J-1a Drawings.pdf
PDF 13 MB Posted
- Attached to
- OMA ATCT - Roof and Fall Protection Upgrade
- Solicitation number
- 697DCK-22-R-00403
About this file
This solicitation is for roof and fall protection upgrades at the Air Traffic Control Tower on Eppley Airfield in Omaha, Nebraska. Interested vendors must attend a mandatory site visit on June 29, 2022 and submit any questions to the contact by July 05. Proposals are due by July 22, 2022. To be eligible, vendors must be registered in SAM and submit a proposal in accordance with the solicitation instructions. The work will be awarded by the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 697DCK-22-R-00403-0002.pdf | ||
| 697DCK-22-R-00403 - 0001.pdf | ||
| QuestionsandAnswers.docx | DOCX document | |
| 697DCK-22-R-00403Final.pdf | ||
| J-3 Past Performance Questionnaire.pdf | ||
| J-1 Specifications.pdf | ||
| J-2 Wage Determination.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pat Johnston Text Box Roof and Fall Protection Upgrade at
OMA ATCT
on Eppley Airfield Omaha, Nebraska
SHOWN IN CLOUDS
CONTRACTOR SHALL PERFORM ALL WORK
CONTRACT SPECIFICATION.
AND FLASHING AND PREPARE FOR NEW ROOF SYSTEM IN ACCORDANCE WITH THE
REMOVE EXISTING ROOF SYSTEM INCLUDING MEMBRANE, INSULATION, DRAINS, BOOTS
ENGINEERING SERVICES
TERMINAL
ATCT
DEMOLITION
6TH FLOOR ROOF DETAILS
NEEPPLEY AIRFIELDOMAHA
PROJECT ENGINEER MGR: ENGINEERING - KANSAS CITY
01/10/2022 1701903
OMA-D-ATCT-D016
o m a -d -a tc t-d .d g n
DRAWING PRODUCED ON ACE RO MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
C O
N S
T R
U C
T
IO
N o m a -d -a tc t-d .d g n
/1
/2
:0
:5
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O R
(DO NOT DISTURB)
ANTENNA MOUNT RACEWAY ASSEMBLY
ON NEW RACEWAY.)
(REMOVE AND RETAIN FOR INSTALLATION
TO BE REMOVED BY FAA.)
(ANTENNAS AND ASSOCIATED CABLES
WORK SHOWN IN CLOUDS
CONTRACTOR SHALL PERFORM ALL
WORK COMMENCEMENT.
ON-SITE REPRESENTATIVE PRIOR TO
SYSTEM. FULLY COORDINATE WITH THE
FOR NEW FALL PROTECTION/RACEWAY
MOUNT RACEWAY IN PREPARATION
REMOVE THE EXISTING ANTENNA
W/ DWG. A5A AND CONTRACT SPECIFICATION.
REMOVE ROOF HATCH IN ACCORDANCE
DEMOLITION
CONTROL CAB PLANS
OMA-D-ATCT-D017
a -d -a tc t-d .d g n
DRAWING PRODUCED ON ACE RO MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
A S -B
U
IL
T
N
N N
N
N
TO WORK COMMENCEMENT.
FULLY COORDINATE WITH THE ON-SITE REPRESENTATIVE PRIOR
AND COORDINATE WITH NEW FALL PROTECTION/RACEWAY SYSTEM.
ROOF SYSTEM IN ACCORDANCE WITH CONTRACT SPECIFICATION
INSULATION AND FLASHING IN PREPARATION FOR NEW
REMOVE EXISTING ROOF SYSTEM INCLUDING MEMBRANE,
o m a -d -a tc t-d .d g n
/1
/2
:0
:5
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O
AND PREPARE FOR NEW ROOF SYSTEM.
REMOVE COMPLETE EXISTING ROOF SYSTEM
WALL
PENTHOUSE
MEMBRANE
BAR FOR EPDM
STEEL TERMINATION
SHOWN IN CLOUDS
CONTRACTOR TO PERFORM ALL WORK
AND TAPERED
A C
C E
S S O
P E
N
IN
G
DEMO DRAWING
CIC CAB (AIR-A-PLANE)
ROOFING DETAILS
OMA-D-ATCT-D018
a -d -a tc t-d .d g n
N S
T R
U C
T
IO
N
1' 2'01'
SCALE: 1" = 1'-0"
SCALE: 3" = 1'-0"
9"6"3"3" 0
SCALE: 1-1/2" = 1'-0"
3"6"9"1' 0 1'
JUST BEFORE ENTRANCE TO CONDUIT. TYP. 2 PLACES.
DOWN CONDUCTOR FASTENED AND BONDED TO PARAPET
TYP. 2 PLACES.
1" PVC WITH DOWN CONDUCTOR, FASTENED EVERY 3' TO TRIM.
