J01 IHS Technical Specifications.pdf
PDF 1 MB Posted
- Attached to
- Nooksack Sulwhanon Community Well (Everson, WA)
- Solicitation number
- 75H70124Q00026
About this file
This is a technical specifications document for drilling a new 12-inch diameter production well for the Nooksack Tribe's Sulwhanon Community Water System in Whatcom County, Washington. The well will replace an existing 6-inch, 64-foot deep supply well that lacks adequate sanitary control and has high iron concentrations.
The project requires cable tool drilling methods to construct a well up to 250 feet deep that can produce at least 20 gallons per minute to serve 25 homes and 5 non-residential connections. Key specifications include installing 12-inch casing with a sanitary seal up to 50 feet deep, well screen assembly with filter pack if needed, well development, test pumping for up to 72 hours, water quality testing (including regular iron concentration sampling), and video survey. The contractor must be licensed in Washington State for well construction, comply with state well drilling regulations, and complete the work within 120 calendar days of Notice to Proceed. The estimated construction cost is between $100,000-$250,000, and the solicitation is set aside for small businesses under NAICS code 237110. Quotes are due March 13, 2025 at 2:00 PM PT, with a site visit scheduled for March 6, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B05 75H70124Q00026-A00001.pdf | ||
| B01 75H70124Q00026.pdf | ||
| J03 WD WA20250134 dated 02072025.pdf | ||
| J02 IHS Drawings and Location.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOOKSACK TRIBE SULWHANON COMMUNITY WELL
SECTION 00001 – CONTRACT DOCUMENTS TITLE PAGE PAGE 1 OF 1
NOOKSACK TRIBE SULWHANON COMMUNITY WELL
PROJECT PO-21-N13
NOOKSACK RESERVATION
WHATCOM COUNTY, WASHINGTON
A COOPERATIVE PROJECT BETWEEN
THE INDIAN HEALTH SERVICE
AND
THE NOOKSACK INDIAN TRIBE
TECHNICAL SPECIFICATIONS
U.S. DEPARTMENT OF HEALTH AND HUMAN SERVICES
PUBLIC HEALTH SERVICE
INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL HEALTH AND ENGINEERING
PORTLAND AREA OFFICE
OLYMPIC DISTRICT OFFICE
MARCH 2024
SIERRA SCHATZ, EIT
ENVIRONMENTAL ENGINEER
(360) 536-7858
SECTION 00010 – TABLE OF CONTENTS Page 1 of 1
SECTION 00010
TABLE OF CONTENTS
VOLUME I – Specifications Division 1 – Division 2
Division 1 – General Requirements 01100 Summary of Work 01270 Price and Payment 01310 Project Management and Coordination 01330 Submittal Procedures and Requirements 01335 Submittal Review Forms 01420 References 01430 Quality Assurance/Quality Control 01500 Temporary Facilities and Controls 01770 Closeout Procedures 01780 Closeout Submittals
Division 2 – Site Construction 02520 Community Well Drilling 02528 Well Abandonment
Attachments Water Testing Requirements Pump Test Field Data Recording Form
END
SECTION 01100 – SUMMARY OF WORK PAGE 1 OF 3
SECTION 01100
SUMMARY OF WORK
PART 1 - GENERAL
1.01 SUMMARY
A. This section summarizes the work to be performed under this contract by the Contractor for the drilling of a new well to provide for the Sulwhanon Community Water System on the Nooksack Reservation, Whatcom County, Washington.
1.02 WORK REQUIRED
A. The Nooksack Tribe (Tribe) seeks to complete a 12-inch diameter production well in an unconfined, shallow alluvial aquifer. This well will replace the existing 6-inch, 64-foot deep supply well for the Sulwhanon Community Water System (CWS), which does not have an adequate sanitary control area and has high iron concentrations.
The goal of the project is to achieve a safe, reliable drinking water source for 25 homes and 5 non-residential connections served by the Sulwhanon CWS. The Tribe also seeks a water source with a lower iron concentration that existing wells in the area, and the aquifer will be sampled for iron at regular intervals during drilling. Well drilling equipment must be capable of drilling a 12-inch bore hole using cable tool drilling methods. The finished well depth is anticipated to be 250 feet or less. The well is proposed to include a sanitary seal of up to 50 feet, and a screen assembly including a riser, filter pack, and tailpipe if necessary. The work includes:
1. Well drilling with 12-inch casing and screen, to an estimated 250 feet
2. Placement of sanitary seal to an estimated 50 feet
3. Well development
4. Test pumping
5. Disinfection, sampling, and water quality testing
B. The work to be performed under this contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles; all transportation and services, including fuel, power, and essential communications; and all labor, work, or other operations required for the fulfillment of the contract in strict accordance with the specifications, drawings, and other contract documents, including such detail sketches as may be furnished by the Project Engineer from time to time during construction in explanation of said contract documents. All work materials and services not expressly listed as being provided by others or called for in the contract which are necessary for the complete and proper construction of the work in good faith shall be furnished, installed, and performed by the contractor.
1.03 WORK COVERED BY CONTRACT
A. The work to be done under this contract consists of furnishing all labor, materials, SECTION 01100 – SUMMARY OF WORK PAGE 2 OF 3 equipment, and supervision necessary to construct, develop, and test a 12-inch diameter production well on the Nooksack Indian Reservation.
B. Test pumping and sampling requirements are detailed in Section 02520.
1.04 SEQUENCE OF WORK
A. The Contractor shall coordinate the construction schedule and operations with the
Project Engineer.
