This Addendum No. 2, issued July 7, 2025, by the Athens-Clarke County Public Utilities Department, provides clarifications and modifications to the bid documents for the J.G. Beacham Water Treatment Plant Sodium Hypochlorite Tank Rehabilitation project. The project involves the rehabilitation of two sodium hypochlorite fiberglass reinforced plastic (FRP) bulk storage tanks. Proposals must be received by 3:00 p.m. local time on July 17, 2025. The addendum addresses 16 detailed questions and clarifications regarding project scope, safety requirements, material specifications, third-party inspections, and site conditions. Key clarifications include confirmation that the owner will empty tanks to the extent possible but the contractor is responsible for achieving the required dryness level; the owner requires 24 hours to remove sodium hypochlorite from one tank; all material cutting must occur in the contractor's shop rather than in the field; resin and catalyst may be packaged in 55-gallon drums with OSHA-approved containment systems; and the contractor is responsible for all confined space entry safety programs, sanitary facilities, power supply, and waste disposal. The owner will provide access to three 55-gallon trash bags per week for disposal but contractors handling non-hazardous waste are otherwise responsible for removal and disposal costs.

The bid form includes three primary compensation items: Item 1 for lump sum administration and completion of work; Item 2 for unit price work to prepare and replace the corrosion barrier on a tiered pricing structure based on square footage (0-15.0 SF, 15.1-100.0 SF, 100.1-150.0 SF, and 150.1+ SF); and Item 3 for cash allowances including a $20,000 contingency allowance and $12,000 for third-party inspection services. The contractor must provide all labor, materials, equipment, and services necessary to complete the work in full accordance with contract documents, with unit prices covering all overhead and profit. Contractors must acknowledge receipt of all addenda, and failure to do so may result in bid rejection. The bid bond amount and total contract amount are to be filled in by the bidder. No separate payment is provided for miscellaneous temporary works, bonds, insurance, or other general condition requirements beyond the listed pay items.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 2

ISSUE DATE: July 07, 2025

For

J.G. Beacham WTP Sodium Hypo Tank Rehab

Athens-Clarke County Public Utilities Department

Proposals to be received until 3:00 p.m., local time, July 17, 2025

Receipt of this addendum, and all other addenda, should be acknowledged as part of your

Bid. Failure to acknowledge receipt of the addenda may result in rejection of the Bid. This addendum forms a part of the Contract Documents

Please note the following CHANGES/CLARIFICATIONS to the above referenced

Contract Documents as follows:

QUESTIONS AND CLARIFICATIONS

1. NOTE: Bids will be due Thursday July 17, 2025 by 3:00 p.m..

2. Will the Owner provide a completely dry tank for Contractor? Answer: Owner will empty tanks to the ability their drains and available sump pumps can. Contractor is responsible for providing level of dryness required to complete work. Owner shall wash down tank prior to Contractor-entry.

3. How long will it take Owner to remove sodium hypochlorite from one bulk tank? Answer: 24 hours.

4. How much time should be given for post-cure? Answer: The Contractor holds unit responsibility to provide all services to design, manufacture parts, prepare materials, perform field work, and manage quality assurance required to rehabilitate the two sodium hypochlorite FRP tanks. Means and methods to do so shall be included in schedule.

5. What are ACCPUD’s confined space entry requirements? Answer: Per Section 00700 Paragraph

6.13, Contractor shall be solely responsible for initiating, maintaining, and supervising all safety precautions and program in connection with the Work.

6. Can you give an example of what should be included in Item 3: Additional Services on Bid

Form? Answer: Item No. 3 on Bid Form removed from Contract.

7. How will Third-Party Inspections be conducted? Answer: See Section 46 50 00 for details regarding third party inspection. An allowance will be added to Section 00300 Bid Form to pay for

Third Party Inspections

8. The bid documents request a price per square foot for fifteen sq ft for tank 1 & five sq ft for tank 2. That will be a very expensive price per sq ft to cover all of the other requirements in the bid documents. Would it be acceptable to provide a tiered price per sq ft? Such as 0-15, 16-

100, 101- to full reline? That way the client will have a clear understanding of the cost and how it decreases with increased quantity of work. Answer: See updated Section 00300 Bid Form.

