J-1 Specifications.pdf
PDF 14 MB Posted
- Solicitation number
- 697DCK-22-R-00464
About this file
This solicitation is seeking proposals for temporary modular office space at Philadelphia International Airport in Philadelphia, Pennsylvania. The Federal Aviation Administration Southwestern Region requires the office space to accommodate personnel needs. Interested vendors must attend an optional site visit on August 30th or 31st, 2022 by registering with three named points of contact by August 23rd. All questions are due by September 6th while proposals must be submitted by September 23rd, 2022 at 3:00 PM Central Time to be considered. To be eligible, offerors must be registered in the System for Award Management and must submit a proposal in accordance with the solicitation's requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A-Number 2-697DCK-22-R-00464.pdf | ||
| Price Proposal Form.xlsx | XLSX spreadsheet | |
| QA - 697DCK-22-R-00464 - Final.docx | DOCX document | |
| 697DCK-22-R-00464-0001.pdf | ||
| Site Visit List.xlsx | XLSX spreadsheet | |
| Site Visit List.xlsx | XLSX spreadsheet | |
| J-1a Drawings.pdf | ||
| 697DCK-22-R-00464.pdf | ||
| J-1b FFE.pdf | ||
| J-2 Wage Determination.pdf | ||
| J-3 Past Performance Questionnaire.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order 0024
Terminal Facilities Modernization and Replacement Design
Final Submission – Specifications
PHL TRACON Temporary Modular Office Space
Philadelphia, PA
June, 2022
Philadelphia ATCT and TRACON 08 June 2022 Temporary Modular Office Space Philadelphia, PA Final Submission
SEALS PAGE 00 01 07 - 1
DOCUMENT 00 01 07 - SEALS PAGE
1.1 DESIGN PROFESSIONALS OF RECORD
A. Architect:
1. Peter Soukas.
2. Commonwealth of Pennsylvania – RA-406841.
3. Responsible for Divisions 01-14 Sections except where indicated as prepared by other design professionals of record.
B. Civil Engineer:
1. Patrick J. MacPartland.
2. Commonwealth of Virginia - 0402058735.
3. Responsible for Divisions 32 -33.
C. Interiors:
1. Kathryn B. Charboneau.
2. State of Maryland - 2398.
3. Responsible for interior finishes listed in
Section 13 34 23.13.
D. Structural Engineer:
1. Byron L. Cook.
2. Commonwealth of Pennsylvania – PE077173.
3. Responsible for Responsible for Divisions 3 -5 and structural portions of Section 13 34 23.13.
E. Fire Protection Engineer:
1. Jacob I. Watkins.
2. State of Maryland - 44038.
3. Responsible for Division 28.
Philadelphia, PA Final Submission
SEALS PAGE 00 01 07 - 2
F. Plumbing Engineer:
1. Kimberly Ledwell.
2. State of South Carolina - 38497.
3. Responsible for Division 22.
G. Electrical Engineer:
1. Mathias M. Becker.
2. Commonwealth of Virginia - 029564.
3. Responsible for Division 26.
END OF DOCUMENT 00 01 07
five (5) five (5)
Field Activity Code Length Description
1 WRKP 3 Workers per day
2 RESP 4 Responsible party
3 AREA 4 Area of work
4 MODF 6 Modification Number
5 BIDI 6 Government Asset Code (ASSET)
6 PHAS 2 Phase of work
7 CATW 1 Category of work
8 FOW 20 Feature of work*
Philadelphia, PA Final Submission
SECTION 02 41 19 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
3. Salvage of existing items to be reused or recycled.
B. Related Requirements:
1. Section 01 10 00 "Summary" for restrictions on use of the premises, FAA-occupancy requirements, and phasing requirements.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Salvage and Deliver to COR: Detach items from existing construction, in a manner to prevent damage, and deliver to FAA ready for reuse. Include fasteners and/or brackets needed for reattachment elsewhere.
C. Remove and Save for Reuse: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Security system components or door hardware that is removed and not incorporated back into the work is to be protected and delivered to the COR.
1.4 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
SELECTIVE DEMOLITION 02 41 19 - 1
Philadelphia, PA Final Submission
3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
5. Review areas where existing construction is to remain and requires protection.
6. Review provisions for temporary power and service to maintain building security systems and components (card readers, security cameras, etc) during demolition and construction.
