J.1 SOW, BOQ and Drawings.pdf

PDF 6 MB Posted

Attached to
Forensic Medicine Institute Storage Facility Renovation- Skopje, North Macedonia
Solicitation number
19GE5023Q0001
Issued by

View the file

Other files

File Type Posted
19GE5023Q0001 0002.pdf PDF
19GE5023Q0001 Questions and Answers.pdf PDF
J.2 Bill of Quantity (updated).pdf PDF
19GE5023Q0001 0001.pdf PDF
19GE5023Q0001.pdf PDF
19GE5023Q0001 Cover Letter.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVESTOR : US Emmbassy Skopje Samoilova # 21, 1000 Skopje

PROJECT: ADAPTATION AND EQUIPPING OF THE STORAGE FACILITIES

IN THE FORENSIC MEDICINE INSTITUTE - SKOPJE

DESIGNER: KOD Project Dooel Skopje

ORDER.No. 19MK8022P0419

FINAL DESIGN

ARCHITECTURAL DESIGN

ELECTRICAL INSTALATIONS

HVAC

Manager:

Teodor Banishki, architect-engineer

Skopje, August-September, 2022

CONTENT:

1. General

1.1. Basic data

1.2. Program data

2. Design

2.1 Technical description

2.2 Bill of quantity

3. DRAWINGS

1. Existing layouts ........................................................................................ 1:50

New design

2. Architecture – storage for hazardous chemicals ...................................... 1:50

3. Architecture – evidence storage room No.01 ............................................ 1:50

4. Architecture – evidence storage room No.02 ............................................ 1:50

5. Doors and windows schedule ................................................................... 1:50

6. Electrotechical – high voltage instalations ................................................ 1:50

7. Electrotechical – distribution board РТ-1-А.............................................. 1:50

8. Electrotechical – low voltage instalations ................................................. 1:50

9. Mechanical – HVAC - instalations ........................................................... 1:50

RECONSTRUCTION OF FORENSIC MATERIAL STORAGE ROOMS Institute of Forensic Medicine and Criminalistics - Skopje

PROJECT DESCRIPTION

Introduction

The main goal of this project is the reconstruction (renovation and adaptation) of part of the existing spaces for receiving, processing, and storing evidence material, as well as rooms for storing chemicals, in conjunction with the Institute of Forensic Medicine in Skopje.

The existing spaces intended for these functions do not satisfy the basic spatial and functional requirements and capacities for the unhindered performance of these daily activities of the department.

These spaces require reconstruction to enable the proper handling, processing and storage of evidential material, handling and storage of chemicals, all according to the minimal standards for this type of activity.

One thing must be clear: with this project, it is not possible to solve the needs for spatial capacities - the capacities of the rooms are given and are used as much as possible.

All interventions are on level -1 (basement), as mentioned above, on already existing facilities and uses.

The main problem in functioning is the inadequate building structure (previous reconstructions and space conversions) and dilapidation of some of the building elements.

Civil works

1. Evidence storage rooms

Two rooms, namely:

Room 01, with access from the rear courtyard of the Institute, with access at the same basement level by vehicle. Located next to the entrance (reception) of the autopsy.

Partly covered with a roof slab with greenery above it, and partly with an improvised tin roof.

The main disadvantage is leakage and moisture from the roof and basement wall.

Room 02, with access from the autopsy room. Covered with an improvised tin roof. The main disadvantage is leakage and moisture from the roof and basementwall.

Both rooms are part of a former extension, it is obvious that they were not included in the initial plans of the building (at least not in that place). Inadequate in size, shape, access and location for the intended purpose.

According described conditions, also taking into account the total available budget for the interventions, the planners decided to focus on the following interventions:

- Replacement of the sheet metal roof covering with a more suitable, “sandwich” thermo-insulation panel. Replacement of the main roof structure is not foreseen.

- Treatment of all joints of the extension with the main building, from the point of view of leakage

RECONSTRUCTION OF FORENSIC MATERIAL STORAGE ROOMS Institute of Forensic Medicine and Criminalistics - Skopje

- Treatment of the visible part (and partially underground) of the basement walls, with insulation and the construction of a monolithic protective pavement, to prevent the basement walls from getting wet.

- Replacing the damaged suspended ceiling with a new one, as well as insulating it, in order to prevent condensates.

- Covering the access corridor (to room 01) with ceramic tiles on the floors and walls.

- Replacement of doors (in room 02, installation in the existing opening), with new, metal, security and fire doors.

2. Storage for hazardous chemicals

A room that was initially provided for that purpose, located in the main building of the Institute

(in the basement). It has exhaust ventilation. The floors are in good condition, designed appropriately for that type of space.

The main intervention is in the rehabilitation of the wall surfaces (worn out in places), with materials suitable for aggressive environments. The existing wooden doors are replaced with a metal, secure, fire doors.

Equipment and furniture

1. Evidence storage rooms

From aspect of equipping, the following are provided:

Open shelves are planned for both rooms, with the maximum capacity of surface utilization.

The shelves should have an adequate load capacity (they are specified in the project), made of steel frames and sheet metal surfaces (for shelving), painted with epoxy powder electrostatic paints. Attested to all domestic hygiene products and disinfectants, suitable for environments with an increased concentration of alkaline compounds in the air and with high protection against corrosion.

The refrigerators (existing) with their accompanying equipment and installations are located in room 02. The Contractor shall provide new shelving for the refrigerator, as specified in the Bill of Quantity

2. Storage for hazardous chemicals

From the aspect of equipping, the following are to be provided:

- Closed cabinets, metal, specially designed for that purpose, certified for resistance from all important acids in each concentration, with a container to collect any leaked contents from the material being stored. They come in two versions: without ventilation and with mechanical ventilation. The project provides places for 5 such cabinets, with connections for forced ventilation. At first, due to lack of budget, some of the cabinets are without ventilation (it would be ideal if they could be upgraded in the future)

- Open shelves, in order to maximize the use of the room surface. The shelves should have an adequate load capacity (they are specified in the project), made of steel

RECONSTRUCTION OF FORENSIC MATERIAL STORAGE ROOMS Institute of Forensic Medicine and Criminalistics - Skopje profiles and sheet metal surfaces (shelves), painted with epoxy powder electrostatic paints. Attested to all domestic hygiene products, disinfectants and suitable for environments with an increased concentration of alkaline compounds in the air and with high protection against corrosion.

ELECTROTECHNICAL INSTALLATIONS AND EQUIPMENT

The project for electrotechnical installations and equipment is made in accordance with the requirements defined in the General requirements, architectural-construction requirements, the project for thermomechanical (HVAC) installations, and according to the conditions on the ground and in accordance with the valid technical regulations and recommendations for this type of facilities.

In the project documentation for the reconstruction of the parts of the facilities of the Institute of Forensic Medicine, the following electrotechnical installations have been processed:

High voltage installations

Power supply and energy distribution

The electrical power supply to the equipment in the premises is from the existing switchboards in the building.

To power the equipment in the chemical storage room, it is planned to install an additional distribution board RT-1-A which is powered by the main distribution board.