B. The Contractor shall submit a schedule for construction in accordance with Section 01310.
1.05 SITE CONDITIONS
A. Utilities
1. Any buried utilities shown on the drawings are an indication as to what the Contractor may encounter, NOT FOR LOCATION PURPOSES. Locations, material and sizes of any shown are approximate and not meant as a complete representation. Contractor must obtain exact locations. Contact information for utilities known to be in the project vicinity include:
a. Water and Sewer: Nooksack Tribal Utilities Manager, Mr. Joe
Bob, 360-389-1597
b. Cable and Internet: Comcast Xfinity, 800-934-6489
c. Electrical: Puget Sound Energy, 888-225-5773
d. Underground Utility Locate: 811
2. Protect existing utilities during construction.
3. Immediately notify Tribe, Project engineer, and the utility owner(s) of any damaged utilities.
4. Any and all damage that results from work under this contract shall be promptly repaired at the expense of the Contractor (exception is utilities owned and located incorrectly by the Tribe. Contractor will repair damage and be reimbursed for costs).
B. Roads
1. Nooksack Tribe Planning Department, Mr. Ross Cline Jr., Nooksack
Planning Department, (360) 592-0162
2. Whatcom County Public Works: 360-778-6220
C. Tribal Employment Rights Ordinance (TERO)
1. There are no TERO requirements for this contract.
SECTION 01100 – SUMMARY OF WORK PAGE 3 OF 3
D. Rights-of-Way
1. All work will be performed within existing rights-of-way of the Tribe.
2. Information on rights-of-way may be obtained from the Tribe.
E. Discovery
1. If any buried cultural materials are encountered after the work begins (Native
American artifacts or human burials), immediately cease work and contact the Project Engineer and the Tribe.
F. Site Ownership
1. The construction site is entirely located on off-reservation trust land under the jurisdiction of the Nooksack Indian Tribe.
END OF SECTION
SECTION 01270 – PRICE AND PAYMENT Page 1 of 8
SECTION 01270
PRICE AND PAYMENT
PART 1 – GENERAL
1.01 SUMMARY
A. Work covered by this section includes method of measurement and basis of payment for all divisions included.
B. All measurements and payments will be based on completed and accepted work performed in strict accordance with the drawings and specifications.
C. Respective prices and payment shall constitute full compensation for all work completed including incidentals.
D. Record drawings must be current and be inspected by the project Engineer before progress payments will be approved.
E. An updated project construction schedule is required before progress payments will be approved.
PART 2 – BID SCHEDULE ITEMS
2.01 GENERAL
A. Payment shall be full compensation to complete the work items in good faith.
B. Work shall include all items described within and will be paid only under the items listed in the Schedule of Items. All work not specifically described in those items is considered to be ancillary to the listed items.
C. Well drilling and the presence of groundwater is inherently unpredictable.
Geological strata, presence of groundwater and other below ground conditions that vary from nearby well logs are not considered differing site conditions or justification for changes to the contract unit price line items.
D. FAR 52.211-18 Variation in Estimated Quantity is incorporated by reference into this contract. Any increase in the bid schedule quantities must be approved by the Contracting Officer.
SECTION 01270 – PRICE AND PAYMENT Page 2 of 8
2.02 BID ITEMS
A. Well Construction
1. Mobilization and Demobilization
a. Measurement: Lump Sum (LS)
b. Basis for Payment: Lump sum compensation is given to cover the cost of equipment and labor to move equipment to and from the job site and to cover the cost of permits and bonds. Bids obviously unbalanced in favor of this item (over 10% of total bid price) will be considered non-responsive.
70% of this line item price will be billable when drilling starts, and the final 30% will be billable when all equipment and materials are removed from the site and the site is left in a clean and orderly state.
c. Work related to this payment is addressed in Section:
(1) 02520 – Community Well Drilling
2. Place and Complete 16-inch Surface Seal
a. Measurement: Linear feet (LF) of completed surface seal, based on the vertical projection.
b. Basis for Payment: Payment shall be full compensation for a hole drilled to 20 feet deep or as directed by the Project Engineer & Hydrogeologist, with a diameter at least 4 inches greater than the diameter of the uppermost permanent casing, with oversized casing removed as the annulus is sealed. Payment includes all materials and labor necessary for drilling the oversized hole with temporary use of casing, following proper sealing procedures, and placing the sanitary grout. Payment for permanent casing is covered in Line Item 4: Well Casing. No payment shall be made for grout required to fill an open hole drilled below the depth to which grouting was authorized in the bid schedule. There shall be no payment for oversized casing that gets stuck, cannot be removed and must be left in place.
3. Drive Shoe, 12-inch diameter
a. Measurement: Each drive shoe utilized (EA).
SECTION 01270 – PRICE AND PAYMENT Page 3 of 8
b. Basis for Payment: Payment shall be full compensation for drive shoe welded to drill casings and successfully driven to final depth.
4. Well Drilling for 12-inch diameter casing
a. Measurement: Linear feet drilled, based on the vertical projection.
b. Basis for Payment: Payment shall be full compensation for drilling, formation sampling, on-site containment and off-site disposal of cuttings, well log, and all other necessary items required for well drilling. No payment will be made for any quantity deeper than authorized by the Contracting Officer.
5. Well Casing, 12-inch diameter
a. Measurement: Linear feet of casing installed in accordance with the Bid
Schedule (estimated quantity includes approximately 2 feet of final stickup) measured over the centerline of the casing and based on the length in the vertical projection.
b. Basis for Payment: Payment shall be full compensation for casing, temporary welded or locking well cap and paint marking, and all other necessary items required for a complete and operational installation. No payment shall be made for large diameter surface casing used as temporary construction aid.
6. 8-inch Stainless Steel Well Screen and Fittings
a. Measurement: Linear feet of stainless steel well screen installed in accordance with the Hydrogeologist’s design recommendations after drilling to depth (up to 30 ft of screen estimated, slot size to be determined), measured over the centerline of the screen and based on the length in the vertical projection. If revision to the measurement for this
SECTION 01270 – PRICE AND PAYMENT Page 4 of 8 item is required based on the Hydrogeologist’s recommendations, a modification shall be negotiated with the Contracting Officer.
b. Basis for Payment: Payment shall be full compensation for the installation of continuous-slot stainless steel screen material, packers, seals, couplings, bottom fittings, and other necessary appurtenances for the screen assembly.
