Pre Climb Checklist

Pre-Climb Checklist
Before climbing, answer each question below (using binoculars, as applicable). If any of the questions in this section are answered "Yes", do not climb the tower. When climbing, if any of the questions change from "No" to "Yes", either due to inspection or a change in conditions, immediately return to ground. Furthermore, questions may require an interim "Do Not Climb" sign be attached to the tower. For further clarification please refer to Tower Structure Inspection Instruction Guide.
1. Reserved
Is the climbing procedure as outlined in FAA Order 3900.19C and ANSI Z359.2 unavailable or not developed by a competent person?
2. Is the rescue plan unavailable or not effective?
3. Do wind speeds exceed 45 mph?
4. Is lightning striking 40 miles away or less?
All Towers
5. Are there any power lines within three feet or any transmission lines (>5000 volts) within one hundred feet of any metal tower components including guy wires?
6. From a distance, does the tower appear to lean more than one foot horizontally for each 40 feet of height?
7. From a distance, does the tower appear bowed, kinked or out of alignment at any point more than one foot horizontally in each 40 feet of height?
8. From the base of each tower leg looking up, does the leg appear to be bowed, kinked or twisted out of that straight line more than one foot for each 40 feet of height at any point along the way from bottom to top?
9. Does the ladder/ladder safety system and its connections have hardware missing, excessive rust or major damage?
10. Does the ladder safety system and ladder have ice or other debis that could cause a loss of proper function, footing, or handholds?
11. Has the leg metal rusted so far into the CSF3 stage such that metal is obviously missing or edges of steel are delaminating (edge appears as thin, separating layers rather than one solid thickness/piece)?
12. Is the leg split/cracked at the corners or the weld to the base plate cracked?
13. If the legs are made from pipes or structural tubing welded to plates so as to be closed off at the bottoms (even if weep holes are open), is a dull thud sound heard rather than more of a ring when struck with a hammer near the base/plate?
14. If the bolts used for the leg splices (or base connections) have rusted to CSF3 stage, are any bolts missing from the splice or nuts from the base plate?
15. If the bolts used for the leg splices (or base connections) have not rusted to CSF3 stage, are half the bolts missing from the splice or nuts from the base plate (if a butt type splice, half from the total or from either side of the joint)?
First evaluate the condition of all tower members (diagonal and horizontal). A “YES” to any of the three questions below (Questions 16-18) fails the individual brace member.

If either of the following conditions apply to any SECTION FACE, the tower is not safe to climb:

• IF the number of all FAILED brace members in that SECTION FACE equal more than half of the TOTAL brace members in that SECTION FACE.

• OR, there are four or more vertically consecutive FAILED brace members in that SECTION FACE. 9

16. Has the bracing rusted so far into the CSF3 stage such that metal is obviously missing or edges of steel are delaminating (edge appears as thin, separating layers rather than one solid thickness/piece)? 9
17. Is the bracing bent or bowed more than three inches in a five foot long piece (six inches if a ten foot long piece, etc.)? 9
18. Are more than half of all bolts used to attach the brace to the tower leg (or its connection plate at the leg) missing or weld cracked more than halfway thru if welded? 9
Guyed Towers ONLY
19. Have any of the tower’s guy wires, connecting hardware or anchor metal rusted to the Corrosion Severity Factor 3 (CSF3) stage?
20. Do concrete guy anchors have large cracks and/or broken/spalled areas that lead to the embedded metal or is more than two feet of vertical concrete surface exposed above grade due to erosion or ground settling?
21. If the tower is >20 years old, are the guy wires connected to a metal rod smaller than one inch in diameter that's in direct contact with the earth with no concrete visible above ground?
22. Do any of the wires for the tower appear to droop or, sag more than one foot from an imaginary line between the anchor and its connection to the tower?
23. If turnbuckles are present near the anchor, are no threads visible inside the barrel portion for either connecting end (connecting rod end flush with or inside the threaded female socket)?
24. Is sharp kinking or fraying of guy wire strands evident at the bend where connected to the anchor or tower (potential for this is much greater if the guy wire/cable has rolled out of the thimble or no thimble is present)?
25. If only two cable clips/clamps are used to connect any of the guy wires either at the anchor or at the tower connection, are they applied incorrectly (saddle on “dead” end, U-bolt over “live” end) or loose?
Self Supported Towers ONLY
26. Has the tower foundation concrete at the support legs been covered/buried such that it cannot be readily exposed to permit a leg base inspection?
27. Are the tower legs at the bases supported by any other method than the legs being embedded directly into concrete or by them being connected to either anchor bolts or other metal items that are embedded in the concrete (ex: tower leg base rests on insulator items of unknown material strength)?
28. Does the tower foundation concrete have large cracks and/or broken/spalled areas that lead to the embedded metal at the leg bases or that expose the embedded reinforcing steel or is more than two feet of vertical concrete surface exposed above grade due to erosion or ground settling?