Lighting

The lighting in the rooms for storing evidential material is planned to be mostly with fluo light fixtures. The type of light fittings is determined according to the type of ceiling and purpose of the room.

The lighting in the chemical storage room, the provided lighting is with LED armature, certified in accordance with the European ATEX regulations, for the prevention and resistance of explosions

The level of brightness in the premises is in accordance with the regulations, for a defined type of space.

Lighting control in the rooms that are being adapted will be local, with switches

The electrical installation will be carried out with NYM cables that will be laid on spandrels above a suspended ceiling, in existing cable carriers, or in superstructure channels for that

Panic lighting

In addition to the basic lighting of the space, panic lighting with panic lamps with signs for the exit and the direction of movement towards the exit, which are lit in case of loss of mains voltage in the event of a fire or other accident, is provided.

RECONSTRUCTION OF FORENSIC MATERIAL STORAGE ROOMS Institute of Forensic Medicine and Criminalistics - Skopje

These light armatures are connected to a 220 V1 network, and they are supplied with their own power source, i.e. with NiCd batteries.

The installation for basic and panic lighting will be carried out with NYM-J lines, with a Y-1.5 mm2 section laid over the suspended ceiling, additional channels for that purpose (where no other solution is possible)

Electrical installations for sockets

No new sockets are provided in the evidence storage rooms. In the chemical storage room, single-phase “shuko” plugs are provided, due to the equipment provided.

El. installation is planned to be carried out with NYM and NYY lines in existing cable carriers and in walls.

Electrical installations for HVAC

The project is made according to the positions and layout of those equipment

Low voltage installations

Installations and equipment for automatic notification and fire alarm

A fire detection and extinguishing center with two detection zones is planned. It is planned that in all rooms that are subject to adaptation, address type optical callers will be placed, according to the space's need for PP protection.

The connection of these optical callers will be with a line of the type J-H(St)H-2x0.8. which does not support combustion.

A fire detection and automatic fire extinguishing system is planned in the chemical storage room. For automatic fire extinguishing upon detection of conventional multi-criteria optical smoke detector in defined spaces is expected to activate

Aerosol Generators for extinguishing fire ASG8-1

Access control

Access control installation is provided in all treated rooms. For this purpose, intelligent terminals consisting of a software module - control panel and a built-in contactless card reader with a relay output for door control are provided. The connection of the connection terminals will be performed with a flexible non-flammable cable LiHXHX 2x1.5mm2 and a communication cable THEN 4x2x0.6mm inserted into the PC - Ø16mm, laid on the wall, and above the suspended ceiling. UPS power supply is provided for the terminals.

Video surveillance system

All treated rooms have sensitive content and need to be covered by technical security with

24-hour video surveillance.

For this purpose, in the IT equipment section (or a place marked by the user), equipment for performing video surveillance will be placed, namely: DVR - with a device (time lapse) that

RECONSTRUCTION OF FORENSIC MATERIAL STORAGE ROOMS Institute of Forensic Medicine and Criminalistics - Skopje will have the possibility of simultaneous recording of 4 cameras, i.e. be with 4 video inputs, with the possibility to turn on only when there is movement of people (motion detection). The capacity of the hard disk of the device is dimensioned so that it can save the material that the cameras will record for a period of 6 months. A new system will be installed.

Cameras should be provided with High Definition 720p HD resolution, with the possibility of automatic switching to night recording mode; the shooting angle to be dimensioned on the spot with the possibility of the zoom lens being manually adjustable. The connection should be provided with cables and connectors supplied with the DVR inserted into the PC, laid on the wall, above the suspended ceiling and on existing cablecarriers.

HVAC

General conditions

For construction and installation of the devices provided by this project, the project itself will serve, the components of which represent technical conditions, calculations, drawings and specification of the equipment, materials and labor.

The assignment of the works foreseen by this project will be carried out according to the existing regulations for this type of work.

The contractor is obliged

- to perform the installation according to the approved project

- to perform the installation in accordance with the technical regulations, instructions and norms

- to take all the necessary measures for the safety of the employed workers, as well as the safety of the facility that it performs

- to carry out the correct organization of the work

All positions subject to employment include:

- complete installation of equipment, testing and regulation

- training of the user of the installation after completion of the installation

- the execution of all necessary tests and trial work of theinstallation.

During the warranty period, the contractor is obliged to perform all repairs and other perceived deficiencies at his own expense.

Before proceeding with the execution of the works foreseen by this project, the contractor is obliged to study it in detail. If errors or deficiencies are found in the project, he is obliged to immediately report them in writing to the COR, how they would be corrected before starting the works.

Before proceeding with the execution of the works, the contractor is obliged to familiarize himself with the construction project, i.e. to check the actual elevations and dimensions, in relation to those in the project

Before starting the works, the contractor is obliged to obtain all measurement sketches of the elements of the selected equipment and, together with the supervisory authority, to harmonize them with the project. For the elements of the equipment that he makes himself, the contractor is obliged to make workshop drawings beforehand.

RECONSTRUCTION OF FORENSIC MATERIAL STORAGE ROOMS Institute of Forensic Medicine and Criminalistics - Skopje

If the contractor realizes during the execution of the works that additional works must be carried out on the installation, which are not covered by the project, he is obliged to immediately submit a specification of the same and wait for approval from the Contracting

Officer.

The developer must keep a construction diary or construction book.

When installing the works provided by this project, the contractor should comply with the existing regulations for this type of devices and installations.

- Special technical conditions for installing ventilation and air conditioning

Refrigeration devices should have the capacity and characteristics prescribed by the project, equipped with all the necessary devices for commissioning, regulation and maintenance of working parameters and safety protection elements. The cooling system must be installed in accordance with the conditions and requirements provided by the manufacturer.

For ventilation, cooling and heating of the rooms, air conditioners are provided for the treatment of fresh air.

The air conditioners are complete with a suitable thermostat for regulating the temperature and humidity in the space, as well as the FREE COOLING option in periods when the outside temperatures allow it.

The air ducts should be made according to the attached drawings, the dimensions of the equipment and the material in the project;

The air ducts should be made of: rectangular ducts made of galvanized sheet, with a thickness of 1 mm

The joints of the tin channels should be made with corner elements, clamps and by placing seals between them; when performing the channels, pay attention to the fashion elements, first of all the handles;

Air distribution channels, as well as current-suction grilles and anemostats, should be regulated with the help of regulation instruments. Each distribution element, grid-anemostat, pressure-suction, should provide the expected amount of air with the project.

Final works

- All concrete, masonry and earthworks related to this type of installations should be performed with materials that comply with construction norms and regulations;

- All consoles, holders as well as carriers should be walled with cement mortar, while the use of plaster is not allowed;

- The reception of the installation will be carried out according to the applicable regulations for this type of installations.

