AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
1 09/22/2022 1067606
6. ISSUED BY CODE 84LM 7. ADMINISTERED BY (If other than Item 6) CODE 84LM
USDA-FS CSA INTERMOUNTAIN 2
R1, LOLO NATIONAL FOREST
24 FORT MISSOULA RD
MISSOULA, MT 59804
USDA-FS CSA INTERMOUNTAIN 2
R1, LOLO NATIONAL FOREST
24 FORT MISSOULA RD
MISSOULA, MT 59804
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
1284LM22Q0101
9B. DATED (SEE ITEM 11)
09/07/2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
MOSCOW REROOFING PROJECT
USDA Rocky Mountain Research Station
The purpose of this amendment is for the following, please see the continued pages for details. The submission date remains unchanged for September 23, 2022 by 12:00 p.m. PDT
Complete Blocks 8 and 15A-15C, return 1 copy with your quote. Submit your Quote and this amendment to the Contracting Officer (CO), Darrin Jackson at darrin.jackson@usda.gov.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER
DARRIN JACKSON
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
09/22/2022 (Signature of person authorized to sign) (Signature of CO)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Digitally signed by DARRIN
JACKSON
Date: 2022.09.22 07:57:37 -07'00'
CONTINUATION OF SF30, BLOCK 14 Amendment: 1 / RFQ: 1284LM22Q0101 Moscow Reroofing Project / Page 2 of 3
Moscow Roofing Pre-Bid Conference
9/15/2022 @ 1300 Mountain Time
Question1: Regarding inconsistencies between the extended warranty as an optional bid add vs the base bid.
Discrepancies regarding warranty between specs and drawings.
A: Specifications. Refer to J-4 amendment 1 attached and the Specifications under paragraph 1.9 Warranty (A. and B.)
for changes that apply to this requirement. Reduced warranty from 30 year manufacture warranty to 20 years. At a minimum, the Contractor shall provide a workmanship warranty for 5 years under the base bid. Contractors shall extend the warranty length for up to 20 years under the optional bid-add.
Changes made to page 20 of 35 (Specifications)
1.9 WARRANTY
A. Manufacturer’s Warranty: Manufacturer's standard form, without monetary limitation, in which manufacturer agrees to repair or replace components of membrane roofing system that fail in materials or workmanship within 20 years from date of Substantial Completion. Failure includes roof leaks.
B. Workmanship: Contractor shall provide a minimum of 5 years workmanship warranty against all leaks.
Workmanship warranty duration shall be extended to 20 years under an optional bid add.
Question2: Regarding the Composition of the existing decking.
A: Existing decking consists of 4x6 T&G wood planking.
Existing insulation below the membrane?
A: Existing insulation is ½ - 2” Polyiso board
Question3: About the possibility of utilizing low-rise foam vs mechanically fastened membranes
A: Government would accept offers to utilize low rise foam as adhesive so long as it complies with manufacturer’s recommendations and does not void warranty.
(End)
Question: I cannot locate the required R value for the new flat rigid insulation that is to be installed for the above referenced project. The drawing does provide an R value for the tapered insulation, but again, neither the specs nor the drawing indicate an R value for the flat rigid insulation. Please advise.
A: Since the roof replacement will go down to the deck, the Contractor must comply with IECC minimum R-values for insulation above the roof deck for ASHRAE climate zone 5. The total insulation and membrane R-value must be at least R-30ci.
Changes made to page 18 of 32 (RFQ 1284LM22Q0101
I-3 52.228-1 Bid Guarantee (SEP 1996)
(c) The amount of the bid guarantee shall be 20% percent of the bid price or $250,000, whichever is less.
55'
57'-5"
18'-7"
14'
5'-1"
6'-9"
8'-7"
10'-11"
37'-5"
101'
40'-81 4" 41'-1"
3'-2"
43'
42'-113 4"
46'
27'
Slope
Slope
Slope
Slope
Exhaust Vent
Slope
Slope
Slope
Slope
Exhaust Duct
SECTION NOT
INCLUDED IN SCOPE
Fan Motor Mount
Roof Drain
Vent Stack
Vent Stack
Vent Stack Roof Drain
Exhaust Duct
Fan Motor Mount
SECTION NOT
INCLUDED IN SCOPE
Vent Stack
HVAC Unit
Boiler Exhaust Stack
Exhaust Fan
Vent Stacks
HVAC Unit
Ductwork
Slope
Slope
Slope
Slope
Slope
10'
6'
Roof Drain
Roof Drain
E
E E
E E
E E
E E
E
EEEE
Exterior light and junction box.
E
Electrical Penetration
E
Exhaust Duct
Exhaust Duct
E E E E E E
Vent Stack
Exhaust Duct
Electrical Penetration
Replace Expansion Joint
HVAC Unit
CONTRACTOR STAGING AREA: NORTH PARKING LOT
Slope
Slope
Slope
Slope
Replace Expansion Joint
Remove and replace approx. 10LF Gutter sections. include downspouts.
HVAC Mounts & Electrical Penetrations
Vent Stack
E E
EEEEEEEEEEEEEEEEEE
E
E
E E
E
EEEEEEEEEEEEE
Exterior light and junction box.
Elevator Shaft: Replace Wall flashing & Roofing section.
Slope Scupper Drain. Replace Downspout.
Wall Flashing.