Site & Assest Data

Annual Tower Structure Inspection Checklist - Site and Asset Data
A.1. Site InformationB. Inspection Information
SSCFAC Phone #Inspector
FAC IDFire #Team Members
FAC TypePolice #Inspection Date
CityAmbulance #
StateRescue #Skies
Total # Tower Structures# Self Supporting# Guyed StructuresWindspeed
A.2. Tower InformationDirection of Wind From
Tower ID #Serial #Temperature
Year of ConstructionLatitudeContact #
ManufacturerLongitudeDistrict POC Reviewer
***File Naming: SSC_Site Ident_Site Type_Year_TMT-Inspection_Tower_#of#
C.1. Site Sketch (ID North and Tower Numbers)
(To number the towers according to FAA protocol, face north and number the towers clockwise from 1 to x.)
C.2. Tower Sketch (Tower Height, Ob Lights, and Guy Wires/Anchors, as applicable)
(Sketch : Guys numbered from bottom to top of point connected on tower - show distance of anchor to tower & indicate torque arms)
D. Tower Information
D1. What is the tower type?Self-supportingGuyedMonopoleOther
If other, describe:
D2. What is the tower shape?CylinderSquare ShaftSquare PyramidSquare Pyramid Base w/Shaft Top
Triangle ShaftTriangle PyramidTriangle Pyramid Base w/Shaft Top
D3. What is the tower material?Coated Steel - GalvanizedCoated Steel - Painted
Uncoated SteelWoodOther
D4. What is the tower height?feet
D5. Face Widthinches
D6. If present, where is the antenna feedline/conduit located on the tower?InsideOutside
D7. Number of Sections / Length(s) / Panels (per section or entire tower)
D8. Leg Splice 9Yes/No
D9. Leg Material / Dimensions (At Base) 9Leg A / B / C / D (Circle All that apply)
TypeAngle TubeThicknessinches
Width / Diameterinches
MaterialCoated Steel - GalvanizedCoated Steel - Painted
Uncoated SteelWoodOther
Leg A / B / C / D (Circle All that apply)
TypeAngle TubeThicknessinches
Width / Diameterinches
MaterialCoated Steel - GalvanizedCoated Steel - Painted
Uncoated SteelWoodOther
D10. Leg Material / Dimensions (At Height or Change of Shape)Leg A / B / C / D (Circle All that apply)
TypeAngle TubeThicknessinches
Width / Diameterinches
MaterialCoated Steel - GalvanizedCoated Steel - Painted
Uncoated SteelWoodOther
Leg A / B / C / D (Circle All that apply)
TypeAngle TubeThicknessinches
Width / Diameterinches
MaterialCoated Steel - GalvanizedCoated Steel - Painted
Uncoated SteelWoodOther
Confirm Data Initial:
E. Obstruction Light Information
F1. Ob Light InfoTypeQTYMaterialQTYColorQTY
Steady-BurningIncandescentRed
FlashingLEDWhite
Red/White
ConfigurationQTYAccess MethodQTYConduit LocationQTY
SinglePlatformInside
DualLadderOutside
Off Ladder
Confirm Data Initial:
G. Ladder Information
G1. What is the rung shape?Solid RoundTubular RoundAngle
Structural LumberBar
G2. What is the side rail shape?Solid RoundTubular RoundAngle
Structural LumberBar
G3. What is the ladder material?Coated Steel - GalvanizedCoated Steel - Painted
Uncoated SteelWoodAluminum
StainlessFiberglass
Other
G4. Where is the ladder located?Inside TowerOutside Tower
G5. What is the total ladder height (from ground/floor/roof to top)?feetinches
G6. Are the rungs at least 16" wide? Measure from inside of one side rail to the other.YesNoWhat is spacing?inches
G7. Is the rung spacing not more than 12" and uniform throughout? Measure from rung top to rung top. Pay attention to spacing between ladder sections.YesNoWhat is spacing?inches
G8. What is the rung diameter?inches
G9. What is the height from the ground/floor/roof to the lowest rung?feetinches
G10. Is the clearance on the climbing side at least 30"?YesNoList any obstructions:
G11. Is there a 7" backside clearance throughout the ladder length?YesNoIf no, describe:
G12. Is the ladder pitch between 75 & 90 degrees from horizontal? (estimate)YesNoIf no, describe:
G13. Does the ladder extend at least 42" above platform?YesNoIf no, what is height?inches
G14. Is a ladder cage present?YesNoIf No, skip to section G.
G15. What is the ladder cage material?Coated Steel - GalvanizedCoated Steel - Painted
Uncoated SteelOther
Confirm Data Initial:
H. Ladder Safety System (LSS) Information
H1. Is there a LSS present?YesNoIf No, skip to section H.
H2. What type of LSS rail is present?T Rail (Radian, Antenna Products, etc.)Tubular Round (Antenna Products, North, etc.)
Channel Notched (MSA/Rose, etc.)Solid Round
Cable - Galvanized Steel (LadSafe, Latchways, Other)Cable - Stainless Steel (LadSafe, Latchways, Other)
FlatOther
H3. Where is the safety sleeve stored?At the siteWith the ATSSOther (specify):
H4. Is the height from the ground/floor/roof to the bottom of the LSS, 42" or less?YesNoIf no, what is height?inches
H5. Who is the manufacturer and what is the model, if identifiable?

