1240LT22R0008_Amend 01.pdf

PDF 3 MB Posted

Attached to
Alturas Water System Improvement & Cabin Creek Drainage Restoration project on the Sawtooth National Forest
Solicitation number
1240LT22R0008
Issued by

About this file

This amendment to solicitation 1240LT22R0008 provides additional information to support the Alturas Water System Improvement and Cabin Creek Drainage Restoration project for the Sawtooth National Forest. The projects include installing a new well and pumphouse, upgrading an existing water system, restoring drainage along Cabin Creek, and improving parking areas. The amendment releases photos of project sites to help address questions from interested offerors. It depicts the location for the new well and pumphouse, existing restroom facilities, available borrow material, areas requiring fill removal and ditch grading work. The amendment clarifies that 151 cubic yards of excavation material is available from borrow stockpiles and fill removals. It also confirms the proposal due date of March 1, 2022 at 1:00 PM MST and instructions to email proposals to the contracting officer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240LT22R0008

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40LT

IDAHO FALL ID 83401

1405 HOLLIPARK DRIVE

USDA-FS CSA INTERMOUNTAIN 8

02/22/20220001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/26/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to release photos to address questions and answers that have been submitted in response to the solicitation. See attached pages for photos and information.

The due date and time for receipt of proposals is not extended. Proposals are due no later than 1300 MST, Tuesday, March 1, 2022. Proposals shall be emailed to the Contracting

Officer at kellie.shaw@usda.gov.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

KELLIE SHAW

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Alturas Water System Improvement & Cabin Creek Drainage Restoration Project Solicitation 1240LT22R0008 Amendment 01

Photo of the new well area. There are a couple trees that exist just to the west of the new well. The pumphouse will be installed in that vicinity in an existing clearing.

Photo of existing outlet picnic area parking lot with restroom and other existing amenities in the background.

Photo of unclassified borrow stockpile. Estimate approximately 135 CY of material available. Sheet 17 of the drawings indicates 16 CY cut plus this 135 CY equals the 151 CY “Excavation” quantity noted in Section 204 Special Provision. With the fill removals in general, there will be ample opportunity to find suitable material for use in completing the required earthwork.

Photo of fill removal area 1, standing at the end of the unclassified borrow stockpile looking north.

Existing woody debris/slash will need to be peeled back to allow for the remaining material to be excavated to the limits noted on the drawings.

Photo of the pullout ditch grading area, standing at the road pullout and looking west. You can see the typical ditch that requires filling in.

Photo of existing chlorination vault and existing well area that will be converted to a handpump service.