J-1a Drawings.pdf
PDF 7 MB Posted
- Solicitation number
- 697DCK-22-R-00464
About this file
This solicitation requests proposals for temporary modular office space at Philadelphia International Airport in Philadelphia, Pennsylvania. Interested vendors must attend an optional site visit by August 23rd and submit any questions by September 6th. Proposals are due by September 23rd. The Federal Aviation Administration will award a contract for modular office complexes totaling approximately 6,400 square feet of floor space and a 320 square foot gym trailer. The period of performance and pricing terms are not specified. Vendors must be registered in the System for Award Management to be eligible for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A-Number 2-697DCK-22-R-00464.pdf | ||
| Price Proposal Form.xlsx | XLSX spreadsheet | |
| QA - 697DCK-22-R-00464 - Final.docx | DOCX document | |
| 697DCK-22-R-00464-0001.pdf | ||
| Site Visit List.xlsx | XLSX spreadsheet | |
| Site Visit List.xlsx | XLSX spreadsheet | |
| J-1 Specifications.pdf | ||
| 697DCK-22-R-00464.pdf | ||
| J-1b FFE.pdf | ||
| J-2 Wage Determination.pdf | ||
| J-3 Past Performance Questionnaire.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
P L O
T D
A T
E /T
IM
E
Department of Transportation Federal Aviation Administration
/8
/2
:5
:4
A M
PHILADELPHIA PAPHL ATCT and TRACON
PHL EASTERN SERVICE AREA
ENGINEERING
SERVICES
TERMINAL
06/08/2022 20015307
PHL - D - TRAILER - G001
COVER SHEET
PHILADELPHIA (PHL) ATCT AND TRACON
TEMPORARY MODULAR OFFICE SPACE
E. ROLAF
B.REDD
P. SOUKAS
PHL ATCT AND TRACON
PHILADELPHIA
PENNSYLVANIA
Philadelphia (PHL) ATCT and TRACON Temporary Modular Office Space Philadelphia, Pennsylvania
Final Submission June 2022
PROJECT LOCATION:
PHILADELPHIA (PHL) AIR TRAFFIC CONTROL TOWER AND TRACON
15 HOG ISLAND ROAD
PHILADELPHIA, PA, 19153
PROJECT
LOCATION
N
PROJECT
LOCATION
N
REV. APPROVED
DATE DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
PL
O
T D
AT
E/
TI
M
E:
6/
/2
7:
:0
PM
PHILADELPHIA PAPHL ATCT and TRACON
PHL EASTERN SERVICE AREA
ENGINEERING
SERVICES TERMINAL
06/08/2022 20015307
PHL - D - TRAILER - G002
INDEX OF DRAWINGS, GENERAL NOTES, LOCATION
MAP & BUILDING CODE ANALYSIS
PHILADELPHIA (PHL) ATCT AND TRACON
TEMPORARY MODULAR OFFICE SPACE
E. ROLAF
B.REDD
P. SOUKAS
PHL ATCT AND TRACON
PHILADELPHIA
PENNSYLVANIA
REV
DRAWING
NUMBER DRAWING TITLE
GENERAL
G001 COVER SHEET
G002 INDEX OF DRAWINGS, GENERAL NOTES, LOCATION MAP & BUILDING CODE
ANALYSIS
G003 GENERAL ABBREVIATIONS
G004 GENERAL, ARCHITECTURAL, STRUCTURAL - LEGENDS
G005 CONSTRUCTION STAGING PLAN
G101 LIFE SAFETY PLAN - TEMPORARY MODULAR OFFICE AND GYM
G102 CODE COMPLIANCE SITE PLAN
CIVIL
C001 GENERAL NOTES, LEGEND, AND ABBREVIATIONS
C101 EXISTING CONDITIONS AND DEMOLITION PLAN
C102 SITE LAYOUT PLAN
C103 VEHICLE CIRCULATION PLAN
C201 GRADING PLAN
C501 UTILITY PLAN
C541 UTILITY DETAILS
C551 UTILITY PROFILES
C801 SITE DETAILS
ARCHITECTURE
A001 FIRE RESISTANCE RATED GUIDE PLAN - EXISTING BASE BUILDING
A100 FLOOR PLANS - TEMPORARY MODULAR OFFICE AND GYM
A101 ROOF PLANS - TEMPORARY MODULAR OFFICE AND GYM
A110 DEMOLITION PLAN AND FLOOR PLAN - BASE BUILDING
A300 STAIR AND RAMP SECTIONS AND DETAILS
A301 MODULAR OFFICE VESTIBULE BUIDLING SECTIONS AND RAILING DETAILS
A500 DOOR SCHEDULE, FINISH SCHEDULE, AND DETAILS
INTERIORS
I100 FURNITURE PLAN - TEMPORARY MODULAR OFFICE
PLUMBING
P001 PLUMBING PLAN - EXISTING BASE BUILDING
ELECTRICAL
E001 ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
E100 ELECTRICAL SITE PLAN
E110 POWER PLAN
E120 LIGHTING PLAN
E130 LIGHTNING PROTECTION SYSTEM PLAN
E161 EARTH ELECTRODE SYSTEM GROUNDING PLAN
E500 PANELBOARD SCHEDULES
E501 PANELBOARD SCHEDULES
E502 PANELBOARD SCHEDULES
E550 ELECTRICAL SCHEDULES
E600 ELECTRICAL DETAILS
E601 ELECTRICAL DETAILS
E602 ELECTRICAL DETAILS
E603 ELECTRICAL DETAILS
E800 POWER ONE-LINE DIAGRAM
FIRE
F001 FIRE ALARM GENERAL NOTES & SYMBOLS
F101 FIRE ALARM PLAN - TEMPORARY MODULAR OFFICE
INDEX OF DRAWINGS GENERAL NOTES LOCATION MAPBUILDING CODE ANALYSIS
A. DIMENSION LINES SHOWN ON ARCHITECTURAL SHEETS ARE FROM FINISHED FACE OF
WALL, UNLESS OTHERWISE NOTED.
B. FIELD VERIFY EXISTING CONDITIONS & DIMENSIONS BEFORE DEMOLITION OF SYSTEMS.
COORDINATE DEMOLITION WITH THE WORK AND NOTIFY COR OF CONFLICTS. NO
DEMOLITION WORK MUST PROCEED UNTIL CONFLICTS ARE RESOLVED TO
SATISFACTION OF COR.
C. FINISHES & ASSOCIATED ADJACENT FINISHES AFFECTED BY THE WORK MUST BE
PATCHED AND REPAIRED TO MATCH EXISTING ADJACENT FINISHES.
D. VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF ELECTRICAL,
TELECOMMUNICATIONS, AND PLUMBING SYSTEMS. FOR DEMOLITION REQUIRED
OUTSIDE OF AREA SHOWN ON ARCHITECTURAL DRAWINGS, REFER TO CIVIL,
ELECTRICAL, AND PLUMBING FOR ITEMS TO BE REMOVED.
E. EXISTING FACILITY WILL BE OCCUPIED BY FAA DURING CONSTRUCTION. COORDINATE
THE WORK IN ADVANCE WITH COR TO AVOID DISRUPTING FAA OPERATIONS. MAINTAIN
MEANS OF EGRESS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. IF AN EXIT IS
TEMPORARILY PLACED OUT OF USE DURING THE WORK, COORDINATE WITH COR FOR
TEMPORARY EGRESS MEASURES. PROVIDE NECESSARY SIGNAGE WARNING BUILDING
OCCUPANTS OF THE CHANGE, AND THE DIRECTION TO THE NEAREST EXIT. WORK
AFFECTING EGRESS MUST BE COORDINATED WITH AND APPROVED IN WRITING BY
COR, A MINIMUM OF 30 DAYS PRIOR TO PERFORMANCE OF WORK.
F. CLEAN CONSTRUCTION AREAS DAILY. CONSTRUCTION DEBRIS & EQUIPMENT MUST NOT
BE LEFT IN OCCUPIED AREAS.
G. MAINTAIN FIRE RATINGS OF FIRE RATED ASSEMBLIES OR SMOKE BARRIERS
PENETRATED BY CONDUITS AND OTHER PENETRATIONS CAUSED BY THE WORK OF
THIS PROJECT WITH AN APPROVED U.L. SYSTEM. WHERE WORK IS REQUIRED ON
BUILDINGS WHICH ARE PART OF THE FACILITY, COORDINATE WITH COR TO VERIFY
EXISTING CONDITION OF BUILDING SYSTEMS (INCLUDING EXTERIOR WALLS,
PARTITIONS, FLOORS, CEILINGS AND ROOFS) BEFORE ANY DEMOLITION OR
CONSTRUCTION.
H. DO NOT SCALE DRAWINGS.
I. EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT MUST REMAIN
OPERATIONAL DURING CONSTRUCTION. COORDINATE WITH COR DEMOLITION WORK
THAT MAY CAUSE VIBRATION OR DISRUPTION TO EQUIPMENT IN THE WORK AREA.
COORDINATE WITH COR NOT TO DISRUPT FAA OPERATIONS, TYP. ACCOMODATE THE
24-HOUR OPERATIONAL FACILITY SCHEDULE AND REQUIREMENTS.
J. PROVIDE OPENINGS THROUGH EXISTING WALLS (GWB, MASONRY, AND CONCRETE)
FOR PROVISION OF ELECTRICAL, & PLUMBING EQUIPMENT. COORDINATE SIZE &
LOCATION WITH ELECTRICAL AND PLUMBING.
K. UNSCHEDULED INTERRUPTIONS TO BUILDING SERVICES/UTILITIES WILL NOT BE
TOLERATED. WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES
MUST BE SCHEDULED AND APPROVED IN WRITING BY COR AT LEAST 10 WORKING DAYS
IN ADVANCE OF PERFORMANCE OF THE WORK.