Manufacturer markings are sometimes found on the back of the safety rail and usually found on the safety sleeve. Enter "unknown" if not identifiable.

H6. Does the LSS extend at least 42" above platform?YesNoIf no, what is height?inches
H7. If the LSS is a rigid rail, does the rail have a top stop (to prevent sleeve from sliding off)?YesNoN/A
H8. Is a pivot davit mounted at the top of the LSS?YesNoN/A
H9. If the LSS is a cable, is its diameter at least 3/8"?YesNoN/AIf no, what is diameter?inches
H10. If the LSS is a cable, are cable guides used every 25'?YesNoN/AIf no, describe:
Confirm Data Initial:
I. Platform Information
I1. What is the platform type?WorkLandingBridgeCatwalk
I2. What is the platform shape?RectangleTriangleSquare
I3. What is the platform floor material?Steel GratingSolid MetalWood
Coated Steel - GalvanizedStructural LumberOther
I4. Are there unused ports/openings greater then 2"?YesNo
I5. How is the platform accessed and protected?Swing Gate1-Door Hatch2-Door HatchOffset Opening
Self-Closing Swing Gate1-Door Hatch with CounterweightNo Access
I6. What is the angle at which the hatch cover rests when open?
Measure from horizontal (estimate). If 2-door hatch, provide greater angle.degreesN/A
I7. Is the step-across distance from the ladder to the platform between 2.5" and 12"? Or on ladders greater then 16" wide is the distance from the platform to the center of the ladder less then 20"?YesNoIf no, what is distance?inches
I8. Is there a ladder rung located at the platform level?YesNoN/A
I9. Do vertical grab bars, if present, have the at least same spacing as the ladder side rails but no greater 30"and are at least the equivalent of the round-rung diameters?YesNoN/A
I10. Is the platform hatch cover constructed of material that has the same strength as the platform?YesNoN/A
If no, describe:
I11. Is the platform hatch cover set flush with the platform, or projects no more than 1"?YesNoN/A
If no, describe:
I12. Conduit, Junction Boxes and Fasteners at Platform Level Secure?YesNo
I13. Is an OSHA-compliant guardrail provided for platforms 4' or more above grade?

