J.2 Section B - Schedule of supplies or services.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- NOAA Ship Ronald H. Brown: Mid-Life Refit Federal contract opportunity
- Solicitation number
- 1305M221RNMAN01155
About this file
This document includes a schedule of prices and work packages for the mid-life refit of the NOAA Ship Ronald H. Brown. The refit modification will replace or overhaul many of the ship's systems, such as repowering, bow thrusters, Z-drives, potable water, HVAC, science refrigeration, and exterior tanks. It will also replace much of the ship's piping and steel. The schedule lists 37 work packages with blank unit prices. Additional items include laydays, temporary services, and additional request items priced by labor hours and material markup. The related federal contract opportunity provides details on the solicitation to establish a firm fixed price contract for the mid-life refit. Interested offerors must submit inquiries by June 28, 2021 and proposals by August 6, 2021 to the Department of Commerce National Oceanic and Atmospheric Administration. The refit aims to upgrade key ship systems and infrastructure to support continued NOAA research and operations.
View the file
Other files for this federal contract opportunity
Show all 50
NOAA Ship Ronald H. Brown: Mid-Life Refit has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Prices
| PRICE SCHEDULE | ||||||
| BASIC ITEMS | ||||||
| CLIN | WORK PACKAGE | WORK PACKAGE TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 0001 | WP 00 | Shipyard Contract Technical Specification | JB | 1 | $0.00 | |
| 0002 | WP 01 | Repower | JB | 1 | $0.00 | |
| 0003 | WP 02 | Bow Thruster System Modifications | JB | 1 | $0.00 | |
| 0004 | WP 03 | Z-Drive Overhaul | JB | 1 | $0.00 | |
| 0005 | WP 04 | Ballast System Piping | JB | 1 | $0.00 | |
| 0006 | WP 05 | Firemain System Piping Replacement | JB | 1 | $0.00 | |
| 0007 | WP 06 | Potable Water System Modifications | JB | 1 | $0.00 | |
| 0008 | WP 07-A | AC Spaces General | JB | 1 | $0.00 | |
| 0009 | WP 07-B | AC Controls Upgrades | JB | 1 | $0.00 | |
| 0010 | WP 07-C | AHU-5 Zone Redesign | JB | 1 | $0.00 | |
| 0011 | WP 07-F | AC in Winch Room 2-99-0 | JB | 1 | $0.00 | |
| 0012 | WP 07-G | Addition of AHU-9 for Fwd Berthing | JB | 1 | $0.00 | |
| 0013 | WP 08-A | HVAC Makeup Air Upgrades | JB | 1 | $0.00 | |
| 0014 | WP 08-B | Generator Room Supply Fan Modifications | JB | 1 | $0.00 | |
| 0015 | WP 08-C | Laundry Room HVAC Modifications | JB | 1 | $0.00 | |
| 0016 | WP 10 | Sewage System and Drain Replacement | JB | 1 | $0.00 | |
| 0017 | WP 11 | Ship Stores Refrigeration Equip. Replacement | JB | 1 | $0.00 | |
| 0018 | WP 12 | Science Refrigeration System Modifications | JB | 1 | $0.00 | |
| 0019 | WP 13 | Uncontaminated Seawater system Modifications | JB | 1 | $0.00 | |
| 0020 | WP 15 | Dial Telephone System Modifications | JB | 1 | $0.00 | |
| 0021 | WP 16 | Navigation Lighting System Modifications | JB | 1 | $0.00 | |
| 0022 | WP 18 | Aft Control Station Console Removal | JB | 1 | $0.00 | |
| 0023 | WP 19 | Exterior Ballast and Fuel Tank Vent Modifications | JB | 1 | $0.00 | |
| 0024 | WP 20 | Hydraulic Oil Transfer Pump Installation | JB | 1 | $0.00 | |
| 0025 | WP 21 | Oily Water Separator Replacement | JB | 1 | $0.00 | |
| 0026 | WP 23 | Anchor and Chain Maintenance | JB | 1 | $0.00 | |
| 0027 | WP 24 | Overhead Lighting Upgrades | JB | 1 | $0.00 | |
| 0028 | WP 25 | Steel Replacement | JB | 1 | $0.00 | |
| 0029 | WP 26 | Drydocking | JB | 1 | $0.00 | |
| 0030 | WP 27 | Transducer Modifications | JB | 1 | $0.00 | |
| 0031 | WP 28 | Scientific Power and Network System Modifications | JB | 1 | $0.00 | |
| 0032 | WP 30 | TLI System Renewal | JB | 1 | $0.00 | |
| 0033 | WP 31 | CTD Winch Overhauls | JB | 1 | $0.00 | |
| 0034 | WP 33 | Interior Decking Replacement | JB | 1 | $0.00 | |
| 0035 | WP 35 | Radar Renewals | JB | 1 | $0.00 | |
| 0036 | WP 37 | Navigational System Renewals | JB | 1 | $0.00 | |