L. EXISTING BUILDING FLOOR PLANS FOR THE EXISTING BUILDING CONSTRUCTION
PRESENTED IN THIS DOCUMENT WERE OBTAINED FROM THE FAA. FIELD VERIFY
EXISTING BUILDING AND SITE CONDITIONS PRIOR TO ANY CONSTRUCTION WORK
REQUIRED.
M. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS OR PIPE VALVES. REQUEST
PERMISSION IN WRITING OF FAA 10- WORKING DAYS IN ADVANCE FOR EACH CASE OF
BREAKER OR PIPE VALVE OPERATION. DO NOT OPEN (DE-ENERGIZE) OR CLOSE
(ENERGIZE) ANY CIRCUIT BREAKER OR PIPE VALVE. COORDINATE DE-ENERGIZING, AND
ENERGIZING, OF ANY PANELBOARD FOR CIRCUIT BREAKER REPLACEMENT WITH COR.
N. WORK IN CONFINED SPACES OR AREAS MUST BE DONE IN ACCORDANCE WITH OSHA
REQUIREMENTS, 29 CFR 1910.146 AND 1926.21(B)(6).
O. CONCRETE WORK MUST COMPLY WITH SILICA MANAGEMENT REQUIREMENTS.
P. DIMENSIONS (LAYOUTS, MOUNTING HEIGHTS, HEIGHTS ABOVE FINISH FLOOR, ETC.)
AND CLEARANCES SHOWN ON THE DRAWINGS, IDENTIFIED IN MANUFACTURERS'
PRODUCT DATA, OR REFERENCED IN APPLICABLE ABA DOCUMENTS, CODES, AND
CRITERIA FOR THE HANDICAPPED ACCESSIBILITY ARE TO BE HELD TRUE; PLUS OR
MINUS TOLERANCES FROM THESE DIMENSIONS ARE NOT ALLOWED.
Q. REFER TO OTHER DISCIPLINES FOR ADDITIONAL DEMOLITION REQUIRED. PATCH AND
REPAIR DAMAGED FINISHES, AND/OR FIRE RATED ASSEMBLIES TO MATCH EXISTING
ADJACENT SURFACES.
R. ROOM NAMES AND NUMBERS AS INDICATED ARE FOR PROJECT DOCUMENTATION
PURPOSES ONLY. COORDINATE WITH COR FINAL ROOM NAMES AND NUMBERS AS
ESTABLISHED BY FACILITY FOR ANY BUILDING AUTOMATION INTEGRATION, FIRE ALARM
SYSTEM INTEGRATION, OR OTHER SYSTEM INTEGRATION WHICH RELIES ON ACTUAL
FACILITY ROOM NAMES AND NUMBERS.
S. SEAL PENETRATIONS THROUGH EXTERIOR WALL ASSEMBLIES RESULTING FROM THE
WORK TO BE AIR AND WEATHER TIGHT.
T. MODULAR OFFICE SPACE MANUFACTURER'S DESIGNATED PROFESSIONAL ENGINEER
MUST DESIGN FOUNDATIONS, STAIRS, RAMPS, ELEVATED WALKWAY, WALKWAY
COVERING, AND VESTIBULE IN ACCORDANCE WITH THE PERFORMANCE
REQUIREMENTS INDICATED.
APPLICABLE CODES AND FAA AIR TRAFFIC ORGANIZATION TERMINAL FACILITIES DESIGN STANDARD, VERSION 1.1 (DECEMBER 31, 2021)
REGULATIONS NFPA 101, LIFE SAFETY CODE, 2021 EDITION
2021 INTERNATIONAL BUILDING CODE (IBC)
ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS (2015)
OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA) INDUSTRY SAFETY & HEALTH STANDARDS (29
CFR 1910 AND 1926 - CURRENT ISSUE)
2021 INTERNATIONAL FIRE CODE (IFC)
2021 INTERNATIONAL PLUMBING CODE (IPC)
NFPA 10, PORTABLE FIRE EXTINGUISHERS 2022 EDITION
NFPA 70, NATIONAL ELECTRICAL CODE, 2017 EDITION
NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2022 EDITION
NFPA 780, INSTALLATION OF LIGHTNING PROTECTION SYSTEMS, 2020 EDITION
REFER TO SHEET E001 FOR ADDITIONAL ELECTRICAL REFERENCE STANDARDS
CODE SUMMARY MODULAR OFFICE COMPLEX:
IBC OCCUPANCY CLASSIFICATION: GROUP B (WITH ACCESSORY GROUP S-2)
CONSTRUCTION TYPE: IBC, TYPE VB
SPRINKLERED: NO
FIRE ALARM: YES
STORIES: 1 (ACTUAL) / 2 (MAXIMUM)
HEIGHT: 13 FT (ACTUAL) / 40 FT (MAXIMUM)
MODULAR GYM BUILDING:
IBC OCCUPANCY CLASSIFICATION: GROUP B
CONSTRUCTION TYPE: IBC, TYPE VB
SPRINKLERED: NO
FIRE ALARM: NO
STORIES: 1 (ACTUAL) / 2 (MAXIMUM)
HEIGHT: 13 FT (ACTUAL) / 40 FT (MAXIMUM)
COMBINED AREA CALCULATION (INCLUDING ALL TRAILERS AND RAMPS):
6,065 SQFT (MODULAR OFFICES) + 320 SQFT (MODULAR GYM) + 1,515 SQFT (RAMPS) = 7,900 SQFT / 9,000
(MAXIMUM)
EGRESS REQUIREMENTS MODULAR OFFICE COMPLEX:
MAX TRAVEL DISTANCE (BUSINESS): 200 FEET
MAX COMMON PATH OF TRAVEL (BUSINESS): 75 FEET
MAX DEAD END (BUSINESS): 20 FEET
MIN CLEAR WIDTH (CORRIDOR): 44 INCHES
MIN CLEAR WIDTH (EXIT DOOR): 32 INCHES
MODULAR GYM BUILDING:
MAX TRAVEL DISTANCE (BUSINESS): 200 FEET
MAX COMMON PATH OF TRAVEL (BUSINESS): 75 FEET
MAX DEAD END (BUSINESS): 20 FEET
MIN CLEAR WIDTH (CORRIDOR): 44 INCHES
MIN CLEAR WIDTH (EXIT DOOR): 32 INCHES
SEISMIC DESIGN CRITERIA RISK CATEGORY: II
SEISMIC DESIGN CATEOGRY (SDC): B
VICINITY MAP
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
P L O
T D
A T
E /T
IM
E
/8 /2
:5
:5
A M
PHILADELPHIA PAPHL ATCT and TRACON
PHL EASTERN SERVICE AREA
ENGINEERING
SERVICES TERMINAL
06/08/2022 20015307
PHL - D - TRAILER - G003
GENERAL ABBREVIATIONS
PHILADELPHIA (PHL) ATCT AND TRACON
TEMPORARY MODULAR OFFICE SPACE
E. ROLAF
B.REDD
P. SOUKAS
PHL ATCT AND TRACON
PHILADELPHIA
PENNSYLVANIA
STGP SIGNAL TRANSPORT GROUND PLANE
STL STEEL
STOR STORAGE
STRUC STRUCTURAL, STRUCTURE
SUCT SUCTION
SUSP SUSPENDED
SW SWITCH
SYM SYMMETRICAL
T T THERMOSTAT, TREAD
TBD TO BE DETERMINED
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TC TEMPERATURE CONTROL SWITCH
TELCO TELECOMMUNICATION, TELEPHONE COMPANY LINE
TEMP TEMPERATURE
TI TEMPERATURE INDICATOR
TIC TEMPERATURE INDICATING CONTROLLER
TK TANK
TM&O TELECOMMUNICATIONS MANAGEMENT AND
OPERATIONS
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TOW TOP OF WALL
TRACON TERMINAL RADAR APPROACH CONTROL FACILITY
TRANS TRANSVERSE
TS TEMPERATURE SENSOR, TAMPER SWITCH
TYP TYPICAL
U UBC UNIFORM BUILDING CODE
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES, INC.