RACEWAY SYSTEM
PREPARATION FOR CONNECTION TO THE NEW CAB ANTENNA MOUNT/
REMOVE EXISTING DOWN CONDUCTOR AND PORTION OF CONDUIT IN
o m a -d -a tc t-d .d g n
/1
/2
:0
:3
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O
Text Box SKETCH - Third Level Roof Fall Protection
1701903ROOF AND FALL PROTECTION UPGRADE01/10/2022F
SIXTH FLOOR AND ROOF PLANS
James L. BlairMark Benne
JBP
06/25/1998
F
PSJ07/07/2008314806AS BUILT INTERIOR MODERNIZATION CCD #04/26/2009E
PSJ 314806INTERIOR MODERNIZATION04/19/2007D
AM06/01/1999314806ANNUAL BASELINE UPDATE CCD #2581809/29/2004C
c e o m a a a s rf .d g n
DRAWING PRODUCED ON ACE RO MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
CE-D-OMA-7252-A4A
C O
N S
T R
U C
T
IO
N c e o m a a a s rf .d g n
/1
/2
:0
:3
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
38'-3"
3'-5" 4'-10 1/2" 12'-0" 6'-2"
11 1/2"9'-10 1/2"
14'-3"
11 1/2"
1'-6 1/2"
18'-2"
9"
8"
18'-2"
9 @ 9 1/2"=7'-1 1/2"5'-2 1/2" 3'-8"
1'-2"
2'-0"
18'-2"11 1/2"
5'-0" 3'-0"8"
18'-2" 11 1/2"
38'-3"
14'-3"
6'-8"
3'-9"
38'-3"
9'-0"
24'-0"
9'-0"
INTEGRITY RELIABILITY
C O
N F
IG
U R
A T
IO
N M A
N A
G E
M E
N T
S
NOITAREPO LACI
N
HC
E T
CHANGES REQUIRE AN AUTHORIZING CCD.
THIS FACILITY IS UNDER CONFIGURATION CONTROL.
CM MANAGER DATE
N O I
T A
R T
SI
NIMDA NOIT
AI
V
A
L
A R
E D
E F
D
M
IS
S
U
R
MARILYN TOMKO 8-11-2009
P
LETTERING
"B" LABEL
ROOM NAME N E S
3'-0"x7'-0"x1 3/4" B 3 6TH FLOOR 3
3'-0"x7'-0"x1 3/4" A 3 7
3'-0"x7'-0"x1 3/4" A 6 7
3'-0"x7'-0"x1 3/4" A 9 7
3'-0"x7'-0"x1 3/4" A 5 MECH. ROOM 7
A 10 - 3 "B" LABEL
A 7 4
2'-6"x7'-0'x1 3/4" A 1 4
3'-0"x7'-0"x1 3/4" A 3 1
W
W
STAIR 'A'
P P P
P
BREAK ROOM
P P P P
P P P P
MECH. ROOM
P P P P
P P P P
P P P P
2HR RATING
P
E C
W
E
W
C
W
W
E C
COAT RACK
BRONZE ANODIZED STORM-PROOF LOUVER
W.G. DIFFERENTIAL PRESSURE, STAIR
TO ELEVATOR LOBBY. ROOF HATCH
E C
W
1'O"x4'0"x4" DEEP
DOWN 10 R
S T
A
IR
B
E C
W
1.
2.
3.
SEE NOTES SHEET A1
W
W
E C
P
P P P P
P
REMOVE AND DISPOSE:
ILS MONITOR ANTENNA
SUPPORT PER
DETAIL ON DWG.
CONDUCTOR
IN INSET OF CORNER
SEE "TYPICAL ROOF EDGE
DETAIL", DWG. CE-D-7252-A4-1,
SHEET 1.
WAVE GUIDE ROOF ENTRANCE
ASSEMBLY PER DRAWING
CE-D-7385-2A.
WAVE GUIDE SUPPORT
TO PERIMETER CABLE
ALONG RACEWAY ON CAB ROOF
TOWER CAB
SEE SHT. A4-1 AT CAB BASE
1 1/4" GALV. PIPE
HANDRAIL. SEE
DETAIL THIS SHEET
SEE STRUCTURAL DRAW-
INGS FOR LOCATION.
4" DIA. TML
ANTENNA
TML ANTENNA MOUNTING
ASSEMBLY PER DWG.
CE-D-7385-2.
ROOF REPLACED IN 1999
W/ FIRESTONE ADHERED
EPDM MEMBRANE.
EPDM FIREST0NE WALKPADS.
PADS ARE SPACED 1" TO 3"
BETWEEN PADS. CUT 3"-6"
WIDE CHANNEL IN PADS TO
ALLOW RUNOFF FLOW TO
DRAINS IN SWALE OF ROOF.
ILS MONITOR ANTENNA
SUPPORT PER DETAILS ON
DWG. CE-D-7252-A4-1.
