J.2 Statement of Work (2 Pages).pdf
PDF 150 KB Posted
- Attached to
- Brown/Booths/Staker Horseshoe Pit Crushing Federal contract opportunity
- Solicitation number
- 1240LT23R0058
- Issued by
- Department of Agriculture Forest Service
About this file
The document contains a statement of work for a federal contract to conduct pit crushing services at the Horseshoe Flat Pit located on the Manti-La Sal National Forest in Utah. The project scope includes minor pit development, crushing 16,000 cubic yards of aggregate to 2.5 inches or less, with an optional item to crush up to an additional 10,000 cubic yards to 1.5 inches or less. The work is governed by FP-14 specifications and is estimated to begin on July 10, 2023, with a performance period of 60 calendar days. The related solicitation provides additional details including a solicitation number, project name, opportunity type, agency, and notes the estimated value is between $250,000 and $500,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1240LT23R0058.0001 - SITE VISIT DATE CHANGE AND EXTEND DUE DATE.pdf | ||
| J.3 Project Specifications (2 Pages).pdf | ||
| J.1 Wage Determinations Sanpete County, UT (UT20230027) (01.06.2023) (6 Pages).pdf | ||
| J.5 Horseshoe Flat Pit (1 Page).pdf | ||
| J.4 Project Map (2 Pages).pdf | ||
| 1240LT23R0058 - Brown.Booths.Staker Horseshoe Pit Crushing.pdf | ||
| J.6 Experience Questionnaire (3 Pages).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C 1
SECTION C
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Horseshoe Flat Pit Crushing
C1 SCOPE OF CONTRACT
This project consists of minor pit development, crushing pit run aggregate crushing and placing it in a stockpile within the site. Base bid is for crushing 16,000 CY (Cubic Yards) of 2.5 inch minus pit run aggregate. Optional bid item is for crushing up to 10,000 CY (Cubic Yards) of 1.5 inch minus pit run aggregate. Material will be taken in even layers up to 3 ft. in depth across entire areas within the pit boundary as marked on ground by the Forest Service. The work shall be in accordance with the FP-14 “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects”.
The intent of the contract is to provide for the complete construction of the project described in the contract.
Unless otherwise provided, the contractor is to furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in reasonably close conformity with the drawings and specifications, and in accordance with the provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for the items shown in the Schedule.
- Base Option is for crushing 16,000 CY (Cubic Yards) of pit run aggregate where 100% will pass through 2 ½ inch sieve.
- Optional bid item is for crushing up to 10,000 CY (Cubic Yards) of pit run aggregate where 100% will pass through 1 ½ inch sieve.
C2 PROJECT LOCATION
Project is located approximately 22 miles northeast of Ephraim, You can access the Horseshoe Flat Pit from Ephraim by traveling east on Higway 29 up Ephraim Canyon to the intersection with Forest road 50150 Skyline drive, then North on 50150 Skyline Drive to the pit. Pit is located just East of 50150 Skyline Drive.
C3 SITE INFORMATION AND LIMITATIONS
The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
(a) Utilities are not available at the site for construction purposes.
(b) No fuel storage on site is permitted. Fuel trucks must be equipped with spill containment kits and portable berms that meet all state and federal regulations. A spill containment plan must be submitted and approved prior to construction.
(c) All construction equipment shall be pressure washed before entering the Site in compliance with the specifications. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations. The contractor shall notify the
SECTION C 2
Contracting Officer 48 hours in advance of mobilizing equipment to the site to arrange an inspection and meet the requirements of FSSS 171 Weed Prevention.
(d) The contractor will be able to utilize the Forest Service Roads; however, the Contractor will be responsible for any damage to the roads due to construction activities. The contractor shall be responsible for obtaining permission to use all other roads and staging areas.
C4 TRAFFIC CONTROL AND CONSTRUCTION SIGNING
No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Bid Schedule.
C5 WORK CAMPS, STAGING AND STORAGE AREAS
Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site.
C6 INSPECTION OF WORKSITE
The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions, including unclassified material for excavation, that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
C7 START DATE
July 10, 2023
C8 CONTRACT TIME
60 Calendar days
C9 SPECIFICATIONS
The Forest Service, US Department of agriculture has adopted FP-14 - “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” from “U.S. Department of Transportation” Federal Highway Administration for construction of National Forest System Roads. The FP-14 is available for downloading at the following URL: https://flh.fhwa.dot.gov/resources/specs/fp-14/fp14.pdf https://flh.fhwa.dot.gov/resources/specs/fp-14/fp14.pdf
| SECTION C |
| DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK |
| C1 SCOPE OF CONTRACT |
| C2 PROJECT LOCATION |
| C3 SITE INFORMATION AND LIMITATIONS |
| C4 TRAFFIC CONTROL AND CONSTRUCTION SIGNING |
| C5 WORK CAMPS, STAGING AND STORAGE AREAS |
| Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site. |
| C6 INSPECTION OF WORKSITE |
| C7 START DATE |
| C8 CONTRACT TIME |
| C9 SPECIFICATIONS |
File details come from the government source that posted it. Updated .