be obtained at the individual District Ranger Office. A specific list of roads per Ranger District will be found in Attachment 2, the road maintenance activities schedule.
There are 3 Ranger Districts located within the Nantahala National Forest. Below is a table listing information about each ranger district and what National Forest (Zone) they are located within.
National Forest/Zone Ranger District Address Counties Nantahala Nantahala 90 Sloan Road, Franklin, NC 28734 Macon, Jackson & Swain
Nantahala Cheoah 1070 Massey Branch Rd Robbinsville, NC 28771
Graham & Swain
Nantahala Tusquitee 123 Woodland Drive Murphy, NC 28906
Cherokee & Clay
Nantahala NF Road Maintenance 2024 RFP � March 2024
A vicinity map/project map will also be attached with each task order in Attachment 3.
C.3.1 ACCESS
In most cases, roads are open continuously. The Government will supply a key to the Contractor for roads closed by Forest Service gates. It is the contractor�s responsibility to obtain all keys for closed roads from the District Ranger Office prior to start of work and must be returned when the work included in the Task Order is completed.
C.3.2 PHYSICAL SECURITY
Key Control. The contractor shall establish and implement methods of ensuring that all keys issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons.
No keys issued to the contractor by the Government shall be duplicated. The contractor shall develop procedures covering key control that shall be included in the quality control plan. ALL keys issues by the Government are to be returned prior to final payment request.
C.4 SCHEDULE OF WORK
Task orders may be placed throughout the contract period. A Road Maintenance Schedule will be delivered to the Contractor after award. The Road Maintenance Schedule, Exhibit �B�, specifies the road number, required maintenance activity, general sequence and frequency of performance and other pertinent information or special instructions necessary for planning and executing the work.
Adjustments to these schedules may be made in accordance with CHANGES (FAR 52.243 1) PART II SECTION I.25. Any such adjustments require prior written documentation from the Contracting Officer
(CO).
The Contractor shall inform the Contracting Officer's Representative (COR) of his proposed operating schedule on a weekly basis to facilitate timely inspections. Normal grading time shall be Monday through Friday. Any grading done on the weekend shall be coordinated with and approved by COR.
Contractor shall notify of the COR or inspector of location every two (2) days minimum.
The Contractor shall complete all maintenance required for one road before starting another road.
Contractor shall inform the COR of each road completed.
If Contractor elects to use more than one motorgrader on the project, the Contractor shall coordinate with the COR/Inspector as to location and time graders are working.
C.4.1 PERIODS OF OPERATION
Periods of Operations will be identified on the Activity Schedules (Attachment 2). Actual grading periods are also subject to temperature and moisture content restraints as specified in the road maintenance specifications section 802.3 (Attachment 5)
C.5 OBLIGATON OF THE CONTRACTOR
Contractor shall furnish all supplies, materials, tools, equipment, labor, supervision and transportation to do the required work. Each week, unless otherwise approved, the Contractor shall report his location and progress of work in writing to the Contracting Officer's Technical Representative (COTR) to permit
Nantahala NF Road Maintenance 2024 RFP � March 2024 timely inspection and acceptance of completed work by the Government. If construction work is included in the task order, the Contractor shall forward to the COTR each week the payrolls, including the WH 347, for the prior week in accordance with the Department of Labor Davis Bacon requirements.
WH 347 provided in Attachment 8.
C.5.1 SUPERIENDENCE BY THE CONTRACTOR
At all times during the performance of the contract and until the work is completed and accepted, the Contractor shall directly supervise the work or assign and have on the work site a competent superintendent who is satisfactory to the CO and has authority to act for the Contractor. The superintendent shall be designated in writing to the CO prior to the commencement of work on the first task order.
C.5.2 EQUIPMENT REQUIREMENTS
All equipment proposed to be used for performance of the work shall be of the size, type, number and in such condition to properly pursue the requirements of this contract. Grading equipment must be capable of cutting, crowning and shaping operations necessary to meet the requirements of Activity Codes applicable in the technical (performance standards) requirements and Typical Section Drawings.
All equipment shall conform to the requirements of Section 802 � Supplemental Specifications.
The Contractor's proposed equipment shall be made available for inspection prior to award of the contract. If at any time during the course of this contract the equipment is deemed unsatisfactory, the CO may order removal and may require a satisfactory replacement, at Contractor's expense.
Replacement equipment, if ordered, is to be onsite and working within 48 hours.
Any movement or transportation of equipment to or from work areas required to pursue the work on designated roads, to repair or replace equipment, or for the Contractor's convenience shall be at the Contractor's expense.
C.5.3 ACCOMPLISHMENT REPORTS
The Contractor shall maintain records of accomplishments using the Daily Accomplishment Report.
These records are to be delivered to the COR on a weekly basis, or other time interval agreed upon by the Contractor and COR, with an invoice for the services rendered that month and shall become the property of the Government. No payment will be made prior to receipt of these records and acceptance of the work performed.