DOWN CONDUCTOR
IN INSET OF CORNER
TO COUNTERPOISE
SEE DWG. CE-D-7252-A4-1 FOR EDGE AND
FLASHING DETAILS.
SCALE: 1/4" = 1'
FIELD-FABRICATED PIPE BOOT
LAPPED MIN. 3" & OUT 3" FROM
EDGE OF PIPE ONTO MEMBRANE
20 GA. GALV. SHEET METAL
HIGH W/ 2" LAP AT PIPE
SEALED AT TOP W/CAULKING.
METAL HAS FLAT BLACK FINISH.
LIGHT-WEIGHT
CONCRETE FILL INSULATION
METAL DECK
BOLT TO BEAM
4"x6"x1/4" WELDED
ANCHOR PLATE
THIS DRAWING REPLACES CE-D-7252-A4
DWG. CE-D-7252-A21
4.
5.
W
E C
W
E C
W
E C
SCALE:
HANDRAIL DETAIL AT ROOF
A43" = 1'-0" A4
A9A1
A9A1
A9A1
7A9A1
S2A4
A1
A
A
A
A4
3A
A
A
A
7'-10 1/2"
CONCRETE FILL
1" FIBERBOARD
SUBSTRATE OVER
INSULATION
60 MIL ADHERED
EPDM MEMBRANE
ROOF PLAN
5'-0" x 6'-0" x 4"
DEEP WEATHERPROOF
MECHANICAL
BREAK ROOM
D
1 1/4" STD. GALV. PIPE RAILING
2 RAIL, 3'-6" ABOVE ROOF SURFACE
HANDRAIL, FLAT BLACK6.
ROOF WITH 80 MIL ADHERED TPO
SINGLE-PLY MEMBRANE OVER 1/2" COVERBOARD
POLYISOCYANURATE BOARDS AND CONCRETE FILL INSULATION.
TO OBTAIN WARRANTY AND POSITIVE DRAINAGE.
ACCORDING TO MANUFACTURERS' RECOMANDATIONS
TAPERED CRICKET AROUND FAN SHROUD
N
M
L
1.311.11
L
N
EXHAUST FAN
DOWN CONDUCTOR
4" VENT
RIDGE
3" VENT STACK
DOWN
WOOD BLOCK, TYP
EVERY 3'-0"
DOWN CONDUCTOR
TO COUNTERPOISE
PRECAST PANEL BELOW
RADIO ANTENNA SUPPORT
PER DETAIL ON DRAWING
CE-D-7552-A4-1.
PER DWG. CE-D-7385-2A.
SEE DWG. CE-D-7385-2
FOR ROOFING & FLASHING
AROUND TML EQUIPMENT.
RIDGE
FLASHING DETAIL FOR TYPICAL
FLASHING DETAIL.
RIDGE
ROOF
HATCH
SEE
SPEC
3" R.D.
RIDGE
3" R.D.
3" R.D.
PRECAST PANEL
BELOW
3" VENT STACK
3" R.D.
2'-6" X 3'-0"
1.11 1.17
DOOR
SIZE TYPE
HDW
SET
NO.
SIGN
ON DOOR
DET.
NO.
ON.
SHT.
A-B
REMARKS
DOOR SCHEDULE
ROOM
NO. FLOOR
WALLS
ROOM FINISH SCHEDULE
6-1
STAIR
6-2
TRAINING
6-3 STAIR
6-4 E.P.D.O.
6-5
6-6 PR 3'-0"x6'-8"x1 3/4"
6-7 2'-6"x7'-0"x1 1/34" TOILET
6-8 CLOSET
6-9 HALL
"B" LABEL DOOR & LABELED FRAME.
600 CONC CMU CMU CMU CMU &
STRUC
601 GWB GWB GWB GWB
602 E.P.D.O. GWB GWB GWB GWB
603 GWB
CMU
CMU
GWB GWB GWB
CMU CMU CMU
CMU CMU CMU
604 CABLE CHASE GRATING
605 ELEVATOR
606 TOILET
CER. CMU CMU CMU CMU
607 CLOSET
CMU CMU CMU CMU
608 LOBBY GWB GWB GWB GWB
609 HALL GWB GWB GWB GWB
SUSP.
GYP. BD.
CEILING
STRUCT.
ACOUSTIC
PANEL
605 600
6-6
6-3
6-2
6-5
6-9
6-4
6-1
6-8
6-7
ACCESS PNL.
