J.3_FP14SupplementalSpecs_AlturasWater_Restoration.pdf
PDF 822 KB Posted
- Attached to
- Alturas Water System Improvement & Cabin Creek Drainage Restoration project on the Sawtooth National Forest
- Solicitation number
- 1240LT22R0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This document package includes specifications for the Alturas Water System Improvement & Cabin Creek Drainage Restoration project on the Sawtooth National Forest. The project involves improvements to the existing water distribution system at the Alturas Lake Outlet Picnic Area, modifications to existing wells, installation of a new pump house utility building, and drainage restoration work along Cabin Creek. Key requirements include installing new water pipelines, valves, hydrants, a pressure reducing valve assembly, modifying existing wells and installing submersible pumps, constructing precast concrete vault restrooms and a utility building, removing channel fill, restoring drainage, and seeding disturbed areas. The specifications provide detailed requirements for various civil, plumbing, electrical, and other construction components. Bidders must adhere to all material, testing, and construction standards specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Forest Service Supplemental Specifications Alturas Water System Improvements & Cabin Creek Drainage Restoration
Table of Contents
Table of Contents Preface 101 – Terms, Format, and Definitions 102 – Bid, Award, and Execution of Contract 103 – Scope of Work 104 – Control of Work 105 – Control of Material 106 – Acceptance of Work 107 – Legal Relations and Responsibility to the Public 108 – Prosecution and Progress 109 – Measurement and Payment 151 – Mobilization 154 – Contractor Sampling and Testing 155 – Schedules for Construction Contracts 156 – Public Traffic 157 – Soil Erosion and Sediment Control 170 – Develop Water Supply and Watering 171 – Weed and Disease Prevention 201 – Clearing and Grubbing 203 – Removal of Structures and Obstructions 204 – Excavation and Embankment 205 – Rock Blasting 301 – Aggregate Courses 552 – Structural Concrete 609 – Curb and Gutter 611 – Water Systems 614 – Lean Concrete Backfill 619 – Fences, Gates, and Cattle Guards 624 – Topsoil 625 – Turf Establishment 633 – Permanent Traffic Control 635 – Temporary Traffic Control 636 – Electrical Systems 703 – Aggregate 713 – Roadside Improvement Material 716 – Material For Timber Structures 717 – Structural Metal 719 – Paint
Preface Preface_wo_01_31_2019
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.
101 – Terms, Format, and Definitions
101.01_national_11_09_2016
101.01 Meaning of Terms.
Add the following:
Delete all references in FP-14 to Transportation Acquisition Regulations (TAR).
101.03_national_11_09_2016
101.03 Abbreviations.
Add the following to (a) Acronyms:
AGAR
AFPA
FSAR
MSHA
NESC
WCLIB
Agriculture Acquisition Regulations American Forest and Paper Association Forest Service Acquisition Regulations Mine Safety and Health Administration National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following new subpart (f):
(f) Miscellaneous unit abbreviations.
101.04_national_09_05_2018
101.04 Definitions.
Delete the following definitions and replace with the following:
Bid Schedule--The Schedule of Items.
Bridge-- A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
MP milepost (location) ppm parts per million (volume)
STA Station (location)
Culvert-- Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings -- (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Notice to Proceed -- (Public Works Contracts) Written notice to the Contractor to begin the contract work.
Right-of-Way --A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicitation -- (Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Add the following definitions:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service -- The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.
Utilization Standards-- The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
R ig ht of
W ay
R oa ds id e R oa ds id e
C le ar in g W id th
R oa dw ay
C le ar in g Li m it
X Y
G ro un d
Li ne
Tr av el ed
W ay C L
B er m S ur fa ce C ou rs e B as e
C ou rs e
Fi ll
S lo pe
B ac k Sl op e
D ra in ag e D itc h
G ro un d
Li ne
S ub gr ad e
R oa d Be d
S ha pe s an d di m en si on s w ill va ry to fi t l oc al c on di tio ns
S ee d ra w in gs fo r t yp ic al s ec tio ns
X a nd Y d en ot e cl ea rin g ou ts id e of ro ad w ay
N ot e:
Right - of - Way Line
Right - of - Way Line
Clearing Limit
Shoulder
Shoulder
102 – Bid, Award, and Execution of Contract 102.00_national_11_09_2016
102 Bid, Award, and Execution of Contract Delete Section 102 in its entirety.
103 – Scope of Work 103.00_national_11_09_2016
Delete all of Section 103 except Subsection 103.01 Intent of Contract.
