This statement of work document outlines repairs required for the 2023 National Grasslands Visitor Center located in Wall, South Dakota. Work includes replacing the geothermal heat pump and electric duct heaters, repairing and insulating HVAC ductwork, rerouting and insulating water lines, sealing air intake ducts, installing new drywall, insulation, vapor barriers and flooring, and repainting walls. Optional work that may be awarded includes painting the entire interior, installing new doors, and replacing carpet. Products and services will be paid through lump sum line items, with measurement and payment terms defined. All work must meet applicable federal, state and local codes and standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-1
Section C - Description/Specifications/Statement of Work
1.1
GENERAL SPECIFICATIONS
2023 National Grasslands Visitor Center Repairs
SCOPE OF CONTRACT
A. This project includes repairs to the National Grasslands Visitor Center (NGVC) due to flood damage. Work includes HVAC repairs, insulation, vapor barrier, drywall, painting, and acoustical covering repairs.
B. The base bid item work includes replacement of geothermal heat pump, electric duct heaters, insulated duct work, and junction box coverings. Reroute, repair, and insulate two-inch water line above bathroom ceilings that broke and caused flood.
Reconfiguration, seal and insulate air intake duct above bathroom ceilings that caused freeze break in the two-inch waterline. Installation of polyisocyanurate and fiberglass batt insulation, installation of plastic vapor barrier and gypsum board, taping and mudding seam where existing gypsum board butts new gypsum board and joints between new gypsum board. Texture to match existing and prime new gyp. bd. and newly mudded areas. Paint repaired areas to match existing walls. Removal of existing acoustic wall covering and installation of new acoustical wall covering in theater room. Prep, repair, and reinstallation of any and all removed slat wall panels, wood trim, baseboards, and door casings.
C. Optional work that may be awarded includes work described below:
1. Option #1: Paint entire interior, except bathrooms which will be primer only over the new/repaired drywall on ceilings and walls.
2. Option #2: Install new door in existing cased opening between room 113 and 114.
Cut and frame new opening and install new door, hardware, and casework between room 112 and 113.
3. Option #3: Remove old and install new carpet tile throughout except areas currently tile, ceramic or vinyl tile.
4. Option #4: Grade dirt and install reinforced vapor barrier in crawlspace.
D. Quantities associated with these options are identified in the Schedule of Items.
1.2 PROJECT LOCATION
A. The project is located in the Wall Ranger District of the Nebraska National Forest, Pennington County, South Dakota State, in Section 6, T 1S, R 16E, Black Hills Meridian.
It is located in Wall, South Dakota. The project may be accessed from I-90 and exit 110.
Address is 708 Main Street.
1.3 SITE INFORMATION AND LIMITATIONS
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-2
A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
1. Construction site will be closed to the public during construction. The Contractor will be responsible for signing and limiting public access.
2. Water is not available at the site for construction purposes. Power is available for construction purposes.
3. The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work.
1.4 WORK CAMPS, STAGING AND STORAGE AREAS
A. Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage work trailers on site.
B. No overnight camping will be allowed on site.
1.5 INSPECTION OF WORKSITE
A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
1.6 MEASUREMENT AND PAYMENT
A. Measurement shall be lump sum for installation of new office door in current opening.
Work includes supplying and installing door frame, door, hardware, and trim. Trim to match existing in door trim in building.
1.7 START DATE
A. July 31, 2023
1.8 CONTRACT TIME
A. Base Bid: 120 Calendar Days
B. Options # 1-4: 60 Calendar Days
1.9 SPECIFICATIONS
A. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to or are included in payment for other pay items in this contract. These items are considered incidental, and no additional compensation will be made.