7. Review demolition work with Construction Waste Management requirements.
1.5 ACTION SUBMITTALS
A. Hot Work Permit: Prepare and submit the FAA Hot Work Permit or Contractor's equivalent to the COR. Coordinate project Hot Work with the COR.
1.6 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for dust control and , for noise control. Indicate proposed locations and construction of barriers.
1. Dust Control: Provide Dust Control Plan including proposal for adequate ventilation and accompanying sketches or shop drawings. Plan must include Negative Air Machines (NAM) and proposed routing of exhaust. Coordinate with COR.
2. Proposed Noise Control Plan.
3. Hot Work and Torch Cutting Plan. Refer Part 3 for requirements.
4. Hot Work Plan: Include a copy of permit, if applicable.
5. Silica Management Plan.
6. Air Quality Plan: Submit plan for maintaining fresh air in work areas and removal of odors from work area during construction. Include list of products that will emit an air-borne odor and SDS for each product, including, but not limited to:
a. Paints.
b. Adhesives.
c. Sealants.
B. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure FAA's on-site operations and security systems and components are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Coordination of FAA's continuing occupancy of portions of existing building .
SELECTIVE DEMOLITION 02 41 19 - 2
Philadelphia, PA Final Submission
5. Provisions to ensure uninterrupted site utility service for underground utility work.
6. Plan for maintaining site vehicular circulation and fire department access.
C. Predemolition Photographs or Video: Show existing conditions of adjoining construction, including finish surfaces, that might be misconstrued as damage caused by salvage and demolition operations.
D. Inventory: Submit list of items to be removed and delivered to FAA prior to the start of demolitions.
E. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.
1.7 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
B. Record Drawings: Identify and accurately locate capped utilities and other subsurface structural, electrical, or mechanical conditions.
1.8 FIELD CONDITIONS
A. FAA will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so FAA's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by FAA as far as practical.
C. Notify COR of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: Present in buildings and structures to be selectively demolished.
A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.
1. Manage in place asbestos containing material and presumed asbestos containing materials
2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.
3. FAA will provide material safety data sheets for suspected hazardous materials that are known to be present in buildings and structures to be selectively demolished because of building operations or processes performed there.
E. Storage or sale of removed items or materials on-site is not permitted.
SELECTIVE DEMOLITION 02 41 19 - 3
Philadelphia, PA Final Submission
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1.9 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties. Notify warrantor before proceeding.
B. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect.
Submit documentation at Project closeout.
1.10 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with FAA's operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
C. Refer to and comply with protective measures for concrete and/or masonry demolition requirements in FAA Order 3900.19C, "FAA Occupational Safety and Health Policy."
D. Sustainable Design Requirements for Building Reuse:
1. Maintain existing interior nonstructural elements (interior walls, doors, floor coverings, and ceiling systems) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.
2.2 REPAIR MATERIALS
A. Use repair materials to match existing materials.
1. Where identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.
SELECTIVE DEMOLITION 02 41 19 - 4
Philadelphia, PA Final Submission
2. Use materials whose installed performance is equal to or surpasses that of existing materials.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by FAA. FAA does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Survey existing conditions and correlate with requirements indicated to determine extent of selective demoiltion required.
D. Verify that hazardous materials have not been remediated before proceeding with building demolition operations.
E. Survey of Existing Conditions: Record existing conditions by use of measured drawings and preconstruction photographs or video.
1. Inventory and record the condition of items to be removed and salvaged.
2. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.
F. Prior to cutting or core drilling reinforced concrete and/or precast concrete, locate reinforcing and utilities embedded within concrete with a magnetic steel locator approved by COR prior to use.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. COR will arrange to shut off indicated services/systems when requested by Contractor.
2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
SELECTIVE DEMOLITION 02 41 19 - 5
Philadelphia, PA Final Submission
3. Disconnect, demolish, and remove plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
3.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified elsewhere in Documents.
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
C. Dustproof Partitions and Protection: Erect and maintain dustproof partitions to limit dust and dirt migration and to separate areas from fumes and noise.
1. Construct dustproof partitions of not less than 3-5/8-inch metal studs, 3-1/2-inch sound attenuation blanket with fire-retardant 8-mil polyethylene sheeting and gypsum wallboard or 1/2" fire retardant plywood, with joints taped to form dustproof barrier, as directed by COR. COR must approve final construction and configuration.