Skopje, 18.09.2022

1_Civil Works

DESCRIPTION units quantity unit price

EUR

TOTAL

EUR

I PREPARATORY WORKS

1. 1. Removal of the existing equipment and materials from the area for reconstruction to a temporary storage; place determined by the beneficiary (within the Institute) lump sum х =

1. 2. Dismantling of existing metal, PVC and wooden doors, suitable for their re-installation, with disposal in a temporary warehouse; place determined by the beneficiary (within the Institute) dim. 90/280 PVC pcs 1.00 х = dim. 90/280 Мmetal pcs 1.00 х = dim. 90/210 Wooden pcs 2.00 х =

1. 3. Demolishing walls for door opening. The position also includes cleaning, removal, loading, transporting and unloading the rubble to a suitable landfill (distance up to 15 km) pcs 1.00 х =

1. 4. Dismantling of existing roofing (metal sheet roofing), together with existing gutter. The position also includes cleaning, removal, loading, transporting and unloading the rubble to a suitable landfill (distance up to 15 km) м² 49.00 х =

1. 5. Demolition of existing plasterboard ceilings, together with substructure, including thermal insulation material. The position also includes cleaning, removal, loading, transport and unloading of rubble to a suitable landfill (distance up to 15 km).

м² 36.70 х =

1. 6. Stripping plaster, grout and paint on walls, beams and ceilings up to a solid base. The position also includes cleaning, removal, loading, transporting and unloading the rubble to a suitable landfill (distance up to 15 km) м² 29.00 х =

RECONSTRUCTION OF FORENSIC MATERIAL STORAGE ROOMS

Institute of Forensic Medicine and Criminalistics - Skopje

Donator: Embassy of USA Beneficiary: Institute of Forensic Medicine and Criminalistics

BILL OF QUANTITY

CIVIL WORKS

1. 7. ! Alternatively! Demolition of wall ceramic tiles to a height specified by the supervising authority, together with adhesive and mortar, up to a solid base.

The position will be used if there is a reason for it approved by the supervising engineer.

The position also includes cleaning, removal, loading, transporting and unloading the rubble to a suitable landfill (distance up to 15 km) м² 11.60 х =

1. 8. Dismantling and removal part of the external metal structures and fences, which are located in the intervention zone.

Appropriate for their re-incorporation, with disposal in a temporary warehouse determined by the beneficiary (on site).

паушал х =

1. 9. Removal of a part of an external paving (next to the walls to which intervention shall be done), in a width of 100 cm. and a length of about 21 m.

Appropriate for their re-incorporation, with disposal in a temporary site.

м² 29.00 х =

II EARTH WORKS

2. 1. Excavation of the substrate under the paving (from the previous position), to a depth of min.

30 cm. (up to solid substrate, according to supervision instructions). The position includes excavation, loading, transport and unloading of the rubble to a suitable landfill (distance up to 15 km) м3 11.60 х =

2. 7. Laying a layer of gravel as a base for concrete protective pavement around building, with d=30 cm, Compaction of gravel layer should be according required compressibility.

м3 11.60 х =

ВКУПНО:

III WATERPROOFING

3. 1. Cleaning of the existing concrete basement walls next to the trench, suitable for applying a waterproofing layer (waterproofing material on a cement base, suitable for concrete surfaces).

Surfaces shall be cleaned from soil and deposits, suitable for waterproofing м² 42.05 х =

3. 2. Construction of waterproofing - cement based coating (hydromal flex or similar), in 3 layers.

with substrate preparation (base coating), reinforcement of the edges, and protection finish layer.

position include material supply, transport, and construction (works) according to the material manufacturer's instructions.

м² 42.05 х =

IV CONCRETE WORKS

4. 1. Construction of a concrete sidewalk (protective pavement), d=10-13 cm, structurally reinforced with rebar mesh R131/Q131/139, in-line with the surrounding paved surfaces (platform), with smooth finish and chamfered (processed) edges position include material supply, transport, construction (works), and cleaning after finishing.

м² 29.00 х =

4. 2. Cement screed, depth 4-5 cm, as a layer for paving with ceramic tile floor.

position include material supply, transport, construction (works), and cleaning after finishing.

м² 4.00 х =

V MASSONERY WORKS

5. 1. Wall from ceramic block d=12sm, (closing existing door opening), complete with double-sided plastering with lime mortar position include material supply, transport, construction (works), and cleaning after finishing.

м² 2.50 х =

5. 2. Plastering with cement based mortar on external walls (for heavy weather conditions) position include material supply, transport, construction (works), and cleaning after finishing.

м² 15.93 х =

5. 3. Plastering with lime mortar for reparation on internal walls (filling the cracks, voids, etc.)

position include material supply, transport, construction (works), and cleaning after finishing.

м² 21.90 х =

5. 4. Plastering with lime mortar for reparation on concrete surfaces i.e. beams and ceilings (filling the cracks, voids, etc.)

position include material supply, transport, construction (works), and cleaning after finishing.

м² 12.30 х =

V CERAMIC TILES

5. 1. Ceramic tiles for floor, "gress" type, dim.30x30 sm, with adhesive for cement screed, with sealed joints.

position include material supply, transport, construction (works), and cleaning after finishing.

м² 4.00 х =

5. 1. Ceramic tiles for wall covering, dim.20x20 sm, with adhesive for mortar surface, with sealed joints.

position include material supply, transport, construction (works), and cleaning after finishing.

м² 11.60 х =

VI GYPSUM BOARDS SUSPENDED CEILINGS

6. 1. Construction of suspended ceiling from gypsum boards, placed over metal carriers hinged on existing stell rafters (suitable sub construction).Joints shall be filled with gypsum based filler, reinforced with mesh, and sanded up to smooth surface.

position include material supply, transport, construction (works), and cleaning after finishing.

м² 38.70 х =

6. 2. Construction of stone wool layer, above suspended ceiling from previous position, min.layer depth shall be 20 sm, position include material supply, transport, construction (works), and cleaning after finishing.

м² 38.70 х =

VII STEEL (LOCKSMITH) WORKS

7. 1. Upgrading existing steel roof truces with steel profiles for roof panels installation, min.

30х30мм on distance form 100 to 150 sm.

Welded Sanction of existing structure shall be included in price, together with anticorrosion layer (paint) for whole structure м² 59.20 х =

VIII ROOFING AND SHEET METAL WORKS

8. 1. Roofing with heat-insulated metal "sandwich" panels, produced from corrugated galvanized sheets, on both sides, painted, with polyurethane filling of min. d=5 cm. Installation shall be performed with factory supplied bonded materials and elements for edges.

position include material supply, transport, construction (works), and cleaning after finishing.

м² 59.20 х =

8. 2. Production and installation of sheet metal elements, in relation to the previous position, namely:

freestanding edges, with working width up to 40 sm. м 12.60 х = edges upon a wall, (min.20sm on wall) with working width up to 60 sm. м 37.30 х = under gutter edges with working width up to 30

sm. м 15.10 х =

8. 3. Gutter, approx.. 10x10 sm (working width up to 40 sm.). Produced and installed according measures on site, hinged.

position include material supply, transport, construction (works), and cleaning after finishing.

horizontal gutter м 15.10 х = vertical gutter м 2.20 х =

IX DOOR AND WINDOWS

9. 1. Single-wing fire door with a 90-minute non-flammability certificate, produced from steel profiles for the frame, with double-sided solid coating of steel sheets, with non-combustible filling between the sheets, safety and FF lock and fittings.