11 - 12"x12"x60"
DOUBLE TIER LOCKERS
& MOTORIZED DAMPER CONTROLLED BY
PRESSURE SWITCH SET TO OPEN AT .15"
FIREPROOF ACCESS PANEL
TO FIREDAMPER
2 HR. CEILING
ACCESS PANEL
4"x4" CONC. CURB
TO FACP
TO FACP
TO FACP
EDGE OF CEILING DROP
2'-6"
FLOOR
HATCH
COVER
2'-6" x 4'-0" x 4" DEEP
WEATHERPROOF TYPE LOUVER
W/BIRD SCREEN
WEATHGERPROOF
TYPE LOUVER
W/BIRD SCREEN
U P
FIN. FL. EL. 137'-9"
ALL CEILING HEIGHTS ARE 9'-0" EXCEPT
TOILET, CLOSET & E.P.D.O. ARE 8'-0".
NOT USED
USED VINYL BASE AT VAT FLOORING.
SCALE: 1/4" = 1'
6TH FLOOR BLDG. AREA - 1288.125 S.F.
ROOM
ELECTRIC STRIKE
VISION PANEL
TILE PT-4 PT-4 PT-4 PT-4
GWB
PT-4
GWB
2HR. GWB
2HR. CEILING IN HALL 609 & CAB
STAIRWAY. SEE DWG. A-11
FOR KITCHEN UNIT LAYOUT, SEE
P.H.
TOWEL
AND
WASTEMIRROR
SCREEN
F .H .C
TO FACP
FLOOR GRATING
SEE SECTION
1'-0"
A10
A13
2HR. CEILING IN HALL 609 & CAB
REFER TO DWG. CE-D-7252-A5A FOR LEGEND
7'-3"
6TH FLOOR PLAN
NOTES:
TYPE LOUVER
W/BIRD SCREEN
TOILET CLOSET
ELEVATOR
LOBBY
HALL
CABLE CHASE
"A"
STAIR
MECHANCIAL ROOM
E.P.D.O. (FUT.)
COLUMN & BLDG. LINE
EPOXY FLOOR COATING
TENNANT ECO-PT 250 & ECO-HTS 100
ACT-1
ACT-1
VCT-1
VCT-1
NOTE 6
W/EPOXY
CONC.
VCT-1
VCT-1
VCT-1
RT-1
1.31
OVER LADDER
TO ROOF
SHAFT
NO.
F
REPLACEMENT.
PROTECTION SYSTEM AS REQUIRED FOR THE ROOF
INFORMATION. REMOVE AND REINSTALL THE LIGHTNING
CONTRACT DRAWINGS AND SPECIFICATION FOR MORE
THE EAST HALF OF THE ROOF AREA. REFER TO THE
THE WEST HALF AND A FALL RESTRAINT SYSTEM ON
SYSTEM WHICH INCLUDES A GUARDRAIL SYSTEM ON
SUPPLY AND INSTALL OSHA COMPLIANT FALL PROTECTION
MEMBRANE COVER BOARDS, INSULATION AND FLASHING.
INSTALL A FULL EPDM ROOF SYSTEM INCLUDING
REMOVE: EXISTING EPDM ROOF SYSTEM. SUPPLY AND
CONTRACTOR SHALL PERFORM ALL WORK
SHOWN IN CLOUDS
F
F
STACK
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O R
REMOVE AND DISPOSE:
F
REMOVE AND DISPOSE:
SYSTEM
NEW COMPLETE INSULATED
AND CURB. REPLACE WITH
REMOVE: ROOF HATCH LID
BY THE FAN MANUFACTURER.
MAINTAIN CRICKET AND FLASHING AS REQUIRED
REMOVE AND REPLACE EXHAUST FAN AND CURB.
CE-D-7252-A4-1
1701903ROOF AND FALL PROTECTION UPGRADE01/10/2022J
CONTROL CAB PLANS
James L. BeselMark Benne
JBP
05/25/1998
J
PLJ02/14/2012500666AS BUILT CAB MODERNIZATION09/13/2012H
PLJ07/07/2008500666AS BUILT INTERIOR MODERNIZATION CCD #04/26/2009G
PLJ 314806INTERIOR MODERNIZATION04/03/2007F
c e o m a a a s rj .d g n
DRAWING PRODUCED ON ACE RO MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
CE-D-OMA-7252-A5A
C O
N S
T R
U C
T
IO
N c e o m a a a s rj .d g n
/1
/2
:0
:4
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
E D
M
IS
S
U
R
FLUORESCENT
12"x12"
CONTROL CAB CONSOLES SHOWN ABOVE AND DETAILED ON DWGS. CE-D-7252-A14 THRU A17.
4" HOLE THRU CEILING
1/
1'-5 11/16"
" 7'-6 13/16"
4'-4 9/16"
7" RAISED FLOOR SYSTEM
(SEE DETAIL ABOVE)
METAL CEILING HATCH
NOTE 3
MONTE CARLO 4C028 COLONY II, 4-BLADE CEILING FAN. BLACK IN COLOR.
LIGHTOLIER BLACK MATTE EYEBALL CAN LIGHT FIXTURE LOL1062 LV W/6497BK MR16 FRAMING PROJECTOR & 1000LV FRAME.