9. One of the stub flanges to be replaced on tank 1 reads "iii. One (1) 1-in to dilution panel with

2-in.". Is the stub flange to be replaced to a 1" or 2"? Answer: In reference to Section 46 50

Paragraph 1.01.E,1,a,iii, it shall be replaced with a 2” as stated.

10. The specification makes several references for the need to have P.E. stamped drawings. There are no modifications being done to the vessels, only repairs to put the vessels back in near original condition. Based on that, aren't the original engineering calculations on the fabrication drawings sufficient? If not, please explain exactly what an engineer will be stamping as there are no modifications being performed. Answer: Per Section 46 50 00

Paragraph 1.02.A, the most recently published standards in effect at the time of bid opening shall apply to this Specification. NBIC, ASME RTP-1, EPA, and OSHA for tanks recognize two types of repairs, temporary and engineered. Removing and replacing nozzles plus fixing shell cracks included in this Contract are engineered repairs which require a RFP subject matter expert

Professional Engineer’s approval. The Professional Engineer shall stamp their detailed shop drawings and design report as required in this Contract Document.

11. Per section 1.06, A., 2. states " 2. All kits shall be precut in Contractor’s shop and properly sequenced in each wrap." What is the reasoning behind this? Material sizes should be cut in the field to avoid material waste. At this point, we aren't even sure what all will be laminated.

It will be impossible to cut kits at the shop. We and most other shops do all of the material cutting in the field to ensure proper sizing. Is this permissible? Answer: This is not permissible.

12. Per section 1.06, A., 4. states "Resin and Catalyst (hardener) shall be packaged and properly labeled in Department of Transportation (DOT) approved five (5) gallon or smaller pails.

Separate pails must be provided for Inner Corrosion Barrier, Structural Layer and Outer

Surface resin, Finish Coat resin and Paste used to fill allowable gaps at fit up of joints." The standard packaging for the resin (Derakane 411 WSR) that we will be proposing to use is a 55-gallon drum. That resin will be used for all phases of the work. Is it the client's intent for the contractor to re-package all of the resin into 5-gallon pails? Answer: 55 gallon drums are permissible and shall include OSHA-approved containment systems provided by the Contractor.

Resin finish coat per Section 46 50 00 Paragraph 2.03.B.1,8 and any paste used shall be shop formulated and packaged as specified and shown on PE-stamped documents.

13. Per section 2.02, F., 1., C., states "Verify equipment structural thickness has not been compromised by surface preparation." This is referring to the re-application of gel coat to the dish top of both vessels. The specification states that 80 grit sandpaper is to be used. This will ensure that the structure to the dish top will almost certainly not be compromised due to the finer grit being used. If a thickness verification is still required, what will be the proposed method of determining that with non-destructive testing? Will the contractor be required to purchase and use a UT machine? Answer: Verification may be provided by visual inspection as the surface preparation is being performed. For example, if a woven roving or other deeper top head plies are exposed through laminate excavation, then they shall be accounted for. In the event of the top head being compromised, this accounting shall be reported per Section 46 50 00 Paragraph 1.03

C.1 and 4.b, discussed with the Contractor’s Professional Engineer who signed and sealed submittals, and result in a final top head repair design. This final design shall be submitted for

Owner/Engineer review prior to affecting such repair.

14. Due to U.V. degradation of the original gel coat finish, it will be impossible to achieve an exact color match. Will a standard white gel coat be acceptable? Answer: Contractor shall select a color that matches Brine Tank No. 2.