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-3
Section 011250 - Measurement And Payment Section 011900 - Mobilization Section 013300 - Submittal Procedures Section 014100 - Quality Control Section 024100 - Waste Material Disposal Section 024102 - Removal And Disposal Of Structures And Obstructions Section 072100 - Thermal Insulation
Section 072600 - Vapor Retarders Section 079200 - Joint Sealants Section 092900 - Gypsum Board Section 096813 - Tile Carpeting Section 097700 - Special Wall Finishes Section 099123 - Interior Painting Section 220501 - Interior PEX Piping Section 230713 - Duct Insulation Section 233113 - Metal Ducts Section 233300 - Air Duct Accessories Section 238216 - Electric-Resistance Air Coils Section 260500 - Common Work Results For Electrical
END OF SECTION C
June 2023
MEASUREMENT AND PAYMENT 011250-1
USDA FOREST SERVICE, R2
NGVC - HVAC, WALL, TRIM & FINISH REPAIRS 2023
SECTION 011250 - MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.
B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.
1.2 DETERMINATION OF QUANTITIES
A. The following measurements and calculations shall be used to determine contract quantities for payment.
1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.
2. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.
3. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.
4. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.
1.3 UNITS OF MEASUREMENT
A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
1. Each (EA): One complete unit, which may consist of one or more parts.
2. Linear Foot (LF): Measurement of work along its length from point-to-point;
parallel to the base or foundation. Do not measure overlaps.
3. Lump Sum (LS): One complete unit.
MEASUREMENT AND PAYMENT 011250-2
1.4 METHOD OF MEASUREMENT
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.
2. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION (NOT APPLICABLE)
END OF SECTION 011250
MOBILIZATION 011900-1
NGVC - HVAC, WALL, TRIM & FINISH REPAIRS 2023
SECTION 011900 - MOBILIZATION
PART 1 - GENERAL
1.1 SUMMARY
A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
1.2 MEASUREMENT AND PAYMENT
A. The measurement shall be lump sum for mobilization. Payment shall be as follows:
1. Bond premiums will be reimbursed after receipt of the evidence of payment.
2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.
3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.
4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.
5. Progress payments for mobilization and preparatory work shall be subject to retainage.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION 011900
SUBMITTAL PROCEDURES 013300-1
NGVC - HVAC, WALL, TRIM & FINISH REPAIRS 2023
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
B. See other specification section within this package for additional requirements on submittal.
1.2 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed permitting coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 14 days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
SUBMITTAL PROCEDURES 013300-2
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. If more than one item is shown on submittal sheet, identify item.
D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
1.3 MEASUREMENT AND PAYMENT
A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS – (Submittals requiring CO approval)
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
SUBMITTAL PROCEDURES 013300-3
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Notation of dimensions established by field measurement.
2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
E. Samples: Prepare physical units of materials or products, including the following:
1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
2.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)
A. General: Prepare and submit Informational Submittals required by other Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.
2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."
B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.
SUBMITTAL PROCEDURES 013300-4
E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
PART 3 - EXECUTION
3.1 GENERAL
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance, and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
F. Requests for substitutions will only be considered if contractor submits the following:
1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution.
Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
3.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required
SUBMITTAL PROCEDURES 013300-5
submittals for the project - the table is to assist the Contractor and may not be all inclusive
– additional submittals may be required by specific specifications:
TABLE 013000-1
Spec.
Section Section Title Subse ction Required Submittal
014100 Quality Control 1.3A As-Built drawings
072100 Thermal Insulation 1.2A Product Data
079200 Joint Sealants 1.2A Product Data
072600 Vapor Retarders 1.2A Product data
092900 Gypsum board 1.2.A Product Data
096813 Tile Carpeting 1.3A Product Data
096813 Tile Carpeting 1.3B Sustainable Design
096813 Tile Carpeting 1.3C Samples
096813 Tile Carpeting 1.4A Product Test Reports
096813 Tile Carpeting 1.4B Sample Warranty
096813 Tile Carpeting 1.5A Maintenance Data
097700 Special Wall Finishes 1.2A Samples
099123 Interior Painting 1.3A Product Data
220501 Interior PEX Piping 1.3A Product Data
230713 Duct Insulation 1.3A Product Data
233113 Metal Ducts 1.4A Product Data
233113 Metal Ducts 1.4B Welding Certificates
233300 Air Duct Accessories 1.3A Product Data
233000 Air Duct Accessories 1.3A Operation and Maintenance Data
238216 Electric-Resistance Air Coils 1.2A Product Data
238216 Electric-Resistance Air Coils 1.2B Shop Drawings
238216 Electric-Resistance Air Coils 1.3A Operation and Maintenance Data
SUBMITTAL PROCEDURES 013300-6
END OF SECTION 013300
QUALITY CONTROL 014100-1
NGVC - HVAC, WALL, TRIM & FINISH REPAIRS 2023
SECTION 014100 - QUALITY CONTROL
PART 1 - GENERAL
1.1 This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.
1.2 QUALITY CONTROL
A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.