SUPERVISOR'S CONSOLE PER DWG. CE-D-OMA-7252-A16.
CONVENIENCE UNIT, SEE DWG. CE-D-OMA-7252-A17.
STAIR SHELF, CORIAN BRAND; COLOR IS PLATINUM, SIZE 30"x50" W/4" BACK SPLASH.
9. HEADSET/BINDER STORAGE UNIT PER DWG. CE-D-OMA-7252-A15.
1.
2.
3.
4.
5.
6.
7.
8.
ATC
NOT TO SCALE
FLOOR
CEILING
CEILING TILE & GRID
(a) PLASTIC LAMINATE
CONSOLES
STAIRS
& WALLS
(a) PLASTIC LAMINATE
(b) PAINT
BLACK #205
ITEM COLOR MANUFACTURER
S.R.P. = SIGNAL REFERENCE PLANE
NOTES:
LEGEND:
CAB ROOM FINISH AND COLOR LEGEND
GALILEO #4070 JULIE INDUSTRIES
TOP OF GLASS PANELS
EDGE OF ROOF
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
LIGHTNING AIR TERMINAL ACCESS HOLE (5 PLACES)
ANTENNA MOUNT
LIGHTNING AIR TERMINAL SUPPORT
MASTS AND AIR TERMINALS. SEE
DWG. CE-D-7252-E10 FOR
FABRICATION AND INSTALLATION
MOUNT/RACEWAY SYSTEM.
RELOCATED TO NEW ANTENNA
DETAILS (TYP 5 PLACES) TO BE
DRAIN (3 PLACES)
SUPPLY AND INSTALL: NEW ROOFTOP
ANTENNA MOUNT/CABLE RACEWAY
SLOPE1/2" TO 5/8" (TYP.)
HATCH
PENTHOUSE
PER DETAIL ON DWG.
HVAC VENT HOODS
CE-D-7252-A5-1
OBSTRUCTION LIGHT
(5 PLACES)
CEILING
HATCH
ROOF NOTICE STICKER TO
INSIDE OF HATCH COVER
ZONE SENSOR
(TYP 2 PLACES)
SMOKE DETECTOR
LIGHT FIXTURE
(12 PLACES)
CLOSURE
PANEL
REMOTE
DETECTOR
FOR
PENTHOUSE
CEILING GRID
AND PANELS
CEILING CLOSURE
PANEL AND EXHAUST
AIR SLOT
WINDOW SHADE
CHAIN HOIST HOOK
RECESS
CEILING PANEL
(5 PLACES)
REFLECTED CEILING PLAN ROOF PLAN
FROST CLIMAPLUS #414-205, 8 PIECES / CARTON
USG INTERIORS, INC. SHADOW LINE EDGE
1595-60 BLACK
1595-60 BLACK
ESD CARPET W/CONDUCTIVE RESEALABLE
ADHESIVE OVER 1/2" PLYWOOD WHICH IS OVER
COPPER EQUIPOTENTIAL PLANE (EPP) (CPT-4)
REF. DWG. CE-D-7252-E11.
2' X 2' X 3/4" ACOUSTICAL LAY-IN
(b) ESD PLASTIC LAMINATE
(c) PAINT (POWDER COAT)
(c) SOLID SURFACE TRIM WORK
SDG S60074T-BLACK
BLACK
VARIOUS
PLATINUM
WILSONART
NEVAMAR
WILSONART
VARIOUS
CORIAN BRAND
SCALE: 1/4" = 1'-0"
FLOOR PLAN
SCALE: 1/4" = 1'-0"
FLOOR PLAN-CONSOLE LAYOUT
FLOOR PLAN-STRUCTURE
NOTE 9
NOTE 5
SUPERVISOR'S CONSOLE
NOTE 4
SHELF
NOTE 8
CONVENIENCE UNIT
NOTE 7
7" RAISED FLOOR
NOTE 5
2'x2' ACOUSTICAL TILE CEILING AND
GRID PER FINISHED SCHEDULE THIS
DETAIL
SHEET, SEE METAL CEILING HATCH
(2 PLACES)
ABANDON IN PLACE
LIGHT GUN BOX
CEILING FAN
(2 PLACES)
NOTE 2
SLATWALL CONSOLE SYSTEM
BY EVANS CONSOLES
FAA MODEL C-1c STANDARD ATCT CAB
REFER DETAILS ON DWG. CE-D-OMA-7252-A15
OPEN TO FLOOR BELOW
SLATWALL CONSOLE SYSTEM
BY EVANS CONSOLES
INSTALLED IN SPRING 2012
TATE CONCOR CC1250 ALL STEEL 24"x24" RAISED FLOOR SYSTEM @ 7" TALL.
CONSOLE FINISHES BELOW AND DWG. CE-D-OMA-7252-A15.
