J.8 Office Test (4 Pages).pdf

PDF 692 KB Posted

Attached to
CCRD RADON MITIGATION Federal contract opportunity
Solicitation number
1240LT24Q0094
Issued by
Department of Agriculture Forest Service

About this file

This document is a radon test report for a federal contract opportunity. The report summarizes the results of short-term radon testing performed at 9 locations within a facility in Idaho Springs, Colorado. The test results ranged from 1.4 to 12.4 pCi/L, with an average of 8.3 pCi/L. One duplicate test was performed for quality assurance. The testing was conducted in accordance with industry standards.

The related federal contract opportunity is for a radon mitigation project on the Clear Creek Ranger District in Idaho Springs, Colorado. The project involves installing radon mitigation systems in two buildings. The opportunity has a solicitation number of 1240LT24Q0094, with a magnitude of construction under $25,000. Proposals are to be submitted to the Forest Service, which is the federal agency for this contract.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

101132 AL

N/ASTATE:

NRPP:

Laboratory Certification Info

RADON RESULTSOffice TestProject:

Field Testing Protocol: ANSI-AARST MAMF 2017 Rev 1/21 Individual reports available online at results.aelabs.com

Serial # Radon Level Error TypeProperty Tested StructureTest Duration

101 Co-103 Idaho Springs, CO 80452

USA

Tester:

Nicoe Malandri Nicoe Malandri

1) AA433307 101 Co-103 Idaho Springs, CO 80452

Deployment: Retrieval:

n/a10.1 +/- 0.5 pCi/L

Closed: Yes

Type: Slab Floor: 1st Floor

01/12/202408:52 AMStart:

End:

Duration: 122.94 Hours

01/17/202411:48 AM

Bathroom

Received 1/22/2024

Nicoe Malandri Nicoe Malandri

2) AA433306 101 Co-103 Idaho Springs, CO 80452

Deployment: Retrieval:

n/a11.6 +/- 0.6 pCi/L

Closed: Yes

Type: Slab Floor: 1st Floor

01/12/202408:53 AMStart:

End:

Duration: 122.93 Hours

01/17/202411:49 AM

Mailroom

Received 1/22/2024

Nicoe Malandri Nicoe Malandri

3) AA433304 101 Co-103 Idaho Springs, CO 80452

Deployment: Retrieval:

n/a6.3 +/- 0.3 pCi/L

Closed: Yes

Type: Slab Floor: 1st Floor

01/12/202408:54 AMStart:

End:

Duration: 122.92 Hours

01/17/202411:49 AM

Large Conference Room Received 1/22/2024

Nicoe Malandri Nicoe Malandri

4) AA433303 101 Co-103 Idaho Springs, CO 80452

Deployment: Retrieval:

n/a11.1 +/- 0.6 pCi/L

Closed: Yes

Type: Slab Floor: 2nd Floor

01/12/202408:55 AMStart:

End:

Duration: 122.95 Hours

01/17/202411:52 AM

Plotter

Received 1/22/2024

Nicoe Malandri Nicoe Malandri

5) AA433305 101 Co-103 Idaho Springs, CO 80452

Deployment: Retrieval:

Duplicate n/a10.7 +/- 0.5 pCi/L

Closed: Yes

Type: Slab Floor: 2nd Floor

01/12/202408:57 AMStart:

End:

Duration: 122.92 Hours

01/17/202411:52 AM

Plotter 2

Received 1/22/2024

Nicoe Malandri Nicoe Malandri

6) AA433310 101 Co-103 Idaho Springs, CO 80452

Deployment: Retrieval:

n/a12.4 +/- 0.6 pCi/L

Closed: Yes

Type: Slab Floor: 2nd Floor

01/12/202408:59 AMStart:

End:

Duration: 122.88 Hours

01/17/202411:52 AM

Brant’s Office

Received 1/22/2024

Nicoe Malandri Nicoe Malandri

7) AA433308 101 Co-103 Idaho Springs, CO 80452

Deployment: Retrieval:

n/a1.9 +/- 0.1 pCi/L

Closed: Yes

Type: Slab Floor: 1st Floor

01/12/202409:10 AMStart:

End:

Duration: 122.88 Hours

01/17/202412:03 PM

Mt Blue Sky Office

Received 1/22/2024

Page 1 of 4See Page 1 for project, device, and laboratory details. See page 2 for disclaimers and accuracy information.

Serial # Radon Level Error TypeProperty Tested StructureTest Duration

Nicoe Malandri Nicoe Malandri

8) AA433309 101 Co-103 Idaho Springs, CO 80452

Deployment: Retrieval:

n/a1.4 +/- 0.1 pCi/L

Closed: Yes

Type: Slab Floor: 1st Floor

01/12/202409:12 AMStart:

End:

Duration: 122.92 Hours

01/17/202412:07 PM

Large Bunkhouse

Received 1/22/2024

Nicoe Malandri Nicoe Malandri

9) AA433311 101 Co-103 Idaho Springs, CO 80452

Deployment: Retrieval:

n/a9.2 +/- 0.5 pCi/L

Closed: Yes

Type: Slab Floor: 1st Floor

01/12/202409:13 AMStart:

End:

Duration: 122.94 Hours

01/17/202412:09 PM

Small Bunkhouse

Received 1/22/2024

QA/QC - Short Term Radon Tests have an estimated margin of error of ±5% when used according to directions.

Please see page 3 of the report for a list of personnel.

Measurement Specialist / Laboratory Director Date 1/25/2024

Quality Assurance (QA): Sample Type: Short Term. Technology: Activated Charcoal. Device Manufacturer: Alpha Energy Laboratories. Model: RD-1. NRPP Approved Device: AC-8202.

Device Performance Standard: ANSI-AARST MS-PC 2022. Quality Assurance Standard: ANSI-AARST MS-QA 2019. Lab Methodology: EPA-402-R-92-004. Test instructions designed in accordance with ANSI-AARST MAH-2019. Radon level uncertainty is calculated using a 95% confidence level. One sampler can test up to 2,000 ft2.

Disclaimer: Results are only indicative of the sample as received in the lab. Incorrect information or improper sampling procedures will affect results. Alpha Energy Laboratories (AEL) did not provide sampling services unless otherwise indicated. Device deployment/retrieval is assumed to be performed by the person submitting the sample, unless otherwise specified by the client. The person(s) performing sampling are responsible for sampling QA, which may include duplicate, blank, and/or spiked detectors. Analysis, laboratory QA, and production QA performed by AEL. Measurements are not necessarily predictive or supportive of measurements conducted at different times or locations. AEL is not responsible for the consequences of any action you do or do not take based on the results. This report may only be reproduced in full, unless authorized in writing by AEL.

Paul Fletcher NJ - MES11306 FL - R2470

Page 2 of 4See Page 1 for project, device, and laboratory details. See page 2 for disclaimers and accuracy information.

N/ASTATE ID#:

NRPP ID#:

Laboratory Certification Info

Personnel

Name Company Address Phone # Certification

Office TestProject: 101 Co-103 Idaho Springs, CO 80452

USA

Tester:

Nicoe Malandri 101 CO-103 Idaho Springs, CO 80452

720-667-9280

Measurement Specialist / Laboratory Director Date 1/25/2024

Quality Assurance (QA): Sample Type: Short Term. Technology: Activated Charcoal. Device Manufacturer: Alpha Energy Laboratories. Model: RD-1. NRPP Approved Device: AC-8202.

Device Performance Standard: ANSI-AARST MS-PC 2022. Quality Assurance Standard: ANSI-AARST MS-QA 2019. Lab Methodology: EPA-402-R-92-004. Test instructions designed in accordance with ANSI-AARST MAH-2019. Radon level uncertainty is calculated using a 95% confidence level. One sampler can test up to 2,000 ft2.

Disclaimer: Results are only indicative of the sample as received in the lab. Incorrect information or improper sampling procedures will affect results. Alpha Energy Laboratories (AEL) did not provide sampling services unless otherwise indicated. Device deployment/retrieval is assumed to be performed by the person submitting the sample, unless otherwise specified by the client. The person(s) performing sampling are responsible for sampling QA, which may include duplicate, blank, and/or spiked detectors. Analysis, laboratory QA, and production QA performed by AEL. Measurements are not necessarily predictive or supportive of measurements conducted at different times or locations. AEL is not responsible for the consequences of any action you do or do not take based on the results. This report may only be reproduced in full, unless authorized in writing by AEL.

N/ASTATE ID#:

NRPP ID#:

Laboratory Certification Info

RADON RESULTS SUMMARY

This page includes a summary and basic statistics. Quality Assurance (QA) tests are generally recommended but not always required. When required, Blanks should be placed at a rate of 5% of all testing locations and Duplicates should be placed at a rate of 10% of all testing locations. Spikes may be required for some projects.

Office TestProject: 101 Co-103 Idaho Springs, CO 80452

USA

Tester:

Result # of Tests % of Tests

< 2 pCi/L

2-4 pCi/L

≥ 4 pCi/L

22.2%

0.0%

77.8%

Error 0 0.0%

Average Result: 8.3 pCi/L

Lowest Result: 1.4 pCi/L

Highest Result: 12.4 pCi/L

Median Result: 10.1 pCi/L

Standard Deviation: 3.9 pCi/L

Breakdown by Radon Concentration Statistics

# Blanks: 0 (0.0%)

# Standard: 8

# Duplicates: 1 (12.5%)

Quality Assurance

Note: Additional QA tests may have been performed on a blind basis (not reported to the laboratory as QA tests). This report only considers tests reported to the lab as QA tests.

Summary of Measurement Results A total of 9 radon detectors were deployed during the testing period. To ensure accuracy, Quality Assurance tests were performed, including 1 duplicate detector(s) (placed side-by-side for intercomparison). Results ranged from the lowest reading of 1.4 pCi/L to the highest reading of

12.4 pCi/L.

Note: Blank tests are excluded from statistics above.Note: Blank tests are excluded from statistics above.

Measurement Specialist / Laboratory Director Date 1/25/2024

Quality Assurance (QA): Sample Type: Short Term. Technology: Activated Charcoal. Device Manufacturer: Alpha Energy Laboratories. Model: RD-1. NRPP Approved Device: AC-8202.

Device Performance Standard: ANSI-AARST MS-PC 2022. Quality Assurance Standard: ANSI-AARST MS-QA 2019. Lab Methodology: EPA-402-R-92-004. Test instructions designed in accordance with ANSI-AARST MAH-2019. Radon level uncertainty is calculated using a 95% confidence level. One sampler can test up to 2,000 ft2.

Disclaimer: Results are only indicative of the sample as received in the lab. Incorrect information or improper sampling procedures will affect results. Alpha Energy Laboratories (AEL) did not provide sampling services unless otherwise indicated. Device deployment/retrieval is assumed to be performed by the person submitting the sample, unless otherwise specified by the client. The person(s) performing sampling are responsible for sampling QA, which may include duplicate, blank, and/or spiked detectors. Analysis, laboratory QA, and production QA performed by AEL. Measurements are not necessarily predictive or supportive of measurements conducted at different times or locations. AEL is not responsible for the consequences of any action you do or do not take based on the results. This report may only be reproduced in full, unless authorized in writing by AEL.

File details come from the government source that posted it. Updated .