J.2 Cost Proposal Template CPFF.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- National Roadside Survey
- Solicitation number
- 693JJ922R000060
About this file
This document outlines requirements for a federal contract to conduct a national roadside survey. The contractor will perform a survey in 2024 to estimate the prevalence of drivers and other road users under the influence of alcohol, over-the-counter drugs, prescription drugs, and illegal drugs. At a minimum, the contractor must obtain oral fluid samples from 8,000 drivers and additional samples from other road users such as pedestrians, bicyclists, and scooter riders. The contractor will also conduct a separate pilot test of methodology and protocol for surveying non-driver road users to determine feasibility of future large-scale surveys. Both the national roadside survey and pilot test will be conducted according to the protocol from a 2013-2014 survey. The contractor must ensure all aspects of the study such as site selection, data collection, specimen handling and analysis, and reporting are performed efficiently and on schedule. The Department of Transportation National Highway Traffic Safety Administration is the awarding agency for this contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J.7 Small Business Subcontracting Plan Template (FY2022).docx | DOCX document | |
| RFP 693JJ922R000060 National Roadside Survey.pdf | ||
| J.6 SUBCONTRACTING CHECKLIST.docx | DOCX document | |
| J.5 Other Direct Cost Breakdown Spreadsheet.xlsx | XLSX spreadsheet | |
| J.3 SFLLL_1_2-V1.2.pdf | ||
| J.1 PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| J.4 Travel Cost Breakdown Spreadsheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| COST ELEMENTS | Total FTEs | TASK 1 | TASK 2 | TASK 3 | Total | ||||||||
| Hours | Rates | Total | Hours | Rates | Total | Hours | Rates | Total | Hours | Rates | Total | ||
| COST ELEMENTS |
| Direct Labor | ||||||||||||
| $20.00 | $0 | 40 | $20.00 | $800 | 10 | $20.00 | $200 | 50 | $20.00 | $1,000 | ||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | |||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | |||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | |||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | |||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | |||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | |||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | |||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | |||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | |||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | |||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | |||||
| Subtotal Direct Labor | 0 | $0 | 40 | $800 | $200 | 50 | $1,000 |
Fringe Benefits (at ____%)
Total Direct Labor $0 $800 $200 $1,000
| Travel (See separate schedule) | $0 | $0 | $0 | $0 | ||||
| SUBCONTRACTORS | ||||||||
| Subcontractor Name | $0 | $0 | $0 | $0 | ||||
| Subcontractor Name | $0 | $0 | $0 | $0 | ||||
| Subcontractor Name | $0 | $0 | $0 | $0 | ||||
| Subcontractor Name | $0 | $0 | $0 | $0 | ||||
| Subcontractor Name | $0 | $0 | $0 | $0 | ||||
| Subcontractor Name | $0 | $0 | $0 | $0 | ||||
| Subcontractor Name | $0 | $0 | $0 | $0 | ||||
| Total Subcontractor | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 |
Other Direct Costs (See separate schedule) $0 $0 $0 $0
SUBTOTAL ALL DIRECT COSTS $0 $800 $200 $1,000
Indirect Costs (at ______ %) $0 $0 $0 $0
SUBTOTAL COSTS BEFORE FEE $0 $800 $200 $1,000
Fee/Profit (at ______%)
TOTAL PRICE per PLAN and Parent $0 $800 $200 $1,000
Offerors can add more columns as necessary to incorpotate all tasks.
National Roadside Survey
RFP # 693JJ922R000060
J.2 Cost Proposal Template
Sheet2
Sheet3