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SYSTEM
UTIL UTILITY
UV UNIT VENTILATOR
V V VOLT
VAT VINYL ASBESTOS TILE
VAV VARIABLE VOLUME TERMINAL
VB VINYL BASE
VBT VINYL BASE & TRIM COMPONENTS
VC VERTICAL CURVE
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
VF VERTICAL FEET, VENTILATION FAN
VFD VARIABLE FREQUENCY DRIVE
VGWB VINYL SURFACED GYPSUM WALL BOARD
VIF VERIFY IN FIELD
VP VELOCITY PRESSURE, VACUUM PRODUCER
VS VIBRATION SWITCH
W W WATT
W/ WITH
WD WOOD
WG WATER GAGE
WJHTC WILLIAM J. HUGHES TECHNICAL CENTER
W/O WITHOUT
WP WEATHERPROOF
WT WEIGHT
X XFER, XFR TRANSFER
XFMR TRANSFORMER
Y Y WYE CONNECTION
YD YARD
MECH MECHANICAL
MET METAL
MFG(R) MANUFACTURER
MG MOTOR GENERATOR
MIL MILLIMETER
MIN MINIMUM
MO MASONRY OPENING
MOD MODIFICATION
MS MOISTURE SENSOR
MTG MOUNTING, MOUNTED
N N/A NOT APPLICABLE
NAM NEGATIVE AIR MACHINE
NARACS NATIONAL RADIO COMMUNICATIONS SYSTEM
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO, # NUMBER
NOM NOMINAL
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
O OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER, OPEN DRAIN
OF OUTSIDE FACE
OFD OVERFLOW ROOF DRAIN
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION
OSW OPERATIONS SUPPORT WING
P P PUMP, PHASE, POLE
PACM PRESSUMED ASBESTOS CONTAINING MATERIAL
PBX PRIVATE BRANCH EXCHANGE
PC PRESSURE CONTROL SWITCH
PCB POLYCHLORINATED BIPHENYLS
PCF POUNDS PER CUBIC FOOT
PD PRESSURE DIFFERENTIAL
PDI PRESSURE DIFFERENTIAL INDICATOR
PDS PRESSURE DIFFERENTIAL SENSOR
PH PHASE
PHC PREHEAT COIL
PI POINT OF INTERSECTION, PRESSURE INDICATOR
PIV POST INDICATOR VALVE
PL PROPERTY LINE, PLATE
PLAM PLASTIC LAMINATE
PLF POUNDS PER LINEAR FOOT
PNL PANEL
POC POINT OF CONNECTION
PRV PRESSURE REDUCING VALVE
PS PRESSURE SENSOR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSM POWER SYSTEMS MODIFICATION
PT PAINT, POINT OF TANGENCY
PTVC POINT OF VERTICAL CURVATURE
PVC POLYVINYL CHLORIDE
PVDS PORTABLE VISUAL DISPLAY SYSTEM
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
R R RISER, RADIUS
RA RETURN AIR
RAD RADIUS
RCP REFLECTED CEILING PLAN
RCRA RESOURCE CONSERVATION AND RECOVERY ACT
RD ROOF DRAIN
RECEPT, RPTS RECEPTACLE
REF REFERENCE
REG REGISTER
REINF REINFORCING
REQ'D REQUIRED
REV REVERSE, REVISION
RF RETURN FAN
RGS RIGID GALVANIZED STEEL
RHC REHEAT COIL
RM ROOM
RO ROUGH OPENING
RV REFRIGERANT VENT
S S SMOKE DETECTOR
SA SUPPLY AIR
SAN SANITARY
SAP SOUND ABSORBING PANEL
SCH, SCHED SCHEDULE
SCWD SOLID CORE WOOD
SD SMOKE DAMPER
SEC SECTION
SF SUPPLY FAN, SQUARE FEET
SHT SHEET
SIG SIGNAL
SIM SIMILAR
SM SPRINKLER MAIN
SP SUMP PUMP/SEWAGE PUMP,
STATIC PRESSURE INDICATOR
SPEC SPECIFICATIONS
SQ SQUARE
SRF SAFETY RUBBER FLOOR TILE
SRGG SIGNAL REFERENCE GROUND GRID
SRS SIGNAL REFERENCE STRUCTURE
SSDI SECURITY SYSTEMS DESIGN AND
INTEGRATION
SSTL, SS STAINLESS STEEL
ST STEAM, STREET
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STE STANDARD TAPERED END
FLA FULL LOAD AMPERES
FLEX FLEXIBLE DUCT
FLG FLANGE
FLUOR FLUORESCENT
FM FLOW METER, FIRE MAIN
FO FIBER OPTIC
FOL FUEL OIL LEVEL
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FIBER OPTIC TERMINAL
FOV FUEL OIL VENT
FPM FEET PER MINUTE
FPU FIELD PROGRAMMING UNIT
FRP FIBER GLASS REINFORCED PLASTIC
FS FLOW SWITCH
FT, ' FEET
FTR FINNED TUBE RADIATION
FV FULL VOLTAGE
FZ FREEZESTAT
G G GAS
GA GAGE, GAUGE
GALV GALVANIZED
GEN GENERATOR
GFE GOVERNMENT FURNISHED EQUIPMENT
GFM GOVERNMENT FURNISHED MATERIAL
GL GLASS
GND GROUND, GROUND CONNECTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRILLE
GRV GRAVITY VENT
GS GAS SENSOR
GV GATE VALVE
GW GLYCOL WASTE
GWB GPYSUM WALLBOARD
GWH GAS WATER HEATER
H H HUMIDISTAT
HAZMAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HEATING COIL
HCS HOST COMPUTER ROOM
HDW HARDWARE
HE HEAT EXCHANGER
HERM HERMETIC
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSE POWER, HEAT PUMP, HIGH PRESSURE
HPL HIGH PRESSURE LAMINATE
HPS HIGH PRESSURE SODIUM, HIGH PRESSURE STEAM
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH, HUMIDITY SENSOR
HT HEIGHT
HTG HEATING
HTP HOT TAP (W/ STOPPLE FITTING)
HTR HEATER
HU HUMIDIFIER
HVAC HEATING/VENTILATING/AIR CONDITIONING
HW DOMESTIC HOT WATER
HWL HIGH WATER LEVEL
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HZ HERTZ
HWY HIGHWAY
I IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IEWH INSTANTANEOUS ELECTRIC WATER HEATER
IF INSIDE FACE, INTERNAL FILTER
IN, " INCH
INST INSTRUMENTATION
INSUL INSULATION
INT INTERIOR
INT'L INTERNATIONAL
INV INVERT
ITEA INFORMATION TECHNOLOGY EQUIPMENT AREA
ITER INFORMATION TECHNOLOGY EQUIPMENT ROOM
J J JUNCTION
JB JUNCTION BOX
JC JANITOR'S CLOSET
K KCMIL THOUSAND CIRCULAR MILS
KVA KILOVOLT AMPERE
KW KILOWATTS
L LAN LOCAL AREA NETWORK
LBS, # POUNDS
LCC LEAD CONTAINING COATING
LCP LOCAL CONTROL PANEL
LCV LEVEL CONTROL VALVE
LF LINEAR FEET
LG LEVEL GAUGE
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LP LOW POINT
LPS LOW PRESSURE STEAM
LS LEVEL SWITCH
LT LIGHT
LTG LIGHTING
M M MOTOR
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
COMM COMMUNICATIONS
COMP COMPRESSIBLE, COMPRESSED
CONC CONCRETE
COND CONDITION, CONDENSATE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUATION
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICERS REPRESENTATIVE
CP CONTROL PANEL, CIRCULATING PUMP
CPC CRITICAL POWER CENTER
CPDS CRITICAL POWER DISTRIBUTION SYSTEM
CPT CARPET
CPU CENTRAL PROCESSING UNIT
CR CEILING REGISTER, CONTROL RELAY
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CRAH COMPUTER ROOM AIR HANDLING UNIT
CRU COMPUTER ROOM UNIT
CS CONTROL SWITCH
CT CABLE TRAY, COOLING TOWER
CTR CENTER, COOLING TOWER WATER RETURN
CTS COOLING TOWER WATER SUPPLY
CU CONDENSING UNIT
CW DOMESTIC COLD WATER
CWR CHILLER WATER RETURN
CWS CHILLER WATER SUPPLY
CWV COMBINATION WASTE AND VENT
CU CONDENSING UNIT
CV CONTROL VALVE, CONSTANT VOLUME TERMINAL
CYD CUBIC YARD
D D DRAIN, DELTA CONNECTION, DIFFUSER, DAMPER
DB DIRECT BURIAL, DRY BULB
DBL DOUBLE
DC DIRECT CURRENT
DDCP DIRECT DIGITAL CONTROL PANEL
DEG DEGREE(S)
DET DETAIL
DGP DATA GATHERING PANEL
DI DROP INLET, DAMPER POSITION INDICATOR, DIGITAL
INPUT
DIA DIAMETER
DIAG DIAGONAL
DISC DISCONNECT
DISP DISPENSER
DIST DISTRIBUTION
DL DEAD LOAD
DM DEMAND METER
DN DOWN
DO DIGITAL OUTPUT
DOM DOMESTIC
DP DUSTPROOF PARTITION, DIFFERENTIAL PRESSURE
SWITCH
DPDT DOUBLE POLE DOUBLE THROW
DPNL DISTRIBUTION PANEL
DPST DOUBLE POLE SINGLE THROW
DR DOOR
DWG(S) DRAWING(S)
E EA EACH, EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECP ENGINE CONTROL PANEL
EDAM ELECTRICAL DATA ACQUISITION AND MONITORING
EF EXHAUST FAN
EFF EFFICIENCY
EG ENGINE GENERATOR, EXHAUST GRILLE
EH ELECTRIC HEATER
EHC ELECTRIC HEATING COIL
EL, ELEV ELEVATION, ELEVATOR
ELEC ELECTRIC(AL)
EMD ESTIMATED MAXIMUM DEMAND
EMERG EMERGENCY
EMT ELECTRICAL METAL TUBING
ENT, ENTR ENTRANCE
EP EXHAUST PIPE
EPMS ELECTRICAL POWER MONITORING SYSTEM
EPX EPOXY