104 – Control of Work 104.00_national_11_09_2016
Delete Subsection 104.01, 104.02, and 104.04.
104.06_national_11_09_2016
Add the following new subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 – Control of Material 105.02_forest_3_9_2021
105.02 Material Sources.
Add the following before the first paragraph:
Sources have been designated for this project as follows:
Waste Site – Government Furnished – The Waste Site for excess, unsuitable, and boulder material is located in Section 21, Township 8N, Range 14E, at the Champion Creek Pit which is located approximately 7.5 miles north of this project via Forest Road #205 and State Highway 75.
Crushed Aggregate Base (Grading ‘D’), and Crushed Surface Course Aggregate (Grading ‘G’) – There is no available Government source for Crushed Aggregate Base (Grading ‘D’), or Crushed Surface Course Aggregate (Grading ‘G’) for this project. The Forest Service has not obtained any commitment for price, quantity, quality, or availability for commercial material. Bidders must make their own determinations regarding acquisition of Crushed Aggregate that meets the requirements of the project.
Prior to development of a new Crushed Aggregate source and/or use of materials from a previously developed Crushed Aggregate source pit, the pit site and/or developed Crushed Aggregate material shall be approved by the CO and the Contractor shall certify the pit and material derived from the pit is free of noxious weeds listed on the "All States Noxious Weeds List”.
Pipe Zone Bedding – There is no available Government source for Pipe Zone Bedding. The Forest Service has not obtained any commitment for price, quantity, quality, or availability for commercial material. Bidders must make their own determinations regarding acquisition of Pipe Zone Bedding that meets the requirements of the project.
Prior to development of a new Pipe Zone Bedding source and/or use of materials from a previously developed Pipe Zone Bedding source pit, the pit site and/or developed Pipe Zone Bedding material shall be approved by the CO and the Contractor shall certify the pit and material derived from the pit is free of noxious weeds listed on the "All States Noxious Weeds List”.
Temporary Stockpile Area/Staging Area. – Temporary stockpile/staging areas will be staked on the ground by the CO. The primary area will likely be the existing Alturas Outlet Picnic Area parking lot, the existing Alturas Tent Campground parking lot, or other appropriate areas as approved by the CO.
105.05_national_6_29_2020
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at Government-approved location, at no additional cost to the Government.
106 – Acceptance of Work 106.01_national_07_18_2017
106.01 Conformity with Contract Requirements.
Delete Subsection 106.01 and replace with the following:
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price.
Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
1. Sampling method;
2. Number of samples;
3. Sample transport;
4. Test procedures;
5. Testing laboratories;
6. Reporting;
7. Estimated time and costs; and
8. Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
1. Have the work accepted at a reduced price; or
2. Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.02_national_11_9_2016
106.02 Visual Inspection.
Delete Subsection 106.02 and replace with the following:
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.
107 – Legal Relations and Responsibility to the Public 107.05_national_07_18_2017
107.05 Responsibility for Damage Claims.
Delete this entire subsection.
107.10_forest_3_9_2021
107.10 Environmental Protection.
Supplement subsection (b) Oil and hazardous substances with the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
• Exact time and location of spill including a description of the area involved.
• Containment procedures.
• Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
107.11_nat_us_02_17_2005
107.11 Protection of Forests, Parks, and Public Lands:
Add the following new paragraph to the end of this subsection:
Before starting any operations on the project, the Contractor shall prepare & submit a Project Fire Plan, in cooperation with the Contracting Officer, providing for the prevention and control of fires in the project area. The Contractor shall certify compliance with all fire protection and suppression requirements, before beginning operations during the fire period and closed season. Required Tools and Equipment shall be kept currently in serviceable condition and immediately available for initial attack on fires.