2. Seal joints and perimeter. Equip partitions with gasketed or weather-stripped doors and door sweeps to maintain dustproof conditions and to control noise.
3. Weather-strip openings.
4. Maintain equipment access for FAA personnel.
5. Coordinate with COR installation of Negative Air Machines to minimize dust migration into operational areas of the facility. Routing of ductwork, exhaust to the exterior, and security requirements must be coordinated with and approved by
COR.
D. Remove temporary barricades and protections where hazards no longer exist.
SELECTIVE DEMOLITION 02 41 19 - 6
Philadelphia, PA Final Submission
3.4 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required.
Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Maintain fire watch during and for at least 1-hour after flame-cutting operations.
5. Maintain adequate ventilation when using cutting torches.
6. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
7. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
8. Dispose of demolished items and materials promptly. Comply with requirements in Section 01 74 19 "Construction Waste Management and Disposal."
9. The edges of pavement to be removed must be saw-cut with neat, straight lines.
10. Protect existing vegetation to remain (trees, shrubs, etc) from damage using orange construction fencing set at the drip line of vegetation.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to FAA.
4. Transport items to FAA's storage area designated by COR.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
SELECTIVE DEMOLITION 02 41 19 - 7
Philadelphia, PA Final Submission
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by COR, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions indicated.
1. Verify that no embedded utilities are within concrete. If discovered, notify COR and coordinate how to proceed with the work.
B. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.
C. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.
1. Verify that no embedded utilities are within concrete. If discovered, notify COR and coordinate how to proceed with the work.
D. Ensure no mud or debris is transported from construction site to on-site travelways or onto public roads.
3.6 HOT WORK AND TORCH CUTTING
A. Hot Work is any activity that creates heat, flame, sparks, or smoke. Examples of Hot Work include, but are not limited to: Hot Work (gas or arc), Cutting, Torch Cutting, Grinding, Brazing, Soldering, use of Open Flame Heaters in Buildings, and Hot Tar Operations.
B. Obtain a Hot Work Permit prior to any activity involving Hot Work. A fire guard must remain on station as indicated herein following the cessation of Hot Work activities to extinguish any incipient stage fires that may develop.
C. Submit a Hot Work and Torch Cutting Plan for approval prior to beginning Hot Work and Torch Cutting activities. The Plan must identify the portions of work where Hot Work and Torch Cutting will be performed, locations of the work, types of Hot Work and Torch Cutting being proposed, schedule for the proposed activities, plan for protecting the facility and its occupants, operations, and equipment during the Hot Work and Torch Cutting activities. Special attention is required for procedures and protection for Hot Work and Torch Cutting around or adjacent to existing electronic equipment.
SELECTIVE DEMOLITION 02 41 19 - 8
Philadelphia, PA Final Submission
D. Building electrical power MUST NOT be used for arc Hot Work or Torch Cutting.
Building components, including structural or miscellaneous steel MUST NOT be used as grounding return for Hot Work or Torch Cutting Activities.
E. Ventilation and exhasut to the outside must be provided during Hot Work and Torch Cutting activities to keep the zone clear. Do not weld or cut unless ventilation and exhasut have been deemed acceptable to the Authorities Having Jurisdiction. Provide non-flammable shields to protect persons and property. Keep cylinders upright and chained or secured to their supports.
F. Remove flammable materials from Hot Work and Torch Cutting areas prior to beginning Hot Work and Torch Cutting activities. Keep fire extinguishers in the Hot Work and Torch Cutting Areas.
G. Perform Hot Work and Torch Cutting in accordance with the American Society's Specifications and Safe PRactice Codes criteria, and with OSHA Safety Requirements.
H. Fire Watch: Provide Fire Watch Operations in accordance with requirements and policies of Authorities Having Jurisdiction.
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and recycle or dispose of them according to Section 01 74 19 "Construction Waste Management and Disposal."
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Comply with requirements specified in Section 01 74 19 "Construction Waste
Management and Disposal."
B. Burning: Do not burn demolished materials.
C. Disposal: Transport demolished materials off FAA's property and legally dispose of them in compliance with 01 74 19 "Construction Waste Management and Disposal".
3.8 SILICA MANAGEMENT
A. Any work involving the jackhammering, cutting, sanding, sawing, grinding, drilling or general demolition of concrete material or masonry will generate dust containing silica which is harmful when inhaled. Comply with local regulatory requirements and Federal OSHA regulations for Silica Management.