C.5.4 QUALITY CONTORL PLAN
The Contractor shall submit to the CO, a Quality Control Plan (QCP) as part of their technical proposal that will detail the methods the Contractor will use to perform self inspection to ensure the requirements of this contract are performed in accordance with the contract documents. The QCP shall at a minimum record the reference pay item, location, frequency, type of test and resulting outcome.
QCPs shall be submitted with the Accomplishment Report and no payment will be made prior to receipt of these records and acceptance of the work performed.
C.5.5 PLAN CONTENTS
Nantahala NF Road Maintenance 2024 RFP � March 2024
1) Inspection System. An inspection system must cover all of the services listed in the �description� column of the Performance Requirements Summary (PRS). The inspection system need only cover items included in the task orders. It must specify the work items to be inspected on either a scheduled or unscheduled basis, how often inspections will be accomplished, and the title of the individual(s) who will perform the inspection. The inspection system must provide for a written record of inspections and results.
2) Methods. Identify the proposed methods for identifying and preventing defects before the level of performance becomes unacceptable.
3) Records. The contractor shall maintain on site records of all inspections and necessary corrective action(s) taken. This documentation shall be furnished at the time payment is requested, or when requested by the Contracting Officer�s Representative during the term of the contract. Project inspectors reserve the right to check contractor�s Quality Control Inspections at any time during the life of a task order.
C.6 GOVERNMENT�S QUALITY ASSURANCE (QA)
The Government will monitor progress to ensure that the Contractor is providing the quality promised in their QC Plan and that work meets performance standards. Visual observation may be used. The Government reserves the right, if deemed necessary to ensure compliance with the contract, to make random or 100% full inspections of the work. Each road will be inspected separately, and the results will not be averaged.
Government inspections will be documented on Daily Diaries and placed in the contract file. If work in part of an area does not meet the Acceptable Quality Level given above, a Notice of Non Compliance will be issued to the Contractor (see section E). See Attachment 4 for sample of form. The CO may issue other cure notices if work is not being performed in a timely manner or does not comply with contract specifications.
Upon completion of a road or an area and notification by the Contractor, the COTR or designated Inspector shall make an overall inspection of that/those roads. If a need for remedial work prior to acceptance is reflected by the COTR/Inspector`s inspection, such remedial work will be performed before the Contractor moves to the next area. If the inspection results in acceptance of the area, the Contractor may immediately proceed with work on the next area.
Government inspections are for the sole benefit of the Government and do not
1) Relieve the Contractor of responsibility for providing adequate quality control measures;
2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
3) Constitute or imply acceptance; or
4) Affect the continuing rights of the Government after acceptance of the completed work.
C.7 DOCUMENTATION AND RECORDS
The contractor shall maintain records of accomplishment using the Daily Accomplishment Report form shown in Attachment 4. Reports are to be updated Daily, COR/Inspector reserves the right to view these documents at any time during inspection visits. These reports shall be verified and signed by the Project Inspector and submitted to the Contracting Officer�s Representative along with the contractor�s invoice
Nantahala NF Road Maintenance 2024 RFP � March 2024 for payment and shall be become the property of the Government. No payment or acceptance shall be made prior to receipt of these records.
All documentation, records and schedules as described in the PWS that are the responsibility of the contractor, are the property of the Government and shall be turned over to the Government upon completion or termination of the contract. All records are subject to the Freedom of Information and/or Privacy Acts and any requests for release of any records shall be handled accordingly.
C.8 OBLIGATION OF THE GOVERNMENT
When required by the specifications or drawings, the locations of special work items will be staked on the ground by the government.
C.9 GOVERNMENT FURNISHED PROPERTY
The use of Government furnished property shall be stated in each individual task order as applicable.
Government Keys. The Government will provide a gate key to the contractor, if any of the road gates are locked. Refer to Section C3.1 & C3.2.
C.10 MEASUREMENT AND PAYMENT
All measurement and payments will be in accordance with Section 801.4 of the project specifications for road maintenance (Attachment 5).
C.10.1 PAYMENT PROCEDURES
The Government may make progress payments as the work proceeds per the Contractor�s request. The Contractor shall make this request by submitting the following to the COR:
1) Itemized Invoice that includes your Name/Company Name, Address, City, State, Zip Code, Vendor Number, Delivery Order Number, Invoice Number, and Date. Purchase Order Numbers are not overall Contract Numbers and will be different for each Task Order issued. Delivery Order Numbers typically follow the format AG XXXX D XX XXXX.
2) Daily Accomplishment Reports for the days covered in the Invoice. Daily Accomplishment Reports are to be signed by the Contractor and Inspector prior to submission.
3) Quality Control Plan inspection records for all roads for which payment is being requested for.
4) A written receipt from the District Office stating that all keys issued to the Contractor have been returned in order to process the Final Invoice.
