J02 IHS Drawings.pdf

PDF 7 MB Posted

Attached to
Tulalip Community Sewer System Repairs - Tulalip, WA
Solicitation number
75H70124Q00027
Issued by

About this file

This document is a Solicitation for a federal contract opportunity related to the repair of the Tulalip community sewer system in Snohomish County, Washington.

The Indian Health Service is procuring a Firm Fixed Price construction contract to clean, grout, seal, and line 99 manholes in the Tulalip Bay sewer collection system in order to address infiltration and inflow issues. The project has an anticipated magnitude between $100,000 and $250,000, with a period of performance of 80 calendar days from the notice to proceed. This is a 100% Small Business set-aside under NAICS code 237110, with Tribal Employment Rights Ordinance (TERO) requirements applicable. Quotes are due by August 19, 2024 at 2:00 PM PT, and will be evaluated on price as the primary factor. An organized site visit is scheduled for July 30, 2024, and registration in the System for Award Management (SAM) is mandatory.

View the file

Other files

File Type Posted
J05 Manhole Inspection Reports Phase 2.pdf PDF
J04 MH Depths.xlsx XLSX spreadsheet
J03 WA20240113 dated 07122024.pdf PDF
B01 75H70124Q00027-A00001.pdf PDF
J01 IHS Technical Specifications.pdf PDF
J03 WD WA20240129 dated 05242024.pdf PDF
B01 75H70124Q00027.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TULALIP BAY

OUTFALL

HERMOSA

POINT

SEWAGE

BELLINGHAM

KELSO

VANCOUVER

12o

5 14

EVERETT

5p 90

SEATTLE

TACOMA

OLYMPIA

ANGELES

PORT

FORKS

QUINAULT

ABERDEEN

p p p o o o o

AREA MAP

NTS

VICINITY MAP

NTS

PROJECT SITE

PROJECT SITE

MARYSVILLE

5p

5p

MARYSVILLE

SMOKEY POINT

EVERETT

WARM BEACH

TULALIP RESERVATION

P U

G E

T S

O U N D

CALL 2 BUSINESS DAYS BEFORE YOU DIG

UNDERGROUND UTILITIES LOCATION CENTER

Know what's below.