108 – Prosecution and Progress 108.01_forest_12_31_2021
108.01 Commencement, Prosecution, and Completion of Work.
Replace this subsection in its entirety with the following:
Perform work under this contract according to the following:
(a) For construction operation occurring up to the Thursday prior to Memorial Day, the Contractor can work any time during the week;
(b) For construction operations occurring between the Tuesday following Memorial Day and Labor Day the Contractor shall only be able to work from 8:00 a.m. to 8:00 p.m., Mondays through Thursdays and 8:00 a.m. to 5:00 p.m., on Fridays;
(c) For construction operations occurring after the Tuesday following Labor Day, the Contractor can work any time during the week.
General work sequence or procedures:
Spring/Summer, 2022
(a) Prepare/review/approve shop drawings for precast concrete vault toilets and pump house utility building.
(b) Prepare/review/approve other required material submittals and complete other relevant administrative tasks in preparation for construction.
Fall, 2022
(a) Connect new well and pump house utility building to the existing water distribution system supply line, make water system supply piping modifications to existing storage tank, and connect new hydrant and pump-out drain to the existing water distribution system supply line, marking the new end of the water system supply line at the Outlet Picnic Area parking lot.
(b) Perform required electrical and radio telemetry system work, including new float installation in existing storage tank, to connect the new pump house utility building to existing storage tank.
(c) Remove the two existing restrooms, replace with new vault toilets, and complete all required Outlet Picnic Area parking lot improvements.
(d) Modify the existing well to accommodate the new hand pump and remove/abandon all existing water system piping, vaults, and appurtenances.
(e) Remove existing fill material blocking the Cabin Creek channel, complete necessary ditch re-grading, remove/abandon existing utilities as applicable, and restore/rehabilitate disturbance areas to their original state.
(f) Clean and restore site.
109 – Measurement and Payment 109.00_national_11_09_2016
Delete the following entire Subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.01_national_2_22_2019
109.01 Measurement of Work.
Delete the third paragraph and Table 109-1 of this Subsection and replace with the following:
Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.
Table 109-1 Decimal Accuracy of Quantities for Payment
Pay Item Level of Precision Linear Foot 1
Exception--Timber, Steel, and Concrete Piles 0.1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1 Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1 Cubic Yard 1
Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;
0.1
Exception--Concrete; Masonry 0.01 Pound 1 Ton 0.1
Exception--Calcium Chloride;
Sodium Chloride; Hydrated Lime;
Bituminous Materials; Pavements;
Bed Course Materials
0.01
Hour 0.1
MFBM 0.01
Station Yard 1 Cubic Yard Mile 1 Ton Mile 1
109.02_national_11_09_2016
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following to this subsection:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
151 – Mobilization 151.01_forest_3_9_2021
151.01 Description
Add the following at the end of the last sentence of this subsection:
Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area.
154 – Contractor Sampling and Testing
154.01_forest_3_9_2021
154.01 Description.
Delete this subsection in its entirety and replace with the following:
This work consists of obtaining samples for testing, performing the tests, and reporting the test results.
154.04_forest_3_9_2021
154.04 Testing.
Delete the first sentence and replace with the following:
Perform all tests required by the Sampling and Testing Requirements tables at the end of each Section.
154.07_forest_3_9_2021
154.07 Measurement.
Delete this subsection in its entirety and replace with the following:
Do not measure Contractor Sampling and Testing for payment.
154.08_forest_3_9_2021
154.08 Payment.
Delete this subsection in its entirety and replace with the following:
Do not measure Contractor Sampling and Testing for payment. Compensation is made as an indirect payment.
155 – Schedules for Construction Contracts 155.00_national_11_09_2016
Delete Section 155 in its entirety.
156 – Public Traffic 156.04_forest_3_9_2021
Construction Requirements
156.04 Accommodating Traffic During Work.
Delete the following from the end of the second paragraph.
