J.3 Drawings_G-01 Clearwater Station Site Map.pdf
PDF 493 KB Posted
- Attached to
- Clearwater Station Water Tank Replacement Federal contract opportunity
- Solicitation number
- 12970223Q0055-0001
- Issued by
- Department of Agriculture Forest Service
About this file
This document provides details for a federal contract solicitation to replace the water tank at Clearwater Station in the Sierra National Forest. The solicitation seeks to furnish and install a new water tank, valves, piping and a fire hydrant as shown on the site map drawing. The period of performance is from June 12, 2023 to November 10, 2023. The amendment extends the submission deadline from May 23 to June 2, 2023 and changes the total anticipated period of performance to 150 days to allow time for furnishing the water tank and other equipment. The solicitation is issued by the U.S. Department of Agriculture Forest Service for work to be completed in the Pacific Southwest Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J.1 SPECS_Clearwater Station Water Tank Replacement.pdf | ||
| J.2 Fire Plan 2013_North Fork_Clearwater Station Water Tank Replacement.doc | DOC document | |
| 12970223Q0055 Clearwater Fire Station Water Tank Replacement.pdf | ||
| J.4 MAP_Clearwater Station Water Tank Replacement.pdf | ||
| Response to RFIs Received by the Forest Service.pdf | ||
| 12970223Q0055_0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
CLEARWATER
STATION
WATER TANK
REPLACEMENT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
CLEARWATER SITE MAP
4/15/2023
MRIOS
MRIOS
ANTONIO C.
G-01 01 01
NOTES FOR PROJECT
INSTALL ONE VALVE AT TANK FOR
MAINLINE.
INSTALL ONE VALVE W/ BOX TO DRAIN
THE TANK.
INSTALL ONE VALVE W/ BOX BEFORE
THE FIRE HYDRANT.
ADJUSTMENT TO LAYOUT MAY BE
NEEDED ONCE CONSTRUCTION BEGINS.
CLEARWATER STATION SITE MAP
ENGINE BAY
BARRACKS
PUMP HOUSE
EXISTING TANKS
AND PROPOSED
LOCATION FOR
NEW TANK
PROPOSED LAYOUT
OF WATER LINE
PROPOSED
LOCATION FOR
FIRE HYDRANT
VALVE
VALVEVALVES
DRAIN LINE
N
S
EW
Feet
0 50 100
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
| Sheets and Views |
| G-01 Clearwater Station Site Map |
File details come from the government source that posted it. Updated .