J1 - Statement of Work.pdf
PDF 106 KB Posted
- Attached to
- ACP LTR Bridge Trail Crossing Fence Replacement
- Solicitation number
- 12445525B0010
- Issued by
-
Department of Agriculture Forest Service
About this file
This Statement of Work (SOW) details the ACP LTR Bridge Trail Crossing Fence Replacement project for the Savannah River Site (SRS). The scope involves removing and replacing 11,000 linear feet of boundary fence across multiple locations including HWY 125, Rocky Point Rd, Boiling Springs, and Patterson Mill Road. Key work requirements include replacing wooden fence posts with steel t-posts, attaching 3-strand barbed wire, clearing a 6-foot vegetation zone around the fence line, removing trees up to 10-inch diameter, mowing vegetative cover to 4-6 inches, and replacing boundary signs at 50-100 foot intervals.
The project is managed by the Department of Agriculture Forest Service with a 90-day performance period. Contractors must provide all labor, materials, equipment, and safety supplies, and are not required to be RadCon-trained unless disturbing soil contaminated areas. A site visit is scheduled for June 10th, 2025, with proposal submissions due by June 18th, 2025 at 3:00 PM EST. The contract will be awarded to the lowest-priced, responsible offeror. Government-furnished equipment includes a Motorola radio, property pass, remote worker map, gate materials, and site boundary signs. The primary point of contact is Travis McCullough, with Jeremy Prince as the alternate Contracting Officer Representative.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACP LTR Bridge Trail Crossing Fence Replacement Scope of Work
1) INTRODUCTION:
Replace Tail Bridge Crossing Boundary Fences located at HWY 125, Rocky Point Rd, Boiling Springs, and Patterson Mill Road.
2) SCOPE:
Remove and replace 11,000 linear feet of fence line at the SRS Tail Bridge Crossing area. Work includes providing all labor, material, tools, equipment, Personal Protective Equipment (PPE), supervision, mobilization, and other incidentals necessary to construct and clear the boundary fence.
Clearing limits are 3 feet from both sides of the fence line (total 6 feet).
i. Remove all wooden posts from the fence line and replace existing wooden posts with steel t-posts. Existing wooden fence posts will be cut at ground level. Existing corner posts, bracing, and two post pull points will remain in place. Any pull point or corner post with bracing posts that need replacing will be cut at ground level and a new post shall be driven adjacent with post in kind. Attach 3-strands barbed wire to the top, middle and bottom, of steel tee line post.
ii. Remove any downed trees and trees (10-inch diameter or less at breast height (DBH), within the clearing limits. Disburse all removed vegetation on the Government side of the boundary, but outside the fence clearing limits.
iii. Rocky Point bridge crossing: Mow vegetative cover within the clearing limits to a cover height of 4 to 6 inches. Remove brush saplings and undergrowth from fence line property boundary locations. Vegetative growth within the clearing limits must be trimmed and mowed to 4 to 6 inches and 14 ft above the fence.
iv. Replace any missing SRS boundary signs at 50 ft – 100 ft intervals along the replaced fence line.
Traffic Control
i. Contractor shall provide all necessary traffic control measures, personnel and obtain permitting required to perform this work as required referencing the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD) and/or SCDOT MUTCD supplement/requirements.
For the corner, end, intersection, immediate line brace, and gate brace panel of woven wire fences and 3-strand barbed wire fences: furnish and install brace panel with 9-gage twisted tension brace wires or 4-in diameter diagonal brace post with post set in concrete.
i) Remove and dispose all existing fence material.
ii) Replace hinge/line post structure.
iii) Replace gate openings. (Where needed)
3) PERSONAL QUALIFICATIONS
None, except for the contractor’s requirements.
4) GOVERNMENT-FURNISHED EQUIPMENT (GFE) AND MATERIALS
a) Site Motorola Radio
b) Property Pass & PACA Pass
c) Remote Worker Map
d) Gate and materials for hanging new gate
e) Site boundary signs
REGULATIONS/POLICIES
a) Contractors must furnish all labor, personnel, materials, quality assurance, supervision, transportation, equipment, tools, and supplies (including safety supplies).
b) Following all specifications for moving and maintenance for Post Closure Projects for EC-ACP, no limit to, within the boundaries of the
Savannah River Site. (SRS)
c) The contractor must provide a safety plan prior to commencing work.
d) The contractor is not required to be RadCon-trained unless they disturb SCA (Soil Contaminated Area) or enter the creek. RadCon inspector will be present and survey the equipment in case the soil accidently gets disturbed.
5) TRAINING
a) The contractor is responsible for all training for its employees on proper use of equipment.
POINT OF CONTACT (POC)
Contracting Officer (CO):
Contracting Officer Representative: (COR) Travis McCullough
(803) 226-1166
Alt. Contracting Officer Representative: (COR) Jeremy Prince
(828) 644-6793