“according to Subsection 106.07(b).”
156.09_forest_3_9_2021
156.09 Traffic Control Supervisor.
Delete this subsection in its entirety.
157 – Soil Erosion and Sediment Control 157.01_forest_3_9_2021
157.01. Description
Add the following to the end of this subsection:
Soil erosion and sediment control activities are expected to be minimal with the focus being on the Outlet Work Area, specifically that of implementing approved turbidity removal/reduction measures if needed during the Cabin Creek channel fill removal effort, and that of placing straw wattles or other approved measures on the disturbed soil areas following the channel fill removal effort in general.
157.04_forest_3_9_2021
157.04 General.
Delete the first two paragraphs and add the following:
Submit a Dewatering and Sediment Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after construction according to the contract specifications, contract permits, Section 107, and this Section. Contract permits amend the requirements of this Section. Do not modify the type, size, or location of any control or practice without approval. Submit the erosion control plan proposal at least 14 days before operations begin to the Contracting Officer for approval.
Reflect in the erosion control plan special concerns and measures necessary to protect resources and Government improvements. Include:
1. The construction activities and sequence of implementation relating to specific erosion control measures.
2. The location and type of permanent controls to be implemented during construction.
3. A detailed dewatering plan for work in or adjacent to stream channels.
4. For work in stream channels without flowing water describe level of ground and vegetative disturbance and measures to reduce potential sediment delivery.
5. Describe what monitoring will take place.
Add to the third paragraph:
All sediment barriers must remain in place for the duration of the project and be maintained in proper working condition. Material shall be removed from behind barriers prior to their final removal. Upon completion of construction at the site, all temporary erosion control measures, dewatering materials, and equipment are to be removed from
Government property with the exception of straw wattles or other approved measures placed on disturbed soil areas following the respective fill removals.
The Contractor shall adhere to the following standard practices:
a) The Contractor shall operate in a manner that will protect aquatic organisms.
b) Construct the Dewatering and Sediment Control according to the Contractor’s approved plan.
c) Maintain the roads/trails in a manner that prevents direct entry of surface drainage into the stream.
d) Construct permanent and temporary control features to intercept sediments.
e) Any sanitation facilities established by the Contractor shall be located as designated by the CO.
157.12_forest_3_9_2021
157.12 Temporary Soil Stabilization.
Delete Subpart (b) Temporary turf establishment from this Subsection.
157.15_forest_3_9_2021
157.15 Maintenance and Cleanup.
Delete the third and fourth paragraphs under this subsection in their entirety and add the following:
Removal and disposal of temporary erosion control measures, not including turbidity removal/reduction products, will be by Government personnel after the work is complete and once vegetation is satisfactorily established and exposed areas stabilized.
170 – Develop Water Supply and Watering
170.00_forest_3_9_2021
Description
170.01 This work consists of developing an acceptable water supply and restoring it to pre-construction condition or better as determined by the CO, following completion of the work. Work also includes obtaining a temporary water right permit, as required by the Idaho Department of Water Resources, along with paying any associated fees that are required for this permit.
Materials
170.02 Conform to the following subsection.
Water 725.01
170.03 Temporary Water Right Permit. Contractor shall fill out the required “Application for Temporary Approval of Water Use” permit request, Idaho Department of Water Resources standard form 202A, and obtain approval prior to development and use of intended water drafting site. Online form can be found at https://www.idwr.idaho.gov/forms/water-rights.html
170.04 Development of Supply & Access. Water can be drafted from Alturas Lake in the vicinity of the Alturas Outlet Picnic Area or from Alturas Lake Creek at the Forest Road 205 bridge crossing in a locations approved by the CO that does not impede traffic or inconvenience the public.
Water drafting may only occur during daylight hours.
Contractor’s drafting equipment and operations shall be as such to limit suction velocities within the intake influence area to less than 0.40 feet per second. Pump intake screens shall be oriented longitudinally (or parallel) to the stream flow direction and shall have a maximum screen opening size of 3/32”.