SELECTIVE DEMOLITION 02 41 19 - 9
Philadelphia, PA Final Submission
3.9 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 02 41 19
SELECTIVE DEMOLITION 02 41 19 - 10
Philadelphia, PA Final Submission
SECTION 03 20 00 - CONCRETE REINFORCING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Steel reinforcement bars.
2. Welded-wire reinforcement.
1.2 ACTION SUBMITTALS
A. Product Data: For the following:
1. Each type of steel reinforcement.
B. Shop Drawings: Comply with ACI SP-066:
1. Include placing drawings that detail fabrication, bending, and placement.
2. Include bar sizes, lengths, materials, grades, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, location of splices, lengths of lap splices, details of mechanical splice couplers, details of welding splices, tie spacing, hoop spacing, and supports for concrete reinforcement.
1.3 QUALITY ASSURANCE
A. Testing Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage.
1. Store reinforcement to avoid contact with earth.
PART 2 - PRODUCTS
2.1 STEEL REINFORCEMENT
A. Reinforcing Bars: ASTM A615/A615M, Grade 60, deformed.
CONCRETE REINFORCING 03 20 00 - 1
Philadelphia, PA Final Submission
B. Plain-Steel Welded-Wire Reinforcement: ASTM A1064/A1064M, plain, fabricated from as-drawn steel wire into flat sheets.
2.2 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
PART 3 - EXECUTION
3.1 PREPARATION
A. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.
3.2 INSTALLATION OF STEEL REINFORCEMENT
A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.
B. Accurately position, support, and secure reinforcement against displacement.
1. Locate and support reinforcement with bar supports to maintain minimum concrete cover.
2. Do not tack weld crossing reinforcing bars.
C. Preserve clearance between bars of not less than 1 inch, not less than one bar diameter, or not less than 1-1/3 times size of large aggregate, whichever is greater.
D. Provide concrete coverage in accordance with ACI 318.
E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.
F. Splices: Lap splices as indicated on Drawings.
1. Bars indicated to be continuous, and all vertical bars to be lapped not less than 36 bar diameters at splices, or 24 inches, whichever is greater.
2. Stagger splices in accordance with ACI 318.
3. Weld reinforcing bars in accordance with AWS D1.4/D 1.4M, where indicated on Drawings.
G. Install welded-wire reinforcement in longest practicable lengths.
1. Support welded-wire reinforcement in accordance with CRSI "Manual of Standard Practice."
CONCRETE REINFORCING 03 20 00 - 2
Philadelphia, PA Final Submission
a. For reinforcement less than W4.0 or D4.0, continuous support spacing to not exceed 12 inches.
2. Lap edges and ends of adjoining sheets at least one wire spacing plus 2 inches for plain wire and 8 inches for deformed wire.
3. Offset laps of adjoining sheet widths to prevent continuous laps in either direction.
4. Lace overlaps with wire.
3.3 JOINTS
A. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.
1. Place joints perpendicular to main reinforcement.
2. Continue reinforcement across construction joints unless otherwise indicated.
3.4 INSTALLATION TOLERANCES
A. Comply with ACI 117.
3.5 FIELD QUALITY CONTROL
A. Special Inspections: Owner will engage a special inspector to perform field tests and inspections and prepare test reports.
B. Inspections:
1. Steel-reinforcement placement.
2. Steel-reinforcement mechanical splice couplers.
END OF SECTION 03 20 00
CONCRETE REINFORCING 03 20 00 - 3
Philadelphia, PA Final Submission
SECTION 03 30 00 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cast-in-place concrete, including concrete materials, mixture design, placement procedures, and finishes.
B. Related Requirements:
1. Section 03 20 00 "Concrete Reinforcing" for steel reinforcing bars and welded-wire reinforcement.
1.2 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash, slag cement, other pozzolans, and silica fume; materials subject to compliance with requirements.
B. Water/Cement Ratio (w/cm): The ratio by weight of water to cementitious materials.
1.3 ACTION SUBMITTALS
A. Product Data: For each of the following.
1. Portland cement.
2. Fly ash.
3. Slag cement.
4. Aggregates.
5. Admixtures:
a. Include limitations of use, including restrictions on cementitious materials, supplementary cementitious materials, air entrainment, aggregates, temperature at time of concrete placement, relative humidity at time of concrete placement, curing conditions, and use of other admixtures.