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM
ES EXHAUST SILENCER
ET ELECTRIC HEAT TRACE
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXH EXHAUST
EXIST, EX EXISTING
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
F F FILTER, FIRE LINE
FA FAN COOLED
FAA FEDERAL AVIATION ADMINISTRATION
FC FAN COIL UNIT
FCO FLOOR CLEANOUT
FCV FLOW CONTROL VALVE
FD FIRE DAMPER OR FLOOR DRAIN
FD/SD COMBINATION FIRE AND SMOKE DAMPER
FDR FEEDER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FEPC FRONT END PERSONAL COMPUTER
FFE FINISHED FLOOR ELEVATION
FHC FIRE HOSE CABINET
FI FLANGE INSULATION, FLOW INDICATOR
FIN FINISH
FIX, FIXT FIXTURE
FL, FLR FLOOR
A A AMPERE, AIR, COMPRESSED AIR LINE
AA AIR COOLED
AAV AUTOMATIC AIR VENT
AC ALTERNATING CURRENT, ASPHALT CONCRETE, AIR
COMPRESSOR
ACC AIR COOLED LIQUID CHILLER
ACD ADDRESSABLE CONTROL DEVICE
ACF ACCESS FLOOR SYSTEM
ACM ASBESTOS CONTAINING MATERIAL
ACP ACOUSTICAL CEILING PANEL
ACT ACCESS CONTROL TERMINAL, ACOUSTICAL CEILING
TILE
ACU AIR CONDITIONING UNIT
A/C AIR CONDITIONING
AD AREA DRAIN, ACCESS DOOR
ADJ ADJACENT, ADJUSTABLE
ADR ACCESS DOOR
ADTN ADMINISTRATIVE DATA TRANSMISSION NETWORK
AED AUTOMATED EXTERNAL DEFIBRILLATOR
AF AMPERE FRAME, AIR FLOW SENSOR
AFF ABOVE FINISH FLOOR
AFMS AIR FLOW MEASURING STATION
AH AIR HANDLING UNIT
AHU AIR HANDLING UNIT
AIC AMPERES INTERRUPTING CAPACITY
AID ADDRESSABLE INTERFACE DEVICE
AIF AIR INTAKE FILTER
AL ALUMINUM
ALT ALTERNATE
AM AMP METER
AMM AMMETER
ANN ANNUNCIATOR
AO ANALOG OUTPUT
AP ANNUNCIATOR POINT
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL)
ARTCC AIR ROUTE TRAFFIC CONTROL CENTER
ARTS AUTOMATED RADAR TERMINAL SYSTEM
AS AIR SEPARATOR
ASSY ASSEMBLY
AT AMPERE TRIP, AIR TRAFFIC
ATB AIR TERMINAL BOX
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILIARY
AV ACID VENT
AVG AVERAGE
AWG AMERICAN WIRE GUAGE
AWP ACOUSTICAL WALL PANEL
AWR AUTOMATION WING REHABILITATION
& AND
@ AT
B B BOILER, BUILDING
BAT CHR BATTERY CHARGER
BC BARE COPPER
BD BOARD, BACK-DRAFT DAMPER, BLOWDOWN
BEL BELOW
BF BLIND FLANGE
BFP BACK FLOW PREVENTER
BFV BUTTERFLY VALVE
BFW BOILER FEED WATER
BHP BRAKE HORSE POWER
BKR BREAKER
BLDG BUILDING
BLKG BLOCKING
BLO BLOWER
BLV BALANCING VALVE
BM BENCH MARK, BEAM
BOCA BUILDING OFFICIALS AND CODE ADMINISTRATORS
INTERNATIONAL, INC
BOD BOTTOM OF DUCT, BASIS OF DESIGN
BOP BOTTOM OF PIPE
BOT, BOTT BOTTOM
BPU BREAKER PROGRAMMING UNIT
BRG BEARING
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTU/H BRITISH THERMAL UNIT PER HOUR
BV BALL VALVE
BWP BACK WATER PREVENTER
BWV BACK WATER VALVE
C C CONDUIT
CA COMBUSTION AIR
CAB CABINET
CB CIRBUIT BREAKER
CC COOLING COIL
CCMS CENTRAL CONTROL AND MONITORING SYSTEM
CD CONTROL DAMPER, CEILING DIFFUSER,
CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FOOT
CG CEILING GRILLE
CH CHILLER
CI CURB INLET, CAST IRON
CIP CAST IRON PIPE, CAST IN PLACE
CIR CIRCULATING
CKT CIRCUIT
CL CENTER LINE
CLF CURRENT LIMITING FUSE
CLG CEILING
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT, CONDUIT ONLY
COL COLUMN
COMB COMBINATION, COMBINE, COMBUSTION AIR
GENERAL ABBREVIATIONS
TEMPORARY INTERIOR
WALL WITH DOOR
TEMPORARY DUSTPROOF
PARTITION WITH DOOR
DOOR NUMBER
WALL TYPE NUMBER
SUPPLY AIR DUCT
EMERGENCY SHOWER AND EYEWASH
FLOOR DRAIN
ELECTRICAL PANEL
SYMBOLS
LOUVER NUMBER
FLOOR SINK
FLOOR HATCH
ROOF HATCH
LADDER
SUMP
LOCKERS
FIRE EXTINGUISHER
CABINET
ACOUSTICAL BAFFLES
DPDP
2A
FIRE RESISTANCE RATING
PARTITION TYPE DESIGNATION
FD FD
FS
RH
SURFACE MOUNTED SEMI-RECESSED
MATERIALS
EARTH
EARTH, ETC
GRAVEL SAND
CONCRETE TER ASPH
CONCRETE, ETC
STEEL ALUMINUM OTHER
METALS
CMU
MASONRY
BRICK TILE
FINISH EL BLKG STUD
PARTITION
WOOD
GYPSUM
GYPSUM
PLYWOOD
LARGE SCALE SMALL SCALE
GLASS
BATT OR
LOOSE
RIGID
INSULATION
ELEVATION
SYMBOLS
CONTRACTOR'S ACCESS ROUTE
VEHICULAR TRAFFIC DIRECTION
RAISED FLOOR PANELS
PERFORATED
AIR FLOW PANEL
WALL
DEMOLITION WALL
SUSPENDED CEILING SYSTEM
RECESSED
LIGHT FIXTURES
LIGHT FIXTURES
SUPPLY AIR
CEILING DIFFUSER
RETURN AIR
CEILING REGISTER
TRANSFER AIR GRILLE
REFER TO ELECTRICAL DRAWINGS
FOR SYMBOLS
REFER TO MECHANICAL DRAWINGS
FOR SYMBOLS
LAVATORY
URINAL
WATER CLOSET
ELECTRIC WATER
COOLER
ARCHITECTURAL/STRUCTURAL LEGEND
2 X 2 2 X 4
EXISTING NEW CONSTRUCTION
REFERENCE
COLUMN LINE GRID DESIGNATION
CENTER LINES
MATCH LINE SYMBOL
BREAK LINES
ELEVATION SYMBOL
DRAWING/DETAIL TITLE
DETAIL TITLE REFERENCE
SECTION CUT
ELEVATION REFERENCE
PLAN NORTH/PROJECT NORTH
ROOM/AREA NUMBER
DEMOLITION
REVISION
REVISION DESIGNATION
SHEET NOTE NUMBER
DEMOLITION NOTE
HAZMAT NOTE, ASBESTOS
HAZMAT NOTE, LEAD PAINT
GRAPHIC SCALE
Name Elevation
A8 View Name
1/8" = 1'-0"AXXX
SHEET ON WHICH DETAIL
IS DRAWN OR SCHEDULED
DETAIL NUMBER
A1
A001
SHEET ON WHICH
DETAIL IS DRAWN
DETAIL DESIGNATION
A1
A001
A701
A7
A6
A5
A8 E1
A001
PROJECT NORTH
MAGNETIC NORTH
KEY NORTH
Room Name
BLS202
CLOUD TO ENCOMPASS
REVISED AREA
1 RFI-0000
04 8 16268
SCALE: 1/8"=1'-0"
GENERAL LEGEND
1,2,3
1, 2
1,2,3
N
A1
A001
DETAIL DESIGNATION
SHEET ON WHICH
DETAIL IS DRAWN DETAIL
DESIGNATION
SHEET ON WHICH
DETAIL IS DRAWN
ABATE ACM MANAGE ACM
IN PLACE
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
P L O
T D
A T
E /T
IM
E
/8 /2
:5
:5
A M
PHILADELPHIA PAPHL ATCT and TRACON
PHL EASTERN SERVICE AREA
ENGINEERING
SERVICES TERMINAL
06/08/2022 20015307
PHL - D - TRAILER - G004
GENERAL, ARCHITECTURAL, STRUCTURAL -
LEGENDS
PHILADELPHIA (PHL) ATCT AND TRACON
TEMPORARY MODULAR OFFICE SPACE
E. ROLAF
B.REDD
P. SOUKAS
PHL ATCT AND TRACON
PHILADELPHIA
PENNSYLVANIA
UP
MH
T
E
E
E
E
UP
ADMINISTRATION
WING
TRACON
WING
ATCT
GYM TRAILER
MODULAR
OFFICE
COMPLEX
FAA DUMPSTERS
ENTRANCE
SECURITY GATE
SECURITY GATE
MAIN ENTRANCE
SECURITY GATE
MODULAR
OFFICE
COMPLEX
LOADING
AREA
MODULAR OFFICE
ENTRANCE
MODULAR OFFICE COMPLEX
ELECTRICAL SERICE
GYM TRAILER
ENTRANCE
MODULAR
OFFICE
ENTRANCE
PARKING LOT
PERIMTER
FENCE
MAIN BUILDING ENTRANCE
TOWER LINK
ENTRANCE PERIMETER
FENCE
HOG ISLAND ROAD
ENGINE
GENERATOR
ACCESSIBLE
PARKING
PARKING LOT
PARKING
CORRIDOR EXIT
PROPOSED
CONSTRUCTION
STAGING AREA
PROPOSED CONSTRUCTION
STAGING AREA
ENGINE GENERATOR
ROOM ENTRANCE
TRACON
LINK
VISITOR PARKING
(2 SPACES AVAILABLE)
NOTE:
FINAL CONSTRUCTION STAGING AREA MUST BE DETERMINED AT PRECONSTRUCTION MEETING.
GUARD HOUSE
A C
C E
S S
R O
A D
ENVIRONMENTAL
SUPPORT AREA
ENVIRONMENTAL
SUPPORT AREA
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
P L O
T D
A T
E /T
IM
E
/8 /2
:5
:5
A M
PHILADELPHIA PAPHL ATCT and TRACON
PHL EASTERN SERVICE AREA
ENGINEERING
SERVICES TERMINAL
06/08/2022 20015307
PHL - D - TRAILER - G005
CONSTRUCTION STAGING PLAN
PHILADELPHIA (PHL) ATCT AND TRACON
TEMPORARY MODULAR OFFICE SPACE
E. ROLAF
B.REDD
P. SOUKAS
PHL ATCT AND TRACON
PHILADELPHIA
PENNSYLVANIA
THE FOLLOWING NOTES AND ACCOMPANYING "CONSTRUCTION STAGING PLAN" GRAPHICALLY REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO MODIFY OR REPLACE DIVISION 1
REQUIREMENTS.
CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA MUST BE COORDINATED WITH SITE PERSONNEL VIA COR; PARTICULARLY IN CONJUNCTION WITH ONGOING PROJECTS. REFER A8/G005. FOR LOCATION OF PROPOSED CONSTRUCTION STAGING AREA AND PROPOSED CONSTRUCTION TRAILER LOCATION. LOCATION OF FINAL CONSTRUCTION STAGING AREA AND CONSTRUCTION TRAILER LOCATION TO BE DETERMINED AT PRECONSTRUCTION CONFERENCE AND COORDINATED WITH SECURITY REQUIREMENTS.
A. CONSTRUCTION ACCESS
1. CONTRACTOR'S VEHICLES, PEDESTRIANS AND DELIVERIES TO SITE MUST BE THROUGH MAIN ENTRANCE SECURITY GATE. CONTRACTOR'S FAA-BADGED ESCORTS WILL ESCORT CONTRACTOR'S PERSONNEL, VEHICLES, AND DELIVERIES THROUGH THE MAIN ENTRANCE SECURITY GATE. THIS GATE IS MANNED 24 HOURS
A DAY.
2. PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES ON SITE.
PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN AND DIRECT PERSONS NEAR CONSTRUCTION AREAS. BARRICADES, SIGNAGE, LIGHTS, FENCING ETC. MUST BE
COORDINATED WITH COR PRIOR TO BEING IMPLEMENTED.
3. ACCESS TO BUILDING FOR THE WORK WILL BE LIMITED TO THE FOLLOWING LOCATIONS:
1. ENGINE GENERATOR ROOM ENTRANCE;
2. THE CONSTRUCTION WORK AREA AS REQUIRED BY THE WORK, COORDINATED IN ADVANCE WITH THE
COR.
4. LOADING AREA MUST BE ACCESSIBLE AT ALL TIMES FOR FAA DELIVERIES. MAINTAIN FAA ACCESS TO FAA
DUMPSTERS AT ALL TIMES.
5. USE OF BUILDING'S LOADING AREA MUST BE COORDINATED WITH COR.
6. DELIVERIES MUST BE SCHEDULED AND APPROVED IN ADVANCE WITH COR AND AT TIMES OTHER THAN FAA EMPLOYEE SHIFT CHANGES TO AVOID CONGESTION. EMPLOYEE SHIFT CHANGES OCCUR 6:00 AM TO 7:00 AM AND 1:00 PM TO 3:00 PM. COORDINATE DELIVERIES WITH THE COR. DELIVERY VEHICLES MUST ONLY CONTAIN ITEMS BEING DELIVERED TO FAA. IF VEHICLE CONTAINS OTHER DELIVERIES, VEHICLES WILL NOT BE ALLOWED
ON SITE. COORDINATE WITH COR OFF-HOURS DELIVERIES OR WHEN ACCESS IS REQUIRED.
7. TOWER LINK ENTRANCE, ENGINE GENERATOR ROOM ENTRANCE, CORRIDOR EXIT, ACCESSIBLE PARKING, AND
PARKING LOT MUST BE ACCESSIBLE FOR FAA USE AT ALL TIMES.
B. CONTRACTOR PARKING
1. PARKING MUST BE COORDINATED WITH COR. PARKING ON-SITE WILL BE LIMITED TO: TWO SPACES AT VISITOR PARKING AND PAVED CONSTRUCTION STAGING AREA. ADDITIONAL PARKING MUST BE OFF-SITE AND PROVIDED BY CONTRACTOR. EXISTING PARKING SPACES AT FACILITY ARE OFF-LIMITS FOR PARKING.
G. CONSTRUCTION TOILET FACILITIES
1. PORTABLE CHEMICAL TOILETS MUST BE PROVIDED WITHIN THE CONSTRUCTION STAGING AREA. PORTABLE CHEMICAL TOILETS WILL NOT BE ALLOWED WITHIN THE EXISTING BUILDING. COORDINATE WITH THE COR
FOR SCHEDULING OF SERVICE.
2. PROVIDE WASH STATIONS IN ADDITION TO PORTABLE TOILETS IN CONSTRUCTION STAGING AREA.
3. TOILET ROOMS INSIDE TRACON MUST NOT BE USED.
H. DEMOLITION AND CONSTRUCTION HOURS
1. TRACON IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. ADMINISTRATION WING OPERATES UNDER NORMAL BUSINESS HOURS (MONDAY - FRIDAY, 7:00 AM - 4:00 PM). THE TRACON WING, ATCT, AND ENVIRONMENTAL SUPPORT AREAS OPERATE 24 HOURS 7 DAYS PER WEEK. SELECT CONSTRUCTION ACTIVITY WILL BE LIMITED TO OFF-HOURS WORK TO MINIMIZE RISK TO THE OPERATIONAL FACILITY.
A. CONSTRUCTION HOURS: 7:00 AM TO 3:30 PM
B. OFF-HOURS WORK: 12:00 AM TO 5:00 AM.
2. THE FOLLOWING ACTIVITIES ARE LIMITED TO OFF-HOURS: CONNECTING TO EXISTING UTILITIES INCLUDING SEWER, WATER, AND ELECTRIC, UNLESS OTHERWISE COORDINATED AND APPROVED IN WRITING BY COR.
SCHEDULE, COORDINATE AND HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 15 WORKING DAYS
NOTICE IN ADVANCE OF UTILITY OUTAGES DURING THE WORK.
3. ACTIVITIES MUST NOT INTERFERE WITH THE AIR TRAFFIC CONTROL FUNCTION OF THIS FACILITY.
DEMOLITION AND CONSTRUCTION NOISE MUST BE MINIMIZED BETWEEN 5:00 AM TO 12:00 AM. WORK DETERMINED BY THE COR TO BE DISRUPTIVE TO THE OPERATIONS WILL BE STOPPED AND RESCHEDULED
TO BE PERFORMED DURING OFF-HOURS.
4. FAA HAS AND MANTAINS EQUIPMENT THAT IS CRITICAL TO ITS OPERATION THROUGHOUT THIS FACILITY.
COORDINATE WITH COR LOCATION OF CRITICAL EQUIPMENT THAT MAY BE AFFECTED BY THE WORK AND PROCEDURES TO PROTECT THIS AND OTHER FAA/ GOVERNMENT EQUIPMENT. WORK IN AREAS WITH
CRITICAL EQUIPMENT MUST BE ACCOMPLISHED DURING OFF-HOURS OR AS APPROVED BY COR.
5. NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES MUST BE SCHEDULED, COORDINATED AND APPROVED IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS
NOTICE IN ADVANCE OF PERFORMANCE OF THE WORK.
6. CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING WILL BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY COR. SCHEDULE, COORDINATE AND HAVE APPROVAL BY
COR IN WRITING, A MINIMUM OF 10 WORKING DAYS BEFORE THE PERFORMANCE OF THE WORK.
I. HAZMAT REMOVAL AND DISPOSAL
1. WORK AREA & BUILDING CONTAINS HAZARDOUS MATERIALS (HAZMAT). MANAGE ASBESTOS CONTAINING
MATERAILS IN PLACE. DO NOT DISTURB.
Not to ScaleG005
A8 PRELIMINARY CONSTRUCTION STAGING PLAN
C. FAA SECURITY REQUIREMENTS
1. AN ADVANCE LIST AND WEEKLY LOG OF PERSONNEL MUST BE PROVIDED TO COR. FAA RESERVES THE RIGHT NOT TO ACCEPT WORKERS. AT THE START OF EACH WORK SHIFT, ALLOW ADEQUATE TIME FOR CONTRACTOR'S PERSONNEL TO SIGN-IN AT GUARD HOUSE. TEMPORARY SECURITY BADGES WILL BE
ISSUED TO CONSTRUCTION PERSONNEL. SUPERVISORY PERSONNEL ARE BE RESPONSIBLE FOR
CONDUCT OF THEIR PERSONNEL WHILE ON SITE AND WITHIN BUILDINGS. CONTRACTORS VEHICLES MUST
BE MARKED.
2. SITE IS A SECURE AREA AND CONSTRUCTION VEHICLES MUST REMAIN IN CONSTRUCTION AREAS.
3. THE FACILITY IS A SECURE AREA AND CONSTRUCTION PERSONNEL MUST REMAIN IN CONSTRUCTION
AREAS AT ALL TIMES. MINIMIZE INGRESS AND EGRESS TO THE EXISTING BUILDING.
4. FAA BADGED ESCORTS AND DESIGNATED ESCORTS WILL BE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING ON SITE AND IN THE BUILDING. COORDINATE WORK WITHIN THE BUILDING IN ADVANCE WITH
COR. ESCORTS OUTSIDE BUILDING WILL BE REQUIRED.
A. RETAIN ADDITIONAL SECURITY GUARD FROM FAA'S EXISTING SECURITY GUARD CONTRACTOR TO ESCORT DURING CONSTRUCTION ACTIVITIES FOR THE DURATION OF THE PROJECT. COORDINATE
WITH COR THE NAME AND CONTACT INFORMATION OF APPROVED SECURITY GUARD CONTRACTOR.
5. PERSONNEL MAY BE FINGERPRINTED AND PHOTOGRAPHED FOR FAA SECURITY COMPLIANCE. SOCIAL
SECURITY NUMBERS WILL BE REQUIRED.