Equipped with combined electric-mechanical lock, with place for installation of personal electronic card reader. A mechanism for self-closing of the sash should also be installed, and a mechanism for fixing it in the open position. Painted. According schemes and measurements on site pos. 02 dim. 98х280 см pcs 1.00 х = pos. 03 dim. 100х280см pcs 2.00 х = position include material supply, transport, construction (works), and cleaning after finishing. According schemes. All measures shall be checked on site

9. 2. Single-wing metal door produced from steel profiles for the frame, with double-sided solid coating of steel sheets, safety lock and fittings.

Painted. According schemes and measurements on site pos. 01 dim. 90х280 см pcs 1.00 х = pos. 04 dim. 100х280см pcs 1.00 х =

X PAINTING WORKS

10. 1. Plastering of reinforced concrete beams and ceilings м² 26.00 х =

10. 2. Plastering gypsum board surfaces and ceilings м² 38.70 х =

10. 3. Painting ceilings with acrylic paint м² 64.70 х =

10. 4. Painting walls with acrylic paint м² 10.20 х =

10. 5. Plastering and painting walls in a chemical warehouse with epoxy-based materials (acid-resistant) м² 71.40 х =

XI FLOORS

11. 1. Installation of epoxy based floors surface over existing concrete floors, complete with skirt 30

cm. м² 23.80 х = skirt м 29.30 х =

XII EQUIPMENT AND FURNITURE

11. 1. Shelves, metal frame, protected from corrosion (epoxy paint), with 5 shelves, loading capacity min. 300 kg, dimensions: 80-

90х40-45х200H pcs 37.00 х =

11. 2. C Shelves, metal frame, protected from corrosion (epoxy paint), with 5 shelves, loading capacity min. 250 kg, dimensions: 75-

80х30-35х200H pcs 6.00 х =

11. 3. Storage cabinet for chemicals (certified), material: epoxy painted metal + plastic, with 2 doors, security lock, equipped with leakage vessel on bottom, 90х50-60х200H equipped with active ventilation system, sensors for ventilator, carbon (HEPA) filter, and lock.

pcs 2.00 х =

11. 3. Storage cabinet for chemicals (certified), material: epoxy painted metal + plastic, with 2 doors, security lock, equipped with leakage vessel on bottom, 90х50-60х200H, passive ventilation, lock pcs 3.00 х =

11. 3. Specialized cabinet for drying forensic evidence material (clothes, fabrics, etc.), closed, double-winged, with its own air filtration (HEPA), certified for the preservation of DNA and microparticles of the evidence material, avoiding mutual contamination (independent flow regulation on air, on sensor), with safety lock. Suitable for cleaning with ordinary detergents, as well as with reagents for removing pathogens and DNA, from all surfaces.

pcs 1.00 х =

11. 4. Temperature sensor with display for refrigerator up to -18°C for continuous temperature monitoring pcs 1.00 х =

11. 5. Refrigerator shelves up to -18°C pcs 4.00 х =

XIII REMAINING WORKS

11. 1. Complete cleaning of the building once during construction works and after completion lump sum х =

I PREPARATORY WORKS

II EARTH WORKS

III WATERPROOFING

IV MASSONERY WORKS

V CERAMIC TILES

VI GYPSUM BOARDS SUSPENDED CEILINGS

VII STEEL (LOCKSMITH) WORKS

VIII ROOFING AND SHEET METAL WORKS

IX DOOR AND WINDOWS

X PAINTING WORKS

XI FLOORS

XII EQUIPMENT AND FURNITURE

XIII REMAINING WORKS

TOTAL

VAT

GRAND TOTAL (VAT incl.) -EUR

-EUR

RECAPITULATION

EUR -

2_Electrical р.бр No oпис на позицијата description ед.мера unit вкупна количина total amount ед.цена во еур unit price in euro вк.цена во еур total price in euro

E1.

1.00 Dismantling of lightnings and it removal to

previously defined location pcs 7.00

2.00 Dismantling of switches for lights pcs 4.00

3.00 Dismantling of power supply cable. The type of

cable is PP laid under dropped ceiling and into wall

-NYM-J-3x1.5mm2 м 60.00 -NYY-J-3x2.5mm2 м 15.00 -NYY-J-5x2.5mm2 м 15.00

4.00 Dismantling of exit lights pcs 1.00

E.2

Е.2.1 Updating of Surface mounted main distribution boards GRT thermomagnetic automatic fuse B10A/1p+N,10kA pcs thermomagnetic automatic fuse C16A/1p+N,10kA pcs

Paying will be for a whole set with included supply, mounting and connecting.

pcs 1.00

Е.2.2

Distribution panel RT-1 for wall mounting with lock and key, two part IP44, IK08, fire proof up to 750°C, according to the standard IEC 60695-2-1, RAL 7035, fully closed from the front side with covers, masks and door panel. The spare space that should be kept for further additional equipment is 20%.

circuit breaker 125-In/R80A ;16kA-4p, with remote control pcs thermomagnetic automatic fuse B10A/1p+N,10kA pcs thermomagnetic automatic fuse C16A/1p+N,10kA pcs thermomagnetic automatic fuse C16A/3p+N,10kA pcs thermomagnetic automatic fuse D63A/3p+N,16kA pcs

FID 25A/4p/0.03, pcs 1 Paying will be for a whole set with included supply, mounting and connecting.

pcs 1.00

RECONSTRUCTION OF FORENSIC MATERIAL STORAGE ROOMS

Institute of Forensic Medicine and Criminalistics - Skopje

Donator: Embassy of USA Beneficiary: Institute of Forensic Medicine and Criminalistics

BILL OF QUANTITY

ELECTROTECHICAL

ELECTROTEHNICAL INSTALATIONS AND EQUIPMENT

Dismantling of existing electrical installation, storage and removal of material

TOTAL Е.1.

Distribution boards & cables

Е 2.7 Cables - 0.6/1.0kV Supply, install and connect, cables 0.6/1 kV, to IEC 502 including junction boxes, cable cleats, cable glands, sealing compound, cable sleeves and all necessary accessories including conduits where necessary, as specified and shown on drawings The electrical cables, have to be fixed to cable trays/ladders and metal supports by metal clamps.