B. Design Mixtures: For each concrete mixture, include the following:
1. Mixture identification.
2. Minimum 28-day compressive strength.
3. Durability exposure class.
4. Maximum w/cm.
CAST-IN-PLACE CONCRETE 03 30 00 - 1
Philadelphia, PA Final Submission
5. Slump limit.
6. Air content.
7. Nominal maximum aggregate size.
8. Intended placement method.
9. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.
1.4 INFORMATIONAL SUBMITTALS
A. Material Certificates: For each of the following, signed by manufacturers:
1. Cementitious materials.
2. Admixtures.
3. Bonding agents.
B. Field quality-control reports.
1.5 QUALITY ASSURANCE
A. Ready-Mixed Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C94/C94M requirements for production facilities and equipment.
B. Laboratory Testing Agency Qualifications: A testing agency qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated and employing an ACI-certified Concrete Quality Control Technical Manager.
1. Personnel performing laboratory tests to be an ACI-certified Concrete Strength Testing Technician and Concrete Laboratory Testing Technician, Grade I.
Testing agency laboratory supervisor to be an ACI-certified Concrete Laboratory Testing Technician, Grade II.
C. Field Quality-Control Testing Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified in accordance with ASTM C1077 and ASTM E329 for testing indicated.
1. Personnel conducting field tests to be qualified as an ACI Concrete Field Testing Technician, Grade 1, in accordance with ACI CPP 610.1 or an equivalent certification program.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Comply with ASTM C94/C94M and ACI 301.
CAST-IN-PLACE CONCRETE 03 30 00 - 2
Philadelphia, PA Final Submission
1.7 FIELD CONDITIONS
A. Cold-Weather Placement: Comply with ACI 301 and ACI 306.1 and as follows.
1. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
2. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.
3. Do not use frozen materials or materials containing ice or snow.
4. Do not place concrete in contact with surfaces less than 35 deg F, other than reinforcing steel.
5. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.
B. Hot-Weather Placement: Comply with ACI 301 and ACI 305.1, and as follows:
1. Maintain concrete temperature at time of discharge to not exceed 95 deg F.
2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete.
Keep subgrade uniformly moist without standing water, soft spots, or dry areas.
PART 2 - PRODUCTS
2.1 CONCRETE, GENERAL
A. ACI Publications: Comply with ACI 301 unless modified by requirements in the Contract Documents.
2.2 CONCRETE MATERIALS
A. Source Limitations:
1. Obtain all concrete mixtures from a single ready-mixed concrete manufacturer for entire Project.
2. Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant.
3. Obtain aggregate from single source.
4. Obtain each type of admixture from single source from single manufacturer.
B. Cementitious Materials:
1. Portland Cement: ASTM C150/C150M, Type I/II, .
2. Fly Ash: ASTM C618, Class C or F.
3. Slag Cement: ASTM C989/C989M, Grade 100 or 120.
CAST-IN-PLACE CONCRETE 03 30 00 - 3
Philadelphia, PA Final Submission
C. Normal-Weight Aggregates: ASTM C33/C33M, Class 3M coarse aggregate or better, graded. Provide aggregates from a single source.
1. Maximum Coarse-Aggregate Size: 1 inch nominal.
2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
D. Air-Entraining Admixture: ASTM C260/C260M.
E. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride in steel-reinforced concrete.
1. Water-Reducing Admixture: ASTM C494/C494M, Type A.
2. Retarding Admixture: ASTM C494/C494M, Type B.
3. Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type D.
4. High-Range, Water-Reducing Admixture: ASTM C494/C494M, Type F.
5. High-Range, Water-Reducing and -Retarding Admixture: ASTM C494/C494M, Type G.
6. Plasticizing and Retarding Admixture: ASTM C1017/C1017M, Type II.
F. Water and Water Used to Make Ice: ASTM C94/C94M, potable
2.3 RELATED MATERIALS
A. Bonding Agent: ASTM C1059/C1059M, Type II, nonredispersible, acrylic emulsion or styrene butadiene.
2.4 CONCRETE MIXTURES, GENERAL
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, in accordance with ACI 301.
1. Use a qualified testing agency for preparing and reporting proposed mixture designs, based on laboratory trial mixtures.