7. 8-inch Tailpipe and Riser
a. Measurement: Linear feet of tailpipe and riser assembly around screen installed in accordance with the Hydrogeologist’s design recommendations after drilling (up to 70 ft of length estimated), measured over the centerline of the pipe and based on the length in the vertical projection. If revision to the measurement for this item is required based on the Hydrogeologist’s recommendations, a modification shall be negotiated with the Contracting Officer.
b. Basis for Payment: Payment shall be full compensation for the installation of blank riser, tailpipe, associated fittings, and any other materials included in the Hydrogeologist’s design. Any screen used is not measured for payment.
8. Filter Pack for Screen Assembly
a. Measurement: Linear feet of filter pack material installed in accordance with the Hydrogeologist’s design recommendations after drilling (up to 100 ft of length estimated, and 12-inches in diameter around the 8-inch riser, screen, and tailpipe), based on the length in the vertical projection.
If revision to the measurement for this item is required based on the Hydrogeologist’s recommendations, a modification shall be negotiated with the Contracting Officer.
b. Basis for Payment: Payment shall be full compensation for the installation of filter pack media as specified in the Hydrogeologist’s design.
SECTION 01270 – PRICE AND PAYMENT Page 5 of 8
9. Separation of Drive Shoe, 12-inch diameter
a. Measurement: One-time lump sum payment based on a successful separation of the drive shoe from its casing string. Payment is to be based on a 12-inch drive shoe. If reduction to an 8-inch shoe is required based on field conditions encountered, a modification shall be negotiated with the Contracting Officer.
b. Basis for Payment: Payment shall be full compensation for the shoe cutter assembly, as well as running in, cutting, and removing the cutter assembly from the well.
10. Test Pumping
a. Measurement: Hourly basis (HR) while the pump is running.
b. Basis for Payment: Payment shall be full compensation for test pumping based on the length of time of actual pump testing, including step pumping, constant-rate test pumping, and standby time for recovery measurement. Time spent setting and removing the pump shall not be included in the basis for payment. Price bid includes provision of an accepted discharge method for water pumped, such as a recently-calibrated flow meter, orifice weir, or other means of accurate flow measurement; a valve or other means to adjust flow rate; and any cost for additional pipe to convey discharge water to the point of disposal. If for any reason the pump or water level indicator or meter fails prior to completion of the specified test period, no payment will be made for the partial test.
11. Mechanical Well Development
a. Measurement: Hourly basis beginning with the mechanical well development in the water production zone and ending upon completion of such action. Time required for hauling water, rigging up, running tools and other preparatory and disassembly work shall not be included in the basis
SECTION 01270 – PRICE AND PAYMENT Page 6 of 8 for payment. Mechanical well development may include one or more of the following procedures: mechanical surging via a surge block or swab, air developing via surging and air-lift pumping, bailing, or high-velocity water jetting combined with pumping. The method(s) must be approved by the Project Engineer based on the Hydrogeologist’s recommendation.
b. Basis for Payment: Payment shall be full compensation for well development based on the length of time of actual well development.
12. Authorized Rig Work
a. Measurement: Hourly basis while the drilling rig is running.
b. Basis for Payment: Payment shall be full compensation for any work, authorized by the Contracting Officer at the request of the Project Engineer, that requires a fully operating rig and a minimum of a two-person crew and is not otherwise covered by unit prices herein. No extra payment for hourly work shall be made when equipment being used is not in good working condition.
13. Authorized Stand-by/Shop Time
a. Measurement: Hourly basis.
b. Basis for Payment: Payment shall be full compensation for any work, authorized by the Contracting Officer at the request of the Project Engineer, not otherwise covered by unit prices herein, which does not require a fully operating rig. Stand-by/Shop Time shall also be paid per hour for time lost during a single 8-hour working shift while geophysical logging is delaying work, or for time required for one employee to fabricate shop items. During geophysical logging, the Contractor shall provide one employee for assistance.
SECTION 01270 – PRICE AND PAYMENT Page 7 of 8
14. Disinfection and Water Quality Sampling
a. Measurement: One-time lump sum payment will be issued once three conditions are met:
(1) Receipt by the project Engineer of satisfactory bacteriological analysis after disinfection.
(2) Receipt by the project Engineer of chemical analysis lab results.
(3) Receipt by the Hydrogeologist of any water samples taken by the contractor for iron testing.
b. Basis for Payment: Payment shall be full compensation for disinfection, removing all traces of chlorine from the well column, dechlorination, sampling the water strata, delivering all tests to an EPA-certified laboratory, submitting the results to the project Engineer, performing water sampling for iron testing at regular intervals during drilling as instructed by the Hydrogeologist, and all other necessary items required for a complete analysis. No additional payments shall be made for repeat disinfections required due to unsatisfactory bacteriological analysis.
c. Work related to this payment is addressed in Section:
(1) 02520 – Community Well Drilling
15. Optional Item: Video Survey
a. Measurement: One-time lump sum for successful closed-circuit television (CCTV) video survey of well interior.
b. Basis for Payment: Payment shall be full compensation for all equipment and labor for video inspection of the entire well casing after test pump removal with all internal physical features visible, and three copies of the video in a format compatible with Microsoft Windows Media Player.
c. Work related to this payment is addressed in Section:
(1) 02520 – Community Well Drilling
16. Optional Item: Salvage Credit for 12-inch Casing
a. Measurement: Linear feet of casing recovered and usable by the Contractor, as agreed upon by the Contractor, Project Engineer, and Hydrogeologist, during construction (such as casing extracted to make room for a well screen), measured over the centerline of the casing and based on the length in vertical projection, shall be deducted from total payment.
SECTION 01270 – PRICE AND PAYMENT Page 8 of 8
b. Basis for Payment: Deduction shall be based on recovered casing in lengths of 5 feet or greater as established by the Project Engineer based on the Hydrogeologist’s recommendation. Labor for salvage work will be paid at the bid rate for Authorized Rig Work (Item 9). All recovered casing becomes the Contractor’s property.