15. Section 46 50 00 Paragraph 2.03, A. states that CoNap/MEKP shall be used for the inner structural laminates. We prefer to use DMA/BPO cure for all internal laminates regardless of if they are structural or corrosion barrier. Will this be acceptable? Answer: This is not acceptable. Section 46 50 00 does not discuss inner structural laminates. Section discussed

Structural Layer and Outer Surface.

16. A climate-controlled environment will be required for the vessel (in order to maintain the environmental requirements) and for the materials storage per the specification. Will power be supplied by the client for these items or will it be the responsibility of the contractor? Answer: Per Section 00700 Paragraph 6.03.A, Contractor shall provide and assume full responsibility for all power necessary for the performance, testing, startup, and completion of the

Work. The Contractor shall coordinate with Owner if exterior 120V receptacles are to be utilized.

17. Dumpster access. I may have missed it, but who is responsible for the non-hazardous waste disposal? Will a dumpster rental be necessary or will we have access to the site's dumpsters?

Answer: Contractor is limited to three (3) 55-gallon trach bags per week if they choose to use

Owner’s facilities. Per Section 00700 Paragraph 6.11.B, during the progress of Work, Contractor shall keep the Site and other areas free from accumulation of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations.

18. Sanitary facilities. Will we have access to the site's restrooms or will we be required to rent sanitary facilities. Answer: Per Section 00700 Paragraph 6.03.A, Contractor shall be responsible for all sanitary facilities.

SPECIFICATIONS

1. Section 00001 CHANGE seal bids will be accepted FROM 3:00 p.m. Thursday July 10, 2025 TO

3:00 p.m. Thursday July 17, 2025.

2. Section 00100 Paragraph 3.03, Milestone Date CHANGE Bid Due Date and Opening FROM July

10, 2025 TO July 17, 2025.

3. REPLACE Section 00300 Bid Form

4. REPLACE Section 01 20 00 Measurement and Payment

5. Section 46 50 00 Paragraph 1.06.A.4. REPLACE “Resin and Catalyst (hardener) shall be packaged and properly labeled in Department of Transportation (DOT) approved five (5) gallon or smaller pails” WITH “Resin and Catalyst (hardener) shall be packaged and properly labeled in Department of Transportation (DOT) approved containment not to exceed 55-gallons in volume.”

ATTACHMENTS

1. Section 00300 Bid Form [Add. 2]

2. Section 01 20 00 Measurement and Payment [Add. 2]

End Addendum No. 2

ACCGOV BID # 25044

J.G. BEACHAM WTP SODIUM HYPO TANK REHAB

32580-013 BID FORM

07/07/2025 00300-1

SECTION 00300 [ADD. NO. 2]

BID FORM

TO: UNIFIED GOVERNMENT OF ATHENS-CLARKE COUNTY, GEORGIA

FROM:

(Bidder's Company Name)

FOR: Bid #25044, J.G. Beacham WTP Sodium Hypo Tank Rehab

Submitted: , 20____

The undersigned Bidder, in compliance with your Invitation to Bid for the construction of this Project, having examined the Contract Documents, the site of the proposed work and being familiar with all of the conditions surrounding the construction of the proposed Project, including the availability of materials and labor, hereby proposes to construct the Project in accordance with the Contract Documents.

The Bidder proposes and agrees, if this Bid is accepted, to contract with the Unified

Government of Athens-Clarke County, Georgia, in the form of Contract Agreement specified, to furnish all necessary products, machinery, tools, apparatus, means of transportation, and labor necessary to complete the construction of the Work in full and complete accordance with the reasonably intended requirements of the Contract Documents to the full and entire satisfaction of the Unified Government of Athens-Clarke County, Georgia, with a definite understanding that no money will be allowed for extra work except as set forth in the Contract Documents, for the following prices:

BID FORM

QTY UNIT DESCRIPTION

SPECIFICATION

/ DETAIL

UNIT PRICE TOTAL PRICE

ITEM 1 – Lump Sum Amount 1 LS Administration and completion of

Work, as specified in the Contract Documents, except where quantified in Item 2 or 3.