B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:
1. Fly Ash or Other Pozzolans: 25 percent by mass.
2. Slag Cement: 50 percent by mass.
C. Admixtures: Use admixtures in accordance with manufacturer's written instructions.
1. Use water-reducing plasticizing admixture in concrete, as required, for placement and workability.
CAST-IN-PLACE CONCRETE 03 30 00 - 4
Philadelphia, PA Final Submission
2. Use water-reducing and -retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.
3. Use water-reducing admixture in pumped concrete,.
4. Use corrosion-inhibiting admixture in concrete mixtures where indicated.
2.5 CONCRETE MIXTURES
A. Normal-weight concrete used for footings, grade beams, sidewalks, and tie beams.
1. Exposure Class: ACI 318 F0 S0 W1 C1.
2. Minimum Compressive Strength: 3000 psi at 28 days.
3. Maximum w/cm: 0.50.
4. Slump Limit: 4 inches, plus or minus 1 inch.
5. Air Content:
a. Exposure Class F1: 5.0 percent, plus or minus 1.5 percent at point of delivery for concrete containing 3/4-inch nominal maximum aggregate size.
6. Limit water-soluble, chloride-ion content in hardened concrete to 1.00 percent by weight of cement.
2.6 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete in accordance with ASTM C94/C94M and ASTM C1116/C1116M, and furnish batch ticket information.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verification of Conditions:
1. Before placing concrete, verify that installation of concrete forms, accessories, and reinforcement, and embedded items is complete and that required inspections have been performed.
2. Do not proceed until unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Provide reasonable auxiliary services to accommodate field testing and inspections, acceptable to testing agency, including the following:
1. Daily access to the Work.
2. Incidental labor and facilities necessary to facilitate tests and inspections.
CAST-IN-PLACE CONCRETE 03 30 00 - 5
Philadelphia, PA Final Submission
3. Secure space for storage, initial curing, and field curing of test samples, including source of water and continuous electrical power at Project site during site curing period for test samples.
4. Security and protection for test samples and for testing and inspection equipment at Project site.
3.3 INSTALLATION OF EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining Work that is attached to or supported by cast-in-place concrete.
1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of ANSI/AISC 303.
3.4 JOINTS
A. Construct joints true to line, with faces perpendicular to surface plane of concrete.
B. Construction Joints: Coordinate with floor slab pattern and concrete placement sequence.
1. Install so strength and appearance of concrete are not impaired, at locations indicated on Drawings or as approved by Architect.
2. Place joints perpendicular to main reinforcement.
3. Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.
3.5 CONCRETE PLACEMENT
A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections are completed.
B. Notify Architect and testing and inspection agencies 24 hours prior to commencement of concrete placement.
C. Do not add water to concrete during delivery, at Project site, or during placement unless approved by Architect in writing, but not to exceed the amount indicated on the concrete delivery ticket.
D. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301, but not to exceed the amount indicated on the concrete delivery ticket.
CAST-IN-PLACE CONCRETE 03 30 00 - 6
Philadelphia, PA Final Submission
E. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness.
1. If a section cannot be placed continuously, provide construction joints as indicated.
2. Deposit concrete to avoid segregation.
3. Deposit concrete in horizontal layers of depth not to exceed formwork design pressures and in a manner to avoid inclined construction joints.
4. Consolidate placed concrete with mechanical vibrating equipment in accordance with ACI 301.
a. Do not use vibrators to transport concrete inside forms.
b. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer.
c. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity.
d. At each insertion, limit duration of vibration to time necessary to consolidate concrete, and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.
F. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.
1. Do not place concrete floors and slabs in a checkerboard sequence.
2. Consolidate concrete during placement operations, so concrete is thoroughly worked around reinforcement and other embedded items and into corners.
3. Maintain reinforcement in position on chairs during concrete placement.
4. Screed slab surfaces with a straightedge and strike off to correct elevations.
5. Level concrete, cut high areas, and fill low areas.
6. Slope surfaces uniformly to drains where required.
7. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface.
8. Do not further disturb slab surfaces before starting finishing operations.
3.6 FINISHING FORMED SURFACES
A. As-Cast Surface Finishes:
1. ACI 301 Surface Finish SF-1.0: As-cast concrete texture imparted by form-facing material.
a. Patch voids larger than 1-1/2 inches wide or 1/2 inch deep.
b. Remove projections larger than 1 inch.
c. Tie holes do not require patching.
d. Surface Tolerance: ACI 117 Class D.
e. Apply to concrete surfaces not exposed to public view.