SECTION - 01310 PROJECT MANAGEMENT AND COORDINATION PAGE 1 of 2
SECTION 01310
PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
A. Section includes the preconstruction conference, construction scheduling and coordination requirements.
B. Costs associated with project management and coordination are incidental to the contract work and are included in the contract unit and lump sum costs.
1.02 PRE-CONSTRUCTION CONFERENCE AND PROGRESS MEETINGS
A. Prior to beginning construction, but following contract award, the Contractor, Subcontractors and other interested parties must participate in a Preconstruction Conference with the Tribe, Hydrogeologist, and Project Engineer.
B. Periodically throughout the contract performance period, the Contractor and
Subcontractors shall avail themselves to project progress meetings. These meetings shall be held as often as the parties determine is necessary, but will be at least once every other month (bimonthly).
C. Representatives from the following shall attend each meeting:
1. Prime Contractor
2. Subcontractors, if applicable
3. Contracting Officer
4. IHS Project Engineer and Construction Inspector
5. Hydrogeologist
6. Nooksack Tribal Utilities
D. Contractor is responsible for notifying Subcontractors of meeting time and date.
E. Meeting Minutes:
1. Meeting Minutes will be recorded, typed up in a memorandum and distributed to all attendees by the Project Engineer.
2. Any attendee may question or challenge the content of the meeting minutes, in writing to the Project Engineer, prior to the next project
SECTION - 01310 PROJECT MANAGEMENT AND COORDINATION PAGE 2 of 2 meeting. If the meeting minutes are unchallenged, they will be accepted as an accurate representation of the meeting discussions and decisions.
3. Challenges will be resolved as “old business” at the subsequent project progress meeting.
1.03 CONSTRUCTION SCHEDULE
A. Present two original signed copies (electronic PDF submittals are acceptable) to the Project Engineer and Tribe of a written preliminary construction schedule showing the following as a minimum, with all times referenced to calendar dates:
1. Activity
2. Activity description
3. Duration
B. Provide enough detail to allow the Project Engineer to evaluate work progress both on-site and off-site.
C. Review of the schedule by the Project Engineer shall not constitute endorsement of the Contractor’s approach, means, methods sequences or procedures nor shall it constitute assignment of the Contractor’s responsibility to provide superintendence and project management.
D. Provide the Project Engineer with a revised schedule whenever major changes occur to the schedule.
1.04 WEEKLY ACTIVITY SCHEDULE
A. Provide the Project Engineer, Tribe, and Hydrogeologist a written weekly activity schedule (facsimile or email is acceptable) indicating planned activities, locations, and approximate schedules.
B. Note the planned visits by manufacturer’s representatives, testing firms, or other site visitors that may be of significance to the Project Engineer and Hydrogeologist.
C. Provide the weekly activity schedule by noon on the last day of the workweek for activities during the following week.
SECTION 01330 – SUBMITTAL PROCEDURE PAGE 1 OF 3
SECTION 01330
SUBMITTAL PROCEDURES AND REQUIREMENTS
A. This section includes information on submittal procedures and general submittal requirements. Materials requiring submittal are listed in the appropriate specification section.
1.02 SUBMITTAL PROCEDURES
A. Submit two (2) original copies of submittals to the Project Engineer and copy the Tribe. Electronic PDF submittals are acceptable.
B. Identify each cut sheet or shop drawing with the following information:
1. Contract number.
2. Supplier.
3. Specification section, plan sheet or detail drawing number to which the submittal pertains.
C. Submit the following information, as applicable, in accordance with the submittal requirements of each section.
1. Manufacturer’s cut sheets indicating compliance with references and standards (e.g. applicable ASTM, AWWA standards).
2. Laboratory results, as applicable.
3. Dimensional drawings or shop drawings, as applicable.
4. Other specific information required by the particular section of the specification.
D. Variations from Contract Documents or Products Specified:
1. Bring all submitted variations to the attention of the Project Engineer.
2. Variations not brought to the Project Engineer’s attention, in writing, and that conflict with the Contract Documents, do not relieve the contractor from the requirements of the contract documents.
SECTION 01330 – SUBMITTAL PROCEDURE PAGE 2 OF 3
E. Revisions and Resubmittals:
1. Revise and resubmit submittals as required and identify all changes made since previous submittal.
2. Engineer Obligations for Resubmittals:
a. The Project Engineer will be obligated to review the original submittal and one resubmittal for each item requiring submittal.
b. Subsequent resubmittals will be at the Contractor’s expense, deducted from the subsequent partial pay request and ultimately credited to the contract via subsequent change order at an hourly rate of $160 per hour.
3. Incomplete submittals or rejected submittals that result in the need for the
Contractor to resubmit cannot be grounds for a contract time extension or equitable adjustment to contract price, unless the engineer did not meet the obligations outlined in Paragraph 1.02, Subparagraphs E and G.
F. Distribute copies of reviewed submittals to concerned parties, (i.e. suppliers, sub-contractors).
G. Submittal Time Requirements:
1. Submit information to the Project Engineer at least three weeks in advance of the work to be performed.
2. The Project Engineer will have up to 14 calendar days, from the date received in the Engineer’s office, to respond to the submittal or resubmittal.
3. If the Project Engineer takes longer than 14 calendar days to respond to a submittal or resubmittal and if the Contractor can show damage resulting from the Engineer’s delay in responding, the contractor will receive a contract time extension and/or equitable adjustment for the number of days in excess of 14 calendar days that the Engineer held the particular submittal.
4. Repeated resubmittals resulting from “Rejected” or “Incomplete
Submittals” (as defined in Article 1.03) will not be grounds for a contract time extension.
5. Lack of response does not constitute approval.
SECTION 01330 – SUBMITTAL PROCEDURE PAGE 3 OF 3
H. Approval Required Before Installation:
1. Approval of submittals must be provided by the Project Engineer prior to installation of materials.
2. Materials installed without written submittal approval will be at the
Contractor’s risk, and may require removal, at no expense to the Tribe or Government.
