J-4 Drawing MoscowRoof 1284LM22Q0101.pdf
PDF 199 KB Posted
- Attached to
- MOSCOW REROOFING PROJECT / Moscow Forestry Science Lab / Rocky Mountain Research Station
- Solicitation number
- 1284LM22Q0101
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
55'
57'-5"
18'-7"
14'
5'-1"
6'-9"
8'-7"
10'-11"
37'-5"
101'
40'-8
" 41'-1"
3'-2"
43'
42'-11
46'
27'
Slope
Slope
Slope
Slope
Exhaust Vent
Slope
Slope
Slope
Slope
Exhaust Duct
SECTION NOT
INCLUDED IN SCOPE
Fan Motor Mount
Roof Drain
Vent Stack
Vent Stack
Vent Stack
Roof Drain
Exhaust Duct
Fan Motor Mount
SECTION NOT
INCLUDED IN SCOPE
Vent Stack
HVAC Unit
Boiler Exhaust Stack
Exhaust Fan
Vent Stacks
HVAC Unit
Ductwork
Slope
Slope
Slope
Slope
Slope
10'
6'
Roof Drain
Roof Drain
E
E E
E E
E E
E E
E
EEEE
Exterior light and junction box.
E
Electrical Penetration
E
Exhaust Duct
Exhaust Duct
E E E E E E
Vent Stack
Exhaust Duct
Electrical Penetration
Replace Expansion Joint
HVAC Unit
CONTRACTOR STAGING AREA: NORTH PARKING LOT
Slope
Slope
Slope
Slope
Replace Expansion Joint
Remove and replace approx. 10LF Gutter sections. include downspouts.
HVAC Mounts & Electrical Penetrations
Vent Stack
E E
EEEEEEEEEEEEEEEEE
E
E
E
E E
E
EEEEEEEEEEEEE
Exterior light and junction box.
Elevator Shaft: Replace Wall flashing & Roofing section.
Slope
Scupper Drain. Replace Downspout.
Wall Flashing.
Wall Flashing
Slope
10LF Gutter section: To be removed.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
8/2 9/2
2 1 0:
A
W
UR
ST
ER
C :\U
SE
RS
\A W
UR
ST
ER
\B
OX
\70
R
MR
S
EN
GI
NE
ER
IN
G\
M
OS
CO
W
\F Y2
2 R
OO
F
RE
PA
IR
\P
LA
NN
IN
G
DE
SI
GN
\D
RA
W
IN
GS
\M
OS
CO
W R
OO
F
DR
AW
IN
GS
.D W
G;
(R22)
ROCKY MOUNTAIN RESEARCH STATION
MOSCOW ROOF
REPAIR
MOSCOW FORESTRY
SCIENCE LABORATORY
RMRS
PLANS
04/22/2022
A. WURSTER
A. WURSTER
D. MATHEWS
1 1
NOTES:
1. CONTRACTOR SHALL REMOVE AND REPLACE THE HIGHLIGHTED
COMPONENTS OF THE ROOF TO COMPLY WITH THE LATEST VERSION
OF NCRA'S ROOFING MANUAL LATEST EDITION. ELEMENTS OF THE
SCOPE INCLUDE:
1.1. REMOVE AND REPLACE FLAT ROOF SURFACE WITH 60-MIL, WHITE
TPO FLAT ROOFING WITH 30 YEAR MANUFACTURER'S WARRANTY.
1.2. REMOVE AND REPLACE INSULATION WITH TAPERED INSULATION.
INSULATION MUST HAVE AN R-VALUE OF 5 PER INCH THICKNESS.
ALL ROOF AREAS MUST HAVE A SLOPE OF
" PER FOOT.
1.3. REMOVE AND REPLACE EXPANSION JOINTS AT THE TRANSITIONS
BETWEEN OLD AND NEW ROOFS.
1.4. REMOVE AND REPLACE REPLACE EXISTING STRAINER BASKETS
ON ALL ROOF DRAINS.
1.5. PENETRATION AND ROOF VENT FLASHING AND BOOTS.
1.6. EXISTING GUTTERS SHALL BE REPLACED (UNLESS OTHERWISE
NOTED) WITH MATCHING 5" WIDE, K-STYLE SEAMLESS METAL
GUTTERS WITH FACTORY PVDF COATING. DOWNSPOUTS ARE
INCLUDED IN GUTTER REPLACEMENT.
1.7. ALL EXPOSED SHEET METAL FLASHING WILL HAVE MATCHING
PVDF FACTORY COATING.
1.8. ANY OTHER COMPONENT REQUIRED TO PROVIDE A WATERTIGHT
ENVELOPE NOT SPECIFICALLY LISTED HERE.
2. INSTALL ALL ROOFING MATERIALS IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
3. EXISTING SURFACE MOUNTED ELECTRICAL AND COMMUNICATION
LINES WILL NEED TO BE REMOVED AND RESTORED TO THEIR ORIGINAL
CONDITION AFTER REPAIR. EXISTING CONDUIT, JUNCTION BOXES, AND
MOUNTS MAY BE REUSED.
4. DURING DEMOLITION, CONTRACTOR SHALL INSPECT SUBSTRATE AND
DECKING FOR WATER DAMAGE AND MOLD AND SHALL REPLACE
DAMAGED DECKING IF REQUIRED.
5. THE FACILITY WILL BE OCCUPIED BY US FOREST SERVICE DURING
CONSTRUCTION. COORDINATE WITH COR NO LATER THAN 30 DAYS
PRIOR TO CONSTRUCTION START. ENSURE ALL ADJACENT WALKWAYS
CONTAIN BARRIERS TO AVOID FALLING DEBRIS MISHAPS. USE 4FT
PLASTIC ORANGE TEMPORARY FENCING IN ACCORDANCE WITH OSHA
29 CFR 1926 SUBPART M.
6. CONTRACTOR SHALL VERIFY ALL QUANTITIES AND DIMENSIONS PRIOR
TO ORDERING MATERIALS.
7. CONTRACTOR SHALL LEAVE THE JOB SITE CLEAN AT THE END OF EACH
WORKING DAY. ALL MATERIALS SHALL BE STORED IN A NEAT AND SAFE
PLACE TO PREVENT MISHAPS. CONTRACTOR STAGING AREA AND
MATERIAL STORAGE SHALL BE CONFINED TO THE NORTH PARKING
AREA.
8. PROTECT EXISTING LANDSCAPING AND VEGETATION TO THE MAXIMUM
EXTENT POSSIBLE. IF THE CONTRACTOR MUST DRIVE OVER
LANDSCAPED AREA TO ACCESS AREAS OF THE ROOF, USE PLYWOOD
OR OSB UNDER WHEEL PATHS TO PREVENT RUTTING. IF DAMAGE TO
LANDSCAPING OCCURS DUE TO CONSTRUCTION ACTIVITIES,
CONTRACTOR SHALL REPAIR AT NO ADDITIONAL COST TO THE
GOVERNMENT.
9. CONTRACTOR SHALL INSTALL ALL MATERIALS SPECIFIED ACCORDING
TO MANUFACTURER'S RECOMMENDATIONS UNLESS OTHERWISE
SPECIFIED. ALL GUARANTEES, INSTRUCTION BOOKLETS, EXTENDED
WORKMANSHIP WARRANTIES, MATERIAL WARRANTIES AND
INFORMATION REGARDING MATERIALS USED SHALL BE DELIVERED TO
THE COR VIA EMAIL PRIOR TO CONSTRUCTION START.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
| Sheets and Views |
| Plans |
File details come from the government source that posted it. Updated .