J.3 Schedule of Items - Hiawatha NF West Zone.pdf

PDF 158 KB Posted

Attached to
Cadastral Survey Services IDIQ on Various Region 9 National Forests
Solicitation number
12445523R0007
Issued by

View the file

Other files

File Type Posted
AMENDMENT 0001_J.2 CORRECTED Schedule of Items - Chippewa NF.pdf PDF
Amendment 0001 - SF30.pdf PDF
J.1 SCA WD 2015-4247 Forest and Warren Counties.pdf PDF
J6 SF330.pdf PDF
J.4 Schedule of Items - Ottawa NF.pdf PDF
J.2 Schedule of Items - Chippewa NF.pdf PDF
RFP 12445523R0007.pdf PDF
J.5 SCA WD 2015-4181 Seneca and Schuyler Counties.pdf PDF
J.3 Schedule of Items - Hiawatha NF East Zone.pdf PDF
J.4 Ottawa NF - Exhibits 1-11.pdf PDF
J.4 Ottawa NF - Cadastral Survey Specifications.pdf PDF
J.1 Schedule of Items - Allegheny NF South Zone.pdf PDF
J.4 SCA WD 2015-4871 Baraga, Gogebic, Houghton, Iron, Marquette, Ontonagon Counties.pdf PDF
J.3 Hiawatha NF - Cadastral Survey Specifications.pdf PDF
J.1 Allegheny NF - Cadastral Survey Specifications.pdf PDF
J.5 Schedule of Items - Finger Lakes NF.pdf PDF
J.2 Chippewa NF Exhibits 1-10.pdf PDF
J.1 Schedule of Items - Allegheny NF North Zone.pdf PDF
J.2 SCA WD 2015-4959 Itasca County.pdf PDF
J.1 SCA WD 2015-4249 Elk and McKean Counties.pdf PDF
J.2 Chippewa NF Vicinity Map.pdf PDF
J.3 Hiawatha NF - Exhibits 1-11.pdf PDF
J.5 Finger Lakes NF - Cadastral Survey Specifications.pdf PDF
J.2 Chippewa NF - Cadastral Survey Specifications.pdf PDF
J.3 SCA WD 2015-4871 Alger, Chippewa, Delta, Mackinac, Marquette, Schoolcraft Counties.pdf PDF
J.2 SCA WD 2015-4955 Beltrami and Cass Counties.pdf PDF
J.5 Finger Lakes NF - Vicinity Map.pdf PDF
J.1 Allegheny NF - Zone Map.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I – THE SCHEDULE

SECTION B- SUPPLIES OR SERVICES AND PRICE/COSTS

SCHEDULE OF ITEMS

Hiawatha National Forest - West Zone - 2 (See Exhibit 1)

Cadastral Survey Services IDIQ Alger, Delta, Marquette & Schoolcraft Counties

B.1 SCHEDULE OF ITEMS – BASE YEAR (05/15/23 to 05/14/24):

ITEM NO. 0001 Cadastral Survey Services

DESCRIPTION QTY UNIT UNIT PRICE

0001AA *Corner Search - Low 1 Each

0001AB

*Corner Search – Medium 1 Each

0001AC *Corner Search - High 1 Each

0001AD *Control Corner Measurement - Low 1 Each

0001AE

*Control Corner Measurement – Medium

Each

0001AF *Control Corner Measurement – High 1 Each

0001AG

Road Centerline Measurement

0001AH Monumentation of GLO Corner 1 Each

0001AJ Monumentation of Section Sub Corners 1 Each

0001AK Monumentation of Minor Sub Corners 1 Each

0001AL Monumentation of Point on Line 1 Each

0001AM Corner Maintenance 1 Each

0001AN *Property Line Clearing & Posting - Low 1 Mile

0001AP

*Property Line Clearing & Posting - Medium

Mile

0001AQ *Property Line Clearing & Posting – High 1 Mile

0001AR Property Line Maintenance 1 Mile

0001AS Property Line Reposted 1 Mile

0001AT Certificate of Survey 1 Each

0001AU Certificate of Survey – Additional Section 1 Each

0001AV Mobilization - To be determined at time of task order issuance – see 14. Mobilization Costs in project specifications.

1 LS TBD

Alger, Delta, Marquette & Schoolcraft Counties

B.1 SCHEDULE OF ITEMS – PRICING PERIOD 1 (05/15/24 to 05/14/25):

ITEM NO. 1001 Cadastral Survey Services

DESCRIPTION QTY UNIT UNIT PRICE

1001AA *Corner Search - Low 1 Each

1001AB

1001AC *Corner Search - High 1 Each

1001AD *Control Corner Measurement - Low 1 Each

1001AE

1001AF *Control Corner Measurement – High 1 Each

1001AG

1001AH Monumentation of GLO Corner 1 Each

1001AJ Monumentation of Section Sub Corners 1 Each

1001AK Monumentation of Minor Sub Corners 1 Each

1001AL Monumentation of Point on Line 1 Each

1001AM Corner Maintenance 1 Each

1001AN *Property Line Clearing & Posting - Low 1 Mile

1001AP

1001AQ *Property Line Clearing & Posting – High 1 Mile

1001AR Property Line Maintenance 1 Mile

1001AS Property Line Reposted 1 Mile

1001AT Certificate of Survey 1 Each

1001AU Certificate of Survey – Additional Section 1 Each

1001AV Mobilization - To be determined at time of task order issuance – see 14. Mobilization

B.1 SCHEDULE OF ITEMS – PRICING PERIOD 2 (05/15/25 to 05/14/26):

ITEM NO. 2001 Cadastral Survey Services

DESCRIPTION QTY UNIT UNIT PRICE

2001AA *Corner Search - Low 1 Each

2001AB

2001AC *Corner Search - High 1 Each

2001AD *Control Corner Measurement - Low 1 Each

2001AE

2001AF *Control Corner Measurement – High 1 Each

2001AG

2001AH Monumentation of GLO Corner 1 Each

2001AJ Monumentation of Section Sub Corners 1 Each

2001AK Monumentation of Minor Sub Corners 1 Each

2001AL Monumentation of Point on Line 1 Each

2001AM Corner Maintenance 1 Each

2001AN *Property Line Clearing & Posting - Low 1 Mile

2001AP

2001AQ *Property Line Clearing & Posting – High 1 Mile

2001AR Property Line Maintenance 1 Mile

2001AS Property Line Reposted 1 Mile

2001AT Certificate of Survey 1 Each

2001AU Certificate of Survey – Additional Section 1 Each

2001AV Mobilization - To be determined at time of task order issuance – see 14. Mobilization

B.1 SCHEDULE OF ITEMS – PRICING PERIOD 3 (05/15/26 to 05/14/27):

ITEM NO. 3001 Cadastral Survey Services

DESCRIPTION QTY UNIT UNIT PRICE

3001AA *Corner Search - Low 1 Each

3001AB

3001AC

*Corner Search - High 1 Each

3001AD *Control Corner Measurement - Low 1 Each

3001AE

3001AF *Control Corner Measurement – High 1 Each

3001AG

3001AH Monumentation of GLO Corner 1 Each

3001AJ Monumentation of Section Sub Corners 1 Each

3001AK Monumentation of Minor Sub Corners 1 Each

3001AL Monumentation of Point on Line 1 Each

3001AM Corner Maintenance 1 Each

3001AN *Property Line Clearing & Posting - Low 1 Mile

3001AP

3001AQ *Property Line Clearing & Posting – High 1 Mile

3001AR Property Line Maintenance 1 Mile

3001AS Property Line Reposted 1 Mile

3001AT Certificate of Survey 1 Each

3001AU Certificate of Survey – Additional Section 1 Each

3001AV Mobilization - To be determined at time of task order issuance – see 14. Mobilization

B.1 SCHEDULE OF ITEMS – PRICING PERIOD 4 (05/15/27 to 05/14/28):

ITEM NO. 4001 Cadastral Survey Services

DESCRIPTION QTY UNIT UNIT PRICE

4001AA *Corner Search - Low 1 Each

4001AB

4001AC *Corner Search - High 1 Each

4001AD *Control Corner Measurement - Low 1 Each

4001AE

4001AF *Control Corner Measurement – High 1 Each

4001AG

4001AH Monumentation of GLO Corner 1 Each

4001AJ Monumentation of Section Sub Corners 1 Each

4001AK Monumentation of Minor Sub Corners 1 Each

4001AL Monumentation of Point on Line 1 Each

4001AM Corner Maintenance 1 Each

4001AN *Property Line Clearing & Posting - Low 1 Mile

4001AP

4001AQ *Property Line Clearing & Posting – High 1 Mile

4001AR Property Line Maintenance 1 Mile

4001AS Property Line Reposted 1 Mile

4001AT Certificate of Survey 1 Each

4001AU Certificate of Survey – Additional Section 1 Each

4001AV Mobilization - To be determined at time of task order issuance – see 14. Mobilization

ITEM DEFINITIONS

For definitions of each Item listed above, see the “Definitions” portion (last pages) in the Statement of Work.

INFORMATION FOR ITEMS MARKED *

*Unit prices for Corner Search, Control Corner Measurement and Property Line Clearing & Posting for both the Hiawatha and Ottawa National Forest work zones will be determined within a range of low, medium, and high. To define the range, Item 1A is typically (but not limited to) defined as a low complexity search for an original GLO corner position when little original or subsequent evidence appears to be recoverable, based on original bearing tree species and/or lack of records, and/or access to the area is relatively easy. Item 1C is defined as a higher complexity search for an original GLO corner position when a decent chance of original or subsequent evidence appears to be recoverable, based on original bearing tree species and/or subsequent records, and/or access to the area is relatively difficult.

Item 2A and 9A are typically defined (but not limited to) as field conditions where measurement takes place on or near a road or other open area with excellent visibility, and/or access to the area is easy. Item 2C and 9C are defined as field conditions where measurement takes place in an area of dense vegetation, hilly terrain, and/or access to the area is difficult. Items 1B, 2B and 9B are an average of their respective A and C. Each project’s field conditions with those three items will be determined by the Contracting Officer’s Representative (COR) to establish what items fall at low, medium or high with potential input and discussion from the Contractor.

PART I – THE SCHEDULE
SECTION B- SUPPLIES OR SERVICES AND PRICE/COSTS

File details come from the government source that posted it. Updated .