Government will provide the following approved screen if available:
1. Small Screen https://www.idwr.idaho.gov/forms/water-rights.html
6” diameter, 24” length, threaded connection
Contractor shall provide the required fittings necessary to connect either pump screen to their intended pump to render a water-tight, secure connection. Damage to either pump screen, as a result of the Contractor’s use or negligence, shall be repaired to equal or better condition at the Contractor’s expense. If a satisfactory repair, as determined by the Contracting Officer, is not possible, Contractor shall be responsible for replacing the respective screen, in kind, at no expense to the Government.
Pumps shall be enclosed in a containment basin having 110% of the pumps fuel capacity.
170.05 Equipment. All drafting equipment to be placed in the water shall be disinfected in order to ensure the equipment is clean and free of any substance that could be injurious to plants and wildlife.
Provide mobile watering equipment with watertight tanks of known capacity. Provide for positive control of water application from the driver’s position.
170.06 Application. Apply water uniformly without ponding or washing.
170.07 Acceptance. Developing water supplies and watering will be evaluated under Subsections 106.02 and 106.04.
Measurement
170.08 Measurement.
All work associated with developing a water supply and watering required by the Contract is included under other applicable Sections.
Payment
170.09 Payment.
All costs associated with this Section 170 work shall be included in other applicable Sections.
171 – Weed and Disease Prevention 171.00_forest_3_9_2021
171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands.
Material
171.02 Conform to the following Subsection:
Water 725.01
171.03 General. Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.
Perform all work at a location designated on the plans or other locations approved in writing. Provide the CO with an opportunity to monitor the washing and inspection.
171.04 Equipment. Use a high-pressure washing system.
For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner.
Do not mix soaps, detergents, or other chemicals with the wash water.
For work at a commercial washing facility, use an approved facility.
171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.
171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed.
171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.
171.08 Aggregate. Contractor shall certify the pit and material derived from the pit is free of noxious weeds listed on the "All States Noxious Weeds List”.
171.09 Do not measure weed prevention for payment.
171.10 Include all costs associated with the Section 171-Weed Prevention in the unit price for Section 151-Mobilization.
201 – Clearing and Grubbing 201.01_forest_12_31_2021
201.01 Description.
Replace this subsection in its entirety with the following:
This work consists of clearing and grubbing within the cut/fill clearing limits designated on the Plans for the parking lot and access roadway, for the respective Cabin Creek channel fill removal areas, and for the ditch fill grading area adjacent to Forest Road #205 bound between the existing road edge and the dashed disturbance limits. This work also includes disposing of this clearing and grubbing debris from the above noted areas, by scattering in locations as noted on the Plans and disposing of any excess material according to the requirements of this Section.
Clearing and grubbing required to accommodate the installation of the new water system improvements including but not limited to trenches, drains, hydrants, well modifications, structure installations, and other required water system work, shall be considered incidental to those respective items.
Clearing and grubbing required to accommodate construction of the new Picnic Area Trail Loop, construction of the new Picnic Area Family Unit Sites, and installation of the new Picnic Area Logworm Fence shall be considered incidental to those respective items.
Up to four (4) large trees will need to be felled in the vicinity of the existing water storage tank for sake of improving sun exposure on the new solar panels. Contracting Officer will flag trees to be removed prior to work beginning.
201.02_forest_3_9_2021
201.02 Material.
Delete all references to “Tree wound dressing material”.
201.03 – 201.07_forest_3_9_2021
201.03 General.
Delete the last sentence under this subsection and add the following:
Trees and vegetation removed with this clearing and grubbing effort shall be salvaged for use in restoring/rehabilitating former developed areas to their native state. Coordinate temporary stockpile locations, as applicable, with Contracting Officer prior to beginning work. Excess material shall be disposed of per Section 201.06
201.04 Clearing.
Delete paragraph (c) and replace with the following:
(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 6 inches of the ground, measured on the side adjacent to the highest ground.