C.11 SAFETY
Contractor Safety Responsibilities. It shall be the responsibility of the Contractor to assure that proper techniques and procedures are followed and precautions taken to prevent injury to any person or property as a result of work performed under this specification. The Contractor shall be solely responsible for the repair of, or payment for, any damage or injury to government property and their property caused by his representatives, materials, or equipment. All work areas shall be left in a safe and clean condition equal to that in which they were found.
Nantahala NF Road Maintenance 2024 RFP � March 2024
The Contractor and the Contractor�s employees shall adhere to all safety regulations and guidelines applicable to this type of work. These include, but are not limited to safety requirements provided by the Occupational Safety and Health Administration (29 CFR 1910 1926, www.osha.gov). It is the contractor�s responsibility to know what safety regulations and guidelines are applicable to this type of work.
The Contractor shall exercise caution and care while pursuing the work to prevent unnecessary conflict with, or potential hazards to, road users or others within the work area.
The Contractor is to pursue all work on site in accordance with all Federal, State and Local laws governing the transportation and work being performed.
For traffic control requirements refer to the road maintenance specifications, Section 802 (Attachment 5)
C.12 SCHEDULINGWORK
Delivery of materials and equipment shall be made with a minimum of interference to Government operations and personnel. All deliveries shall be coordinated with the COTR , ahead of the delivery date.
The work shall, so far as practicable, be done in definite sections or divisions and confined to limited areas which shall be completed before work in other sections, or division is begun. Work sequencing shall be coordinated with the COTR , so as to have minimal impact on Government operations and personnel.
C.13 PERFORMANCE REQUIREMENTS
The Contractor is required to adhere to all requirements listed in the contract and to Adhere to all Standard Specifications, Special Specification, and Drawings for each project.
The Contractor is to communicate with the CO and COTR as to progress, location, and completion of items and to adhere to all requirements of the National Forests of North Carolina Fire Protection Requirements.
C.14 WORKING HOURS
Work hours are generally limited to weekdays between dawn and dusk. Work outside of those times requires approval by the COR or Project Inspector. Work on federal holidays requires prior written approval from the Contracting Officer. Approval of the COR is required prior to work done on weekends.
C.15 ENVIRONMENTAL PROTECTION
The contractor shall instruct employees in environmental protection practices. The contractor shall be responsible for operating under conditions which preclude the waste of fuel or spoiling the environment which shall include:
Disposal of Refuse: Contractor shall be required to remove all refuse from each respective work site every day work is performed and shall dispose of the refuse off of Government property.
Nantahala NF Road Maintenance 2024 RFP � March 2024
Fuel for equipment, trucks and vehicles shall not be wasted. Extended engine idling shall not be permitted.
Machine fluids (fuel, oils, coolants, etc.) shall not be drained on the ground or allowed to enter any watercourse. Inadvertent spills shall be contained immediately and the District Ranger, Project Inspector, and local authorities shall be notified immediately. Promptly remediate the spill unless otherwise directed by authorities.
The Contractor shall provide protective barriers to prevent soil erosion on all projects requiring excavation. Also, included will be environmental protection to prevent sedimentation drainage of silts into storm drains. All protective barriets will be continually maintained on the project until the project is completed and accepted by the Government.
C.16 FIRE PROTECTION
The Contractor shall comply with all policies and rules of the National Forests of North Carolina to prevent forest fires. The Forest Service Health and Safety Code Handbook (FSH 6709.11), National Wildfire Coordination Group Fireline Handbook, and Forest and District policies describe procedures to avoid the unintentional ignition and spread of wildfire. These include, but are not limited to:
1) Use spark arrestors on fuel powered vehicles and machinery.
2) Have onsite access to a fire extinguisher and/or other fire fighting tools, such as shovels or rakes.
3) Ensure proper storage and handling of flammable liquids.
4) Ensure positive extinguishing of any open flames or burning materials, such as tobacco.
5) Obtain COTR and District approval for any open fires.
6) Completely extinguish all approved fires before departing worksite.
C.17 NOISE CONTROL
The Contractor shall comply with all applicable local laws, regulations, and ordinances relative to noise control.
C.18 ROAD MAINTEANCE SPECIFICATIONS � PERFORMANCE BASED
Road maintenance specifications are included as Attachment 5
C.19 DRAWINGS/PLANS
Road maintenance drawings are included as Attachment 4.
C.20 PROJECT PRICE RANGE
Price ranges shall be established for each individual task order as they are issued.
C.21 LIST OF ATTACHMENTS
1. Attachment 1 � Applicable Wage Rates � Service or Davis Bacon
2. Attachment 2 � Road Maintenance Activity Schedules
3. Attachment 3 � Project Maps
Nantahala NF Road Maintenance 2024 RFP � March 2024
4. Attachment 4 � Road Maintenance Drawings
5. Attachment 5 � Road Maintenance Specifications
6. Attachment 6 � Performance Requirements Summary (PRS)
7. Attachment 7 � Daily Accomplishment Report