J-3-Cat-B(2023.11.03) MILK PSA.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- USNS Harvey Milk PSA
- Solicitation number
- N3220524R4124
About this file
This document appears to be a pricing template for Category B items related to the Post Shakedown Availability (PSA) of the USNS Harvey Milk (T-AO 206) under Solicitation Number N3220524R4124. The solicitation is for the Department of the Navy Military Sealift Command. The template includes line items for services such as physical security, continuation of services, main engine overhaul assistance, piping replacement, fuel oil service pipe replacement, and drydocking/undocking. Each line item provides a description, quantity, unit price, and total price. The template does not include any performance work statement or high-level objectives, but rather focuses on the detailed pricing breakdown for the various contract line items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3220524R4124 0001.docx | DOCX document | |
| J-2-Cat-A(2022.11.22).xlsx | XLSX spreadsheet | |
| HMK-J4-PSA.xlsx | XLSX spreadsheet | |
| J-10 Interport Differential Milk PSA.docx | DOCX document | |
| J-13- Past Perf Questionaire.docx | DOCX document | |
| J-14 Technical NDA (1).docx | DOCX document | |
| J-11 Dry Dock Evaluation Form (for N10) MILK PSA.docx | DOCX document | |
| N3220524R4124.pdf | ||
| J-8-RFC(2022.12.28).docx | DOCX document | |
| J-12 Past Perf Data.docx | DOCX document | |
| J-7 MSC Ship Repair Facility Survey.docx | DOCX document | |
| J-9 Disclsr Lobbying Activities SF-LLL.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-3
| GENERAL REQUIREMENT | QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 0025 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | ||||||||||||||
| 7.1 | ESTABLISH FPCON CHARLIE | 1 | job | $ - 0 | |||||||||||
| 7.2 | ESTABLISH FPCON DELTA | 1 | job | $ - 0 | |||||||||||
| 7.3 | MAINTAIN FPCON CHARLIE | 1 | day | $ - 0 | |||||||||||
| 7.4 | MAINTAIN FPCON DELTA | 1 | day | $ - 0 | |||||||||||
| WI 0025 SUBTOTAL | $ - 0 | ||||||||||||||
| 0030 | CONTINUATION OF SERVICES | ||||||||||||||
| 7.1 | CONTINUATION OF WI 0010 | 15 | day | $ - 0 | |||||||||||
| 7.2 | CONTINUATION OF WI 0011 | 15 | day | $ - 0 | |||||||||||
| 7.3 | CONTINUATION OF WI 0012 | 15 | day | $ - 0 | |||||||||||
| 7.4 | CONTINUATION OF WI 0013 | 15 | day | $ - 0 | |||||||||||
| 7.5 | CONTINUATION OF WI 0016 | 15 | day | $ - 0 | |||||||||||
| 7.6 | CONTINUATION OF WI 0017 | 15 | day | $ - 0 | |||||||||||
| 7.7 | CONTINUATION OF WI 0019 | 15 | day | $ - 0 | |||||||||||
| 7.8 | CONTINUATION OF WI 0020 | 15 | day | $ - 0 | |||||||||||
| WI 0030 SUBTOTAL | $ - 0 | ||||||||||||||
| 203 | TAO205 MAIN ENGINE OVERHAUL INDUSTRIAL ASSISTANCE | ||||||||||||||
| 7 | Provide Industrial Assist for twi (2) Main Engine 18K | 1 | Job | $ - 0 | |||||||||||
| WI 00203 SUBTOTAL | $ - 0 | ||||||||||||||
| 589 | MISCELLANEOUS PIPING REPLACEMENT | ||||||||||||||
| 7.1.1 | Provide all material and labor as unit price per linear foot for 16” pipe listed in 3.1.2 to remove existing and replace with new | 12 | LF | $ - 0 | |||||||||||
| 7.1.2 | Provide all material and labor as unit price per linear foot for 14” pipe listed in 3.1.2 to remove existing and replace with new | 12 | LF | $ - 0 | |||||||||||
| 7.1.3 | Provide material and labor as unit price per linear foot for 12” pipe listed in 3.1.2 to remove existing and replace with new | 12 | LF | $ - 0 | |||||||||||
| 7.1.4 | Provide material and labor as unit price per 16” fitting listed in 3.1.2 to remove existing and replace with new | 4 | Each | $ - 0 | |||||||||||
| 7.1.5 | Provide material and labor as unit price per 14” fitting listed in 3.1.2 to remove existing and replace with new | 4 | Each | $ - 0 | |||||||||||
| 7.1.6 | Provide material and labor as unit price per 12” fitting listed in 3.1.2 to remove existing and replace with new | 4 | Each | $ - 0 | |||||||||||
| WI 0589 SUBTOTAL | $ - 0 | ||||||||||||||
| 599 | MAIN ENGINE FUEL OIL SERVICE PIPE REPLACEMENT | ||||||||||||||
| 7.0 | Provide all labor, material, rigging and services required to clean and certify gas free “Safe for Men” and “Safe for Hot Work” the surrounding spaces and effected systems/equipment required to accomplish the repairs listed in this specification | 1 | Job | $ - 0 | |||||||||||
| WI 0599 SUBTOTAL | $ - 0 | ||||||||||||||
| 951 | TAO205-CCSI-DRYDOCKING AND UNDOCKING THE VESSEL | ||||||||||||||
| 7.1 | Submit unit price per day up to a maximum of 15 days to continue all services in accordance with parent item if directed | 15 | day | $ - 0 | $ - 0 | ||||||||||
| WI 0951 SUBTOTAL | $ - 0 | ||||||||||||||
| TOTAL | ERROR:#REF! |
| &"Times New Roman,Regular"&10USNS HARVEY MILK (T-AO 206) | &"Times New Roman,Regular"&10CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "B" ITEMS | &"Times New Roman,Regular"&10N3220524R4124 |
&"Times New Roman,Regular"&10ATTACHMENT J-3 Page &P of &N
File details come from the government source that posted it. Updated .