Guardrail height measurements:

Toeboard: 4" (no more than 1/4" gap between platform floor and base of toeboard) Midrail: located between toeboard and top rail so that no opening is greater than 19" Top rail: 42" Guardrail material:

Angle iron: 2x2x3/8"; space between posts 8' or less Standard pipe: 1.5" diameter; space between posts 8' or less

Wood: 2x4"; space between posts 6' or lessYesNo
If no, describe (include measurements):
Confirm Data Initial:
J. Stairway Information
J1. What is the stairway material?Coated Steel - GalvanizedStructural LumberOther
J2. Where is the stairway located?Inside TowerOutside Tower
J3. Are there 4 or more risers (steps) in the stairway?YesNo
J4. Is the stairway at least 22" wide?
Measure at narrowest point.YesNoIf no, what is the width?inches
J5. Is tread depth at least 8" for stairs with closed risers or 6" for stairs with open risers? Measure narrowest tread if depth varies.YesNoIf no, describe:
J6. Is the approximate stairway rise between 30 and 50 degrees? Estimate.YesNoIf no, describe:
J7. Are stair treads slip-resistant?YesNoIf no, describe:
J8. If stairway landings/platforms are present, are they at least the width of the stairway and at least 30" in length (measured in the direction of travel)?YesNoN/A
If no, describe:
J9. Is a vertical clearance of at least 7' maintained throughout the stairway?YesNoIf no, describe:
J10. Is the stairway enclosed on the sides?NoOne sideBoth sides
J11. Is there a handrail present?YesNoIf no, continue to Pre-Climb Checklist
I12. Is it an OSHA-compliant stair handrail?

Handrail height measurements:

30-34" from upper surface of handrail to surface of tread in line with face of riser at forward edge of tread Handrail material:

Hardwood: at least 2" diameter Metal pipe: at least 1-1/2" diameter Bracket measurements:

Provide minimum 3" clearance between handrail and wall or any projection from wall

Spacing between brackets shall not exceed 8'YesNo
If no, describe (include measurements):

Confirm Data Initial:

N/A

N/A N/A N/A

Annual If Guyed

Annual Tower Structure Inspection Checklist - Guyed Towers
B. Inspection Information
Inspector
Team Members
Inspection Date
Skies
Windspeed
Direction of Wind From
Temperature
Contact #
District POC Reviewer
E. Guy Cable Information
E1. Leg A Guy Number________________________________________
Guy Cable Size (in)
Guy Cable Type
Initial Tension
Height on Tower (ft)
Anchor Distance to Tower (ft)
Anchor Elevation Relative to Tower Base (ft)
E2. Leg B Guy Number________________________________________
Guy Size
Guy Type
Initial Tension
Height on Tower
Anchor Distance to Tower (ft)
Anchor Elevation Relative to Tower Base (ft)
E3. Leg C Guy Number________________________________________
Guy Size
Guy Type
Initial Tension
Height on Tower
Anchor Distance to Tower (ft)
Anchor Elevation Relative to Tower Base (ft)
E4. Leg D Guy Number________________________________________
Guy Size
Guy Type
Initial Tension
Height on Tower
Anchor Distance to Tower (ft)
Anchor Elevation Relative to Tower Base (ft)
Confirm Data Initial:
L. Guy Cable Information
ProblemExample
L1. Anchor GroundYesNoErosion, Settling, Anchor Head Burried, Drainage, Obstructions
L2. Anchor ConcreteYesNoCracking, Spalling, Chipped/Broken, DustingErosion, Settling, Anchor Head Burried, Drainage Obstructions
L3. Anchor Rods/PlatesYesNoBroken, Bent, Rust/Corrosion, Cracked Welds
L4. Are there any problems with the Guy System Hardware? (loose, missing, rust/corrosion, improper installation)YesNo
If yes, explain:
L5. Are any of the guy cables damaged or severely rusted/corroded?YesNo
If yes, explain:
L6. Are any of the guy cables sagging excessively?YesNo
If yes, explain:
L7. Are there any obstructions/transmission lines around the guy cables or anchors?YesNo
If yes, explain:
Note: Add Guy Numbering Scheme to Column Headers as Appropriate.
Note: Record Ground Resistance for Guy Anchors in Question M6.
L8. Leg A Guy Number________________________________________
Measured Tension/Temp
L9. Leg B Guy Number________________________________________
Measured Tension/Temp
L10. Leg C Guy Number________________________________________
Measured Tension/Temp
L11. Leg D Guy Number________________________________________
Measured Tension/Temp
NOTES (Guy Wire System)
M. Grounding
Problem
M1. Tower base groundingYesNo
M2. Tower legs groundingYesNo
M3. Guy wire grounding (bridged and connected to earth ground)YesNo
M4. Down conductors bend radius (must be > 8")YesNo
M5. Grounding/lightning arrest equipment (in place, secure, and corrosion-free)YesNo
N. Obstruction Light Information
Problem?
N1. OB Light Control BoxYesNo
N2. OB Light Photo CellYesNo
N3. Conduit/Junction Box (Secure)YesNo
N4. Fastener/Hardware (Secure)YesNo
N5. OB Light Bulbs and Lenses -ConditionYesNo
Notes:
O. Ladder Information
O1. Is there a ladder present?YesNoIf No continue to Section P
O2. Is the ladder sound?YesNoIf no, describe:
O3. Is the ladder free of splinters, sharp edges, burrs, or projections?YesNoIf no, describe:
P. Ladder Safety System (LSS) Information
P1. Does the LSS function properly?YesNo
P2. Faulty Safety Sleeve/SliderYesNoIf yes, describe:
P3. Broken/Bent/Misaligned SectionsYesNoIf yes, describe:
P4. Rust/CorrosionYesNoIf yes, describe:
P5. Loose/Missing HardwareYesNoIf yes, describe:
P6. OtherYesNoIf yes, describe:
Q. Platform Information
Q1. Is there a platform present that is more than 4' above the ground/floor/roof? (Measure to floor of platform.)YesNoIf No continue to Section R
Q2. Is the platform floor sound (grating adequately secured, no openings into which materials or people may fall, wood in good condition, etc.)?YesNo
If no, describe:
Q3. Is the guardrail sound? (Is it capable of withstanding a load of at least 200 pounds applied in any direction? Is hardware rusted or missing? Are rails bent or broken?)YesNo
If no, describe:
Q4. Is the platform hatch or swing gate sound? Look for severe corrosion, missing or poorly functioning hinges, etc. 9YesNoIf no, describe:
R. Stairway Information
R1. Is a stairway present?YesNoIf No Continue to Section S
R2. Is the stairway sound?YesNoIf no, describe:
R3. Is the stair handrail sound?YesNoIf no, describe:
S. Photo List
Naming Method:SSC_Site Ident_Site Type_Year_Descriptionie: CAK_MFD_RTR_2014_Tower-Leg-A-Hardware_1of2
* Take several general photos of tower(s) and grounds. Take specific pictures of any noted issues

N/A N/A N/A N/A N/A N/A

Annual If Self Supporting

Annual Tower Structure Inspection Checklist - Guyed Towers
B. Inspection Information
Inspector
Team Members
Inspection Date
Skies
Windspeed
Direction of Wind From
Temperature
Contact #
District POC Reviewer
K. Tower Information
K1. Based on the condition of the tower, do you consider this tower safe to climb?YesNo
If problems are found below please explain further in the Notes section, reference line item.
ProblemsExample
K2. Ground Around Tower Base AreaYesNoHardware (nuts, bolts, washers)
K3. Foundation EarthYesNoErosion, Settling, Tilting, Drainage
K4. Foundation ConcreteYesNoDusting, Spalling, Cracking, Honeycombing
K5. Foundation GroutYesNoCracking, Chipping, Other concerns
K6. Foundation Low SpotsYesNoMoisure Collection
K7. Tower Base/Leg Drainage Holes OpenYesNo
K8. Bends and TwistsYesNoVertical bends, curves, twists, alignment/lean
K9. Structure LegYesNoBroken, Bent, Cracked Welds, Rust/Corrosion, Paint/Coating
K10. Structure Hardware (Leg)YesNoLoose, Missing, Cracked, Rust/Corrosion
K11. BraceYesNoBroken, Bent, Cracked Welds, Rust/Corrosion, Paint/Coating
K12. Brace HardwareYesNoLoose, Missing, Cracked, Rust/Corrosion
K13. Antenna Mounting PipesYesNoLoose, Missing, Cracked, Rust/Corrosion
K14. Antenna Conduit, Junction Boxes and Fasteners Secure?YesNoLoose, Missing, Cracked, Rust/Corrosion
K15. Alignment (enter observed displacements to right of crosshair as positive, left as negative) 9
Selected Elevation (ft)Width of Face at That ElevationDisplacement at that Elevation on leg ___Displacement at that Elevation on leg ___Displacement at that Elevation on leg ___Displacement at that Elevation on leg ___Total Calc Disp (in)