D. CONSTRUCTION MATERIAL STORAGE
1. STORAGE OF CONSTRUCTION MATERIALS ON SITE IS LIMITED. STORAGE OF CONSTRUCTION MATERIALS ON SITE WILL BE LIMITED TO THE CONSTRUCTION STAGING AREA. MATERIALS MUST BE NEATLY STORED AND PROTECTED. LIGHTING MUST BE INSTALLED AT THE DISCRETION OF COR. DO NOT DIG WITHOUT PRIOR PERMISSION FROM COR. BURIED CABLES (UNDERGROUND UTILITIES) MAY RUN THROUGH STAGING
AREA AND ELSEWHERE.
2. THE CONSTRUCTION STAGING AREA MUST BE SURROUNDED BY A LOCKABLE FENCE. CONSTRUCTION OF THE FENCE MUST BE TO THE SATISFACTION OF THE COR. PROVIDE COR AND SECURITY WITH KEYS TO
FENCE. COORDINATE NUMBER OF KEYS WITH COR.
E. CONSTRUCTION DEBRIS
1. ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS MUST BE PROVIDED WITHIN THE
CONSTRUCTION STAGING AREA. AREAS AROUND DUMPSTERS MUST BE KEPT CLEAN AND FREE OF
EXCESS DEBRIS AND DUST DURING CONSTRUCTION. DEBRIS MUST BE REMOVED DAILY. QUANTITY AND POSITION OF DUMPSTERS MUST BE COORDINATED WITH THE COR PRIOR TO THEIR DELIVERY AND
PLACEMENT.
F. CONSTRUCTION OFFICE
1. CONSTRUCTION TRAILER FOR OFFICE, MATERIALS AND EQUIPMENT STORAGE MUST BE LOCATED IN CONSTRUCTION STAGING AREA AS COORDINATED WITH SECURITY REQUIREMENTS. CONSTRUCTION TRAILER MUST BE POWERED BY GENERATOR. NO UTILITY HOOK-UPS WILL BE PERMITTED. PROVIDE
BOTTLED WATER.
N
J. PARKING LOT, DRIVEWAY REPAIR, AND LANDSCAPED AREAS
1. ACCESSIBLE PARKING SPACES MUST REMAIN ACCESSIBLE FOR FAA USE AT ALL TIMES.
2. UPON COMPLETION OF THIS PACKAGE'S WORK, REPAIR PAVED SURFACES AT AFFECTED WORK AREAS TO
ORIGINAL CONDITION, INCLUDING STRIPING OF DAMAGED PAVED SURFACES.
3. DISTURBED LAWNS AND LANDSCAPING MUST BE RESTORED TO ORIGINAL CONDITION TO THE
SATISFACTION OF COR. LAWN DAMAGED BY THIS PACKAGE'S WORK MUST BE REPLACED TO MATCH
EXISTING AND TO SATISFACTION OF COR.
K. EQUIPMENT PROTECTION
1. PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, FROM DAMAGE, INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT, VIBRATIONS, WATER, ASBESTOS, DEBRIS, DUST, AND CORE DRILLING.
2. SHUTDOWNS AND SWITCHOVERS OF MECHANICAL AND ELECTRICAL SYSTEMS MUST BE ACCOMPLISHED DURING OFF-HOURS AS INDICATED UNDER DEMOLITION AND CONSTRUCTION HOURS ON THIS SHEET.
PREPARATORY WORK MUST BE COMPLETED PRIOR TO SHUTDOWN AND SWITCHOVER. SCHEDULE,
COORDINATE AND HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF WORK. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS OR MECHANICAL/PIPE VALVES. REQUEST PERMISSION, COORDINATE, AND HAVE APPROVAL IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE FOR EACH CASE OF BREAKER OR MECHANICAL/PIPE VALVE OPERATION. DO NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT
BREAKER OR MECHANICAL/PIPE VALVE AT ANY TIME.
3. NO WELDING EQUIPMENT WILL BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING WILL NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY COR WITH A MINIMUM 10- WORKING DAYS NOTICE IN ADVANCE OF THE WORK. OSHA WORK PRACTICES MUST BE EXERCISED FOR
ALL PHASES OF CONSTRUCTION INCLUDING WELDING OPERATIONS.
4. USE GREAT CARE AND CAUTION WHILE WORKING IN ALL AREAS OF THIS FACILITY. WORK MUST BE
COORDINATED WITH COR. DISRUPTION OF THIS FACILITY WILL NOT BE PERMITTED.
5. EXISTING FAA AIR TRAFFIC EQUIPMENT WILL REMAIN OPERATIONAL THROUGHOUT DURATION OF THIS CONTRACT. PROVIDE CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL OR ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO EQUIPMENT. NOTIFY COR IMMEDIATELY OF DAMAGE OR DISRUPTION OF
ELECTRICAL AND/OR MECHANICAL SERVICES.
6. VENT TO THE EXTERIOR FUMES AND ODORS RESULTING FROM THE WORK. VENTS MUST NOT DISCHARGE NEAR AIR INTAKES OR WINDOWS. TAKE CARE NOT TO EXPOSE FAA EMPLOYEES TO FUMES, ODORS, OR
OFF GASSING.
GENERAL CONSTRUCTION STAGING NOTES
OFFICE
T105 FLM OFFICE
T106
OFFICE
T107
OFFICE
T113
OFFICE
T112
TECH OPS OFFICE
T111
TOILET
T110
TOILET
T109
CONFERENCE
T114
C O
R R
ID
O
R T1
CORRIDOR
T103
CORRIDOR
T101
CORRIDOR
T102
VESTIBULE
T001
LAN/TELCO ROOM
T115
SELF STUDY
T214
INSTRUCTOR OFFICE
T206
CLASSROOM 1
T207
TOILET
T210
TOILET
T211
CLASSROOM 2
T212
CLASSROOM 3
T213
OFFICE
T205
BREAKROOM
T215
CORRIDOR
T201
CORRIDOR
T202
CORRIDOR
T203
OPEN OFFICE
T204
JC
T209
GYM
T300
T114 CONFERENCE 518 BUSINESS 15 35
# ROOM NAME
AREA
(SQ. FT) OCCUPANCY
LOAD FACTOR
(SQ. FT/OCC)
OCC.
LOAD
T213 CLASSROOM 3 BUSINESS 20 14264
T214 SELF-STUDY BUSINESS 20 12229
T215 BREAKROOM BUSINESS 15 27399
TOTAL (OFFICE) 156
- REM. GROSS BUSINESS 100 424,137
T207 CLASSROOM 1 259 BUSINESS 20 13
T212 CLASSROOM 2 259 BUSINESS 20 13
LIFE SAFETY SYMBOLS:
TD = #FT
OCCUPANT LOAD:
TRAVEL DISTANCE (MAX: 300 FT)
COMMON PATH OF TRAVEL (MAX: 100 FT)
WALL-MOUNTED ABC FIRE EXTINGUISHER
X Y
W
Z
CP = #FT
OCCUPANT LOAD TABLE
SHEET NOTES -
EXIT CAPACITY:
W = EXIT CAPACITY FACTOR (IN/PERSON)
X = OCCUPANTS USING EXIT (PERSONS)
Y = EXIT CAPACITY (PERSONS)
Z = EXIT CLEAR WIDTH (IN)
1. EXTERIOR EXIT RAMPS TO PROVIDE ACCESSIBLE MEANS OF EGRESS.
2. SHARED RAMP IS UTILIZED TO PROVIDE TWO ACCESSIBLE MEANS OF
EGRESS FOR THE OFFICE TRAILER COMPLEX WITHIN MAXIMUM
COMMON PATH OF TRAVEL.
3. GYM WILL USE SINGLE MEANS OF EGRESS AS PERMITTED BY NFPA 101.
T300 GYM BUSINESS 50 7320
TD = 58FT TD = 82FT
C P
FT
CP = 24FT
.2
.2
.2
.2
1 1
FE
FE FE
FE
FE
FE
CP = 33FT
TD = 52FT
FE FE
8 0 8
Scale: 1/8 INCH = 1 FOOT
N
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
KEY NORTH
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
PL
O
T D
AT
E
/T
IM
E:
6/
8/
0:
:2
AM
PHILADELPHIA PAPHL ATCT and TRACON
PHL EASTERN SERVICE AREA
ENGINEERING
SERVICES TERMINAL
06/08/2022 20015307
PHL - D - TRAILER - G101
LIFE SAFETY PLAN - TEMPORARY MODULAR OFFICE
AND GYM
PHILADELPHIA (PHL) ATCT AND TRACON
TEMPORARY MODULAR OFFICE SPACE
J. WATKINS
J. WATKINS
R. ALPERT
PHL ATCT AND TRACON
PHILADELPHIA
PENNSYLVANIA
1/8" = 1'-0"G101
E8 LIFE SAFETY PLAN - OFFICE
1/8" = 1'-0"G101
B8 TEMPORARY MODULAR GYM LAYOUT
SITE PLAN SYMBOLS:
HYD = #FT
OCCUPANT LOAD:
TRAVEL DISTANCE TO FIRE HYDRANT (MAX: 400 FT)
FIRE SEPARATION DISTANCE (IMAGINARY LOT LINE SHOWN DASHED)
EXISTING FIRE HYDRANT
SHEET NOTES -
1. EXTERIOR EXIT RAMP DOES NOT REQUIRE RATED SEPARATION FROM
BUILDING PER IBC. RAMP MUST BE SEPARATED FROM OTHER
BUILDINGS BY A MINIMUM OF 10 FEET.
2. MODULAR TRAILERS ARE TREATED AS THE SAME BUILDING FOR
PURPOSES OF FIRE SEPARATION DISTANCE AND AREA CALCULATION.