N/A N/A

ITEM 2 – UNIT PRICE ITEMS

a 15 SF Prepare and Replace Corrosion Barrier (0-15.0 SF)

Spec 46 50 00

$_________ /SF $

b 0 SF Prepare and Replace Corrosion Barrier (15.1-100.0 SF)

Spec 46 50 00

$_________ /SF $

c 0 SF Prepare and Replace Corrosion Barrier (100.1-150.0 SF)

Spec 46 50 00

$_________ /SF $

d 0 SF Prepare and Replace Corrosion Barrier (150.1+ SF)

Spec 46 50 00

$_________ /SF $

MANDATORY SUBMITTAL

A C

C G o v

P U

D M a st e r

S p e c a p p ro ve d

/1 /2

07/07/2025 00300-2

BID FORM

QTY UNIT DESCRIPTION

SPECIFICATION

/ DETAIL

UNIT PRICE TOTAL PRICE

ITEM 3 – CASH ALLOWANCE

a 1 LS Contingency Allowance Spec 00700 $ 20,000.00/LS $ 20,000.00/LS b 1 LS Inspection Services Sec 46 50 00 Paragraph 2.04.B

$ 12,000.00/LS $ 12,000.00/LS

BID TOTAL, ITEMS 1, 2, 3, INCLUSIVE, THE AMOUNT OF

DOLLARS ($ ).

The Bidder agrees hereby to commence Work under this Contract, with adequate personnel and equipment, on a date to be specified in the written Notice to Proceed from the Engineer, and to fully complete all Work under this Contract within the time limits stated in the

Agreement. The Bidder further agrees to pay as liquidated damages for each consecutive calendar day thereafter required to complete all work as provided in the Agreement.

The Bidder declares an understanding that the quantities shown for unit price items are subject to either increase or decrease, and that should the quantities of any of the items of Work be increased, the Bidder proposes to do the additional Work at the unit prices stated herein;

should the quantities be decreased, the Bidder also understands that payment will be made on the basis of actual quantities at the unit price bid and will make no claim for additional costs or anticipated profits for any decrease in quantities. The Bidder also understands that actual quantities will be determined upon completion of Work, at which time adjustment will be made to the Contract amount by direct increase or decrease.

In case of discrepancies between the figures shown in the unit prices and the totals, the unit prices shall apply and the totals shall be corrected to agree with the unit prices. In case of discrepancies between written amounts and figures, written amounts shall take precedence over figures and the sum of all Bid extensions (of unit prices) plus lump sum items shall take precedence over the Bid Total.

The Bidder furthermore agrees that, in the case of a failure to execute the Contract Agreement and Bonds within 10 days after receipt of conformed Contract Documents for execution, the attached Bid Bond accompanying this Bid and the monies payable thereon shall be paid into the funds of the Owner as liquidated damages for such failure, and not as a penalty.

Attached hereto is a Bid Bond for the sum of

Dollars ($ ) according to the conditions of "Instructions to Bidders" and provisions thereof.

07/07/2025 00300-3

Bidder acknowledges receipt of the Following Addendums:

Addendum No. , dated: Addendum No. , dated:

Addendum No. , dated: Addendum No. , dated:

Addendum No. , dated: Addendum No. , dated:

07/07/2025 00300-4

Bidder:

By:

(name signed)

Title:

(name printed or typed)

Address:

Phone:

Attest:

(name signed)

Title:

(name printed or typed)

(SEAL)

Note: Attest for a corporation must be by the corporate secretary. For a partnership, the Attest must be by another partner. For an individual, the Attest must be by a notary.

Note: If the Bidder is a corporation, the Bid shall be signed by an officer of the corporation. If the bid is by a partnership, it shall be signed by a partner. If signed by others, authority for signature shall be attached.