| 0037 | WP 38 | General Maintenance | JB | 1 | $0.00 | |
| Total Basic Items | $0.00 | |||||
| ADDITIONAL ITEMS - GROWTH | ||||||
| ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The prices established as AIRs/Growth Labor Rate, AIRs/Growth Material Markup/Handling Fee, and the Pre-priced “Lot” items will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown for the number of labor hours and amount needed for materials is an estimate only and may be exceeded. | ||||||
| CLIN | DESCRIPTION | UNIT | QTY | UNIT PRICE | EXTENDED PRICE | |
| 0038 | Laydays (See CAR Clause 1372.271-86) | Day | 1 | $0.00 | ||
| 0039 | Additional Temporary Services (See CAR Clause 1372.271-89) | Day | 1 | $0.00 | ||
| 0040 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate
| Unit Price: $________; Quantity: 28,000; Unit of Issue: Hour; $___________ (enter this amount in Extended Price) | HRS | EST. 28,000 | $0.00 | |
| AIRs/Growth Material Markup/Handling Fee |
Unit Price: $7,000,000.00; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [$7,000,000.00 X percentage quoted + $7,000,000.00]: $___________ (enter this amount in Extended Price) | % | EST. $7,000,000.00 | $0.00 | |
| Pre-priced “Lot” items, as defined by the Work Package in the Specification: This pricing should include labor, material, and markup to represent a total cost. |
WP-00 General Lot 1A: Shell Plating Renewals 3/4" Hull Plating on Vessel's Keel $_____________ 1/2" Hull Plating on Vessel's Underwater Hull and Boottop $_____________ 3/8" Plating on Vessel's Hull and Freeboard $_____________
WP-00 General Lot 1B: Deck Renewals Cut out and Replace Deck (Deck Thickness in inches) 1/2" $_____________ 3/8" $_____________ 5/16" $_____________ 1/4" $_____________
WP-00 General Lot 1C: Fan Room Deck Renewals Fan Room 03-67-1 $_____________ Fan Room 01-60-2 $_____________ Fan Room 1-22-4 $_____________ Fan Room 1-42-1 $_____________ Fan Room 1-64-6 $_____________
WP-00 General Lot 1D: Structural Member Renewals $_____________ WP-00 General Lot 2A: Piping Renewals Pipe Size (in) x Schedule x Material x # of Fittings <2" x 40 x Steel x 4 $_____________ 2"- 4" x 40 x Steel x 2 $_____________ 6" x 40 x Steel x 2 $_____________ <2" x 80 x Steel x 4 $_____________ 2"-4" x 80 x Steel x 2 $_____________ 4"-6" x 80 x Steel x 2 $_____________ <2" x 40 x Stainless Steel x 4 $_____________ 2"-4" x 40 x Stainless Steel x 2 $_____________ 4"-6" x 40 x Stainless Steel x 2 $_____________ <2" x 40 x CuNi x 4 $_____________ 2"-4" x 40 x CuNi x 2 $_____________ 4"-6" x 40 x CuNi x 2 $_____________
WP-00 General Lot 2B: Pipe Insulation Renewals Pipe Size (in.)
<2" $_____________ 2"-4" $_____________ 4"-6" $_____________ WP-00 General Lot 3A: Pipe Penetrations Size (in) <2" pipe $_____________ 2"-4" pipe $_____________ 4"-6" pipe $_____________
WP-00 General Lot 3B: HVAC Penetration $_____________
WP-00 General Lot 3C: MCT installation 5.5” x 4.75” rectangular $_____________ 5.5” x 7” rectangular $_____________ 5.5” x 8.5” rectangular $_____________ 5.5" x 11.75” rectangular $_____________
WP-00 General Lot 4: Coating Renewals on Steel Plate Deck tops $_____________ Underside of decks, including stiffeners $_____________ Vertical surfaces $_____________ Vertical surfaces with stiffeners $_____________
WP-00 General Lot 5: UT Shoots $_____________
WP-00 General Lot 6: Crane Services $_____________
WP-05 Fire System Piping Replacement Cable Replacement $_____________
WP-08A HVAC Makeup Air Upgrades Port Supply Duct $_____________ Starboard Supply Duct $_____________
WP-10 Sewage System and Drain Replacement Ejector Nozzle Assembly Replacement $_____________
WP -19 Exterior Ballast and Fuel Tank Modifications Fuel Oil Vents $_____________
WP-33 Interior Decking Replacement Joiner Panel Replacement $_____________ Coaming Replacement $_____________
| Total Growth | $0.00 |
| BASIC WORK PACKAGES | $0.00 |
| BASE WORK PACKAGES +GROWTH | $0.00 |
&KFF0000(RFP#)
Schedule B