1.03 DEFINITIONS
A. Approved: Deemed to be acceptable for use in accomplishing the requirements of the plans and specifications, but does not extend to the means, methods, or procedures of construction (except where specific means, methods, or procedures are specifically required by the contract documents) and does not imply approval of the system or construction in which the submitted item is a part.
B. Conditionally Approved: Deemed to be acceptable for use in accomplishing the requirements of the plans and specifications, if the conditions noted in the submittal approval letter are met. The approval does not extend to the means, methods, or procedures of construction (except where specific means, methods, or procedures are specifically required by the contract documents) and does not imply approval of the system or construction in which the submitted item is a part.
C. Rejected: Deemed unacceptable for the use for which it was submitted.
D. Incomplete Submittal: Information is insufficient to ascertain acceptability.
Neither approval nor rejection is implied.
SECTION 01335 – SUBMITTAL REVIEW FORM PAGE 1 OF 2
SECTION 01335
SUBMITTAL REVIEW FORM
Contract:
Contract Number:
Contractor:
Contractor’s Signature
Date
Initial
Received by COR
Returned to Contractor
SUBMITTALS REQUIRED
Item No.
Item Description and Specification Reference
Contractor Indicate: Type, Model Number, Manufacturer, etc.
Approved/Rejected and Date
Schedule of activities Section 01310
Name and license number of well driller Section 01430
Well drilling rig operator experience and license number Section 01430
Type of drilling equipment Section 02520
Well casing
Temporary well cap
Grout (surface seal) mixing and installation method
Grout (surface seal) material
Type of well screen and installation method, if applicable
SECTION 01335 – SUBMITTAL REVIEW FORM PAGE 2 OF 2
SECTION 01335
SUBMITTAL REVIEW FORM
Contract:
Contract Number:
Contractor:
Date
Initial
Contractor’s Signature
Received by COR
Returned to Contractor
Item No.
Item Description and Specification Reference
Contractor Indicate: Type, Model Number, Manufacturer, etc.
Approved/Rejected and Date
Filter pack material, if applicable
Method of disinfection
Dechlorination method
Method of development
Pump test data
Video survey
Washington State well report
SECTION 01420 – REFERENCES PAGE 1 OF 2
SECTION 01420
REFERENCES
A. This section includes a list of organizations, associations or appropriate agencies with jurisdiction that have references, standards, laws or regulations cited in these specifications.
B. Use latest revision of all references, standards, laws or regulations.
1.02 LIST OF ORGANIZATIONS, ASSOCIATIONS & AGENCIES
A. National Standards Organizations & Associations
American Association of State Highway and Transportation Officials (AASHTO) 444 North Capital Street NW, Suite 249 Washington DC, 20001
(202) 624-5800 www.aashto.org
American Concrete Institute (ACI) ACI International PO Box 9094 Farmington Hills, MI 48333-9094
(810) 848-3700 www.aci-int.org
American Society for Testing and Materials
(ASTM)
100 Bar Harbor Drive West Conshohocken, PA 19428-2959
(610) 832-9585 www.astm.org
American Water Works Association (AWWA) 6666 West Quincy Avenue Denver, CO 80235
(303) 794-7711 www.awwa.org
National Electric Code (NEC) National Fire and Protection Association 1 Batterymarch Park Quincy, MA 02269-9959 1-888-632-2633 www.nec.com
National Electrical Manufacturer’s Association
(NEMA)
1300 North 17th Street Rosslyn, VA 22209
(703) 841-3200 www.nema.org
Underwriters’ Laboratories, Inc. (UL) 333 Pfingston Road Northbrook, IL 60062
(847) 272-8800 www.ul.com
B. Federal Agencies
Environmental Protection Agency (EPA) U.S. EPA Region 10 1200 6th Avenue Seattle, WA 98101
(206) 553-1200 http://www.epa.gov/region10
Occupational Health and Safety Administration (OSHA) 1111 Third Avenue, Suite 715 Seattle, WA 98101-3212 Phone: (206) 553-5930 Fax: (206) 553-6499 www.osha.gov http://www.aashto.org/ http://www.aci-int.org/ http://www.astm.org/ http://www.awwa.org/ http://www.nec.com/ http://www.nema.org/ http://www.ul.com/ http://www.epa.gov/region10 http://www.osha.gov/
SECTION 01420 – REFERENCES PAGE 2 OF 2
C. State Agencies
Washington Department of Transportation (DOT) Engineering Publications PO Box 47408 Olympia, WA 98504-7408 Phone: (360) 705-7430 https://wsdot.wa.gov/engineering-standards/all-manuals-and-standards
Washington Department of Ecology (DOE) Department of Printing P.O. Box 798 Olympia, WA 98507-0798 Phone: (360) 649-7276 http://www.ecy.wa.gov/
Washington Administrative Code (WAC) https://app.leg.wa.gov/wac
PART 2 – PRODUCTS (N/A)
PART 3 – EXECUTION (N/A)
https://wsdot.wa.gov/engineering-standards/all-manuals-and-standards http://www.ecy.wa.gov/ https://app.leg.wa.gov/wac
SECTION 01430 – QUALITY CONTROL/ QUALITY ASSURANCE PAGE 1 OF 2
SECTION 01430
QUALITY ASSURANCE/QUALITY CONTROL
A. This section includes prerequisites and procedures to ensure the quality of the construction and to provide assurance that the Contractor is capable of meeting quality requirements.
B. The intent of all quality control requirements is that the Tribe will be provided with a complete, properly functioning system upon completion.
C. The costs for Contractor Quality Assurance/Quality Control (QA/QC) measures are incidental to the overall contract and are included in the applicable contract line items.
1.02 CONTRACTOR QUALIFICATIONS
A. The Contractor shall be registered in the State of Washington as a well construction operator.
1.03 INSTALLER QUALIFICATIONS
A. Trade work shall be performed under the direct supervision of personnel licensed in the State of Washington for the trade being performed.