DISTANCE FROM EXISTING MAIN BUILDING IS IN EXCESS OF 60 FEET
AND DOES NOT REQUIRE AN EXTERIOR WALL RATING
FH
FSD = #FT
FH
FH
HYD = 390FT
OFFICE TRAILER
COMPLEX
EGRESS RAMP
GYM TRAILER
EXISTING ATCT
EXISTING BASE
BUILDING
H
YD
FT
EGRESS RAMP1
OFFICE TRAILER
COMPLEX
32 0
Scale: 1/32 INCH = 1 FOOT
32 64
N
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
KEY NORTH
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
PL
O
T D
AT
E
/T
IM
E:
6/
8/
0:
:2
AM
PHILADELPHIA PAPHL ATCT and TRACON
PHL EASTERN SERVICE AREA
ENGINEERING
SERVICES TERMINAL
06/08/2022 20015307
PHL - D - TRAILER - G102
CODE COMPLIANCE SITE PLAN
PHILADELPHIA (PHL) ATCT AND TRACON
TEMPORARY MODULAR OFFICE SPACE
J. WATKINS
J. WATKINS
R. ALPERT
PHL ATCT AND TRACON
PHILADELPHIA
PENNSYLVANIA
1" = 30'-0"G102
E8 SITE CODE COMPLIANCE PLAN
1 INCH = 30 FEET
3030 60
REV.
APPROVED
DATE
DESCRIPTION JCN APVD
REVIEWED BY
APPROVER'S TITLE
DESIGNED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
A
B
E
F
G
A
B
C
8 4 3 2
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
PHL
REDLINE
DATE
SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE
DRAWN BY
CHECKED BY
DEPARTMENT OF TRANSPORTATION
8 7 6 5 4 3 2 1
C
D
H
D
E
F
PHILADELPHIA
G
PA
H
PHL ATCT and TRACON
7 6
EASTERN SERVICE AREA
ENGINEERING
SERVICES
ENROUTE
06/08/2022
PHILADELPHIA (PHL) ATCT AND TRACON
TEMPORARY MODULAR OFFICE SPACE
P. McPARTLAND
PHL ATCT AND TRACON
PHILADELPHIA
PENNSYLVANIA
P. McPARTLAND
D. TIRONA
P L O
T
D
A T
E T
I M
E
PHL - D - TRAILER -
20015307
8 JUNE 2022
GENERAL NOTES ABBREVIATIONS
1. PAY FEES FOR AND SECURE REQUIRED PERMITS FOR CONSTRUCTION.
2. OBTAIN WRITTEN APPROVAL FROM THE COR FOR DEVIATIONS FROM THESE PLANS AND SPECIFICATIONS.
3. PERFORM WORK IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND
ORDINANCES. NOTIFY THE COR IMMEDIATELY IF THERE IS CONFLICT BETWEEN THE APPLICABLE
ORDINANCES AND THE CONTRACT WORK.
4. COORDINATE CONSTRUCTION EFFORTS WITH ADJACENT ACTIVE CONSTRUCTION SITES.
5. USE ESTABLISHED ROADWAYS AND OBSERVE APPLICABLE WEIGHT RESTRICTIONS FOR VEHICLES AND/OR
ROADWAYS.
6. MAINTAIN TRAFFIC AND USAGE OF THE EXISTING ROADWAYS ADJACENT TO THE PROJECT. SUBMIT A
TRAFFIC CONTROL PLAN TO THE COR A MINIMUM OF 30 DAYS PRIOR TO PROPOSED LANE CLOSURES OR
WORK WITHIN THE EXISTING ROADWAYS, IF REQUIRED. MAINTAIN EMERGENCY VEHICLE ACCESS AT ALL
TIMES. OBTAIN ANY LOCAL OR STATE REQUIRED PERMITS FOR LANE OR STREET CLOSURES IF NECESSARY.
7. PROVIDE TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH THE LATEST MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD) REQUIREMENTS.
8. DIMENSIONS ARE TO THE FACE OF CURB / EDGE OF PAVEMENT UNLESS NOTED OTHERWISE.
9. CURB / EDGE OF PAVEMENT RADII ARE 5 FEET UNLESS NOTED OTHERWISE.
10. DIMENSIONS OR VALUES ON THE PLANS TAKE PRECEDENCE OVER ANY SCALED DIMENSIONS OR VALUES.
11. DESIGN TEMPORARY CONSTRUCTION STRUCTURES SUCH AS SHEETING AND SHORING FOR EXCAVATIONS.
PROVIDE DESIGN CALCULATIONS AND DRAWINGS SHOWING THE LOCATIONS AND CONSTRUCTION DETAILS
OF SAID TEMPORARY STRUCTURES PROPOSED. DOCUMENTS MUST BE PREPARED AND SEALED BY A
PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF PENNSYLVANIA.
12. NO DISTURBANCE IS ALLOWED BEYOND THE LIMITS OF DISTURBANCE INDICATED.
13. GRADES SHOWN DENOTE THE TOP OF CURB, TOP OF CONCRETE SIDEWALK/PAVEMENT OR TOP OF
FINISHED GRADE UNLESS OTHERWISE STATED ON TYPICAL SECTIONS OR DETAILS.
14. GRADES BETWEEN SPOT ELEVATIONS AND BETWEEN CONTOURS HAVE A UNIFORM SLOPE UNLESS NOTED
OTHERWISE.
15. MAXIMUM SLOPE IN ACCESSIBLE PARKING SPACES AND ACCESS AISLES IS 2% IN ANY DIRECTION.
16. MAXIMUM SLOPE IN PARKING AREAS OUTSIDE OF ACCESSIBLE PARKING SPACES AND ACCESS AISLES IS 5%.
17. CONSTRUCT ACCESSIBLE ROUTES IN ACCORDANCE WITH FEDERAL REQUIREMENTS.
18. MAXIMUM SLOPE OF DISTURBED AND RESTORED AREAS IS 3:1.
19. STAGING AND LAYDOWN AREA WILL BE COORDINATED DURING THE PRE-CONSTRUCTION MEETING.
20. PROVIDE POSITIVE DRAINAGE AWAY FROM EXISTING AND PROPOSED BUILDINGS DURING CONSTRUCTION
AND AT FINAL GRADING AND STABILIZATION.
21. UPON COMPLETION OF CONSTRUCTION OF THE PROJECT, THE PROJECT AREA MUST BE FREE OF DEBRIS
AND UNUSED MATERIAL. DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES MUST BE RESTORED TO MEET
OR EXCEED THE ORIGINAL EXISTING CONDITION AS DETERMINED BY THE COR, TO INCLUDE PAVEMENT
MARKINGS IN THE VICINITY OF CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST TO THE GOVERNMENT.
22. LOCATE PORTABLE TOILETS A MINIMUM OF 25 FEET AWAY FROM THE NEAREST STORMWATER FEATURE
(INLET, SWALE, DITCH, POND, ETC.).
23. CONSTRUCT TEMPORARY FENCING AS NECESSARY TO SECURE THE PROJECT SITE AT ALL TIMES.
A
A/E AIR ENTRAINED CONCRETE
AC ACRES
ASPH ASPHALT
C
CO CLEANOUT
CONC CONCRETE
C&G CURB AND GUTTER
CL CENTERLINE
CLF CHAIN LINK FENCE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CF CUBIC FOOT
CP COPPER PIPE
D
DATUR DEPICTED ACCORDING TO UTILITY RECORDS
DHCW DOMESTIC HOT/COLD WATER
DIP DUCTILE IRON PIPE
E
E EASTING
EA EACH
ELEV ELEVATION
ELEC ELECTRICAL
EMH ELECTRICAL MANHOLE
EN BUILDING ENTRANCE
EOI END OF INFORMATION
EX EXISTING
F
FD FOUNDATION DRAIN
FH FIRE HYDRANT
FT FOOT
FFE FINISHED FLOOR ELEVATION
FOUN FOUNDATION
FOL FIBER OPTIC LINE
H
HP HIGH POINT
I
IN INCH
INV INVERT
IB IRRIGATION BOX
L
LAT LATERAL
LP LIGHT POLE
LF LINEAR FOOT
LOW LIMITS OF WORK
M
MH MANHOLE
N
N NORTHING
O
OD OUTSIDE DIAMETER
P
PIDS PERIMETER INTRUSION DETECTION SYSTEM
PIV POST INDICATOR VALVE
PROP PROPOSED
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
R
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
S
SAN SANITARY SEWER
SD STORM DRAIN
SW SIDEWALK
SQFT SQUARE FOOT
STD STANDARD
STM STORM
STMH STORM MANHOLE
T
TP# TEST PIT
TYP TYPICAL
TC TOP OF CURB
U
UNDG UNDERGROUND
UNK UNKNOWN
W
WV WATER VALVE
DEMOLITION NOTES
1. LIMITS AND ITEMS SHOWN FOR REMOVAL ARE BASED ON THE TOPOGRAPHIC SURVEY AND AVAILABLE
RECORD MAPPING. REMOVE ITEMS NOT SHOWN WITHIN THE LIMITS OF CONSTRUCTION NECESSARY TO
COMPLETE THE REQUIRED WORK. NOTIFY COR IN WRITING OF ITEMS NOT SHOWN WITHIN THE LIMITS OF
DISTURBANCE THAT REQUIRE DEMOLITION OR TEMPORARY REMOVAL TO COMPLETE THE REQUIRED WORK.
2. PROTECT EXISTING FEATURES TO REMAIN, INCLUDING TREES, ROADS, UTILITIES, PAVING AND SIMILAR
ITEMS NOT PART OF THE CONTRACT WORK. REPAIR OR REPLACE ITEMS TO REMAIN THAT ARE DAMAGED TO
MEET OR EXCEED THEIR EXISTING CONDITION AS DETERMINED BY THE COR. STORE ITEMS REQUIRED TO BE
TEMPORARILY REMOVED IN A SAFE AND SECURE AREA. TEMPORARILY REMOVED ITEMS THAT ARE
DAMAGED DURING STORAGE OR REPLACEMENT MUST BE REPAIRED TO MEET OR EXCEED THEIR EXISTING
CONDITION AS DETERMINED BY THE COR.