before you dig.Call

R

AutoCAD SHX Text GENERAL NOTES ALL WORK AND MATERIALS SHALL COMPLY WITH THESE PLANS AND THE PROJECT SPECIFICATIONS. CONTRACTOR SHALL OBTAIN ALL NECESSARY LICENSES AND CONSTRUCTION PERMITS AND SHALL CONTACT EACH PERMITTING AGENCY AT LEAST TWO BUSINESS DAYS PRIOR TO STARTING WORK. ANY ALTERATION FROM THE THESE PLANS, EXCEPT FOR MINOR FIELD ADJUSTMENT NEEDED TO MEET EXISTING FIELD CONDITIONS, SHALL FIRST BE APPROVED BY THE OWNER'S REPRESENTATIVE. ANY ALTERATION OR VARIANCE FROM THESE PLANS SHALL BE DOCUMENTED ON CONSTRUCTION FIELD PRINTS AND TRANSMITTED TO THE OWNER'S REPRESENTATIVE. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT PRIOR WRITTEN AUTHORIZATION FROM THE ENGINEER OR AUTHORIZED DESIGNEE. THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING IS RESPONSIBLE FOR COMPLYING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING IS RESPONSIBLE FOR COMPLYING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING RESPONSIBLE FOR COMPLYING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING RESPONSIBLE FOR COMPLYING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING FOR COMPLYING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING FOR COMPLYING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING COMPLYING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING COMPLYING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING WITH APPLICABLE SAFETY REGULATIONS, SAFEGUARDING APPLICABLE SAFETY REGULATIONS, SAFEGUARDING APPLICABLE SAFETY REGULATIONS, SAFEGUARDING SAFETY REGULATIONS, SAFEGUARDING SAFETY REGULATIONS, SAFEGUARDING REGULATIONS, SAFEGUARDING REGULATIONS, SAFEGUARDING SAFEGUARDING SAFEGUARDING WORKER SAFETY, AND PUBLIC SAFETY. THE CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL SAFETY, AND PUBLIC SAFETY. THE CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL SAFETY, AND PUBLIC SAFETY. THE CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL AND PUBLIC SAFETY. THE CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL AND PUBLIC SAFETY. THE CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL PUBLIC SAFETY. THE CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL PUBLIC SAFETY. THE CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL SAFETY. THE CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL SAFETY. THE CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL THE CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL THE CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL CONTRACTOR'S COMPETENT PERSON MUST BE AVAILABLE AT ALL COMPETENT PERSON MUST BE AVAILABLE AT ALL COMPETENT PERSON MUST BE AVAILABLE AT ALL PERSON MUST BE AVAILABLE AT ALL PERSON MUST BE AVAILABLE AT ALL MUST BE AVAILABLE AT ALL MUST BE AVAILABLE AT ALL BE AVAILABLE AT ALL BE AVAILABLE AT ALL AVAILABLE AT ALL AVAILABLE AT ALL AT ALL AT ALL ALL ALL TIMES TO ENFORCE SAFETY REGULATIONS FOR EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A TO ENFORCE SAFETY REGULATIONS FOR EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A TO ENFORCE SAFETY REGULATIONS FOR EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A ENFORCE SAFETY REGULATIONS FOR EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A ENFORCE SAFETY REGULATIONS FOR EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A SAFETY REGULATIONS FOR EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A SAFETY REGULATIONS FOR EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A REGULATIONS FOR EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A REGULATIONS FOR EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A FOR EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A FOR EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A EMPLOYEES AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A AND SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A SUBCONTRACTORS. THE OWNER WILL NOT ISSUE A THE OWNER WILL NOT ISSUE A THE OWNER WILL NOT ISSUE A OWNER WILL NOT ISSUE A OWNER WILL NOT ISSUE A WILL NOT ISSUE A WILL NOT ISSUE A NOT ISSUE A NOT ISSUE A ISSUE A ISSUE A A A NOTICE TO PROCEED UNTIL THEY HAVE REVIEWED AND APPROVED THE CONTRACTOR'S SAFETY PLAN. THIS WORK TAKES PLACE WITHIN TRIBAL LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR WORK TAKES PLACE WITHIN TRIBAL LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR WORK TAKES PLACE WITHIN TRIBAL LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR TAKES PLACE WITHIN TRIBAL LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR TAKES PLACE WITHIN TRIBAL LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR PLACE WITHIN TRIBAL LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR PLACE WITHIN TRIBAL LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR WITHIN TRIBAL LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR WITHIN TRIBAL LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR TRIBAL LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR TRIBAL LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR LAND AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR AND COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR COUNTY RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR RIGHTS-OF-WAY. THE OWNER IS RESPONSIBLE FOR THE OWNER IS RESPONSIBLE FOR THE OWNER IS RESPONSIBLE FOR OWNER IS RESPONSIBLE FOR OWNER IS RESPONSIBLE FOR IS RESPONSIBLE FOR IS RESPONSIBLE FOR RESPONSIBLE FOR RESPONSIBLE FOR FOR FOR OBTAINING THE APPROPRIATE GENERAL USE PERMITS FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO THE APPROPRIATE GENERAL USE PERMITS FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO THE APPROPRIATE GENERAL USE PERMITS FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO APPROPRIATE GENERAL USE PERMITS FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO APPROPRIATE GENERAL USE PERMITS FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO GENERAL USE PERMITS FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO GENERAL USE PERMITS FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO USE PERMITS FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO USE PERMITS FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO PERMITS FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO PERMITS FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO FROM THE COUNTY AND TRIBE AND PROVIDING THEM TO THE COUNTY AND TRIBE AND PROVIDING THEM TO THE COUNTY AND TRIBE AND PROVIDING THEM TO COUNTY AND TRIBE AND PROVIDING THEM TO COUNTY AND TRIBE AND PROVIDING THEM TO AND TRIBE AND PROVIDING THEM TO AND TRIBE AND PROVIDING THEM TO TRIBE AND PROVIDING THEM TO TRIBE AND PROVIDING THEM TO AND PROVIDING THEM TO AND PROVIDING THEM TO PROVIDING THEM TO PROVIDING THEM TO THEM TO THEM TO TO TO THE CONTRACTOR. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT CONTRACTOR. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT CONTRACTOR. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT CONTRACTOR WILL BE RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT CONTRACTOR WILL BE RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT WILL BE RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT WILL BE RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT BE RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT BE RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT RESPONSIBLE FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT FOR ALL OTHER PERMITS TO INCLUDE BUT ARE NOT ALL OTHER PERMITS TO INCLUDE BUT ARE NOT ALL OTHER PERMITS TO INCLUDE BUT ARE NOT OTHER PERMITS TO INCLUDE BUT ARE NOT OTHER PERMITS TO INCLUDE BUT ARE NOT PERMITS TO INCLUDE BUT ARE NOT PERMITS TO INCLUDE BUT ARE NOT TO INCLUDE BUT ARE NOT TO INCLUDE BUT ARE NOT INCLUDE BUT ARE NOT INCLUDE BUT ARE NOT BUT ARE NOT BUT ARE NOT ARE NOT ARE NOT NOT NOT LIMITED TO:TRAFFIC CONTROL PLAN FROM COUNTY, STORM WATER POLLUTION PREVENTION PLAN, ETC. THE CONTRACTOR SHALL MAINTAIN SEWER SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE CONTRACTOR SHALL MAINTAIN SEWER SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE CONTRACTOR SHALL MAINTAIN SEWER SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE SHALL MAINTAIN SEWER SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE SHALL MAINTAIN SEWER SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE MAINTAIN SEWER SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE MAINTAIN SEWER SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE SEWER SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE SEWER SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE TO THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE THE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE CUSTOMERS DURING THIS PROJECT. MINOR SERVICE DURING THIS PROJECT. MINOR SERVICE DURING THIS PROJECT. MINOR SERVICE THIS PROJECT. MINOR SERVICE THIS PROJECT. MINOR SERVICE PROJECT. MINOR SERVICE PROJECT. MINOR SERVICE MINOR SERVICE MINOR SERVICE SERVICE SERVICE DISRUPTIONS (4 HOURS MAX.) ARE ACCEPTABLE WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & (4 HOURS MAX.) ARE ACCEPTABLE WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & (4 HOURS MAX.) ARE ACCEPTABLE WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & HOURS MAX.) ARE ACCEPTABLE WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & HOURS MAX.) ARE ACCEPTABLE WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & MAX.) ARE ACCEPTABLE WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & MAX.) ARE ACCEPTABLE WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & ARE ACCEPTABLE WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & ARE ACCEPTABLE WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & ACCEPTABLE WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & ACCEPTABLE WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & WITH 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & 24-HRS WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & WRITTEN NOTICE TO THE TULALIP UTILITY DEPT. & NOTICE TO THE TULALIP UTILITY DEPT. & NOTICE TO THE TULALIP UTILITY DEPT. & TO THE TULALIP UTILITY DEPT. & TO THE TULALIP UTILITY DEPT. & THE TULALIP UTILITY DEPT. & THE TULALIP UTILITY DEPT. & TULALIP UTILITY DEPT. & TULALIP UTILITY DEPT. & UTILITY DEPT. & UTILITY DEPT. & DEPT. & DEPT. & & & IMPACTED RESIDENTS.