1.04 CONTROL OF INSTALLATION
A. Inspect materials for acceptability when delivered to the site.
B. Store and handle materials to prevent damage.
C. Inspect materials, services, and workmanship to ensure that work is performed in accordance with the specifications.
D. Comply with manufacturers’ instructions.
E. Should manufacturers’ instructions conflict with contract documents, request clarification from the Project Engineer before proceeding.
F. Correct defective work to the satisfaction of the Project Engineer.
SECTION 01430 – QUALITY CONTROL/ QUALITY ASSURANCE PAGE 2 OF 2
1.05 SAMPLES
A. When requested by the Project Engineer, supply samples of materials proposed for use.
1.06 START-UP
A. Prior to start-up, ensure that all equipment is ready for its use, as designed.
B. Ensure that all power sources are balanced and ready for use, if applicable.
C. Provide the services of manufacturers’ field representative for start-up, testing, and adjustment of all major equipment items, if applicable.
D. Provide reports from the manufacturer, including their observations and documentation of workmanship to the Project Engineer with the Tribe copied, within 30 days of manufacturer’s visit, unless a sooner response is required by the applicable specification section.
E. Work will not be considered complete until all systems and subsystems have been tested for proper functionality and proper adjustment.
1.07 WARRANTY
A. Provide a minimum one (1) year warranty from date of final acceptance for all materials and labor, covering defects in the materials or deficiencies resulting from contractor installation.
B. Provide additional warranties as required by specific sections.
SECTION 01500 – TEMPORARY FACILITIES AND CONTROLS PAGE 1 OF 5
SECTION 01500
TEMPORARY FACILITIES AND CONTROLS
A. The work covered by this section includes all temporary facilities and controls needed to complete work under the contract in a manner that protects public safety and worker safety, that preserves both public and private property and that appropriately involves local governments, emergency and law enforcement.
1.02 RELATED WORK
A. All work under the contract.
1.03 REFERENCES
A. Federal Highway Administration, Manual on Uniform Traffic Control Devices, Millennium Edition
B. OSHA Standards for the Construction Industry, 29 CFR Part 1926
B. Washington Administrative Code (WAC) 246-290-490: Cross Connection Control
C. Washington Department of Ecology (DOE) 2019 Stormwater Management Manual for Western Washington (SWMMWW)
PART 2 – PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
3.01 GENERAL
A. Provide temporary facilities and controls that are necessary to carry out the requirements of the Contract in a manner:
1. that protects public safety and worker safety in accordance with 29 CFR § 1926, OSHA Standards for the Construction Industry
2. that preserves both private and public property
3. that communicates and cooperates with local authorities and governments.
B. IHS reserves the right to remedy any neglect on the part of the Contractor regarding the protection of the work and public as follows:
SECTION 01500 – TEMPORARY FACILITIES AND CONTROLS PAGE 2 OF 5
1. IHS may issue a written notice outlining the Contractor’s public safety neglect.
2. The Contractor must respond to and remedy the situation within 24 hours;
otherwise, IHS will remedy the situation and deduct any costs from money due the Contractor.
3. If IHS determines an emergency situation to exist, IHS may elect to immediately remedy the situation and deduct any costs from money due the Contractor.
3.02 TEMPORARY WATER
A. Obtain permission from the Tribe of the facility or water system from which water is obtained.
B. Install temporary service connections where necessary. Disconnect and permanently close the connection after use.
C. Cross Connection Control: When connecting to the Tribe’s water supply, protect the water supply from contamination and provide appropriate backflow prevention devices that meet the WAC 246-290-490.
3.03 TEMPORARY SANITARY FACILITIES
A. Access to a permanent restroom facility, adjacent to the worksite, will be provided by the Tribe.
B. Keep facilities in a sanitary and clean condition.
3.04 FENCING
A. Protect existing fencing where possible.
B. Repair and replace all moved fencing.
C. Provide adequate fencing for safety purposes.
3.05 SIGNS, SIGNALS AND BARRICADES
A. Provide traffic barriers that result in compliance with Occupational Health and
Safety Administration 29 CFR Part 1926 and the Federal Highway Administration Manual on Uniform Traffic Control Devices, Millennium Edition.
B. Provide barriers to prevent unauthorized entry to construction areas.
C. Provide barriers to protect adjacent properties from damage.
SECTION 01500 – TEMPORARY FACILITIES AND CONTROLS PAGE 3 OF 5
D. Provide barriers to protect all stored materials, the site and structures from damage.
3.06 TRAFFIC CONTROL
A. Conduct all traffic control operations in accordance with OSHA CFR 29 Part 1926 and the FHWA Millennium Edition of the Manual on Uniform Traffic Control Devices (MUTCD).
B. Within State or County Rights-of-Way, adhere to the conditions of their permit or franchise.
C. Haul Routes:
1. Consult with authority having jurisdiction in establishing public thoroughfares to be used for haul routes and site access.
2. Confine construction traffic to designated haul routes.
3. Provide traffic control at critical areas of haul routes to regulate traffic, to minimize interference with public traffic.
3.07 ACCESS ROADS
A. Construct and maintain temporary roads accessing public thoroughfares to serve construction area.
B. Extend and relocate as work progress requires.
C. Provide detours necessary for unimpeded traffic flow.
D. Provide and maintain access to fire hydrants, free of obstructions.
3.08 PARKING
A. If the site is large enough, the Contractor may park their own and employees' vehicles on the site without charge after obtaining permission from the Tribe.
B. If the site is not large enough, the Contractor shall make parking arrangements.
C. Prevent interference with the flow of local traffic.
D. Prevent interference with emergency vehicle functions.
3.09 ROAD SURFACE MAINTENANCE
A. Maintain publicly traveled gravel roads in a condition equal to that at the outset of construction.
SECTION 01500 – TEMPORARY FACILITIES AND CONTROLS PAGE 4 OF 5
1. Fill potholes resulting from construction traffic, as soon as possible.
2. Prevent washboarding due to construction traffic.
B. Maintain publicly traveled asphalt roads in a condition equal to that at the beginning of construction, unless being excavated across under this contract.