3. PROVIDE CONSTRUCTION DUMPSTERS AND DISPOSE OF DEBRIS AND CONSTRUCTION MATERIAL IN A
LAWFUL MANNER. DISPOSE OF WASTE IN AN APPROVED OFF-SITE WASTE DISPOSAL FACILITY.
4. COORDINATE THE LIMITS OF REMOVAL AND DISTURBANCE WITH THE SITE LAYOUT AND GRADING PLANS.
5. SAWCUT ASPHALT, CONCRETE PAVEMENT, SIDEWALKS OR CURBS/CURBS AND GUTTER TO THEIR FULL
DEPTH AT THE LIMITS OF DEMOLITION. AS AN ALTERNATE, CONCRETE PAVEMENT, SIDEWALK, OR CURBS
MAY BE REMOVED TO THE NEXT JOINT. IF REMOVED TO THE NEXT JOINT, EXTEND WORK TO THE JOINT
MATCHING GRADE AT THE EXISTING INTERFACE.
6. PROVIDE A SMOOTH TRANSITION WHERE CURB, CONCRETE AND ASPHALT MEET EXISTING.
7. DEMOLISH OR ABANDON IN PLACE EXISTING UTILITIES AS SHOWN ON THE DEMOLITION PLANS.
8. EXCAVATED SOIL MAY BE USED FOR BACKFILLING AND FILL PROVIDED IT MEETS THE REQUIREMENTS OF
THE PROJECT SPECIFICATIONS.
9. EXISTING UTILITIES MUST REMAIN IN SERVICE DURING DEMOLITION AND CONSTRUCTION. NOTIFY AND
SCHEDULE ANY NECESSARY UTILITY INTERRUPTIONS WITH THE COR A MINIMUM OF 15 DAYS PRIOR TO THE
SERVICE INTERRUPTION.
SURVEY NOTES
UTILITY NOTES
1. TOPOGRAPHIC INFORMATION DEPICTED IN THESE PLANS IS BASED ON A FIELD RUN TOPO PERFORMED BY
GTS CONSULTANTS, INCORPORATED IN JULY 2021 . THE CONTOUR INTERVAL IS ONE (1) FOOT.
2. THE HORIZONTAL INFORMATION IN THE SURVEY IS BASED ON THE PENNSYLVANIA STATE PLANE SOUTH
COORDINATE SYSTEM (NAD83) AND IS SHOWN IN INTERNATIONAL SURVEY FEET. THE VERTICAL
INFORMATION IS BASED ON (NAVD88). SURVEY REFERENCES LOCAL SURVEY BENCHMARK: PAPH
3. VERIFY FIELD CONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY THE COR IF FIELD CONDITIONS DIFFER.
PERFORM A SITE VISIT AND BECOME FAMILIAR WITH THE SITE CONDITIONS PRIOR TO BIDDING.
4. EXISTING UNDERGROUND UTILITIES SHOWN ARE SHOWN ARE BASED ON THE FIELD RUN SUBSURFACE
UTILITY LOCATING TO A QUALITY LEVEL "A". THREE TEST PITS WERE COMPLETED ALONG COMMUNICATION
DUCT BANK ALONG THE SOUTH EDGE OF THE SITE. AN ADDITIONAL TEST PIT WAS COMPLETED WHERE THE
THE COMMUNICATION AND ELECTRICAL DUCT BANK.
1. PRIOR TO CONSTRUCTION DETERMINE THE EXACT LOCATION OF UTILITIES WITHIN THE LIMITS OF
DISTURBANCE. REPAIR DAMAGES TO UTILITIES DAMAGED DURING CONSTRUCTION AT NO ADDITIONAL
COST TO THE GOVERNMENT. IF DURING CONSTRUCTION UTILITIES OTHER THAN THOSE SHOWN HEREIN
ARE DISCOVERED, IMMEDIATELY NOTIFY THE COR IN WRITING AND TAKE NECESSARY STEPS TO PROTECT
THE UTILITY AND ENSURE CONTINUITY OF SERVICE.
2. WHERE UTILITIES WILL CROSS EXISTING UTILITIES, LOCATE THE EXISTING UTILITY IN BOTH THE HORIZONTAL
AND VERTICAL AND NOTIFY THE COR IN WRITING IF THE EXISTING UTILITY IS IN CONFLICT WITH THE WORK.
PRIOR TO EXCAVATING CONTACT PA ONE CALL.
3. PROVIDE A MINIMUM OF 48 INCHES OF COVER OVER WATERLINES.
4. CONFIRM UTILITY TIE-IN LOCATIONS WITH THE RESPECTIVE UTILITY OWNER PRIOR TO CONSTRUCTION.
5. EXISTING UTILITY TIE-IN LOCATIONS ARE ACTIVE UNLESS NOTED OTHERWISE.
6. REFER TO THE ARCHITECTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, COMMUNICATIONS, AND
ELECTRICAL PLANS TO CONFIRM BUILDING CONNECTION LOCATIONS AND SIZES PRIOR TO CONSTRUCTION.
7. DO NOT OPERATE EXISTING WATER VALVES WITHOUT PRIOR NOTIFICATION AND CONSENT OF THE COR.
8. INSTALL WATER MAINS CROSSING SANITARY SEWER ABOVE THE SANITARY SEWER WITH A MINIMUM
SEPARATION OF 18 INCHES. WHERE WATERLINES AND SANITARY SEWER RUN PARALLEL, PROVIDE A
MINIMUM SEPARATION OF 10 FEET OUTSIDE TO OUTSIDE OF PIPE WITH A VERTICAL SEPARATION OF 18
INCHES, WATER OVER SEWER.
9. THESE WATER MAIN/SERVICE DESIGN PLANS DO NOT DEPICT THE LOCATION OF EVERY NECESSARY ELBOW, TEE, CROSS, THRUST BLOCK, BEND, VALVE, OR FITTING REQUIRED. INCLUDE ALL PIPING, FITTINGS AND
APPURTENANCES REQUIRED FOR A FULLY FUNCTIONING INSTALLED SYSTEM.
10. SEE COMMUNICATIONS AND/OR ELECTRICAL PLANS FOR ALL HANDHOLE, MANHOLE, AND DUCT BANK
INSTALLATION AND DETAILS.
11. ADJUST EXISTING UTILITY STRUCTURE RIMS TO MEET FINAL GRADE.
12. INSTALL SANITARY AND STORM SEWER STARTING AT THE DOWNSTREAM POINT AND CONTINUE TO WORK
UPSTREAM.
13. EXCAVATE TRENCHES TO INDICATED GRADIENTS, LINES, DEPTHS, AND ELEVATIONS.
14. TAKE EXTRA CARE WHILE EXCAVATING NEAR OR WORKING IN CLOSE PROXIMITY TO EXISTING UTILITIES
AND PROTECT UTILITIES THROUGHOUT CONSTRUCTION. HAND EXCAVATE AS NECESSARY TO AVOID
POTENTIAL DAMAGE.
15. UTILIZE TRENCH BOXES AND/OR TRENCH SHEETING OR SHORING AS REQUIRED TO PROTECT EXISTING SITE
FEATURES AND UTILITIES.
C001
GENERAL NOTES, LEGEND, AND ABBREVIATIONS
LEGEND
DEMOLISH CURB CONCRETE FOR UTILITIES
CLEAR AND GRUB
FULL DEPTH ASPHALT REMOVAL
BITUMINOUS PAVEMENT PATCHING
CONCRETE ELEVATION
BOTTOM OF CURB ELEVATION
TOP OF CURB ELEVATION
CX.X
BCX.X
TCX.X
ELECTRICAL DUCTBANK
WATER SUPPLY
SANITARY SEWER MANHOLE
LIGHT POST
SANITARY SEWER
SS
W
E
SANITARY SEWER CLEANOUT
E
ELECTRIC PULL BOX
LIMITS OF DISTURBANCE
LOD
CO
DEMOLISH CONCRETE CURB
TEST PIT
AutoCAD SHX Text S
AutoCAD SHX Text
TP3
XXXXXXXXX
XX
XX
XX
ELECTRIC
DUCTBANK
4' CLEAR ZONE
COMMUNICATION
DUCTBANK
L O
D
LOD
L O
D
LOD
LOD
LOD
LO
D
L O
D
L O
D
LOD
LODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
L O
D L
O D
L O
D
L O
D
LOD
LODLODLODLODLOD
L
O
D
L
O
D
LODLODLOD
REV.
APPROVED
DATE
DESCRIPTION JCN APVD
REVIEWED BY
APPROVER'S TITLE
DESIGNED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
A
B
E
F
G
A
B
C
8 4 3 2
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
PHL
REDLINE
DATE
SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE
DRAWN BY
CHECKED BY
DEPARTMENT OF TRANSPORTATION
8 7 6 5 4 3 2 1
C
D
H
D
E
F
PHILADELPHIA
G
PA
H
PHL ATCT and TRACON
7 6
EASTERN SERVICE AREA
ENGINEERING
SERVICES
ENROUTE
06/08/2022
PHILADELPHIA (PHL) ATCT AND TRACON
TEMPORARY MODULAR OFFICE SPACE
P. McPARTLAND
PHL ATCT AND TRACON
PHILADELPHIA
PENNSYLVANIA
P. McPARTLAND
D. TIRONA
P L O
T
D
A T
E T
I M
E
20 0 20
Scale: 1 INCH = 20 FEET
PHL - D - TRAILER -
20015307
8 JUNE 2022
N
C101
EXISTING CONDITIONS AND DEMOLITION PLAN
C101
B8
EXISTING CONDITIONS AND DEMOLITION PLAN
1" = 20'
LEGEND
CLEAR AND GRUB
A. SEE SHEET C001 FOR LEGEND AND ADDITIONAL
DEMOLITION NOTES.
B. INTERRUPTION TO FACILITY…