J-7 MSC Ship Repair Facility Survey.docx
DOCX document 193 KB Posted
- Attached to
- USNS William McLean MTA 2025 Federal contract opportunity
- Solicitation number
- N3220525R4043
About this file
This document is a Military Sealift Command (MSC) Ship Repair Facility Survey form for the USNS William McLean (T-AKE 12), solicitation number N3220525R4043. The comprehensive survey form is designed to collect detailed shipyard capabilities and infrastructure information, including dry dock specifications, crane capacities, berthing facilities, storage spaces, shop dimensions, and workforce details. The form requires supplemental documentation such as a plot plan of the yard, certified water depth plot, machine tool inventories, previous ship repair work history, and management qualifications.
The survey seeks to assess a shipyard's technical and operational capabilities for potential ship repair and maintenance work, with sections capturing critical infrastructure details like maximum ship sizes accommodatable, water depths, crane specifications, storage space, shop facilities, and current employment levels. Additional required submittals include a listing of officials' qualifications, details of facilities if located in multiple locations, and a point of contact for the submitted information. The form includes sections for documenting navigational restrictions, equipment capabilities, and serves as a standard evaluation tool for the Military Sealift Command to determine a shipyard's suitability for potential repair contracts.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-12 Past Perf Data.docx | DOCX document | |
| J-8-RFC(2022.12.28).docx | DOCX document | |
| J-11 MSC Dry Dock Eval Form.pdf | ||
| J-14-TechnicalNDA(2023.07.07).docx | DOCX document | |
| J-3-Cat-B(2023.11.03).xlsx | XLSX spreadsheet | |
| J-2-Cat-A(2022.11.22).xlsx | XLSX spreadsheet | |
| J-9-DisclosureofLobbyingActivities(1997.07).pdf | ||
| J-13-PastPerfQuestionaire(2022.11.22).docx | DOCX document | |
| J-10 Interport Differential.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220525R4043 USNS WILLIAM MCLEAN
MSC SHIP REPAIR FACILITY SURVEY
NOTE: If survey form has been previously submitted, then enter changes only.
DATE:
SHIPYARD AND ADDRESS
Commander (Code M-4E3) Military Sealift Command Norfolk, VA 23511
SHIPYARD DATA
Telephone No:
Telex No:
Date Found:
BUILDING WAYS (M. I. W.)
NO. LAUNCHING DIMENSIONS MAXIMUM SHIP SIZE
OF (check one) (ton 2,240 lbs)
WAY
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
DEPTH OF WATER
CRANES SERVING WAY
CERTIFICATION DATE &
CERTIFIED BY WHOM
LIFT CAPACITY
(std. tons)
TYPE
NO.
AT DROP
OFF
OVER
WAY END
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] BASIN WIDTH: WIDTH:
[ ] BASIN WIDTH: WIDTH:
[ ] BASIN WIDTH: WIDTH:
[ ] BASIN WIDTH: WIDTH:
LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.
TIDAL RANGE (DIFF. OF M.L. M.H)
IS SNUBBING NECESSARY?
YES NO
IS FIRE PROTECTION AVAILABLE
ON BUILDING WAY?
YES NO
SHEET 1 OF 5
DOCK
MAXIMUM SHIP SIZE
ACCOMMODATED
LENGTH OA-BEAM
LENGTH
at coping (GD), at keel blocks OVERALL on cradle (MR), on PONTOON
(FD)
CLEAR WIDTH
at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height
DEPTH/DRAFT
OVER OVER OVER
SILL FLOOR KEEL
(GD) BLOCKS
LIFTING CAPACITY
(ton 2,240)
DATE CERTIFIED, CERTIFIED BY WHOM, &
DATE CERTIFICATION EXPIRES
DRY DOCKS (continued)
MATERIAL TYPE
Floating--(FD) Graving--(GD) Marine Railway (MR)
DOCK
SERVICES AVAILABLE
(use abbreviation of service below)
USE
REPAIR/
OUTFIT-
ING
HEIGHT
OF
DOCK
(M.L.W.)
OUT-
BOARD
IN-
BOARD
TYPE
LENGTH
(actual & usable)
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
WATER DEPTH
(M. L. W.)
| BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.) | DRY DOCKS (means high water) | ||
| MSC SHIP REPAIR FACILITY SURVEY (continued) | SHIPYARD: |
LEGEND (abbreviation of services) Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.
Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO
MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:
BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)
MAX REACH HEIGHT OF HOOK
NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM & (STD TONS) (BRIDGE) AT REACH LENGTH HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES
DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT
RAILROAD CONNECTION (identify)
NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)
MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES
LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)
| SHIPYARD: | |
| MSC SHIP FACILITY SURVEY (continued) |
STORAGE SPACE FOR COMPONENTS AND MATERIALS
(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)
PRINCIPAL SHOPS AND BUILDINGS
ALL OTHER SHOPS
(LIST NAMES AND DIMENSIONS)
LARGEST EXIT
WIDTH HEIGHT
DIMENSIONS OF
SHOP OR BUILDING
NAME OF SHOP
OR BUILDING
FABRICATING
PLATE
SHEET METAL
SUBASSEMBLY
WOOD WORKING
BOAT ASSEMBLY
OR MOLDING
BOILER
MACHINE
ELECTRICAL
ELECTRONIC
PIPE
FOUNDRY
RIGGER
RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________
WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________
ACREAGE LEGALLY CONTROLLED
IN USE DEVELOPED TOTAL
LIST TYPES OF WORK NORMALLY SUBCONTRACTED
| SHIPYARD: | |
| MSC SHIP REPAIR FACILITY SURVEY (continued) |
LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM
REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:
1. PLOT PLAN OF YARD.
2. CERTIFIED DEPTH OF WATER PLOT
3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND
EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.
4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND
DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN
ACCOMPLISHED BY THE APPLICANT.
5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP
REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE LINE
6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN
LIST EACH FACILITY AND ITS LOCATION.
7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM
(NAME/TITLE/PHONE NUMBER).
NORMAL
SHIFTS
NORMAL
MAXIMUM
POTENTIAL MAXIMUM
CURRENT
CURRENT
EMPLOYMENT
MANAGEMENT, ADMINISTRATION
PROFESSIONAL ENGINEERING
PRODUCTION SKILLED
PRODUCTION UNSKILLED
NONPRODUCTION
TOTAL:
ARE YOU CERTIFIED AS A SMALL BUSINESS ? YES NO
NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED
ATTACHMENT J - 7 MSC Form 4330/26
File details come from the government source that posted it. Updated .