Wall Flashing
Slope
10LF Gutter section: To be removed.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
9/1 5/2
2 1 7:
A
W
UR
ST
ER
C :\U
SE
RS
\A W
UR
ST
ER
\B
OX
\70
R
MR
S
EN
GI
NE
ER
IN
G\
M
OS
CO
W
\F Y2
2 R
OO
F
RE
PA
IR
\P
LA
NN
IN
G
DE
SI
GN
\D
RA
W
IN
GS
\M
OS
CO
W R
OO
F
DR
AW
IN
GS
.D W
G;
(R22)
ROCKY MOUNTAIN RESEARCH STATION
MOSCOW ROOF
REPAIR
MOSCOW FORESTRY
SCIENCE LABORATORY
RMRS
PLANS
A. WURSTER
A. WURSTER
D. MATHEWS
NOTES:
1. CONTRACTOR SHALL REMOVE AND REPLACE THE HIGHLIGHTED
COMPONENTS OF THE ROOF TO COMPLY WITH THE LATEST VERSION
OF NCRA'S ROOFING MANUAL LATEST EDITION. ELEMENTS OF THE
SCOPE INCLUDE:
1.1.
1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
1.8.
REMOVE AND REPLACE FLAT ROOF SURFACE WITH 60-MIL, WHITE
TPO FLAT ROOFING WITH .
REMOVE AND REPLACE INSULATION WITH TAPERED INSULATION.
INSULATION MUST HAVE AN R-VALUE OF 5 PER INCH THICKNESS.
ALL ROOF AREAS MUST HAVE A SLOPE OF 41 " PER FOOT.
REMOVE AND REPLACE EXPANSION JOINTS AT THE TRANSITIONS
BETWEEN OLD AND NEW ROOFS.
REMOVE AND REPLACE REPLACE EXISTING STRAINER BASKETS
ON ALL ROOF DRAINS.
PENETRATION AND ROOF VENT FLASHING AND BOOTS.
EXISTING GUTTERS SHALL BE REPLACED (UNLESS OTHERWISE
NOTED) WITH MATCHING 5" WIDE, K-STYLE SEAMLESS METAL
GUTTERS WITH FACTORY PVDF COATING. DOWNSPOUTS ARE
INCLUDED IN GUTTER REPLACEMENT.
ALL EXPOSED SHEET METAL FLASHING WILL HAVE MATCHING
PVDF FACTORY COATING.
ANY OTHER COMPONENT REQUIRED TO PROVIDE A WATERTIGHT
ENVELOPE NOT SPECIFICALLY LISTED HERE.
2. INSTALL ALL ROOFING MATERIALS IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
3. EXISTING SURFACE MOUNTED ELECTRICAL AND COMMUNICATION
LINES WILL NEED TO BE REMOVED AND RESTORED TO THEIR ORIGINAL
CONDITION AFTER REPAIR. EXISTING CONDUIT, JUNCTION BOXES, AND
MOUNTS MAY BE REUSED.
4. DURING DEMOLITION, CONTRACTOR SHALL INSPECT SUBSTRATE AND
DECKING FOR WATER DAMAGE AND MOLD AND SHALL REPLACE
DAMAGED DECKING IF REQUIRED.
5. THE FACILITY WILL BE OCCUPIED BY US FOREST SERVICE DURING
CONSTRUCTION. COORDINATE WITH COR NO LATER THAN 30 DAYS
PRIOR TO CONSTRUCTION START. ENSURE ALL ADJACENT WALKWAYS
CONTAIN BARRIERS TO AVOID FALLING DEBRIS MISHAPS. USE 4FT
PLASTIC ORANGE TEMPORARY FENCING IN ACCORDANCE WITH OSHA
29 CFR 1926 SUBPART M.
6. CONTRACTOR SHALL VERIFY ALL QUANTITIES AND DIMENSIONS PRIOR
TO ORDERING MATERIALS.
7. CONTRACTOR SHALL LEAVE THE JOB SITE CLEAN AT THE END OF EACH
WORKING DAY. ALL MATERIALS SHALL BE STORED IN A NEAT AND SAFE
PLACE TO PREVENT MISHAPS. CONTRACTOR STAGING AREA AND
MATERIAL STORAGE SHALL BE CONFINED TO THE NORTH PARKING
AREA.
8. PROTECT EXISTING LANDSCAPING AND VEGETATION TO THE MAXIMUM
EXTENT POSSIBLE. IF THE CONTRACTOR MUST DRIVE OVER
LANDSCAPED AREA TO ACCESS AREAS OF THE ROOF, USE PLYWOOD
OR OSB UNDER WHEEL PATHS TO PREVENT RUTTING. IF DAMAGE TO
LANDSCAPING OCCURS DUE TO CONSTRUCTION ACTIVITIES,
CONTRACTOR SHALL REPAIR AT NO ADDITIONAL COST TO THE
GOVERNMENT.
9. CONTRACTOR SHALL INSTALL ALL MATERIALS SPECIFIED ACCORDING
TO MANUFACTURER'S RECOMMENDATIONS UNLESS OTHERWISE
SPECIFIED. ALL GUARANTEES, INSTRUCTION BOOKLETS, EXTENDED
WORKMANSHIP WARRANTIES, MATERIAL WARRANTIES AND
INFORMATION REGARDING MATERIALS USED SHALL BE DELIVERED TO
THE COR VIA EMAIL PRIOR TO CONSTRUCTION START.