AutoCAD SHX Text

NOTES & OVERVIEW

AutoCAD SHX Text TRAFFIC CONTROL THE CONTRACTOR IS RESPONSIBLE FOR TRAFFIC CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK CONTRACTOR IS RESPONSIBLE FOR TRAFFIC CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK CONTRACTOR IS RESPONSIBLE FOR TRAFFIC CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK IS RESPONSIBLE FOR TRAFFIC CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK IS RESPONSIBLE FOR TRAFFIC CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK RESPONSIBLE FOR TRAFFIC CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK RESPONSIBLE FOR TRAFFIC CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK FOR TRAFFIC CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK FOR TRAFFIC CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK TRAFFIC CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK TRAFFIC CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK CONTROL AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK AS NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK NEEDED PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK PER WSDOT 1-0. PROVIDE 1 (ONE) WEEK WSDOT 1-0. PROVIDE 1 (ONE) WEEK WSDOT 1-0. PROVIDE 1 (ONE) WEEK 1-0. PROVIDE 1 (ONE) WEEK 1-0. PROVIDE 1 (ONE) WEEK PROVIDE 1 (ONE) WEEK PROVIDE 1 (ONE) WEEK 1 (ONE) WEEK 1 (ONE) WEEK (ONE) WEEK (ONE) WEEK WEEK WEEK NOTIFICATION (MINIMUM) PRIOR TO ANY CLOSURES. SIGNING, FLAGGING, AND TRAFFIC CONTROL STANDARDS SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY FLAGGING, AND TRAFFIC CONTROL STANDARDS SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY FLAGGING, AND TRAFFIC CONTROL STANDARDS SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY AND TRAFFIC CONTROL STANDARDS SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY AND TRAFFIC CONTROL STANDARDS SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY TRAFFIC CONTROL STANDARDS SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY TRAFFIC CONTROL STANDARDS SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY CONTROL STANDARDS SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY CONTROL STANDARDS SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY STANDARDS SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY STANDARDS SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY SHALL BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY BE IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY IN ACCORDANCE WITH M.U.T.C.D. AND ROADWAY ACCORDANCE WITH M.U.T.C.D. AND ROADWAY ACCORDANCE WITH M.U.T.C.D. AND ROADWAY WITH M.U.T.C.D. AND ROADWAY WITH M.U.T.C.D. AND ROADWAY M.U.T.C.D. AND ROADWAY M.U.T.C.D. AND ROADWAY AND ROADWAY AND ROADWAY ROADWAY ROADWAY JURISDICTION STANDARDS. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL FROM STANDARDS. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL FROM STANDARDS. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL FROM THE CONTRACTOR IS RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL FROM THE CONTRACTOR IS RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL FROM CONTRACTOR IS RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL FROM CONTRACTOR IS RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL FROM IS RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL FROM IS RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL FROM RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL FROM RESPONSIBLE FOR PREPARING AND OBTAINING APPROVAL FROM FOR PREPARING AND OBTAINING APPROVAL FROM FOR PREPARING AND OBTAINING APPROVAL FROM PREPARING AND OBTAINING APPROVAL FROM PREPARING AND OBTAINING APPROVAL FROM AND OBTAINING APPROVAL FROM AND OBTAINING APPROVAL FROM OBTAINING APPROVAL FROM OBTAINING APPROVAL FROM APPROVAL FROM APPROVAL FROM FROM FROM THE OWNER AND ROADWAY AUTHORITY AS APPROPRIATE.