CAST-IN-PLACE CONCRETE 03 30 00 - 7
Philadelphia, PA Final Submission
2. ACI 301 Surface Finish SF-2.0: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams.
a. Patch voids larger than 3/4 inch wide or 1/2 inch deep.
b. Remove projections larger than 1/4 inch.
c. Patch tie holes.
d. Surface Tolerance: ACI 117 Class B.
e. Locations: Apply to concrete surfaces exposed to public view,.
B. Related Unformed Surfaces:
1. At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a color and texture matching adjacent formed surfaces.
2. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.
3.7 FINISHING FLOORS AND SLABS
A. Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.
B. Trowel Finish:
1. After applying float finish, apply first troweling and consolidate concrete by hand or power-driven trowel.
2. Continue troweling passes and restraighten until surface is free of trowel marks and uniform in texture and appearance.
3. Grind smooth any surface defects that would telegraph through applied coatings or floor coverings.
4. Do not add water to concrete surface.
5. Do not apply hard-troweled finish to concrete, which has a total air content greater than 3 percent.
6. Apply a trowel finish to surfaces exposed to view.
C. Broom Finish: Apply a broom finish to exterior concrete platforms, steps, ramps, and locations indicated on Drawings.
1. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route.
2. Coordinate required final finish with Architect before application.
CAST-IN-PLACE CONCRETE 03 30 00 - 8
Philadelphia, PA Final Submission
3.8 INSTALLATION OF MISCELLANEOUS CONCRETE ITEMS
A. Curbs: Provide monolithic finish to interior curbs by stripping forms while concrete is still green and by steel-troweling surfaces to a hard, dense finish with corners, intersections, and terminations slightly rounded.
3.9 TOLERANCES
A. Conform to ACI 117.
3.10 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.
1. Testing agency to be responsible for providing curing container for composite samples on Site and verifying that field-cured composite samples are cured in accordance with ASTM C31/C31M.
2. Testing agency to immediately report to Architect, Contractor, and concrete manufacturer any failure of Work to comply with Contract Documents.
3. Testing agency to report results of tests and inspections, in writing, to Owner, Architect, Contractor, and concrete manufacturer within 48 hours of inspections and tests.
a. Test reports to include reporting requirements of ASTM C31/C31M, ASTM C39/C39M, and ACI 301, including the following as applicable to each test and inspection:
1) Project name.
2) Name of testing agency.
3) Names and certification numbers of field and laboratory technicians performing inspections and testing.
4) Name of concrete manufacturer.
5) Date and time of inspection, sampling, and field testing.
6) Date and time of concrete placement.
7) Location in Work of concrete represented by samples.
8) Date and time sample was obtained.
9) Truck and batch ticket numbers.
10) Design compressive strength at 28 days.
11) Concrete mixture designation, proportions, and materials.
12) Field test results.
13) Information on storage and curing of samples before testing, including curing method and maximum and minimum temperatures during initial curing period.
14) Type of fracture and compressive break strengths at seven days and 28 days.
CAST-IN-PLACE CONCRETE 03 30 00 - 9
Philadelphia, PA Final Submission
B. Batch Tickets: For each load delivered, submit three copies of batch delivery ticket to testing agency, indicating quantity, mix identification, admixtures, design strength, aggregate size, design air content, design slump at time of batching, and amount of water that can be added at Project site.
C. Inspections:
1. Headed bolts and studs.
2. Verification of use of required design mixture.
3. Concrete placement, including conveying and depositing.
4. Curing procedures and maintenance of curing temperature.
D. Concrete Tests: Testing of composite samples of fresh concrete obtained in accordance with ASTM C 172/C 172M to be performed in accordance with the following requirements:
1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mixture exceeding 5 cu. yd., but less than 25 cu. yd., plus one set for each additional 50 cu. yd. or fraction thereof.
a. When frequency of testing provides fewer than five compressive-strength tests for each concrete mixture, testing to be conducted from at least five randomly selected batches or from each batch if fewer than five are used.
2. Slump: ASTM C143/C143M:
a. One test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture.
b. Perform additional tests when concrete consistency appears to change.
3. Air Content: ASTM C231/C231M pressure method, for normal-weight concrete;
a. One test for each composite sample, but not less than one test for each day's pour of each concrete mixture.
4. Concrete Temperature: ASTM C1064/C1064M:
a. One test hourly when air temperature is 40 deg F and below or 80 deg F and above, and one test for each composite sample.