07/07/2025 00300-5

The full names and addresses of persons or parties interested in the foregoing Bid, as principals, are as follows:

Name

Address

END OF SECTION

07/07/2025 00300-6

THIS PAGE INTENTIONALLY LEFT BLANK

32580-002 / 00300 / 08-18-2023 00300 - 7 J.G. BEACHAM WTP

BID SET SODIUM HYPOCHLORITE IMPROVEMENTS

32580-013 / 01 20 00 / 07-07-2025 01 20 00 - 1 J.G. BEACHAM WTP

ADDENDUM No. 2 SODIUM HYPO TANK REHAB

SECTION 01 20 00 [ADD NO. 2]

MEASUREMENT AND PAYMENT

PART 1 – GENERAL

1.01 SUMMARY

A. Section lncludes:

1. Items listed in this Section refer to and are the same pay items listed in the Bid

Form and constitute all pay items for completing the Work.

2. Compensation for all services, items, materials, and equipment shall be include in prices stipulated for lump sum and unit price pay items listed in this Section and included in the Contract.

3. No direct or separate payment will be made for providing miscellaneous temporary or accessory works, bonds, insurance, or other requirements of the General

Conditions, Supplementary Conditions, General Requirements, and other requirements of the Contract Documents.

4. Each lump sum and unit bid price shall include an amount considered by

Contractor to be adequate to cover Contractor’s overhead and profit for each separately identified item.

B. Related Sections:

1. Payments to Contractor: Refer to General Conditions, Supplementary Conditions, and Agreement.

2. Changes to Contract Price: Refer to General Conditions and Supplementary

Conditions.

3. Schedule of Values: Refer to General Conditions and Supplementary Conditions

1.02 ENGINEER’S ESTIMATE OF QUANTITIES

A. ENGINEER’S and OWNER’s estimated quantities for unit price pay items, as listed in the Bid Form, are approximate only and are included solely for the purpose of comparison of Bids. Owner does not expressly or by implication agree that the nature of the materials encountered below the surface of the ground or the actual quantities of material encountered or required will correspond therewith and reserves the right to increase or decrease any quantity or to eliminate any quantity as Owner may deem necessary. Contractor will not be entitled to any adjustment in a unit bid price as a result of any change in an estimated quantity and agrees to accept the aforesaid unit bid prices

32580-013 / 01 20 00 / 07-07-2025 01 20 00 - 2 J.G. BEACHAM WTP

as complete and total compensation for any additions caused by changes or alterations in the Work ordered by Owner.

1.03 ADMINISTRATIVE REQUIREMENTS

A. Contractor shall include all additional Work items, services, goods, resources, and manpower necessary for installation of the Work to provide a completely functional system in accordance with the Contract Documents. Contractor shall include these costs associated with providing a completely functional system within the listed items on the

Bid Form and as specified herein.

B. Proposal Items:

1. Item 1a: Lump Sum Cost:

a. Measurement and Payment: Lump sum for Item 1a will be full compensation for administration and completion of the Work, as specified in the Contract

Documents, not detailed in Item 2 nor 3.

2. Item 2: Unit Price Items

a. 2a. Prepare and Replace Corrosion Barrier.

1) Measurement and Payment: Contractor to provide a unit price cost, as specified in Section 00300, to perform the work specified in Section 46

50 00, Fiberglass Reinforced Plastic (FRP) Sodium Hypochlorite Tank

Rehabilitation Paragraph 1.01.E.1.c and throughout the specification.

2) Unit cost shall be used as the basis of modification of Work performed to prepare and replace up to 15.0 square feet (SF) of corrosion barrier.

Cost shall include all time, material, overhead, and all other costs to evaluate area, prepare surface, and replace corrosion barrier per

Section 46 50 00, Fiberglass Reinforced Plastic (FRP) Sodium

Hypochlorite Tank Rehabilitation.

3) Cost does not include structural barrier improvements.

b. 2b. Prepare and Replace Corrosion Barrier.

1) Measurement and Payment: Contractor to provide a unit price cost, as specified in Section 00300, to perform the work specified in Section 46

50 00, Fiberglass Reinforced Plastic (FRP) Sodium Hypochlorite Tank

Rehabilitation Paragraph 1.01.E.1.c and throughout the specification.