AutoCAD SHX Text PROJECT PARAMETERS AND SPECIFICATIONS: THE PROJECT GOAL IS TO REDUCE INFILTRATION AND INFLOW (I&I) IN THE TULALIP COMMUNITY SEWER SYSTEM BY LINING 99 MANHOLES WITH DOCUMENTED I&I WITH A CEMENTITIOUS LINER OF SUFFICIENT STRUCTURAL STRENGTH TO PROTECT AGAINST LOW-PRESSURE i&i AND OTHER LOW PRESSRE WATER TRANSMISSIONS THROUGH THE MANHOLE WALLS. 1. 99 MANHOLES ARE TO BE REPAIRED WITH CEMENTITIOUS LINER AS SPECIFIED IN SECTION 02958 OF THE 99 MANHOLES ARE TO BE REPAIRED WITH CEMENTITIOUS LINER AS SPECIFIED IN SECTION 02958 OF THE CONTRACT DOCUMENTS. LINER THICKNESS SHALL BE 250 MILS ( INCH). OR, IF PRODUCTS OTHER THAN 14 INCH). OR, IF PRODUCTS OTHER THAN . OR, IF PRODUCTS OTHER THAN THOSE LISTED IN THE SPECIFICATIONS ARE APPROVED FOR USE, THE LINER THICKNESS SHALL BE DETERMINED BY THE PROJECT ENGINEER. 2. MANHOLES TO BE LINED RANGE IN DEPTH FROM 3 TO 18 FEET, WITH AN AVERAGE DEPTH OF 8.4 FT. MANHOLES TO BE LINED RANGE IN DEPTH FROM 3 TO 18 FEET, WITH AN AVERAGE DEPTH OF 8.4 FT. 3. MANHOLE REPAIR LOGS WILL BE REPORTED TO THE PROJECT ENGINEER IN BOTH DIGITAL AND WRITTEN MANHOLE REPAIR LOGS WILL BE REPORTED TO THE PROJECT ENGINEER IN BOTH DIGITAL AND WRITTEN FORMAT. 4. THE CONTRACTOR SHALL SUBMIT A SEWER BYPASS PLAN ALONG WITH A PROPOSED PROJECT SCHEDULE. THE CONTRACTOR SHALL SUBMIT A SEWER BYPASS PLAN ALONG WITH A PROPOSED PROJECT SCHEDULE. 5. SYMBOLS ON THE DRAWINGS (BECAUSE OF THEIR SIZE) MAY NOT REPRESENT THE EXACT LOCATION OF SYMBOLS ON THE DRAWINGS (BECAUSE OF THEIR SIZE) MAY NOT REPRESENT THE EXACT LOCATION OF EXISTING UTILITIES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DETAIL CALL-OUT

AutoCAD SHX Text

SHEET NUMBER ON WHICH DETAIL APPEARS OR SHEET ON WHICH DETAIL IS REFERENCED

AutoCAD SHX Text

DETAIL NOTATIONS

AutoCAD SHX Text PROJECT LOCATION: TULALIP RESERVATION TULALIP BAY, SNOHOMISH COUNTY WASHINGTON 98271

AutoCAD SHX Text SCOPE OF WORK: TULALIP BAY COMMUNITY SEWER SYSTEM REPAIRS SEAL 99 MANHOLES WITH A CEMENTITIOUS LINER

AutoCAD SHX Text PROJECT DESCRIPTION: THIS PROJECT WILL PROVIDE FOR REPAIRS TO THE TULALIP BAY SEWER SYSTEM. THE WORK TO BE DONE UNDER THIS CONTRACT CONSISTS OF FURNISHING ALL LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION NECESSARY TO ELIMINATE SOURCES OF INFLOW AND INFILTRATION INTO MANHOLES OF THE TULALIP BAY SEWER SYSTEM. EACH MANHOLE WILL BE VISUALLY INSPECTED BEFORE REPAIR. RESULTS WILL BE REPORTED IN BOTH DIGITAL AND WRITTEN FORMAT. PHOTOS OF THE REPAIRS ARE TO BE INCLUDED IN THE REPORT. CONTRACTOR TO REPORT ANY DISCREPANCIES IN MANHOLE LOCATION TO THE PROJECT ENGINEER AND TRIBE.

AutoCAD SHX Text X:\ODO Departments\SFC Projects\Tulalip\ACTIVE PROJECTS\20-M88 Tulalip Sewer System Repairs\DESIGN\20M88_SitePlan.dwg

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

INIT.

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

PROJ ENG:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

IHS PROJECT NO:

