J.2 Statement of Work (4 Pages).pdf

PDF 136 KB Posted

Attached to
Montrose Mezzanine and Metal Storage Cages
Solicitation number
1240LT23Q0048
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Montrose Building Mezzanine and Storage Metal Cages

Contents Project General Information

1.0 Scope of Work

Contractor Requirements

2.0 Technical Requirements / Tasks

3.0 Place of Performance

4.0 Deliverables

Attachment

Project Montrose Building Mezzanine and Storage Metal Cages

General Information

1.0 Scope of Work

Provide and install a pre-engineered free-standing steel mezzanine with integrated storage wire cage system.

Contractor Requirements

2.0 Technical Requirements / Tasks

The project consists in providing all material and workmanship to construct a pre-engineered free-standing steel mezzanine with integrated storage wire cage system.

• Mezzanine system o Minimum system requirements:

Designed for 125 PSF Approximate deck dimensions: 28’W x 20’D Clear height 7’ Include a 6’ lift gate, stairs, landing and railing.

o See specification section 134400 and drawings for additional information.

• Wire mesh partitions for storage cages:

o Provide seven cages integrated to the mezzanine system.

o Minimum cages requirements:

Cage # Approx. Dimensions Door type Door Handles

1 7'W x 20'L x 7'H 3' Sliding Door Front key lock with back lever handle 2 7'W x 20'L x 7'H 3' Sliding Door Front key lock with back lever handle 3 7'W x 20'L x 7'H 3' Sliding Door Front key lock with back lever handle 4 7'W x 20'L x 7'H 3' Sliding Door Front key lock with back lever handle 5 7'W x 15'L x 7'H 3' Sliding Door Front key lock with back lever handle 6 7'W x 15'L x 7'H 3' Sliding Door Front key lock with back lever handle 7 7'W x 15'L x 7'H 3' Sliding Door Front key lock with back lever handle o See specification section 102213 and drawings for additional information.

3.0 Place of Performance

Location: This project is located at the Montrose Administrative site located at 1318 6400 Rd, Montrose

CO 81403.

Points of Contact for this project are: Daris M Matos - 970-964-8803.

Roads are accessible all year around under normal circurtances.

Project Scheduling: Work hours for this project are between 8:00 AM – 5:00 PM Monday through Friday.

4.0 Deliverables

• Provide project schedule and estimated material delivery time with proposal.

• Provide manufacture’s product data or brochure of mezzanine and wire mesh partitions with proposal.

• Provide description on how the two systems will be integrated (use manufacturers recommendations or general constructions standards)

• Provide submittals for mezzanine system and wire mesh partitions after contract award, before ordering or manufacturing any equipment.

Attachment

Project
General Information
1.0 Scope of Work
Contractor Requirements
2.0 Technical Requirements / Tasks
3.0 Place of Performance
4.0 Deliverables
Attachment

File details come from the government source that posted it. Updated .