1x16 H07Z1-R м 20.00

Е 2.8 Mechanical equipment Power supply cables 3x2.5 NYY м 10.00

Е.3

LIGHTING AND POWER SUPPLY

Е.3.1 Lighting Fixtures

R_2x28W SURFACE MOUNTED WATER PROOF

LIGHTING FIXTURE IP65

pcs 7.00

SURFACE MOUNTED WATER PROOF LIGHTING

FIXTURE IP65, LED, ATEX - Attest for explosion resistance pcs 3.00

8W EMERGENCY EXIT SIGN WITH 3h. BATTERY pcs 3.00

Е3.2 Switches & Sockets pcs two pole switches, 10A 250V (надрадни)-IP43 pcs 3.00

SOCKET OUTLET, WATERPROOF, SURFACE

MOUNTED, 220V, 16A, 2P+E, IP54

pcs 5.00

Е 3.3 Wirings for Socket and lighting

NYM 5x2,5 mm2 for power supply of sockets m 18.00

NYM 3x2,5 mm2 for power supply of sockets m 20.00

NYM 3x1,5 mm2 for power supply of lighting m 54.00

Ø20 несогорливо црево Ø20 PVC conduit m 74.00 Ø25 несогорливо црево Ø25 PVC conduit m 18.00 ПВЦ разводна кутија PVC junction box pcs 2.00

Е.4 Detection system and automatic fire extinguishing

E.4.1 Conventional fire detection station to 2 zones with spare battery supply 12V/7Ah pcs 1.00

E.4.2 Parallel control console pcs 1.00

E.4.3 Conventional optical smoke detector with base pcs 4.00

E.4.4 Manual activator for manual activation of fire key pcs 3.00

E.4.5 Manual activator for manual stop the fire with the reset button pcs 1.00

E.4.6 Audio visual call point -alarm Horne pcs 1.00

TOTAL Е.2.

TOTAL Е.3

E.4.7 GAS-stop light Alert pcs 1.00 E.4.8 Information panel ATTENTION - Gas pcs 1.00 E.4.9 "Aerosol generator extinguishing ASG8-1-50m3 pcs 2.00

E.4.10 2x2x0.8+0.8mm2 JE-H(st)H FE180 м 62.00

E.4.11 Ø20 PVC conduit m 62.00

Е.5 CCTV system

Supply, install and connect a complete CCTV system including medium gauge rigid and flexible conduits, fixings, frames, programming and connections and all necessary. This Section covers dedicate Close Circuit TV (CCTV) System, including HD cameras, digital video recorders, monitors and power unit AC-24V and feeder 24V cables to camera and batteries. The CCTV System shall consist of all necessary hardware equipment and software programming to perform the functions mentioned in the specifications. General:

DVR: The Digital Video Recorder shall be 16 camera input with the storage to 6 terabytes with motion detection

17'' Colour LCD Monitor pcs 1.00 PC with LCD Display / Компјутер со LCD дисплеј pcs 1.00

4 канален дигитален видео рекордер -за 4 HD камери со 720p resource , односно за 4 камери , кои снимаат со 25fps со зачувување на материјалот за 6 месеци и со можност камерите да се вклучуваат само кога има движење на луѓе 4 channel digital video recorder -for 4 HD cameras with 720p resolution, or 4 cameras, which are monitored with 25fps with preserving the material for 6 months with possibility of cameras to include only when there is movement from people pcs 1.00 internally mounted DOME camera housed in an enclosure with High Definition 720p , with the ability to automatically switch to night mode recording pcs 3.00

RG6 Coaxial Cable / Кабел m 20.00 8x0,5 LIYCY Cable / Кабел m 60.00 Ø20 PVC Conduit /Спроводник m 60.00

Е.6 Испитување од овластено лице и пуштање во работа на инсталација Testing and start operating lump sum 1.00

TOTAL Е.4

TOTAL Е.5

RECAPITULATION

E1. Dismantling of existing electrical installation, storage and removal of material

Е.2 Distribution boards & cables

Е.3 LIGHTING AND POWER SUPPLY

Е.4 Detection system and automatic fire extinguishing

Е.5 CCTV system Е.6 Testing and start operating

TOTAL :

VAT :

GRAND TOTAL (VAT incl.) :

3_Mechanical

DESCRIPTION units quantity unit price

EUR

TOTAL

EUR

I EVIDENCE STORAGE ROOMS

1. 1. Device (heat pump) for supplying 100% fresh air with the following performance according to EN 14511:2013 (7°C/35°C) and internal temp.

(20°C/26°C).

pcs 1.00 х

- fresh air supply 650m³/h

- capacities Ql=3.8kW/Qg=4.8kW

- electronic filter H10 CEN EN 779

- G3 CEN EN 779 exhaust filtration -free cooling

- air recovery system

- working condition demand: at external temperatures -15ºC/+35ºC (min)

- room thermostat for device regulation and temperature and humidity control

- drainage pump for drainage of condensate from the device Position include material supply, transport, installation and other works, testing and commissioning.

1. 2. Opening holes in a masonry wall with a thickness of 25 cm.

Complete with sealing after laying the channels trough hole pcs 2.00 х

1. 3. Production, supply, transport and installation of galvanized steel channels (dimensions according drawings), produced from sheets with thickness of 1mm. Position include all required joints and hanging elements, sealants, and other hardware

kg. 39.00 х

1. 4. Supply, transport and installation of vapor-tight thermal and acoustic insulation, as outer coating of pressure channels, with thickness no less than 9mm.

м² 18.00 х

RECONSTRUCTION OF FORENSIC MATERIAL STORAGE ROOMS

Institute of Forensic Medicine and Criminalistics - Skopje

Donator: Embassy of USA Beneficiary: Institute of Forensic Medicine and Criminalistics

BILL OF QUANTITY

HVAC

3_Mechanical

1. 6. Supply, transport and installation a ceiling diffuser with flow regulation, dimensions ø150, completed with connection box and corner connection ø 200, ANO 2 pcs 4.00 х

1. 7. Supply, transport and installation a polypropylene pipes for drainage of condensate completed with joints and fittings, sealed м' 4.00 х

1. 8. Setup, tuning and commissioning of the entire system. Providing manuals and training for two persons responsible for operation and maintenance lump sum 1.00 х

ВКУПНО:

II STORAGE FOR HAZARDOUS CHEMICALS

2. 2. Opening holes in a masonry wall with a thickness of 25 cm.

Complete with sealing after laying the channels trough hole pcs 1.00 х

2. 7. Supply, transport and installation of Fire Fighting valve on channel - DOZ 400x400, U=230V pcs 1.00 х

2. 6. Supply, transport and installation of an exhaust fan

(replacement of the existing one) Q=500m³/h.

pcs 1.00 х

ВКУПНО:

Recapitulation

I EVIDENCE STORAGE ROOMS

II STORAGE FOR HAZARDOUS CHEMICALS

TOTAL

VAT

TOTAL (VAT incl.)

Recapitulation

TOTAL

VAT

GRAND TOTAL (VAT incl.)