3.10 WATER CONTROL
A. Follow best management practices for Storm Water Management as outlined in the SWMMWW.
3.11 DUST CONTROL
A. Use measures to minimize dust caused by the project.
B. Avoid dust-creating activities during dry and windy conditions.
3.12 PROTECTION OF INSTALLED WORK
A. Protect installed work and provide temporary and removable protection for installed products.
B. Protect finished surfaces from traffic, dirt, wear, or damage.
C. Prohibit traffic in landscaped areas.
D. Restore or repair damage caused by lack of protection or from vandalism.
3.13 SECURITY
A. The Contractor is responsible for security on the site of work.
B. The Contractor will be held responsible for loss or injury to persons or property where their work is involved during the contract period.
C. Provide such watchpersons and take such other precautionary measures as deemed necessary to protect facilities during the contract period.
3.14 PROGRESS CLEANING
A. Maintain areas free of waste materials, debris and rubbish.
B. Remove waste materials, debris, and rubbish from site weekly and dispose off-site in a solid waste disposal facility that is licensed to receive the level of waste generated.
SECTION 01500 – TEMPORARY FACILITIES AND CONTROLS PAGE 5 OF 5
3.15 REMOVAL OF UTILITIES, FACILITIES & CONTROLS
A. Remove temporary above grade or buried utilities, equipment, facilities, and materials.
B. Clean and repair damage caused by installation or use of temporary work.
C. Restore existing facilities and site to original condition if affected by construction.
3.16 MEDICAL SERVICES AND FIRST AID
A. Follow OSHA 29 CFR Part 1926, Subpart D requirements for posting of medical emergency information.
B. Follow OSHA 29 CFR Part 1926, Subpart D requirements for first aid.
1. Ensure that first aid materials are readily available to workers.
2. First Aid Kit Minimum Requirements: Meet ANSI Z308.1-2015.
3.17 TEMPORARY FIRE PROTECTION
A. Provide temporary fire protection in accordance with OSHA 29 CFR Part 1926, Subpart F, and applicable Tribal and State Law.
SECTION 01770 – CLOSEOUT PROCEDURES PAGE 1 OF 1
SECTION 01770
CLOSEOUT PROCEDURES
A. Section includes information on closeout procedures and final inspection.
1.02 RELATED WORK
A. Section 01270 – Price and Payment B. Section 01430 – Quality Assurance / Quality Control
C. Section 01780 – Closeout Submittals
1.03 CLOSEOUT PROCEDURES
A. Substantial Completion Process:
1. Provide the Project Engineer and the Tribe certification that work is substantially complete and that facilities are ready for beneficial use.
2. If the Project Engineer concurs, the Project Engineer will document a warranty date for substantially complete facilities.
B. Final Inspection:
1. Submit to the Project Engineer, Contracting Officer, and Tribe written certification that work is complete in accordance with contract documents and ready for final inspection at least five (5) calendar days prior to final inspection.
2. Perform and coordinate the final inspection with the Project Engineer, Tribal representatives, Hydrogeologist, and any other partners (i.e.
funding agencies) involved in the project.
3. Final Punch List: Remaining deficiencies will be listed, in a written letter, from the Project Engineer.
4. Provide warranties and record documents (e.g. as-built drawings) to the Project Engineer and Tribe within ten (10) days of final inspection.
C. Final Completion: Final completion will be established once the final punch list deficiencies are remedied and applicable General and Contracting Requirements are met.
SECTION 01780 – CLOSEOUT SUBMITTALS PAGE 1 OF 2
SECTION 01780
CLOSEOUT SUBMITTALS
A. This section describes the requirements for closeout submittals including record drawings, warranty information and general operation and maintenance information.
A. Section 01430 – Quality Assurance/Quality Control B. Section 01770 – Closeout Procedures
1.03 DELIVERY
A. Provide all closeout submittals meeting these requirements and any specific requirements of each section.
B. All closeout submittals must be received in a correct and complete manner before final payment can be made.
1.04 DEFINITIONS
A. Record Drawing: A drawing showing the actual installation of facilities, showing changes from the plans, and showing detail enough that future persons can readily locate all objects.
B. Swing Ties: Measurements from three permanent easily locatable objects to an installed object.
PART 2 – PRODUCTS (NOT APPLICABLE)
3.01 RECORD DRAWINGS
A. Provide record data in one of the following manners:
1. On a set of project drawings, neatly draw swing tie measurements for the installed well.
2. On separate 8½ x 11-inch sheets, neatly draw site sketches, well structure sketches, etc., indicating pertinent installation information.
SECTION 01780 – CLOSEOUT SUBMITTALS PAGE 2 OF 2
3.02 WARRANTIES
A. Submit all warranty information regarding the materials installed to the Project
Engineer with the Tribe copied.
B. Minimum warranty information is listed in Section 01430. Specific warranties may be required for other specification sections.
SECTION 02520 – COMMUNITY WELL DRILLING PAGE 1 OF 17
SECTION 02520
COMMUNITY WELL DRILLING
A. This section includes drilling, casing, screening, developing and testing of community water wells.
B. A consultant (referred to as the Hydrogeologist) hired by IHS shall provide hydrogeological services to observe well drilling operation, collect aquifer samples for grain size distribution analysis, design the well screen assembly, observe well completion and development, and oversee the final pumping test(s). The well driller (Contractor) shall fully cooperate with the Hydrogeologist, providing safe access, samples, information and recommendations as requested.
C. A complete IOCs, VOCs, SOCs, Radionuclides, and Secondary Contaminants test for a Group A water system will be completed on each well drilled. Testing cost will be the responsibility of the well driller.
D. Water samples to test for iron concentrations will be taken at regular intervals throughout the depth of the aquifer, as instructed by the Hydrogeologist.
E. The completed well shall be of cased construction, complete with well screen, filter pack (as needed), sanitary seal, and well cap with a 2-inch sampling port.
F. The Contractor shall drill, case and screen well at the size specified in the bid schedule, or as directed by the Project Engineer in accordance with recommendations from the Hydrogeologist.