NOTES

M. Grounding
Problem
M1. Tower base groundingYesNo
M2. Tower legs groundingYesNo
M3. Guy wire grounding (bridged and connected to earth ground)YesNo
M4. Down conductors bend radius (must be > 8")YesNo
M5. Grounding/lightning arrest equipment (in place, secure, and corrosion-free)YesNo
N. Obstruction Light Information
Problem?
N1. OB Light Control BoxYesNo
N2. OB Light Photo CellYesNo
N3. Conduit/Junction Box (Secure)YesNo
N4. Fastener/Hardware (Secure)YesNo
N5. OB Light Bulbs and Lenses -ConditionYesNo
Notes:
O. Ladder Information
O1. Is there a ladder present?YesNoIf No continue to Section P
O2. Is the ladder sound?YesNoIf no, describe:
O3. Is the ladder free of splinters, sharp edges, burrs, or projections?YesNoIf no, describe:
P. Ladder Safety System (LSS) Information
P1. Does the LSS function properly?YesNo
P2. Faulty Safety Sleeve/SliderYesNoIf yes, describe:
P3. Broken/Bent/Misaligned SectionsYesNoIf yes, describe:
P4. Rust/CorrosionYesNoIf yes, describe:
P5. Loose/Missing HardwareYesNoIf yes, describe:
P6. OtherYesNoIf yes, describe:
Q. Platform Information
Q1. Is there a platform present that is more than 4' above the ground/floor/roof? (Measure to floor of platform.)YesNoIf No continue to Section R
Q2. Is the platform floor sound (grating adequately secured, no openings into which materials or people may fall, wood in good condition, etc.)?YesNo
If no, describe:
Q3. Is the guardrail sound? (Is it capable of withstanding a load of at least 200 pounds applied in any direction? Is hardware rusted or missing? Are rails bent or broken?)YesNo
If no, describe:
Q4. Is the platform hatch or swing gate sound? Look for severe corrosion, missing or poorly functioning hinges, etc. 9YesNoIf no, describe:
R. Stairway Information
R1. Is a stairway present?YesNoIf No Continue to Section S
R2. Is the stairway sound?YesNoIf no, describe:
R3. Is the stair handrail sound?YesNoIf no, describe:
S. Photo List
Naming Method:SSC_Site Ident_Site Type_Year_Descriptionie: CAK_MFD_RTR_2014_Tower-Leg-A-Hardware_1of2
* Take several general photos of tower(s) and grounds. Take specific pictures of any noted issues

N/A N/A N/A N/A N/A

Findings Summary

Annual Tower Structure Inspection Checklist - Findings Summary
A.1. Site InformationB. Inspection Information
SSCFAC Phone #Out Brief Date
FAC IDFire #Inspection Date
FAC TypePolice #Inspector
CityAmbulance #Team Members
StateRescue #
Total # Tower Structures# Self Supporting# Guyed Structures
A.2. Tower InformationSSC Manager
Tower ID #Serial #Manager Contact #
Year of ConstructionLatitudeDistrict POC Reviewer
ManufacturerLongitudeDistrict POC Contact #
Question #Finding DescriptionRecommended RepairAction Description (NAP, 2nd Level Review, SSC Repair)Responsibility

Notes:

File details come from the government source that posted it. Updated .