RECAPITULATION

-EUR

-EUR

CIVIL WORKS, ENTERIOR WORKS, EQUIPMENT

AND FURNITURE

ELECTROTECHICAL INSTALATIONS AND

EQUIPMENT

HVAC - INSTALATIONS AND EQUIPMENT

-EUR

L I

S T

B R

08.2020 M 1:50

LOKACIJA: ul. Vodwanska 19, Skopje GP ________ DUP __________ KP _____ K.O.Centar__

Odgovoren proektant: Teodor Bani{ki, dipl.ing.arh

TEH.BR. 08-20

АДАПТАЦИЈА И САНАЦИЈА НА ПРОСТОРИИ на ИНСТИТУТОТ ЗА СУДСКА МЕДИЦИНА

INVESTITOR: Ambasada na SAD - Skopje

Dru{tvo za proektirawe KOD Proekt DOOEL Skopje

0.0

EXISTING CONDITION

ОСНОВЕН ПРОЕКТ

0.5 1.0 1.5 2.0 3.0 4.0 5.0 6.0

ПРОСТОРИЈА ЗА ДОКАЗИ 01 11,90 м2 подови: кер.плочки плафон: гипс картонски спуштен таван зидови: керамички плочки профилиран лим воздушен простор (конструкција) гипс картонски спуштен таван

BASEMENT

GROUND FLOOR (ROOF FOR BASEMENT)

BASEMENT

metal sheet roofing (cca 50m2) gutter постoјни бетонски ѕидови и парапетни ѕидови

STORAGE FOR HAZARDOUS CHEMICALS No.3 13,00 м2 floor: concrete ceiling: existing reinforced concrete slab, painted walls: plastered

EVIDENCE STORAGE ROOM No.2 25,00 м2 floor: ceramic tiles ceiling: suspended ceiling from gypsum boards walls: ceramic tiles

S T

B R

08.2020 M 1:50

LOKACIJA: ul. Vodwanska 19, Skopje GP ________ DUP __________ KP _____ K.O.Centar__

Odgovoren proektant: Teodor Bani{ki, dipl.ing.arh

TEH.BR. 08-20

АДАПТАЦИЈА И САНАЦИЈА НА ПРОСТОРИИ на ИНСТИТУТОТ ЗА СУДСКА МЕДИЦИНА

INVESTITOR: Ambasada na SAD - Skopje

Dru{tvo za proektirawe KOD Proekt DOOEL Skopje

0.0

LAYOUT - BASEMENT

ОСНОВЕН ПРОЕКТ

0.5 1.0 1.5 2.0 3.0 4.0 5.0 6.0

П П

В р а т а х

A A

A

A

A

B

B B

B

C

C

C

C

C

C

B Shelves, metal frame, protected from corrosion (epoxy paint), with 5 shelves, loading capacity min. 300 kg, dimensions: 80-90х40-45х200H pieces. 13

STORAGE FOR HAZARDOUS CHEMICALS

B B

B

B B

B B

B B

STORAGE FOR HAZARDOUS CHEMICALS No.3 13,00 м2 floor: existing concrete floor with with new epoxy layer as finish (acid-resistant) skirt (Н.30) with round corners, from same materials ceiling: existing reinforced concrete slab, painted walls: plastered (means that existing plaster should be inspected and all cracks and holes should be filled with new plaster) finish: painted with acrylic paint

STORAGE FOR HAZARDOUS CHEMICALS No.4 7,20 м2 floors: existing concrete floor with with new epoxy layer as finish (acid-resistant) skirt (Н.30) with round corners, from same materials ceiling: existing reinforced concrete slab, painted walls: plastered (means that existing plaster should be inspected and all cracks and holes should be filled with new plaster) finish: painted with acrylic paint

A Storage cabinet for chemicals (certified), material: epoxy painted metal + plastic, with 2 doors, security lock, equipped with leakage vessel on bottom, 90х50-60х200H pieces. 5

C Shelves, metal frame, protected from corrosion (epoxy paint), with 5 shelves, loading capacity min. 250 kg, dimensions: 75-80х30-35х200H pieces. 6

AutoCAD SHX Text pos.02

AutoCAD SHX Text pos.01

B

B B

B

B B

B

B

B

B

BB

BB

B

B

EVIDENCE STORAGE ROOM No.1 11,90 м2 floor: existing ceramic tiles ceiling: new suspended ceiling from gypsum boards walls: existing ceramic tiles security doors (metal) 100х280 existing gutter pipe

L I

S T

B R

08.2020 M 1:50

LOKACIJA: ul. Vodwanska 19, Skopje GP ________ DUP __________ KP _____ K.O.Centar__

Odgovoren proektant: Teodor Bani{ki, dipl.ing.arh

TEH.BR. 08-20

АДАПТАЦИЈА И САНАЦИЈА НА ПРОСТОРИИ на ИНСТИТУТОТ ЗА СУДСКА МЕДИЦИНА

INVESTITOR: Ambasada na SAD - Skopje

Dru{tvo za proektirawe KOD Proekt DOOEL Skopje

0.0

ОСНОВЕН ПРОЕКТ

0.5 1.0 1.5 2.0 3.0 4.0 5.0 6.0

EVIDENCE STORAGE ROOM No.1

FF Door 100х280

B Shelves, metal frame, protected from corrosion (epoxy paint), with 5 shelves, loading capacity min. 300 kg, dimensions: 80-90х40-45х200H pieces. 16

EVIDENCE STORAGE ROOM ENTRANCE 2,00 м2 floor: new ceramic tiles on cement screed ceiling: new suspended ceiling from gypsum boards walls: new ceramic tiles

LAYOUT - EXTERNAL BASEMENT

AutoCAD SHX Text pos.04 pos.03 concrete sidewalk (new) new roof covering shall be made with eaves no less than 30-40 см.

L I

S T

B R

08.2020 M 1:50

LOKACIJA: ul. Vodwanska 19, Skopje GP ________ DUP __________ KP _____ K.O.Centar__

Odgovoren proektant: Teodor Bani{ki, dipl.ing.arh

TEH.BR. 08-20

АДАПТАЦИЈА И САНАЦИЈА НА ПРОСТОРИИ на ИНСТИТУТОТ ЗА СУДСКА МЕДИЦИНА

INVESTITOR: Ambasada na SAD - Skopje

Dru{tvo za proektirawe KOD Proekt DOOEL Skopje

0.0

ОСНОВЕН ПРОЕКТ

0.5 1.0 1.5 2.0 3.0 4.0 5.0 6.0

ROOF LAYOUT (GROUND FLOOR)

B

B

B

B

B

B

EVIDENCE STORAGE ROOM No.2 25,00 м2 floor: existing ceramic tiles ceiling: new suspended ceiling from gypsum boards walls: existing ceramic tiles

B Shelves, metal frame, protected from corrosion (epoxy paint), with 5 shelves, loading capacity min. 300 kg, dimensions: 80-90х40-45х200H pieces. 8

LAYOUT - EXTERNAL BASEMENT

EVIDENCE STORAGE ROOM No.2 new roof covering shall be made with eaves no less than 30 см.

new roof covering shall be made with eaves no less than 30-40 см.

existing roof trusses (steel) air gap between trusses (existing) stone wool insulation layer no less than 20см.

roof covering from "sandwich panel", roof type, with polyurethane insulation no less than 5см.

steel profiles for roof panels installation, 30х30мм on distance form 100 to 150 см.

new suspended ceiling from gypsum boards security doors (metal) 100х280 pos.03

WALL OPENING DIMENSION

LOCATION

ACESSORIES

FRAME

OPENING

TOTAL

NOTES

TYPE

WING

MATERIAL AND FINISH

GLASS

SURFACE PROTECTION

ALL MEASURES TO BE CHECKED ON SITE

FILL

100/280

BASEMENT

METAL DOOR

STEEL PROFILE

STEEL PLATE

EPOXY POWDER PAINT

LEFT : RIGHT :1 0

90/280

1 0

0 1

100/280

2 0

STANDARD LOCK,

KNOBS AND HIGES

LEFT RIGHT

OPENING SCHEME

BASEMENT

METAL FF DOOR

STEEL PROFILE

STEEL PLATE

electro-mechanical locking / opening system installation for personal card-reader self-closing mechanism, stopper