G. All construction methods and materials for the wells shall meet or exceed Washington State and local requirements.
H. The well drilling Contractor shall comply with all state license requirements for well drilling in the state of Washington. All rig operators must hold valid licenses.
All licensed Trainees must be supervised by Operators.
I. The Contractor shall take such precautions as are necessary or as may be required to prevent contaminated water or water having undesirable physical or chemical characteristics from entering the well. The Contractor shall also take precautions during construction to prevent contamination or pollution from the ground surface.
J. Consolidated, unconsolidated and combinations of formations may be encountered during this contract. Unless specifically mentioned, there will be no
SECTION 02520 – COMMUNITY WELL DRILLING PAGE 2 OF 17
distinction concerning the method of payment for the consolidated and/or unconsolidated drilling. The IHS will not be held accountable for variations of materials encountered during the drilling operations.
1.02 REFERENCES
A. ASTM A53 – Standard Specification for Pipe, Steel, Black and Hot Dipped, Zinc Coated Welded and Seamless.
B. ASTM A276 – Stainless steel well screen
C. Washington State DOE, Water Supply, Well Construction & Licensing
D. Applicable state codes for the State of Washington
E. WAC Chapter 173-160 – Minimum Standards for Construction and Maintenance of Wells
F. AWWA A100-15, Water Wells
1.03 SUBMITTALS
A. Name and license number of licensed well driller
B. Well drilling rig operator(s) experience and license number(s)
C. Type of cable tool drilling equipment
D. Well casing and temporary well cap
E. Grout material, method of mixing and installation
F. Well screen and method of installation (if applicable)
G. Filter pack material (if applicable)
H. Method of disinfection and dechlorination
I. Method of development
J. Pump test data
K. Video surveys
L. Washington State well report
SECTION 02520 – COMMUNITY WELL DRILLING PAGE 3 OF 17
1.04 CONFLICTS WITH STATE WELL CODES
A. The materials and construction methods specified herein are minimum requirements. Where the appropriate state well codes require more stringent materials or execution methods, they shall apply.
B. Notify the Project Engineer of any planned deviation from these specifications before proceeding so any price changes or quantity adjustments may be negotiated.
1.05 ACCEPTANCE
A. Minimum final yield being sought is 20 gallons per minute. If a stratum, which will produce in excess of the minimum yield, is encountered, the well shall be developed to produce the maximum yield obtainable through the well screen installed.
B. Water shall be clear and free of sand.
C. The drilling shall be accomplished by a cable tool drilling machine.
D. Work covered by this section will not be accepted until records and testing connected with the work have been completed satisfactorily.
E. The basic alignment requirement is that all casings, liners, risers, screens, and tools can be freely run through the well, and that a test pump and permanent pump can be freely set in the well. Other alignment tests will not be required unless doubt arises during the work.
PART 2 - PRODUCTS
2.01 WELL CASING
A. Steel Well Casing
1. The steel casing will be 12” diameter or as specified in the bid schedule. If 12” casing meets refusal or the well needs to be drilled deeper than anticipated, reduction to 8” diameter casing will be considered and must be approved by the Project Engineer per recommendation of the Hydrogeologist.
2. Conform to American Society for Testing and Materials (ASTM) A-53 A or B specifications for steel pipe.
3. Each length of pipe shall be clearly marked in accordance with ASTM specifications.
SECTION 02520 – COMMUNITY WELL DRILLING PAGE 4 OF 17
a. Markings shall include manufacturer’s name, type of pipe, ASTM number and pipe length.
b. Mill certificates shall be supplied at the Project Engineer’s request.
c. Marking shall be rolled, stamped or stenciled by the manufacturer. Pipe remarked by a pipe supplier, or well driller, will be rejected by the Project Engineer.
4. Pipe shall be clean and free of oil, grease, rust, or other detrimental materials.
5. Lengths of casing shall be connected with approved welds.
6. Pipe shall meet the following requirements per WAC 173-160-201:
Nominal Outside Nominal Minimum Diameter Diameter Wall Thickness Weight (inches) (inches) (inches) (lbs per linear foot)
12 12.750 0.375 33.38 8 8.625 0.322 22.36
2.02 WELL SCREEN
A. General
1. A well screen shall be installed if the aquifer encountered is an unconsolidated sand or gravel formation, and the Contractor is so directed by IHS based on the Hydrogeologist’s recommendation.
2. Well screen openings shall be of the proper width to permit the maximum practical sand-free yield after development. The openings shall be of geometric shape to permit maximum transmitting capacity without clogging or jamming. The Hydrogeologist will perform sieve analyses of representative samples of the water bearing formation to determine proper sizing of the well screen.
B. Stainless Steel Screen
1. Screen shall be designed to produce a minimum loss of head between the water bearing stratum and the well.
2. Continuous slot design, with outer windings and internal longitudinal bars.
3. Both members shall be type 304 stainless steel conforming to ASTM A276- 92.
4. The maximum recommended tensile pull on the screen is 1600 pounds.
SECTION 02520 – COMMUNITY WELL DRILLING PAGE 5 OF 17
5. Screen shall be a commercial product, equal to screens manufactured by Johnson Screens, Aqseptence Group, New Brighton, MN.
2.03 FILTER PACK
A. Well-rounded, well-sorted grains of washed silica sand, glass beads, ceramic beads, or approved equal, as directed by the Hydrogeologist.
B. Weight loss by the acid test shall be less than 20%.
C. Gradation specified by the manufacturer of the well screen based on the gradation of the water bearing formation, as specified by the Hydrogeologist.
2.04 GROUT
A. Proportion of Portland cement and the least quantity of water (not over 6 gallons per cubic foot of cement) required giving a mixture of such consistency that it can be forced through the grout pipe.
1. Two (2) percent by weight of bentonite clay may be added to the mixture to improve flow properties.
B. Bentonite grout, in lieu of cement, may be allowable if approved by IHS per recommendation of the Hydrogeologist.
2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .