J.3_ Performance Requirements Summary.pdf

PDF 165 KB Posted

Attached to
Infrastructure Materials Laboratories (IML) Support Services Federal contract opportunity
Solicitation number
693JJ322R000003
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains a performance requirements summary and details of a federal contract opportunity for Infrastructure Materials Laboratories Support Services. The performance requirements summary outlines three key performance objectives for deliverables, reporting, and planning with associated performance standards and thresholds. The federal contract opportunity is a solicitation set aside for small businesses to conduct advanced research and development projects and tasks in support of the Federal Highway Administration's Infrastructure Materials Laboratories. The anticipated multiple IDIQ contracts would have a 60-month ordering period for cost-plus-fixed-fee, firm-fixed-price, or hybrid task orders in support of laboratories located at the Turner-Fairbank Highway Research Center.

View the file

Other files for this federal contract opportunity

Other files attached to Infrastructure Materials Laboratories (IML) Support Services, newest first.
File Type Posted
QA_693JJ322R000003_08.18.2022.pdf PDF
693JJ322R000003_0004.pdf PDF
J.1_Labor Rate Schedule_0003.xlsx XLSX spreadsheet
693JJ322R000003_0003.pdf PDF
QA_693JJ322R000003_08.10.2022.pdf PDF
693JJ322R000003_0002.pdf PDF
693JJ322R000003_0001.pdf PDF
Site Visit Instruction_Update 1.pdf PDF
Site Visit Instruction.pdf PDF
693JJ322R000003.pdf PDF
J.1_Labor Rate Schedule.xlsx XLSX spreadsheet
J.2 Labor Category Descriptions.pdf PDF
J.4 Pre-Award Accounting System Checklist.pdf PDF
J.6 Task Order 0001.pdf PDF
0001 Level of Effort Estimate.xlsx XLSX spreadsheet
J.5 Standard Form LLL.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT J.3

PERFORMANCE REQUIREMENTS SUMMARY

The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective Performance Standard Performance Threshold

Method of Surveillance

PRS # 1

The Contractor shall provide all deliverables

1. Deliverables are comprehensive, complete, and accurate

2. Deliverables completed in accordance with schedule

1. 90% of submittals require no change comments

2. >95% of the time

COR Review

PRS #2

The Contractor shall meet all reporting requirements

1. Reports shall be timely, accurate, and inclusive of all required information

2. No substantive or repeated flaws

1. 95% of submittals require no change comments

2. >95% of the time

COR Review

PRS #3

The Contractor shall provide all planning (e.g. annual laboratory safety plan, improvement plan, work plan, staff utilization plan, instrumentation plan, etc.)

stated herein

1. Plans address all required information

2. Plans shall be timely and accurate

1. 90% of submittals require no change comments

2. >95% of the time

COR Review

File details come from the government source that posted it. Updated .