1.3 SUBMITTALS
A. As-Built Drawings
1.4 MEASUREMENT AND PAYMENT
A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 QUALITY CONTROL SYSTEM
A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.
3.2 AS-BUILT DRAWINGS
A. The Contractor shall maintain a set of the contract drawings depicting as-built conditions.
These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.
QUALITY CONTROL 014100-2
END OF SECTION 014100
WASTE MATERIAL DISPOSAL 024100-1
NGVC - HVAC, WALL, TRIM & FINISH REPAIRS 2023
SECTION 024100 - WASTE MATERIAL DISPOSAL
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the loading, handling, hauling, and placing of construction and demolition debris.
1.2 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this Section. Waste material disposal is considered incidental to other items of work shown in the Schedule of Items.
PART 2 - PRODUCTS – NOT APPLICABLE
PART 3 - EXECUTION
3.1 WASTE MATERIAL TO BE HAULED TO A LANDFILL
A. All demolition materials, garbage, and other refuse generated shall be removed from the project site and legally disposed off Government property in an approved landfill.
B. The contractor is responsible for all costs and permits associated with landfill disposal.
C. The Government is not responsible for waste material upon its departure from the project site.
END OF SECTION 024100
Thermal Insulation 072100
NGVC - HVAC, WALL, TRIM & FINISH REPAIRS 2023
SECTION 072100 - THERMAL INSULATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Polyisocyanurate foam-plastic board insulation.
2. Glass-fiber blanket insulation.
1.2 ACTION SUBMITTALS
A. Product Data: For the following:
1. Polyisocyanurate foam-plastic board insulation.
2. Glass-fiber blanket insulation.
PART 2 - PRODUCTS
2.1 POLYISOCYANURATE FOAM-PLASTIC BOARD INSULATION
A. Polyisocyanurate Board Insulation, Unfaced: ASTM C1289, Type I, Class 1 or 2.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Atlas Polyiso Roof and Wall Insulation.
b. Carlisle Coatings & Waterproofing Inc.
c. DuPont de Nemours, Inc.
d. Firestone Building Products.
e. Johns Manville; a Berkshire Hathaway company.
f. Rmax, Inc.
g. The Dow Chemical Company.
2.2 GLASS-FIBER BLANKET INSULATION
A. Glass-Fiber Blanket Insulation, Unfaced: ASTM C665, Type I; passing ASTM E136 for combustion characteristics.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. CertainTeed; SAINT-GOBAIN.
b. Johns Manville; a Berkshire Hathaway company.
c. Knauf Insulation.
http://www.specagent.com/Lookup?ulid=11270 http://www.specagent.com/Lookup?uid=123457173310 http://www.specagent.com/Lookup?uid=123457173309 http://www.specagent.com/Lookup?uid=123457184277 http://www.specagent.com/Lookup?uid=123457173303 http://www.specagent.com/Lookup?uid=123457173311 http://www.specagent.com/Lookup?uid=123457173302 http://www.specagent.com/Lookup?uid=123457173300 http://www.specagent.com/Lookup?ulid=11272 http://www.specagent.com/Lookup?uid=123457173105 http://www.specagent.com/Lookup?uid=123457173098 http://www.specagent.com/Lookup?uid=123457173097
Thermal Insulation 072100
d. Owens Corning.
2. Flame-Spread Index: Not more than 25 when tested in accordance with ASTM E84.
3. Smoke-Developed Index: Not more than 50 when tested in accordance with
ASTM E84.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Comply with insulation manufacturer's written instructions applicable to products and applications.
B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.
C. Install insulation with manufacturer's R-value label exposed after insulation is installed.
D. Extend insulation to envelop entire area to be insulated. Fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.
E. Provide sizes to fit applications and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units unless multiple layers are otherwise shown or required to make up total thickness or to achieve R-value.
3.2 INSTALLATION OF CAVITY-WALL INSULATION
A. Foam-Plastic Board Insulation: Install pads of adhesive spaced approximately 12 inches o.c. both ways on inside face and as recommended by manufacturer.
1. Fit courses of insulation between obstructions, with edges butted tightly in both directions, and with faces flush.
2. Press units firmly against inside substrates.
3.3 INSTALLATION OF INSULATION IN FRAMED CONSTRUCTION
A. Blanket Insulation: Install in cavities formed by framing members according to the following requirements:
1. Use insulation widths and lengths that fill the cavities formed by framing members.
If more than one length is required to fill the cavities, provide lengths that will produce a snug fit between ends.
2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.
END OF SECTION 072100
MAY 2023
http://www.specagent.com/Lookup?uid=123457173099
Joint Sealants 079200-1
USDA FOREST SERVICE, R-2
NGVC - HVAC, WALL, TRIM & FINISH REPAIRS 2023
SECTION 079200 - JOINT SEALANTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes the following, where indicated or required:
1. Silicone joint sealants.
2. Latex joint sealants.
1.2 SUBMITTALS
A. Product Data: For each joint-sealant product indicated.
1.3 QUALITY ASSURANCE
A. Source Limitations: Obtain each kind of joint sealant from single source from single manufacturer.
1.4 PROJECT CONDITIONS
A. Do not proceed with installation of joint sealants under the following conditions:
1. When ambient and substrate temperature conditions are outside limits permitted by joint-sealant manufacturer or are below 40 deg F.
2. When joint substrates are wet.
3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated.
4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates.
1.5 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this section. Payment will be included in the contract unit price for items shown in the schedule of items.
PART 2 - PRODUCTS
2.1 MATERIALS, GENERAL
A. Compatibility: Provide joint sealants, backings, and other related materials that are compatible with one another and with joint substrates under conditions of service and
Joint Sealants 079200-2 application, as demonstrated by joint-sealant manufacturer, based on testing and field experience.
B. Stain-Test-Response Characteristics: Where sealants are specified to be nonstaining to porous substrates, provide products that have undergone testing according to ASTM C 1248 and have not stained porous joint substrates indicated for Project.
C. Colors of Exposed Joint Sealants: As selected by Contracting Officer from manufacturer's full range.
2.2 ELASTOMERIC JOINT SEALANTS
A. Stain-Test-Response Characteristics: Where elastomeric sealants are specified in the Elastomeric Joint-Sealant Schedule to be nonstaining to porous substrates, provide products that have undergone testing according to ASTM C 1248 and have not stained porous joint substrates indicated for Project.
B. Available Products: Subject to compliance with requirements, joint sealant schedule, and manufacturer's recommendations, provide one of the products specified in each category below where needed:
1. Elastomeric Joint Sealant Designation: ES4
a. Base Polymer: Acid-curing silicone.
b. Type: S (single component).
c. Grade: NS (nonsag).
d. Class: 25.
e. Additional Movement Capability: 25 percent movement in extension and 25 percent in compression for a total of 50 percent movement.
f. Use[s] Related to Exposure: NT (nontraffic).
g. Uses Related to Joint Substrates: G (glass), A (aluminum) and, as applicable to joint substrates indicated, O (other).
h. Products:
1) Dow Corning 999-A
2) GE Contractors 1200
3) Pecora 863
4) Tremco Tremsil 300
5) Approved equal
2.3 LATEX JOINT SEALANTS
A. General: For interior locations only and where movement capacity and weathering characteristics are not critical, provide manufacturer's standard one-part, nonsag, mildew-resistant, paintable latex sealant of either acrylic or silicone emulsion formulation indicated that is recommended for exposed applications on interior locations and that accommodates indicated percentage change in joint width existing at time of installation without failing either adhesively or cohesively.
Joint Sealants 079200-3
B. Latex Sealant Standard: Comply with ASTM C 834 for each product of this description indicated in the Latex Joint-Sealant Schedule at the end of Part 3.
C. Available Products: Subject to compliance with requirements, latex joint sealants that may be incorporated in the Work include, but are not limited to, the following:
1. Latex Joint Sealant Designation: LS1
a. Acrylic-Emulsion Sealant: Provide product complying with ASTM C 834 that accommodates joint movement of not more than 5 percent in both extension and compression for a total of 10 percent.
b. Products:
1) "AC-20," Pecora Corp.
2) "Sonolac," Sonneborn Building Products Div., ChemRex, Inc.
3) "Tremco Acrylic Latex 834," Tremco, Inc.
4) Approved equal.
2.4 JOINT SEALANT BACKING
A. General: Provide sealant backings of material that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing.
B. Cylindrical Sealant Backings: ASTM C 1330, Type C (closed-cell material with a surface skin), Type O (open-cell material), Type B (bicellular material with a surface skin), or any of the preceding types, as approved in writing by joint-sealant manufacturer for joint application indicated, and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance.
C. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint. Provide self-adhesive tape where applicable.
2.5 MISCELLANEOUS MATERIALS
A. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials, free of oily residues or other substances capable of staining or harming joint substrates and adjacent nonporous surfaces in any way, and formulated to promote optimum adhesion of sealants to joint substrates. Confirm compatibility of cleaners with adjacent surfaces prior to application.
B. Masking Tape: Non staining, nonabsorbent material compatible with joint sealants and surfaces adjacent to joints.
PART 3 - EXECUTION
3.1 EXAMINATION
Joint Sealants 079200-4
A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint-sealant performance.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements:
1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost.
2. Clean porous joint substrate surfaces by brushing, grinding, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining after cleaning operations above by vacuuming or blowing out joints with oil-free compressed air. Porous joint substrates include the following:
a. Concrete.
b. Exterior insulation and finish systems.
3. Remove laitance and form-release agents from concrete.
4. Clean nonporous joint substrate surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants. Nonporous joint substrates include the following:
a. Metal.
b. Glass.
B. Masking Tape: Use masking tape where required to prevent contact of sealant or primer with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal.
3.3 INSTALLATION OF JOINT SEALANTS
A. General: Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated, unless more stringent requirements apply.
B. Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions indicated.
C. Install sealant backings of kind indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.
Joint Sealants 079200-5
1. Do not leave gaps between ends of sealant backings.
2. Do not stretch, twist, puncture, or tear sealant backings.
3. Remove absorbent sealant backings that have become wet before sealant application and replace them with dry materials.
D. Install bond-breaker tape behind sealants where sealant backings are not used between sealants and backs of joints.
E. Install sealants using proven techniques that comply with the following and at the same time backings are installed:
1. Place sealants so they directly contact and fully wet joint substrates.
2. Completely fill recesses in each joint configuration.
3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability.
F. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified in subparagraphs below to form smooth, uniform beads of configuration indicated; to eliminate air pockets;
and to ensure contact and adhesion of sealant with sides of joint.
1. Remove excess sealant from surfaces adjacent to joints.
2. Use tooling agents that are approved in writing by sealant manufacturer and that do not discolor sealants or adjacent surfaces.
a. Use masking tape to protect surfaces adjacent to recessed tooled joints.
3.4 PROTECTION
A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately so installations with repaired areas are indistinguishable from original work.
3.5 JOINT SEALANT SCHEDULE (Select from the following where indicated or required)
JOINT SEALANT SCHEDULE
DESIGNATION ON
DATA SHEETS
JOINT SEALERS
DESCRIPTION OF JOINT CONSTRUCTION AND
LOCATION WHERE SEALANT IS TYPICALLY APPLIED
Joint Sealants 079200-6
ES-4
One-Part Acid
Curing Silicon
Exterior and interior joints in vertical surfaces of non-pourous surfaces. To be used on exterior and interior perimeter frames of walls and control and expansion and window joints. Between metal to metal, glass to glass, metal to glass, travertine to travertine, cap beads on glass.