(NOTE 5)
INSTALLED SPRING 2012
LIGHT FIXTURE (TYP. 3 PLACES)
CONTROL
GROUND
FLIGHT
DATA
CONTROL
LOCAL
NOTE: THIS DRAWING REPLACES CE-D-7252-A5.
CONTRACT SPECIFICATION.
WITH THE MANUFACTURER'S RECOMMENDATIONS AND THE
INSULATION, MEMBRANE, DRAINS AND FLASHING IN ACCORDANCE
80 MIL SLOPE EDPM ROOF SYSTEM COMPLETE WITH R-30
SUPPLY AND INSTALL:
REPLACE THE PENTHOUSE
LID INCLUDING INSULATED
HATCH AND SEALS IN
ACCORDANCE WITH
CONTRACT SPECIFICATION
ROOF
SUPPLY AND INSTALL PENTHOUSE
STEP SYSTEM PER CONTRACT
SPECIFICATION AND DETAIL 'E'
ON DWG. OMA-D-ATCT-A019
SYSTEM IN ACCORDANCE WITH THE
CONTRACT SPECIFICATION AND
DWG. OMA-D-ATCT-A018 AND A019
RE-INSTALL LIGHTNING PROTECTION
SYSTEM ON NEW ROOFTOP
ANTENNA MOUNT/RACEWAY
NOT BEING USED, SEE DWG. CE-D-7252-E2.
ALL WORK SHOWN IN CLOUDS
CONTRACTOR SHALL PERFORM
J
J
INTEGRITY RELIABILITY
C O
N F
IG
U R
A T
IO
N M A
N A
G E
M E
N T
CHANGES REQUIRE AN AUTHORIZING CCD.
THIS FACILITY IS UNDER CONFIGURATION CONTROL.
CM MANAGER DATE
SPECIFICATION
WITH NEW PER CONTRACT
PULL-DOWN LADDER AND REPLACE
REMOVE EXISTING CAB CEILING
J
J
N
N
N
N
N
X
X0
X
X001
X
X
SCALE: 1/4" = 1'-0"
4' 8'04'
J
J
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O R
Rectangle
1701903ROOF AND FALL PROTECTION UPGRADE01/10/2022E
TYPICAL WINDOW AND WALL DETAILS
LLOYD O. HOLMRALPH C. KENNEDY
RHT
JRC
ACD
PROJECT ENGINEER MGR: ENGINEERING - KANSAS CITY
01/30/1974
E
RCM 1403420REPLACE ALL WINDOWS IN OMA ATCT FUNCT04/04/2016D
RCM AS-BUILT01/21/19893
JSL SMPS63INSTALL NEW ROOF MEMBRANE04/28/19882
c e o m a a s re .d g n
DRAWING PRODUCED ON ACE RO MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
CE-D-OMA-7252-A13
C O
N S
T R
U C
T
IO
N c e o m a a s re .d g n
/1
/2
:0
:0
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
A3 A13 SCALE: 1 1/2" = 1'-0"
1A
A13 SCALE: 1 1/2" = 1'-0"
A1 A13
A4 A13
A13
SECTION PRECAST AT ROOF
SCALE: 3/4" = 1'-0"
A13
SECTION
SECTION
SCALE: 3/4" = 1'-0"
SECTION
WALL SECTION AT
CONCOURSE RAMP
A6 A13
SCALE: 3/4" = 1'-0"
3-A
TYPICAL WINDOW SECTION
TYPICAL EXTERIOR
MASONRY WALL REINF
DETAIL OF PRE-CAST
ANCHOR AT FLOOR
NOT TO SCALE
NOT TO SCALE
WELD
CONCRETE. EACH END OF
SEALANT
WALL ANCHORS
FOR LEDGER AND
SEE SECTION
GROUT IN WALL
NO.4 AT 4'-0" OC
3/16" WIRE
2 - 3/8" DIA x 6" LG STUDS
ANGLE-2 1/2"x2 1/2"x3/8"x0'-5"
1/4
ANGLE-2 1/2"X2 1/2"X3/8"X0'-3"
4 - 1/2" DIA ANCHORS
4 PER 7'-4" PANEL
ANCHORS-2 PER 3' PANEL
4" NOMINAL
FACE BRICK
EXISTING
SLAB
L
X
IS
T
G
N C
O U
R S
E
VAPOR BARRIER
W16
SECOND FLOOR ELEV 88'-0"
SUSPENDED CEILING
FIREPROOFING SPRAY-ON
W16
THIRD FLOOR ELEV 101'-9"
METAL STUDS & 1/2" GWB
FOURTH FLOOR ELEV 113'-9"
W16