AutoCAD SHX Text OLYMPIC DISTRICT OFFICE 500 PACIFIC AVE - SUITE 400 BREMERTON, WA 98337 (360) 792-1235

AutoCAD SHX Text U.S. PUBLIC HEALTH SERVICE INDIAN HEALTH SERVICE SANITATION FACILITIES CONSTRUCTION

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOTES & OVERVIEW

AutoCAD SHX Text

COMMUNITY SEWER SYSTEM REPAIRS: PHASE 2

AutoCAD SHX Text

THE TULALIP RESERVATION, WA

AutoCAD SHX Text

TULALIP TRIBES OF WASHINGTON

AutoCAD SHX Text

R. ESTABAYA

AutoCAD SHX Text

PO-20-M88

AutoCAD SHX Text

XXXX

AutoCAD SHX Text

XXXX

AutoCAD SHX Text

H.ANDINA,5/25/23

AutoCAD SHX Text G-002

AutoCAD SHX Text

AutoCAD SHX Text

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

V

W

PV

WSL

SSL

SFM

STM

UGC

G

E

X X X

W

WSL

SSL

SFM

STM

TV

G

E

XX

S S

OHP

UGP

OHP

UGP

PT PT

M M

W

TELTEL

PV

w

T

FO

T

FO

SFSL SFSL

TULALIP BAY

OUTFALL

HERMOSA

POINT

SEWAGE

Z-3Z-1

Z-2

Z-4

Z-6

Z-5

Z-7

Z-8 Z-9

Z-11

Z-13

Z-17

Z-19Z-18

Z-15

Z-14

Z-12

Z-10

Z-16

S

S

S S

S

S

S S

S S

S S

S S

S S

S S S

SSSS

S S

S S

S

SSSSSSSSSS

S S

S S

S

S

S S

S S S S S S S S

S

S

S

S

S

S

S

S

S

S

S S

SF

M

SFM SFM

Z2 Z1

Z2 Z1

Z1

Z3

Z1

Z3

MH C-1

MH B-6

MH B-7

MH B-8

MH A-4-3

MH LS 1

LS 1

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

Z2 Z1

Z2 Z1

MH C-1-1

MH C-1

S

S

S

S S S

S S

S

S

S

S

S

S

S S

S

S

S

S

S

S

S S

S

SSSS

S S S

S S

S

S

S

S S

S

S

S

SFM SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SF

M

SFM

SFM

Z1

Z3

Z1

Z3

Z3

Z4

Z3

Z4

MH A-3-2

MH A-5-2

MH D-8

MH D-10

MH H-6

S

S S

S S

S S

S S

S

S S S

S S S S S

S

S

S

Z4 Z6

Z5 Z4

Z5 Z4

Z3

Z4

Z3

Z4 Z4

Z7

Z4

Z7

Z5

Z8

MH H-3-2

MH H-3-6

MH H-3-3

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S S

SFM

SFM

SFM

SFM

Z5 Z4

Z5 Z4

Z10

Z5

Z8

Z5

Z8

MH H-3-1

MH H-3

MH H-2

MH H-1

MH H-2-1

S

S S

S S

S

S

S

S

S

S

S

S

S

SS

S S

S S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

Z4 Z6

Z7 Z6

MH H-3-8

MH H-3-9

MH H-3-10

MH H-3-11

MH H-3-12

MH H-3-13

MH H-3-14

MH H

-3-15

MH H-3-16

MH H-3-17

MH H-3-18

MH H-3-19

MH H-3-20

MH H-3-23

MH H-3-21

MH H-3-22

MH H-3-28

MH H-3-27

S

S

S

S

S

S

S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S S S S

S

S

S

S

Z7 Z6

Z8 Z7

Z8 Z7

Z4

Z7

Z4

Z7

Z5

MH H-3-29

MH H-3-30

MH H-3-31

MH H-3-38

MH H-3-39

MH H-3-40

MH H-3-33

S

S

S

S

S

S

S

SSSSSS

S

S

S S

S

S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S S

S

S

S

S

SFM

SFM

SFM

SFM

SFM

Z8 Z7

Z8 Z7

Z10 Z8

Z10 Z8

Z11

Z5

Z8

Z5

Z8

Z8

Z9

Z8

Z9

Z1 0 Z11

MH F-20

M H

F-21

MH G-1-22

MH G-1-17

MH F-20-1

MH F-20-4

MH F-20-9

MH F-20-7

M H

F-21-1

MH F-21-4

S

S

S

