J.05 Attachment 05 -Price Metric.pdf
PDF 158 KB Posted
- Attached to
- Y1DA--(PROJ: 573A4-21-816) DB - Replace Cooling Towers Federal contract opportunity
- Solicitation number
- 36C24822R0107
About this file
This document contains a price metric attachment and details of a related federal contract opportunity. The price metric attachment includes a worksheet for contractors to provide unit pricing for various line items involved in retrofitting an existing bridge structure. Line items cover general conditions, existing conditions, concrete work, metals work, finishes, specialties, electrical work, and bridge modifications. The related federal contract opportunity is a solicitation to replace cooling towers at a Veterans Affairs site. It has a Phase 1 proposal due date of August 22, 2022 at 3:30 PM and is set aside for Service-Disabled Veteran-Owned Small Businesses. The requirement is through the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8.
View the file
Other files for this federal contract opportunity
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET NO 1 OF 2
Project Number Location DATE:
TYPE OF ESTIMATE:
TOTAL COST BY ITEM
CODE: SYSTEM/SUBSYSTEM QTY UNIT $/UNIT TOTAL $/UNIT TOTAL
1 GENERAL CONDITIONS $0.00
1 Mobilization/Demobilization 2 Permits/Environmental Regulations Compliance 3 Safety Requirements 4 Maintenance of Traffic (MOT)
2 Existing Conditions ea $0.00 $0.00 $0.00 1 Removal of Wood Floor System ea $0.00 $0.00 $0.00 2 Removal of Metal Floor System and Connections ea $0.00 $0.00 $0.00 3 Paint Removal ea $0.00 $0.00 $0.00 4 Chain-Link Fabric Removal ea $0.00 $0.00 $0.00 5 Miscellaneous Removal (signs, wiring,conduits, etc. ea' $0.00 $0.00 $0.00
3 CONCRETE ea $0.00 $0.00 $0.00 1 Cracks Repairs at Concrete Ramps ea $0.00 $0.00 $0.00
4 METALS ea $0.00 $0.00 $0.00 1 Retrofit of Existing Structural Connections ea $0.00 $0.00 $0.00 2 New Floor System ea $0.00 $0.00 $0.00 3 New Connections for Floor System ea $0.00 $0.00 $0.00
5 FINISHES ea $0.00 $0.00 $0.00 1 Protective Paint Coating (Epoxy) ea $0.00 $0.00 $0.00 2 Finish Paint Coating ea $0.00 $0.00 $0.00
6 SPECIALTIES ea $0.00 $0.00 $0.00 1 New Vinyl Coated Chain Link Fabric ea $0.00 $0.00 $0.00 2 New Green Chain Link Fence Privacy Slats ea $0.00 $0.00 $0.00 3 New Signage ea $0.00 $0.00 $0.00
7 ELECTRICAL ea $0.00 $0.00 $0.00 1 Electrical Conduits, Wiring, Junctions, Lighting ea $0.00 $0.00 $0.00
8 BRIDGE MODIFICATIONS ea $0.00 $0.00 $0.00 1 Lightning Protection System ea $0.00 $0.00 $0.00 2 Structure Adaptations (To comply with current codes) $0.00 $0.00 $0.00 3 Roof Cover $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
ESTIMATE WORKSHEET
ESTIMATOR: BUILDING NO./LOCATION:
LABOR
Base Offer Cost Breakdown
"FOR OFFICIAL USE ONLY"
PROJECT NAME
MATERIALS/EQUIPMENT
SHEET NO 2 OF 2
$0.00 $0.00 $0.00 Subtotal $0.00 $0.00 $0.00
Overhead % Profit % Bond % $$
$0.00 $0.00 $0.00
Total Base Offer Cost Overhead/Profit Subtotals:
Detail
File details come from the government source that posted it. Updated .