FIREPROOFING SPRAY-ON
SUSPENDED CEILING
AND 1/2" GWB (PAINT)
METAL FURRING CHANNELS
FIREPROOFING SPRAY-ON
W16
FIFTH FLOOR ELEV 125'-9"
TERMINATION
AND MEMBRANE
FOR EDGE FLASHING
DWG CE-D-7252-A4-1
SEE DETAILS ON
3 1/2" BATT INSULATION
AND 1/2" GWB (PAINT)
METAL FURRING CHANNELS
FIREPROOFING SPRAY-ON
W16
(SPRAY-ON)
FIREPROOFING
W10 (VARIES, SEE DWG S4)
INSULATED CONCRETE FILL
SOLDIER COURSE
COPING
18 GA GALV
PRECAST
ANCHOR AT 16" OC
TWISTED GALVANIZED
TO BM
AT 3'-0" OC WELD
PLATE ANCHORS
5/16"x2" BENT
COPING
18 GA GALVANIZED
CONT
BOND BEAM 2-NO.4
TOP OF STEEL EL 149'-11"
DRAINS
7 1/2" MAXIMUM, 4" AT
1/2" GWB
METAL STUDS AND
SIXTH FLOOR EL 137'-9"
WITH POLYETHELENE VAPOR
T
L
8"
A13S2
INSULATION
1" RIGID
BLOCK
LIGHTWEIGHT
SPRAY-ON
FIREPROOFING
8" METAL STUDS AND 1/2" GWB
EL 76'-0"
FIRST FLOOR
INSULATION
2" PERIMETER
FILL
4" GRANULAR
5"x5"x1/2" PLATE WITH
VERTICAL REINFORCING
1/4"x2" TWISTED STRAP
INSERT IN PRECAST
ANCHOR 1/2" BOLT TO
PANEL AT HEAD AND SILL
HEAD FLASHING
EXIST. PRECAST CONC PANEL
EXIST. FOAM BOARD INSUL.
EXIST. 4" NOM. CMU BEYOND
EXIST. 5/8" GYPSUM BEYOND
SEALANT
BRICK BEYOND
P
R E
C A
S T
P
R E
C A
S T
CIP CONCRETE
SEALANT
WITH VAPOR BARRIER
EXIST. FIBERGLAS BATT INSUL
EXISTING VENETIAN BLINDS
LINE OF GYP WALL BEYOND
INSULATED ALUMINUM WINDOW
VINYL TILE
EXISTING CARPET TILE OR
STRAIGHT AT CARPET
VINYL BASE COVED AT TILE
SEALANT
SEALANT
WITH BULLNOSE
SOLID SURFACING MATERIAL SILL
EXIST. FOAM BOARD INSULATION
EXISTING BRICK BEYOND
PAN FLASHING SET IN
SEALANT WITH END DAMS
EXIST. METAL STUDS
STEEL BEAM
PROTECTION ON
EXIST. CEMENT FIRE
CIP CONCRETE
SCALE: 1 1/2" = 1'-0"
10 3/8"
3 5/8" STUD CONT.
7/8" FURRING CHANNEL
1/2" GYPSUM BOARD
RIDGID INSULATION
1 1/2" STUDS
SPANDREL PANEL
EXISTING PRECAST CONC.
2-NO. 4
POLYETHELENE VAPOR BARROR
(2nd & 3rd FLOORS)
FIN TUBE RADIATOR
3 1/4" LIGHT WT. CONC.
1 1/2" STEEL DECK
LOCATION SEE 2/A13
GYPSUM BOARD - VARIES BY
EXISTING ACOUSTICAL TILE OR
A13
A6 A13
WALLCOVERING
WITH PAINTED FINISH OR
GYPSUM WALLBOARD PRIMED
A9A9
4x4-3/ GALV. W.W.M.
5 1/2" +/-
NOTES:
1) GLASS MAY BE INSTALLED IN FRAMES AT SHOP AND
PLACED IN OPENINGS FROM BUILDING INTERIOR. FINAL
SEALING OF WINDOW FRAME TO SUBSTRATE MUST BE
PERFORMED FROM THE EXTERIOR.
A13A13
4x4-3/GALV. W.W.M.
2-#4
GALVANIZED HORIZONTAL JOINT
REINFORCING AT 16" O.C.
2) DO NOT USE WOOD SHIMS OR BLOCKS TO SUPPORT
OR BRACE WINDOW FRAMES.
FINISHED EXTERIOR WALLS
BARRIER TYPICAL ALL
1A
A13A13
BEYOND
EXIST. 3 5/8" MTL STUDS
A13A13
HEAD DETAIL
SCALE: 3" = 1'-0"
A13A13
A13A13
SILL DETAIL
SCALE: 3" = 1'-0"
A13
TPO MEMBRANE
80 MIL ADHERED
1/2" COVERBOARD
POSITIVE DRAINAGE AND R-30.