Delete paragraph (d) and replace with the following:
(d) Do not cut vegetation less than 3 feet tall and less than 3 inches in diameter that is within the clearing limits but beyond the roadway and not in a decking area, and that does not interfere with sight distance along the road.
(e) Trim branches of remaining trees or shrubs to give a clear height of 14 feet above the roadbed unless otherwise indicated. Trim tree limbs as near flush with the trunk as practicable.
201.06 Disposal.
Delete this entire subsection and replace with the following:
All woody debris and timber, except for root wads and stumps, shall be considered as slash and shall be scattered over the surface of exposed earth left from the channel fill removal effort. Slash shall be placed as flat as practicable on the completed slopes.
Any excess woody debris and timber shall be hauled to the Waste Site or other locations approved on the ground by the CO.
201.07 Acceptance.
Delete the second paragraph of this subsection.
201.08_forest_3_9_2021
201.08 Measurement.
Add the following to the end of this subsection:
Do not measure clearing and grubbing required to accommodate the new water system improvements or the three Picnic Area option items.
203 – Removal of Structures and Obstructions 203.01_forest_3_9_2021
Description
203.01 Delete this subsection in its entirety and replace with the following:
This work consists of salvaging, removing, and disposing of culverts, power and phone utilities, water piping and appurtenances, concrete vaults and manholes, junction boxes, posts, irrigation pipe risers, buildings including concrete floors, vaults, privacy screens, electrical, and plumbing appurtenances, curbs, wood retaining walls and steps, concrete sidewalks where directed by the Contracting Officer, signs/posts, and other obstructions as required.
All work associated with salvaging boulders for use as barrier rocks is included under Section 204.
All work associated with removing and resetting bulletin boards and fee tubes is included under Section 633 for those respective items.
203.04_forest_3_9_2021
203.04 Removing Material.
Add the following to the end of this subsection:
Remove all existing pipes exposed during construction activities. Any existing pipe that will be more than 12 inches below the finished surface may remain. All piping that is to remain shall be sealed with concrete one and a half times the diameter of the pipe, or to a minimum length of 12 inches.
203.05_forest_3_9_2021
203.05 Disposing of Material.
(a) Remove from project.
Delete the last two sentences of this Subsection
204 – Excavation and Embankment
204.01_forest_3_9_2021
204.01 Add the following to the end of this subsection:
This work also consists of constructing complete family unit sites at the locations and per the dimensions denoted on the Plans, including furnishing and installing new picnic tables, fire rings, crushed aggregate surface course, and underlying concrete footings/anchorages, completing all required clearing/grubbing, site finishing, and cleanup, and removing/rehabilitating existing trails to their native, pre-developed state.
204.02_forest_3_9_2021
204.02 Definitions.
(e) Barrier Rock. – Excavated rock/boulder material conserved from the excavation and embankment that is suitable for placing adjacent to roads and parking areas as denoted on the Plans and as approved by the Contracting Officer.
204.03_forest_3_9_2021
204.03
Aggregate Courses 301 Concrete 601 Timber Structures 716 Structural Steel 717
204.04_forest_3_9_2021
204.04 Add the following to the end of this subsection:
Picnic Area Trail Loop alignment and Family Unit site locations denoted on the Plans are approximate and intended to convey the rough locations of these elements. Prior to construction, Contracting Officer will flag on the ground the new trail loop alignment and identify site locations/orientation along with site connecting routes to new trail loop.
Flagged alignment and site locations will vary from what’s shown as a function of protecting existing trees/vegetation and conforming to the natural ground contours.
Clear and grub family unit sites according to Section 201. Excavate and backfill new picnic tables and fire rings according to Section 209. Place and compact crushed aggregate surface course according to Section 301.
204.06_forest_3_9_2021
204.06 Roadway Excavation.
Delete Subsection 204.06(b) in its entirety and replace with the following:
(b) Earth Cuts (Parking, Roadway Areas to Remain, & Family Unit Sites). – Scarify earth cuts to 6 inches below subgrade within the roadbed limits. Compact the scarified material according to Subsection 204.11.