2) Unit cost shall be used as the basis of modification of Work performed to prepare and replace 15.1 SF to 100.0 SF of corrosion barrier. Cost shall include all time, material, overhead, and all other costs to evaluate area, prepare surface, and replace corrosion barrier per

32580-013 / 01 20 00 / 07-07-2025 01 20 00 - 3 J.G. BEACHAM WTP

Section 46 50 00, Fiberglass Reinforced Plastic (FRP) Sodium

Hypochlorite Tank Rehabilitation.

3) Cost does not include structural barrier improvements.

4) This cost shall include all Work associated with preparing and replacing corrosion barrier starting at the first SF.

c. 2c. Prepare and Replace Corrosion Barrier.

1) Measurement and Payment: Contractor to provide a unit price cost, as specified in Section 00300, to perform the work specified in Section 46

50 00, Fiberglass Reinforced Plastic (FRP) Sodium Hypochlorite Tank

Rehabilitation Paragraph 1.01.E.1.c and throughout the specification.

2) Unit cost shall be used as the basis of modification of Work performed to prepare and replace 100.1 SF to 150.0 SF of corrosion barrier. Cost shall include all time, material, overhead, and all other costs to evaluate area, prepare surface, and replace corrosion barrier per

Section 46 50 00, Fiberglass Reinforced Plastic (FRP) Sodium

Hypochlorite Tank Rehabilitation.

3) Cost does not include structural barrier improvements.

4) This cost shall include all Work associated with preparing and replacing corrosion barrier starting at the first SF.

d. 2d. Prepare and Replace Corrosion Barrier.

1) Measurement and Payment: Contractor to provide a unit price cost, as specified in Section 00300, to perform the work specified in Section 46

50 00, Fiberglass Reinforced Plastic (FRP) Sodium Hypochlorite Tank

Rehabilitation Paragraph 1.01.E.1.c and throughout the specification.

2) Unit cost shall be used as the basis of modification of Work performed to prepare and replace more than150.0 SF of corrosion barrier. Cost shall include all time, material, overhead, and all other costs to evaluate area, prepare surface, and replace corrosion barrier per

Section 46 50 00, Fiberglass Reinforced Plastic (FRP) Sodium

Hypochlorite Tank Rehabilitation.

3) Cost does not include structural barrier improvements.

4) This cost shall include all Work associated with preparing and replacing corrosion barrier starting at the first SF.

3. Item #3: Cash Allowances

32580-013 / 01 20 00 / 07-07-2025 01 20 00 - 4 J.G. BEACHAM WTP

a. 3a. Contingency Allowances

1) Schedule of Cash Allowances

a) Additional services not included in the Contract Documents nor rendered clear to be needed by information made available by

Owner and Engineer but discovered during construction by

Contractor shall be reimbursed as approved by Owner and

Engineer.

2) See Section 00700 Paragraph 11.02.C: Contingency Allowances

3) No payment will be made for nonproductive time on the part of testing personnel due to the Contractor’s failure to properly coordinate testing activities or the Contractor’s problems with maintaining equipment in good working condition.

4) No payment shall be provided for services that fail to verify the required results.

5) Should the net cost be more or less than the specified amount of the allowance, the Contract shall be adjusted accordingly by Change

Order.

b. 3b. Inspection Services

1) Scope for this item consists of services of a third-party Inspection Firm as defined in Section 46 50 00 Paragraph 2.04.B.Inspector shall be acquired be selected by Owner.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

END OF SECTION

32580-002 / 01 20 00 / 08-18-2023 01 20 00 - 1 J.G. BEACHAM WTP

BID SET SODIUM HYPOCHLORITE IMPROVEMENTS

Addendum No. 2
Section 00300 Bid Form [ADD No. 2]
Section 01 20 00 - Measurement and Payment [ADD. No. 2]