5. Compression Test Specimens: ASTM C31/C31M:
a. Cast and laboratory cure two sets of two 6-inch by 12-inch or 4-inch by 8-inch cylinder specimens for each composite sample.
6. Compressive-Strength Tests: ASTM C39/C39M.
CAST-IN-PLACE CONCRETE 03 30 00 - 10
Philadelphia, PA Final Submission
a. Test one set of two laboratory-cured specimens at seven days and one set of two specimens at 28 days.
b. A compressive-strength test to be the average compressive strength from a set of two specimens obtained from same composite sample and tested at age indicated.
7. Strength of each concrete mixture will be satisfactory if every average of any three consecutive compressive-strength tests equals or exceeds specified compressive strength, and no compressive-strength test value falls below specified compressive strength by more than 500 psi if specified compressive strength is 5000 psi, or no compressive strength test value is less than 10 percent of specified compressive strength if specified compressive strength is greater than 5000 psi.
8. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Architect but will not be used as sole basis for approval or rejection of concrete.
9. Additional Tests:
a. Testing and inspecting agency to make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Architect.
b. Testing and inspecting agency may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C42/C42M or by other methods as directed by Architect.
1) Acceptance criteria for concrete strength to be in accordance with ACI 301, Section 1.6.6.3.
10. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
11. Correct deficiencies in the Work that test reports and inspections indicate do not comply with the Contract Documents.
3.11 PROTECTION
A. Protect concrete surfaces as follows:
1. Protect from petroleum stains.
2. Prohibit use of pipe-cutting machinery over concrete surfaces.
3. Prohibit placement of steel items on concrete surfaces.
4. Prohibit use of acids or acidic detergents over concrete surfaces.
END OF SECTION 03 30 00
CAST-IN-PLACE CONCRETE 03 30 00 - 11
Philadelphia, PA Final Submission
SECTION 05 52 13 - PIPE AND TUBE RAILINGS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Exterior Steel railings.
B. Related Requirements:
1. Section 06 15 33 Wood Patio Decking for wood railings associated with pipe handrails.
1.3 COORDINATION
A. Coordinate installation of anchorages for railings. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry.
Deliver such items to Project site in time for installation.
1.4 ACTION SUBMITTALS
A. Product Data:
1. Fasteners.
2. Post-installed anchors.
3. Handrail brackets.
4. Bituminous paint.
5. Nonshrink, nonmetallic grout.
6. Metal finishes.
B. Sustainable Design Submittals:
1. Product Data: For recycled content, indicating post-consumer and pre-consumer recycled content and cost.
PIPE AND TUBE RAILINGS 05 52 13 - 1
Philadelphia, PA Final Submission
C. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.
D. Delegated-Design Submittal: For railings, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For delegated-design professional engineer.
B. Welding certificates.
1.6 QUALITY ASSURANCE
A. Welding Qualifications: Qualify procedures and personnel in accordance with the following:
1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."
1.7 DELIVERY, STORAGE, AND HANDLING
A. Protect mechanical finishes on exposed surfaces of railings from damage by applying a strippable, temporary protective covering before shipping.
1.8 FIELD CONDITIONS
A. Field Measurements: Verify actual locations of walls and other construction contiguous with railings by field measurements before fabrication.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Delegated Design: Engage a qualified professional engineer, as defined in Section 01 40 00 "Quality Requirements," to design railings, including attachment to building construction.
B. Structural Performance: Railings, including attachment to building construction, shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated:
1. Handrails and Top Rails of Guards:
a. Uniform load of 50 lbf/ ft. applied in any direction.
PIPE AND TUBE RAILINGS 05 52 13 - 2
Philadelphia, PA Final Submission
b. Concentrated load of 200 lbf applied in any direction.
c. Uniform and concentrated loads need not be assumed to act concurrently.
2. Infill of Guards:
a. Concentrated load of 50 lbf applied horizontally on an area of 1 sq. ft..
b. Infill load and other loads need not be assumed to act concurrently.
C. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes.
1. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.
2.2 METALS, GENERAL
A. Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller marks, rolled trade names, stains, discolorations, or blemishes.
B. Brackets, Flanges, and Anchors: Cast or formed metal of same type of material and finish as supported rails unless otherwise indicated.
1. Provide type of bracket with flange tapped for concealed anchorage to threaded hanger bolt and that provides clearance from inside face of handrail…