LS1
Latex Sealant
Exposed interior applications.
Notes:
1. Install sealant in joints fitting descriptions and locations listed.
2. "LS1 is for interior use only and are to be applied only if an "ES" designation is not otherwise indicated and where movement capacity and weathering characteristics are not critical.
4. If locations are encountered that are not described above, sealant manufacturer's recommendations are to be followed. The issue is to be brought to the attention of the Contracting Officer and General Contractor in writing. The appropriate sealant shall be submitted as part of the submittal process.
END OF SECTION 079200
Vapor Retarders 072600-1
NGVC - HVAC, WALL, TRIM & FINISH REPAIRS 2023
SECTION 072600 - VAPOR RETARDERS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Polyethylene vapor retarders.
2. Reinforced-polyethylene vapor retarders.
B. Related Requirements:
1. Section 072100 "Thermal Insulation" for vapor retarders integral with insulation products.
1.2 ACTION SUBMITTALS
A. Product Data: For the following:
1) 6 mil polyethylene vapor barrier (walls)
2) 12 mil reinforced polyethylene vapor barrier (crawlspace)
1.3 INFORMATIONAL SUBMITTALS
A. Product test reports.
PART 2 - PRODUCTS
2.1 POLYETHYLENE VAPOR RETARDERS
A. Polyethylene Vapor Retarders: ASTM D4397, 6 mil thick sheet, with maximum permeance rating of 0.1 perm.
1) Husky 6 mil plastic sheeting, clear, or approved equal.
Vapor Retarders 072600-2
2.2 REINFORCED-POLYETHYLENE VAPOR RETARDERS
A. Reinforced-Polyethylene Vapor Retarders: 12 mil sheet with outer layers of polyethylene film laminated to an inner reinforcing layer consisting of either nylon cord or polyester scrim with maximum permeance rating of 0.1 perm.
1. Nash White Cap 12 mil Standard Reinforced Crawl Space Vapor Barrier or approved equal.
PART 3 - EXECUTION
3.1 INSTALLATION OF VAPOR RETARDERS ON FRAMING
A. Extend vapor retarders to extremities of areas to protect from vapor transmission. Secure vapor retarders in place with adhesives, vapor retarder fasteners, or other anchorage system as recommended by manufacturer. Extend vapor retarders to cover miscellaneous voids in insulated substrates, including those filled with loose-fiber insulation.
B. Seal vertical joints in vapor retarders over framing by lapping no fewer than two studs and sealing with vapor-retarder tape according to vapor-retarder manufacturer's written instructions. Locate all joints over framing members or other solid substrates.
C. Seal joints caused by pipes, conduits, electrical boxes, and similar items penetrating vapor retarders with vapor-retarder tape to create an airtight seal between penetrating objects and vapor retarders.
D. Repair tears or punctures in vapor retarders immediately before concealment by other work. Cover with vapor-retarder tape or another layer of vapor retarders.
3.2 INSTALLATION OF VAPOR RETARDERS IN CRAWL SPACES
A. Install vapor retarders over prepared grade. Lap joints a minimum of 12 inches and seal with manufacturer's recommended tape. Install second layer over pathways to equipment.
B. Extend vapor retarder over footings and seal to foundation wall or grade beam with manufacturer's recommended tape.
1. Extend vapor retarder vertically minimum 16 inches and attach to stem wall to prevent sagging by mechanical means.
C. Seal around penetrations such as utilities and columns to create a monolithic, airtight membrane at grade surface, perimeter, and all vertical penetrations.
Vapor Retarders 072600-3
END OF SECTION 072600
GYPSUM BOARD 092900-1
NGVC - HVAC, WALL, TRIM & FINISH REPAIRS 2023
SECTION 092900 - GYPSUM BOARD
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Interior gypsum board.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.3 MEASUREMENT AND PAYMENT
A. Measurement shall be lump sum for repair of all damage associated with the moisture drying process and mold removal. Work includes installing insulation, installing plastic vapor barrier, drywall, tape/texture, and baseboards. Work includes re-installation or replacing trim boards that have been removed.