S

S

MH F-18

Z11 Z9

Z11 Z9

Z8

Z9

Z8

Z9

Z1 0 Z11

MH F-18-1

M H

F-21

MH F-20-1

M H

F-21-1

S

S

S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

S

S

S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

Z10 Z8

Z10 Z8

Z11 Z9

Z12 Z10

Z12 Z10

Z1 0 Z11

Z1 0 Z11

M H F-3

MH F-4

MH F-6

MH F-6A

MH F-7

MH F-14-1

MH G-1-17

S

S S

S S

S S

S S

S

Z10 Z11 Z9

Z11 Z9

Z12 Z10

Z13 Z11

Z13 Z11

Z1 0 Z11

Z1 0 Z11

MH F-14-1

SFM

SFM

S

S

S

S

S

S

S

S

S

S

Z12 Z10

Z12 Z10

Z16 Z12

Z16 Z12

Z17 Z13

Z1 2 Z13

Z1 2 Z13

MH L-12

MH L-14

S

S S

S

S

S S

S S S

S

S

S

SS

S

S

S

S

S

S

S S S

S

S

S

S

S

S

S

S

S

S

Z12 Z10

Z13 Z11

Z13 Z11

Z16 Z12

Z17 Z13

Z17 Z13

Z1 2 Z13

Z1 2 Z13

MH L-11

MH L-12

MH L-14

MH L

-1

2-

MH L-12-5

M H

L-12-6

MH L-12-7

MH L-12-9

MH L-12-10

MH L-12-11

S

S

S

S

S

S

S

S

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

SFM

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

Z1 4 Z15

Z1 4 Z15

MH J-5-1

S

S

S

SSS

S

S

S

S

S

S

S

S

S

S S

S S

S

S

S

S

S

S S

Z16 Z12

Z18 Z16

Z1 5 Z16

Z1 5 Z16

Z1 4 Z15

Z1 4 Z15

MH K-5

MH K-6

MH K-8

MH K-7-C

M H

K -1

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

S

S

S

S

SEWAGETREATMENT

PLANT

SFM

SFM

SF

M

SF

M

S

S S

S

S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

Z16 Z12

Z16 Z12

Z17 Z13

Z18 Z16

Z18 Z16

Z19 Z17

Z1 6 Z17

Z1 6 Z17

Z1 5 Z16

Z1 5 Z16

MH P-2

M H

K -2

MH M-1M

H

K -1

MH L-2

MH L-5

MH L-6

MH L-7

MH L-9

MH L-11-5

LS 3

S

S

S

S

S

S

S

S S

S

S S

S

S S

S

SSS

S

S

S

S

S

S

S

Z16 Z12

Z17 Z13

Z17 Z13

Z18 Z16

Z19 Z17

Z19 Z17

Z1 6 Z17

Z1 6 Z17

MH L-11-1

MH L-11-5

MH L-11-10

MH L-11-11

MH L-11-14

MH L-11-16

MH L-11-18

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S S

S

S

S

S

S

S

S

SF

M

Z18 Z16

Z18 Z16

Z19 Z17

Z1 8 Z19

Z1 8 Z19

MH P-2

MH P-5

S

S

S

S

S

S

S

S

S

S

S

Z18 Z16

Z19 Z17

Z19 Z17

Z1 8 Z19

Z1 8 Z19

MH P-8

MH P-7

MH L-11-11

Sheets and Views
20M88_SitePlan-COVER SHEET & LOCATION
20M88_SitePlan-NOTES & OVERVIEW
20M88_SitePlan-ABBREVIATIONS & LEGEND
20M88_SitePlan-SITE OVERVIEW
20M88_SitePlan-Z-1
20M88_SitePlan-Z-2
20M88_SitePlan-Z-3
20M88_SitePlan-Z-4
20M88_SitePlan-Z-5
20M88_SitePlan-Z-6
20M88_SitePlan-Z-7
20M88_SitePlan-Z-8
20M88_SitePlan-Z-9
20M88_SitePlan-Z-10
20M88_SitePlan-Z-11
20M88_SitePlan-Z-12
20M88_SitePlan-Z-13
20M88_SitePlan-Z-14
20M88_SitePlan-Z-15
20M88_SitePlan-Z-16
20M88_SitePlan-Z-17
20M88_SitePlan-Z-18
20M88_SitePlan-Z-19
Sheet 2 20M88_SitePlan.pdf
Sheets and Views
NOTES & OVERVIEW
Sheet 2 20M88_SitePlan.pdf
Sheets and Views
NOTES & OVERVIEW

File details come from the government source that posted it. Updated .