J.2 Statement of Work (4 Pages).pdf
PDF 136 KB Posted
- Attached to
- Montrose Mezzanine and Metal Storage Cages
- Solicitation number
- 1240LT23Q0048
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Montrose Building Mezzanine and Storage Metal Cages
Contents Project General Information
1.0 Scope of Work
Contractor Requirements
2.0 Technical Requirements / Tasks
3.0 Place of Performance
4.0 Deliverables
Attachment
Project Montrose Building Mezzanine and Storage Metal Cages
General Information
1.0 Scope of Work
Provide and install a pre-engineered free-standing steel mezzanine with integrated storage wire cage system.
Contractor Requirements
2.0 Technical Requirements / Tasks
The project consists in providing all material and workmanship to construct a pre-engineered free-standing steel mezzanine with integrated storage wire cage system.
• Mezzanine system o Minimum system requirements:
Designed for 125 PSF Approximate deck dimensions: 28’W x 20’D Clear height 7’ Include a 6’ lift gate, stairs, landing and railing.
o See specification section 134400 and drawings for additional information.
• Wire mesh partitions for storage cages:
o Provide seven cages integrated to the mezzanine system.
o Minimum cages requirements:
Cage # Approx. Dimensions Door type Door Handles
1 7'W x 20'L x 7'H 3' Sliding Door Front key lock with back lever handle 2 7'W x 20'L x 7'H 3' Sliding Door Front key lock with back lever handle 3 7'W x 20'L x 7'H 3' Sliding Door Front key lock with back lever handle 4 7'W x 20'L x 7'H 3' Sliding Door Front key lock with back lever handle 5 7'W x 15'L x 7'H 3' Sliding Door Front key lock with back lever handle 6 7'W x 15'L x 7'H 3' Sliding Door Front key lock with back lever handle 7 7'W x 15'L x 7'H 3' Sliding Door Front key lock with back lever handle o See specification section 102213 and drawings for additional information.
3.0 Place of Performance
Location: This project is located at the Montrose Administrative site located at 1318 6400 Rd, Montrose
CO 81403.
Points of Contact for this project are: Daris M Matos - 970-964-8803.
Roads are accessible all year around under normal circurtances.
Project Scheduling: Work hours for this project are between 8:00 AM – 5:00 PM Monday through Friday.
4.0 Deliverables
• Provide project schedule and estimated material delivery time with proposal.
• Provide manufacture’s product data or brochure of mezzanine and wire mesh partitions with proposal.
• Provide description on how the two systems will be integrated (use manufacturers recommendations or general constructions standards)
• Provide submittals for mezzanine system and wire mesh partitions after contract award, before ordering or manufacturing any equipment.
Attachment
| Project |
| General Information |
| 1.0 Scope of Work |
| Contractor Requirements |
| 2.0 Technical Requirements / Tasks |
| 3.0 Place of Performance |
| 4.0 Deliverables |
| Attachment |
File details come from the government source that posted it. Updated .