(c) Earth Cuts (Fill Removal Areas). Scarify earth cuts to 6 inches below subgrade within the fill removal area limits, grade to have natural undulations, and blend to match adjacent terrain/contours as applicable.
204.13_forest_3_9_2021
204.13 Sloping, Shaping, and Finishing.
Add the following to the end of Subsection 204.13(d):
The native surface pedestrian zone and supporting earthen fill material located adjacent to the parking lot and leading up to the new single vault toilet shall be finished like the roadbed. Additionally, all earthen areas outside of the roadbed shall be left having a uniform roughened surface according to Subsection 204.13(a).
204.17_forest_12_31_2021
204.17.
Replace this Subsection in its entirety with the following:
Payment for Channel Excavation and Embankment will be made at the lump sum contract price and will be full payment for all excavation and embankment related work required under this Section for the two channel fill removal locations and the roadside ditch fill grading area. This includes all required material hauling, stockpiling, recontouring, watering, scarifying, and compacting, and it also includes transplanting salvaged grasses, sedge clumps, and willows during the excavation/embankment effort.
The lump sum bid price for this item shall be based on the following estimated excavation and embankment quantities for the three primary channel fill removal work areas:
Fill Removal Area #1
(a) Excavation: 182 cubic yards
(b) Embankment: 0 cubic yards
Fill Removal Area #2
(a) Excavation: 642 cubic yards
(b) Embankment: 0 cubic yards
Ditch Fill Grading Area
(a) Excavation: 70 cubic yards
(b) Embankment: 297 cubic yards
Suitable excess material shall be used as backfill for existing restroom excavations as necessary and at other locations approved by the Contracting Officer in an effort to reduce the overall quantity of excess material.
Payment for Fill Stockpile Excavation & Embankment will be made at the lump sum contract price and will be full payment for all excavation and embankment related work required under this Section to remove the existing fill stockpile and place this material as embankment for sake of reconstructing the existing Outlet Picnic Area parking lot. This includes all required material hauling, stockpiling, recontouring, subgrade preparation, watering, scarifying, and compacting, and it also includes transplanting salvaged grasses and sedge clumps in the former roadway area being occupied by this existing fill stockpile.
The lump sum bid price for this item shall be based on the following estimated excavation and embankment quantities:
(c) Excavation: 151 cubic yards
(d) Embankment: 216 cubic yards
These quantities are based on the Engineer’s comparison between the original ground surface and the planned finished trail section shown in the Plans using digital terrain modeling techniques. The Contractor shall confirm the accuracy of these quantities by his/her own measurements and shall bid the lump sum items accordingly.
Suitable excess embankment material from the Channel Excavation and Embankment effort shall be used to supplement the parking lot construction earthwork effort if needed.
All excavation and embankment required to construct the new Picnic Area Trail Loop and the Picnic Area Family Unit Sites shall be incidental to those respective items. No separate measurement/payment will be made. Include all costs for furnishing and installing new picnic tables, fire rings, concrete footings/anchorages, hardware, and crushed aggregate surface course material under respective Picnic Area Family Unit Sites along with all work associated with finishing and clean-up.
205 – Rock Blasting 205.00_national_11_8_2016
Add the following to Subsection 205.03:
205.03 Regulations
(e) Forest Service. For projects in National Forest Service lands, comply with Forest Service Manual (FSM) 6745, Explosives and Blasting Materials.
Add the following to Subsection 205.06:
205.06 Preblast condition survey and vibration monitoring and control.
Limit blasting induced vibrations in saturated soils or on steep slopes as designated or as directed by the CO.
Notify the owners of nearby utilities at least 24 hours before blasting.
Add the following to Subsection 205.07:
205.07 Test Blasting.
Test blast at all new sources, when rock type changes, and when blast layout changes due to slope or other changes.
Add the following to the bulleted list in the eighth paragraph of Subsection 205.08:
205.08 Blasting.
• Precipitation exceeds 1 inch in any 24 hour period.
• Precipitation exceeds 3 inches in any 96 hour period.