FIRE PROTECTION RATE for 90 min

EPOXY POWDER PAINT (FF certificated)

96/280

BASEMENT

METAL FF DOOR

STEEL PROFILE

STEEL PLATE

electro-mechanical locking / opening system installation for personal card-reader self-closing mechanism, stopper

FIRE PROTECTION RATE for 90 min

EPOXY POWDER PAINT (FF certificated)

LEFT : RIGHT : LEFT : RIGHT : LEFT : RIGHT :

BASEMENT

METAL DOOR

STEEL PROFILE

STEEL PLATE

EPOXY POWDER PAINT

STANDARD LOCK,

KNOBS AND HIGES

ALL MEASURES TO BE CHECKED ON SITE

AutoCAD SHX Text pos.04

AutoCAD SHX Text 100/280cm

AutoCAD SHX Text pos.01

AutoCAD SHX Text 90/280cm

AutoCAD SHX Text pos.02

AutoCAD SHX Text 98/280cm

AutoCAD SHX Text pos.03

100/280cm

S T

B R

08.2020 M 1:50

LOKACIJA: ul. Vodwanska 19, Skopje GP ________ DUP __________ KP _____ K.O.Centar__

Odgovoren proektant: Teodor Bani{ki, dipl.ing.arh

TEH.BR. 08-20

АДАПТАЦИЈА И САНАЦИЈА НА ПРОСТОРИИ на ИНСТИТУТОТ ЗА СУДСКА МЕДИЦИНА

INVESTITOR: Ambasada na SAD - Skopje

Dru{tvo za proektirawe KOD Proekt DOOEL Skopje

0.0

ОСНОВЕН ПРОЕКТ

0.5 1.0 1.5 2.0 3.0 4.0 5.0 6.0 постоечки приклучок постоечки приклучок постоечки приклучок постоечкa RT

- emergency addressable lamp, 1x6W Led, 3 hours battery

- панична адресибилни светилки, 6W-Led, батерија 3 часа

- build on lamp, waterproofed IP66, 2x28W (supply from the normal network)

(напојување од мрежа)- надградна светилка,водотесна изведба IP66, 2x28W

ЛЕГЕНДА/LEGEND

DESCRIPTIONSYMBOL

СИМБОЛОТ ОПИС

SOCKET OUTLET, FLUSH MOUNTED, 220V, 16A, 2P+E

ПРИКЛУЧНИЦА, ВГРАДНА, 220V, 16A, 2P+E

SOCKET OUTLET, COVERED, FLUSH MOUNTED, 220V, 16A, 2P+E

ПРИКЛУЧНИЦА, СО КАПАК, ВГРАДЕНО МОНТИРАНА ,220V,16A,2P+E

SOCKET OUTLET, WATERPROOF, SURFACE MOUNTED, 220V, 16A, 2P+E, IP54

ПРИКЛУЧНИЦА, ВОДООТПОРНА, НАДГРАДНА, 220V, 16A, 2P+E, IP54

OUTLET 230V,380V,16A for cooling, ventilation, Unit heater etc.

ИЗВОД 230V,380V,16A за ладење, вентилација, за греач и др.

POWER SUB-DISTRIBUTION PANELBOARD

РАЗВОДНА ТАБЛА

- build on lamp, waterproofed IP66, LED, >100 LUX, ATEX

(explosion proof)

- надградна светилка, IP66, LED, ATEX (отпорна на експлозија)

РТ-A

- вграден обичен прекинувач

ONE GANG ONE WAY SINGLE POLE SWITCH, FLUSH MOUNTED

- вграден сериски прекинувач

ONE GANG TWO WAY SINGLE POLE SWITCH, FLUSH MOUNTED

BASEMENT LAYOUT

LIGHTING AND ELECTRICAL POWER SOCKETS

A

B

C

РАЗВОДНА ТАБЛА

DISTRIBUTION BOARD

РТ-1-A

Главно напојување

Ру=37.12

Осветлување

ПО-С-1

Рр=22.23

Осветлување

280 W

57.6

A

B

C

D

E

F

B

F

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

NO

РЕВИЗИЈА

Дата

Нацртал

Назив на табла

Цртеж бр.

Бр. на страна

1 /1

C

D

E

F

B

C

D

E

F

A

Оптоварување (kW) Installed / Demand

Опис на кабел

Тип на напојувач

Струјно коло бр.

Тип на напојување

Струја (А)

Локација Бр.

Е л е к т р и ч н и п е с м е т к и

1.27 A

ГРТ/М

Осветлување

ПО-С-2 ПО-С-3 ПО-С-4 ПО-С-5

Осветлување Резерва

480 W

2.18 A

Еднополна шема РТ-A

РТ-A

480 W

2.18 A

Пан.