PART 2 - PRODUCTS
2.1 GYPSUM BOARD, GENERAL
A. Size: Provide maximum lengths and widths available that will minimize joints in each area and that correspond with support system indicated.
2.2 INTERIOR GYPSUM BOARD
A. Gypsum Wallboard: ASTM C 1396/C 1396M.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. CertainTeed Corporation.
b. Georgia-Pacific Building Products.
c. National Gypsum Company.
d. United States Gypsum Company.
B. Gypsum Board, Type X: ASTM C 1396/C 1396M.
1. Thickness: 5/8 inch.
2. Long Edges: Tapered.
2.3 TRIM ACCESSORIES
http://www.specagent.com/Lookup?ulid=12042 http://www.specagent.com/Lookup?uid=123457016076 http://www.specagent.com/Lookup?uid=123457016078 http://www.specagent.com/Lookup?uid=123457016079 http://www.specagent.com/Lookup?uid=123457016082
GYPSUM BOARD 092900-2
A. Interior Trim: ASTM C 1047.
1. Material: Galvanized or aluminum-coated steel sheet, rolled zinc, plastic, or paper-faced galvanized-steel sheet.
2. Shapes:
a. Cornerbead.
b. Bullnose bead.
c. LC-Bead: J-shaped; exposed long flange receives joint compound.
d. L-Bead: L-shaped; exposed long flange receives joint compound.
e. U-Bead: J-shaped; exposed short flange does not receive joint compound.
2.4 VAPOR BARRIER
A. 6 mil minimum plastic sheeting.
B. Vapor barrier tape- 3–4-inch acrylic low permeance seam tape.
2.5 JOINT TREATMENT MATERIALS
A. General: Comply with ASTM C 475/C 475M.
B. Joint Tape:
1. Interior Gypsum Board: Paper.
C. Joint Compound for Interior Gypsum Board: For each coat, use formulation that is compatible with other compounds applied on previous or for successive coats.
1. Prefilling: At open joints, rounded or beveled panel edges, and damaged surface areas, use setting-type taping compound.
2. Embedding and First Coat: For embedding tape and first coat on joints, fasteners, and trim flanges, use setting-type taping compound.
a. Use setting-type compound for installing paper-faced metal trim accessories.
3. Fill Coat: For second coat, use setting-type, sand able topping compound.
4. Finish Coat: For third coat, use setting-type, sand able topping compound.
5. Skim Coat: For final coat of Level 5 finish, use setting-type, sand able topping compound.
2.6 AUXILIARY MATERIALS
A. General: Provide auxiliary materials that comply with referenced installation standards and manufacturer's written instructions.
B. Steel Drill Screws: ASTM C 1002 unless otherwise indicated.
1. Use screws complying with ASTM C 954 for fastening panels to steel members from 0.033 to 0.112 inch thick.
GYPSUM BOARD 092900-3
3.1 APPLYING AND FINISHING PANELS
A. Examine panels before installation. Reject panels that are wet, moisture damaged, and mold damaged.
B. Comply with ASTM C 840.
C. Prefill open joints, rounded or beveled edges, and damaged surface areas.
D. Apply joint tape over gypsum board joints, except for trim products specifically indicated as not intended to receive tape.
1. Level 4: At panel surfaces that will be exposed to view unless otherwise indicated.
a. Primer and its application to surfaces are specified in Section 099123 "Interior Painting."
3.2 PROTECTION
A. Protect installed products from damage from weather, condensation, direct sunlight, construction, and other causes during remainder of the construction period.
B. Remove and replace panels that are wet, moisture damaged, and mold damaged.
END OF SECTION 092900
TILE CARPETING 096813.-1
USDA FOREST SERVICE, R-2
NGVC - HVAC, WALL, TRIM & FINISH REPAIRS 2023
SECTION 096813 - TILE CARPETING
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes modular carpet tile.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Sustainable Design Submittals:
1. Product Data: For adhesives, indicating VOC content.
2. Laboratory Test Reports: For adhesives, indicating compliance with requirements for low-emitting materials.
3. Laboratory Test Reports: For flooring products, indicating compliance with requirements for low-emitting materials.
C. Samples: For each exposed product and for each color and texture required.
1.4 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Sample warranty.
