This document contains a solicitation for the USNS GUADALUPE (T-AO 200) FY21 Mid Term Availability (MTA). The Military Sealift Command requires various Category B items and services to support the overhaul and maintenance of the USNS GUADALUPE including physical security at the contractor's facility, continuation of existing services such as project planning and monitoring, final vessel cleaning, structural steel repairs, and miscellaneous piping repairs. The solicitation includes pricing tables requiring unit prices and total costs to be provided by offerors for labor, materials, and other direct costs for the listed items. The solicitation number is N3220521R4126 and responses are due based on the standard timeline and process for sealed bid procurements conducted by the Military Sealift Command of the Department of the Navy.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| USNS GUADALUPE (T-AO 200) FY 21 MTA | |||||||||||||||
| GENERAL REQUIREMENT | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 025 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | QTY | UI | Unit Price | Total | ||||||||||
| 7.11 | Cost to Establish Condition Bravo | 1 | DAYS | ||||||||||||
| 7.12 | Cost to Establish Condition Charlie | 1 | DAYS | ||||||||||||
| 7.13 | Cost to Establish Condition Delta | 1 | DAYS | ||||||||||||
| 7.11 | Daily Rate to Maintain Condition Bravo | 1 | DAYS | ||||||||||||
| 7.12 | Daily Rate to Maintain Condition Charlie | 1 | DAYS | ||||||||||||
| 7.13 | Daily Rate to Maintain Condition Delta | 1 | DAYS | ||||||||||||
| WI 025 Sub-Total | |||||||||||||||
| 030 | CONTINUATION OF SERVICES | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1 | Parent work item 010 “Overhaul Management Team Services”. | 15 | DAYS | ||||||||||||
| 7.2 | Parent work item 011” General Services for the Ship” | 15 | DAYS | ||||||||||||
| 7.3 | Parent work item 012 “Telephone Services" | 15 | DAYS | ||||||||||||
| 7.4 | Parent work item 013 “Project Planning and Monitoring” | 15 | DAYS | ||||||||||||
| 7.5 | Parent work item 016 “Fire Protection and Ship’s Safety” | 15 | DAYS | ||||||||||||
| 7.6 | Parent work item 019 "Shipboard Access and Security" | 15 | DAYS | ||||||||||||
| 7.7 | Parent work item 020 “Gas Free Certificates” | 15 | DAYS | ||||||||||||
| WI 030 Sub-Total | $0 | ||||||||||||||
| 026 | FINAL VESSEL CLEANING | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1 | Parent work item 026 “Vessel Final Cleaning”. | 1 | EACH | ||||||||||||
| WI 026 Sub-Total | |||||||||||||||
| 115 | STRUCTURAL STEEL REPAIRS | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 3.3.1 | Approx 25,000 lbs of structural steel plate | 25,000 | lbs | ||||||||||||
| 3.3.2 | Approx 10,000 lbs of rolled structural shapes | 10,000 | lbs | ||||||||||||
| 3.3.3 | Approx fifty (50) 6" long or less cracked fillet welds | 50 | ft | ||||||||||||
| 3.3.4 | Approx fifty (50) 7"-12" long cracked fillet welds | 50 | ft | ||||||||||||
| 3.3.5 | Approx twenty (20) sounding tube striker plates | 20 | ea | ||||||||||||
| 3.3.6 | Approx twenty (20) pits clad welded | 20 | ea | ||||||||||||
| WI 115 Sub-Total | $0 | ||||||||||||||
| 510 | MISCL PIPING REPAIR | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 3.1.2.1 | Fifty (50) linear feet of 8" Schedule 80 carbon steel pipe | 50 | ft | ||||||||||||
| 3.1.2.2 | One hundred (100) linear feet of 8" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.3 | One hundred (100) linear feet of 6" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.4 | One hundred (100) linear feet of 5" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.5 | One hundred (100) linear feet of 4" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.6 | One hundred (100) linear feet of 3" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.7 | One hundred (100) linear feet of 2-1/2" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.8 | One hundred (100) linear feet of 2" Schedule 40 carbon steel pipe | 100 | ft | ||||||||||||
| 3.1.2.9 | Twenty (20) 8" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| 3.1.2.10 | Twenty (20) 6" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| 3.1.2.11 | Twenty (20) 5" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| 3.1.2.12 | Twenty (20) 4" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| 3.1.2.13 | Twenty (20) 3" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| 3.1.2.14 | Twenty (20) 2-1/2" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| 3.1.2.15 | Twenty (20) 2" flanges 150# flat face, socket welded | 20 | ea | ||||||||||||
| WI 510 Sub-Total | $0 |
| &"Times New Roman,Regular"&10USNS GUADALUPE | &"Times New Roman,Bold"&14 |
| CATEGORY "B" ITEMS | &"Times New Roman,Regular"&10N3220521R4126 |
ATTACHMENT J-3
File details come from the government source that posted it. Updated .