• Precipitation exceeds 4 inches in any 144 hour period.
• A landslide occurs within 300 feet of a blast site under any precipitation conditions.
301.00_forest_3_9_2021 Delete Section 301 in its entirety and replace with the following:
301 – Aggregate Courses
Description
301.01 This work consists of constructing one or more courses of aggregate on a prepared surface.
Base aggregate grading is designated as shown in Table 703-2. Surface aggregate grading is designated as shown in Table 703-3
301.02 Conform to the following Subsections:
Aggregate 703.05 Water 725.01(c)
301.03 General. Prepare the surface on which the aggregate course is placed according to Section 204 or 303 as applicable, and have it approved in writing by the CO before placing aggregate.
Develop, haul, and apply water in accordance to Section 170.
Submit target values within the gradation ranges shown in Table 703-2 or 703-3 for the required grading. After reviewing the proposed target values the CO will determine the final values for the gradation and notify the Contractor in writing.
After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.
If the aggregate is produced and stockpiled before placement, handle and stockpile in an approved manner to avoid segregation of material size. Establish stockpile sites at approved locations as applicable.
301.04 Mixing and Spreading. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for the specified compaction method.
Spread and shape the mixture on the prepared surface in a uniform layer with no segregation of size, and to a loose depth that will provide the required compacted thickness.
Do not place in layers exceeding 6 inches in compacted thickness for aggregate base and surface courses or twice the maximum particle size for screened aggregate. When more than one layer is necessary, compact each layer according to Subsection 301.05 before placing the next layer. Route hauling and leveling equipment uniformly over the full width.
When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.
301.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified in the schedule of items:
Compaction A. Operating spreading and hauling equipment over the full width of each layer of the aggregate.
Compaction B. Operate rollers over the full width of each layer of the aggregate until visual displacement ceases, but not fewer than three complete passes. Use rollers as specified in Subsection 322.05(a).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures.
(a) Rollers. Use rollers that meet the following minimum requirements:
(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.
(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum weight of 6 tons, specifically designed to compact the material on which it is used.
(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width or the roller and capable of exerting a ground pressure of at least 80 psi.
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
301.06 Thickness and Width Requirements. Ensure that the thickness and width of the compacted aggregate conform to the dimensions shown on the plans, and that measurements on the compacted aggregate meet the following criteria:
(a) The maximum variation from the specified thickness is 1 inch.
(b) The compacted thickness is not consistently above or below the specified thickness.
(c) Ensure that the compacted width is not consistently above the specified width.
The maximum variation from the specified width will not exceed +12 inches at any point.
Correct all defective areas by loosening the material, adding or removing material, reshaping, and compacting.
301.07 Maintenance. Maintain the aggregate course to the correct line, grade, and cross-section by blading, watering, rolling, or any combination thereof until placement of the next course. Correct all defects according to Subsection 301.06.
301.08 Acceptance. See Table 301-1 or Table 301-2 as applicable, for sampling and testing requirements.
Aggregate gradation and surface course plasticity index will be evaluated under Subsection
106.04. If the aggregate is obtained from a Government stockpile then the above characteristics will be evaluated under Subsection 106.02. Other aggregate quality properties will be evaluated under Subsections 106.02 and 106.04. Placement of aggregate courses will be evaluated under Subsections 106.02 and 106.04.
The allowable upper and lower aggregate gradation limits are the Target Value plus or minus the allowable deviations shown in Tables 703-2 and 703-3.
The allowable upper and lower Plasticity index limits for surface courses are stated in 703.05(b).
Preparation of the surface on which the aggregate course is placed will be evaluated under Section 204 or 301 as applicable.
301.09 Measure the Section 301 items listed in the bid schedule according to Subsection
109.02 and the following as applicable.
Measure aggregate by the cubic yard, compacted in place.
Measure thickness perpendicular to the grade of the travel way.
Measure width perpendicular to the centerline.
301.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 301 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Payment for aggregate courses required to accommodate work/improvements under other Sections shall be considered incidental to those other…