1000 W 1000 W

Приклучница

1000 W

4.54 A

Приклучница Приклучница

4.54 A 4.54 A

резерва

ПО-П-1 ПО-П-2 ПО-П-3

AutoCAD SHX Text L1,L2,L3

AutoCAD SHX Text

PE

AutoCAD SHX Text N

AutoCAD SHX Text 3x1.5 NYM-J

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

PE

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

PE

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

PE

AutoCAD SHX Text

QF1

AutoCAD SHX Text

DT40

AutoCAD SHX Text 1P+N

AutoCAD SHX Text 10A B 6kA

AutoCAD SHX Text

QF2

AutoCAD SHX Text

DT40

AutoCAD SHX Text 1P+N

AutoCAD SHX Text 10A B 6kA

AutoCAD SHX Text

QF3

AutoCAD SHX Text

DT40

AutoCAD SHX Text 1P+N

AutoCAD SHX Text 10A B 6kA

AutoCAD SHX Text L1

AutoCAD SHX Text L2

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

PE

AutoCAD SHX Text

QF5

AutoCAD SHX Text

DT40

AutoCAD SHX Text 1P+N

AutoCAD SHX Text 10AB 6kA

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

PE

AutoCAD SHX Text

QF4

AutoCAD SHX Text

DT40

AutoCAD SHX Text 1P+N

AutoCAD SHX Text 10A B 6kA

AutoCAD SHX Text I>

AutoCAD SHX Text

AutoCAD SHX Text 80A/3P3D

AutoCAD SHX Text

TM80D

AutoCAD SHX Text

NSX125F

AutoCAD SHX Text Q1

AutoCAD SHX Text L1

AutoCAD SHX Text L2

AutoCAD SHX Text L3

AutoCAD SHX Text 3x1.5 NYM-J

AutoCAD SHX Text 3x1.5 NYM-J

AutoCAD SHX Text 3x1.5 NYM-J

AutoCAD SHX Text 3x1.5 NYM-J

AutoCAD SHX Text 4x25 NYY

AutoCAD SHX Text 1x16 HO7Z1-R

AutoCAD SHX Text L1,L2,L3

AutoCAD SHX Text L1,L2,L3

AutoCAD SHX Text N

AutoCAD SHX Text L1

AutoCAD SHX Text L2

AutoCAD SHX Text L3

AutoCAD SHX Text L1

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

PE

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

PE

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

PE

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

PE

AutoCAD SHX Text 3x2.5 NYM-J

AutoCAD SHX Text

QRC02

AutoCAD SHX Text ID Domae

AutoCAD SHX Text 3P+N

AutoCAD SHX Text 25A

AutoCAD SHX Text 30mA

AutoCAD SHX Text

QF09

AutoCAD SHX Text

DT40

AutoCAD SHX Text 1P+N

AutoCAD SHX Text 16A C 6kA

AutoCAD SHX Text

QF010

AutoCAD SHX Text

DT40

AutoCAD SHX Text 1P+N

AutoCAD SHX Text 16A C 6kA

AutoCAD SHX Text

QF011

AutoCAD SHX Text

DT40

AutoCAD SHX Text 1P+N

AutoCAD SHX Text 16A C 6kA

AutoCAD SHX Text

QF012

AutoCAD SHX Text

DT40

AutoCAD SHX Text 1P+N

AutoCAD SHX Text 16A C 6kA

AutoCAD SHX Text 3x2.5 NYM-J

AutoCAD SHX Text 3x2.5 NYM-J

3x2.5 NYM-J

LEGEND / ЛЕГЕНДА

conventional detector детектор -конвенционален

AСГ

Aeросолен генератор за гасење пожар

Aerosol generator for extinguishing детектор на чад -постоечки

Existing smoke detector

PPC_2

Конвенционална ПП централа со 2 зони

Конвенционална ПП централа со 2 зони

PPC_4

Конвенционална ПП централа со 4 зони

Конвенционална ПП централа со 4 зони

FFC

Постоечка ПП централа

An existing FF system emergency fire button H = 1,40m рачен активатор H = 1,40m детектор на чад -нов

The new smoke detector алармна труба

The new alarm horne кабел, JH(ST)H 1x2x0,8 BD

PPC_2

L I

S T

B R

08.2020 M 1:50

LOKACIJA: ul. Vodwanska 19, Skopje GP ________ DUP __________ KP _____ K.O.Centar__

Odgovoren proektant: Teodor Bani{ki, dipl.ing.arh

TEH.BR. 08-20

АДАПТАЦИЈА И САНАЦИЈА НА ПРОСТОРИИ на ИНСТИТУТОТ ЗА СУДСКА МЕДИЦИНА

INVESTITOR: Ambasada na SAD - Skopje

Dru{tvo za proektirawe KOD Proekt DOOEL Skopje

0.0

BASEMENT LAYOUT

ОСНОВЕН ПРОЕКТ

0.5 1.0 1.5 2.0 3.0 4.0 5.0 6.0

A С

Г

SYMBOL

СИМБОЛОТ

kab. za kontrola na vlez - THNE -4x2x0.6mm kab. za kontrola na vlez - LiHXHX 2x1,5mm2 electric strike magneten kontakt

Intelegent Reader card elektromagnetska brava

~ita~ na beskontaktna kartica

Door contact

Exit button

Izlezno tipkalo

"Door control panel"

КОНТРОЛЕР/

DESCRIPTION

ОПИС

access control cable - THNE -4x2x0.6mm access control cable -

INDOOR DAY/NIGHT / DH CAMERA

CCTV

CCTV RECORDING DVR CENTER,WITH POWER BOX

ВНАТРЕЕШНА DH КАМЕРА

CCTV СНИМАЊЕ, СО НАПОЈНА КУТИЈА И КАБЛИ

КАМЕРА DOME ЗА ВНАТРЕШНА УПОТРЕБА

INDOOR DOME CAMERA

AND CABLES

1x

17''

MONITOR BANK

DVR

ИТ-соба

POWER UNIT

17''

ОПИССИМБОЛ

ФИКСНА КАМЕРА ЗА ВНАТРЕШНА ИНСТАЛАЦИЈА

ЛЦД 17'' МОНИТОР

СИТЕ КАБЛИ И КОНЕКТОРИ ДО КАМЕРИТЕ СЕ ИСПОРАЧУВААТ СО

DVR

DVR

DVR- со 16 видео влезови со детекција на движење

DVR- with 16 video input with motion detectio

МЕСТО ОПРЕДЕЛЕНО ОД КОРИСНИКОТ

SECURITY AND FIREFIGHTING INSTALATIONS

AutoCAD SHX Text

EB

AutoCAD SHX Text

EM

AutoCAD SHX Text A.

AutoCAD SHX Text

EB

AutoCAD SHX Text A.

AutoCAD SHX Text

EB

AutoCAD SHX Text

EM

AutoCAD SHX Text

EB

AutoCAD SHX Text A.

AutoCAD SHX Text

EB

AutoCAD SHX Text

EM

AutoCAD SHX Text

EB

AutoCAD SHX Text A.

AutoCAD SHX Text

EB

AutoCAD SHX Text

EM

AutoCAD SHX Text

EB

AutoCAD SHX Text INDOOR FIXED CAMERA (HD-1920x1024 resolution)

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

LCD MONITOR 17"

all cables and connectors ,complet with DVR

ОСНОВА НА ПОДРУМ

I

S T

B R

08.2020 M 1:50

LOKACIJA: ul. Vodwanska 19, Skopje GP ________ DUP __________ KP _____ K.O.Centar__

Odgovoren proektant: Teodor Bani{ki, dipl.ing.arh

TEH.BR. 08-20

АДАПТАЦИЈА И САНАЦИЈА НА ПРОСТОРИИ на ИНСТИТУТОТ ЗА СУДСКА МЕДИЦИНА

INVESTITOR: Ambasada na SAD - Skopje

Dru{tvo za proektirawe KOD Proekt DOOEL Skopje

0.0

ОСНОВЕН ПРОЕКТ

0.5 1.0 1.5 2.0 3.0 4.0 5.0 6.0 x p r o t e c t i o n g r i l l x в р а т з е в и з и ј а c o n d e n s a t e o u t l e t

FF valve in air duct housing with grill plates existing air duct (outlet) inlet new air duct connector with grill plate 60х25

300 x 200

360 m3/h

300 x 200

650 m3/h

ANO 2 ф200

150 m3/h

ANO 2 ф200

150 m3/h

ANO 2 ф250

210 m3/h

ANO 2 ф250

210 m3/h

200 x 200

210 m3/h

200 x 200

150 m3/h

200 x 200

150 m3/h

BASEMENT LAYOUT HVAC

existing air duct (outlet)

220V/2.1kW

Grafika EN.pdf
01.pdf
Sheets and Views
Model
02.pdf
Sheets and Views
Model
03.pdf
Sheets and Views
Model
04.pdf
Sheets and Views
Model
05 Shema na stolarija.pdf
Sheets and Views
Model
06.pdf
Sheets and Views
Model
07 0 RT Naslov.pdf
Sheets and Views
Model
07 1 RT drawing.pdf
Sheets and Views
Model
08.pdf
Sheets and Views
Model
09.pdf
Sheets and Views
Model

File details come from the government source that posted it. Updated .