1.5 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.6 WARRANTY
A. Special Warranty for Carpet Tiles: Manufacturer agrees to repair or replace components of carpet tile installation that fail in materials or workmanship within specified warranty period.
1. Warranty Period: 10 years minimum from date of Substantial Completion.
1.7 MEASUREMENT AND PAYMENT:
A. Measurement shall be actual quantity on a square foot basis for all the carpeting in the building to be removed and replaced.
http://www.arcomnet.com/sustainable_design.aspx?topic=11 http://www.arcomnet.com/sustainable_design.aspx?topic=16
TILE CARPETING 096813.-2
PART 2 - PRODUCTS
2.1 CARPET TILE
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
1. Interface, LLC.
2. Mannington Mills, Inc.
3. Shaw Contract Group; a Berkshire Hathaway company.
4. Tandus/Centiva; a Tarkett Company.
B. Color: Gridline
C. Pattern: Mannington Commercial Align Carpet Tile-Gridline 24x24
D. Fiber Content: 100 percent nylon 6, 6.
E. Fiber Type: Antron Lumina Nylon or approved equal.
F. Pile Characteristic: Patterned (level)-loop pile.
G. Pile Height: 0.187 inches for finished carpet tile according to ASTM D 6859.
H. Primary Backing/Back coating: 100% recycled content with Thermoplastic polymer precoat, peel and stick back.
I. Backing System: Powerbond by Tandus-Centiva/Tarkett or approved equal.
J. Size: 24 by 24 inches.
K. Gage 5/64
L. Sustainable Design Requirements:
1. The carpet and under-carpet adhesives shall comply with the Carpet and Rug
Institute’s (CRI) Green Label Plus program.
M. Performance Characteristics:
1. Critical Radiant Flux Classification: Not less than 0.45 W/sq. cm according to
NFPA 253.
2.2 INSTALLATION ACCESSORIES
A. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet tile manufacturer.
B. Adhesives: Water-resistant, mildew-resistant, nonstaining, pressure-sensitive type to suit products and subfloor conditions indicated, that comply with flammability requirements for installed carpet tile, and are recommended by carpet tile manufacturer for releasable installation.
http://www.specagent.com/Lookup?ulid=11985 http://www.specagent.com/Lookup?uid=123457016353 http://www.specagent.com/Lookup?uid=123457016356 http://www.specagent.com/Lookup?uid=123457016361 http://www.specagent.com/Lookup?uid=123457016362
TILE CARPETING 096813.-3
1. Adhesive shall comply with the testing and product requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers." The building concentration of formaldehyde shall not exceed half of the indoor recommended exposure limit or 33 mcg/cu. m and that of acetaldehyde shall not exceed 9 mcg/cu. m.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Concrete Slabs:
1. Moisture Testing: Test to verify moisture content is 3.5 to 4.5 %.
2. Perform tests so that each test area does not exceed 1000 sq. ft, and perform no fewer than three tests in each installation area and with test areas evenly spaced in installation areas.
3.2 PREPARATION
A. General: Comply with CRI's "CRI Carpet Installation Standards" and with carpet tile manufacturer's written installation instructions for preparing substrates indicated to receive carpet tile.
B. Use trowelable leveling and patching compounds, according to manufacturer's written instructions, to fill cracks, holes, depressions, and protrusions in substrates. Fill or level cracks, holes and depressions 1/8 inch wide or wider, and protrusions more than 1/32 inch unless more stringent requirements are required by manufacturer's written instructions.
C. Concrete Substrates: Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical methods recommended in writing by adhesive and carpet tile manufacturers.
D. Broom and vacuum clean substrates to be covered immediately before installing carpet tile.
3.3 INSTALLATION
A. General: Comply with CRI's "CRI Carpet Installation Standard," Section 18, "Modular Carpet" and with carpet tile manufacturer's written installation instructions.
B. Installation Method: As recommended in writing by carpet tile manufacturer.
C. Maintain dye-lot integrity. Do not mix dye lots in same area.