INSULATION NEED TO PROVIDE
RIGID INSULATION AND TAPERED
E
REMOVE EXISTING EPDM ROOF
SYSTEM. SUPPLY AND INSTALL
GUARDRAIL SYSTEM AND NEW EPDM
ROOF SYSTEM IN ACCORDANCE
WITH CONTRACT SPECIFICATION
E
CONTRACTOR SHALL PERFORM ALL WORK
SHOWN IN CLOUDS
E
SCALE: 3" = 1'-0"
9"6"3"3" 0
SCALE: 3/4" = 1'-0"
3'2'1'01'
SCALE: 1 1/2" = 1'-0"
3"6"9"1' 0 1'
E
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O
ACCORDANCE WITH THE CONTRACT SPECIFICATION.
DRAINS, INSULATION, BOOTS, MEMBRANE AND FLASHING IN
SUPPLY AND INSTALL NEW EPDM ROOF SYSTEM INCLUDING
CONTRACTOR SHALL PERFORM ALL WORK SHOWN IN CLOUDS
ACCORDANCE WITH THE CONTRACT SPECIFICATION.
HALF OF THE SHAFT ROOF PERIMETER ON BUILDING EXTERIOR FACE IN
DESIGN, SUPPLY AND INSTALL GUARDRAIL SYSTEM AROUND THE WEST
REPLACE VENT FAN
ACCORDANCE WITH THE CONTRACT SPECIFICATION.
DRAINS, INSULATION, BOOTS, MEMBRANE AND FLASHING IN
SUPPLY AND INSTALL NEW EPDM ROOF SYSTEM INCLUDING
ACCORDANCE WITH THE CONTRACT SPECIFICATION.
DRAINS, INSULATION, BOOTS, MEMBRANE AND FLASHING IN
SUPPLY AND INSTALL NEW EPDM ROOF SYSTEM INCLUDING
REROOF AND FALL PROTECTION
6TH FLOOR ROOF DETAILS
OMA-D-ATCT-A016
a -d -a tc t-a .d g n
N S
T R
U C
T
IO
N
VENT FAN DETAIL
NOT TO SCALE ROOF DRAIN DETAIL
NOT TO SCALE
ROOF SCHUTTLE DETAIL
NOT TO SCALE
VENT FAN DETAIL
NOT TO SCALE
DETAIL AT PRECAST PANELS
NOT TO SCALE
TYPICAL ROOF EDGE DETAIL
NOT TO SCALE
o m a -d -a tc t-a .d g n
/1
/2
:0
:1
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
DRAWING CE-D-7252-A4-1-S1, REVISION D, DATED 07/13/99
DRAWING OMA-D-ATCT-A016, DATED 06/10/21, SUPERSEDES
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O
ROOF AND FALL PROTECTION
6TH FLOOR DETAILS
OMA-D-ATCT-A017
a -d -a tc t-a .d g n
N S
T R
U C
T
IO
N
CONTRACT SPECIFICATION.
ROOF SYSTEM IN ACCORDANCE WITH THE
SYSTEM (LID/CURB) WITH COMPLETE INSULATED
REMOVE AND REPLACE COMPLETE ROOF HATCH
CONTRACT SPECIFICATION.
NEW MEMBRANE ROOF SYSTEM IN ACCORDANCE WITH
MEMBRANE, BOOTS AND INSULATION. SUPPLY AND INSTALL
REMOVE EXISTING ROOF SYSTEM INCLUDING FLASHING,
SPECIFICATION.
ACCORDANCE WITH CONTRACT
NEW GUARD RAILING SYSTEM IN
PREPARE AREA, SUPPLY AND INSTALL
PER NOTE 2, SHEET 1
EPDM MEMBRANE
NOTE 1, SHEET 1
SUBSTRATE, PER
WOOD FIBERBOARD
CONCRETE FILL
EXISTING INSULATED
CONTRACTOR TO PERFORM ALL WORK
PRIOR TO INSTALLATION OF NEW ROOF SYSTEM
REMOVE AND DISPOSE OF ANTENNA MOUNT
o m a -d -a tc t-a .d g n
/1
/2
:0
:3
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
DRAWING CE-D-7252-A4-1-S2, REVISION 2, DATED 7/13/99
DRAWING OMA-D-ATCT-A017, DATED 06/10/21, SUPERSEDES
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O R
SCALE: 3" = 1'-0"
9"6"3"3" 0
SCALE: 6" = 1'-0"
18"12"6"6" 0
CONTRACTOR SHALL PERFORM ALL WORK
PENTHOUSE WALL
REQUIRED DETAILS
EPDM FLASHING PER MANUFACTURER'S
FOR FLASHING AND MEMBRANE
STEEL TERMINATION BARS
TAPERED INSULATION PER NOTE 1
ROOF DECK
REQUIRED DETAILS
EPDM FLASHING PER MANUFACTURER'S
PARAPET WALL
WOOD BLOCKING
MEMBRANE PER NOTE 2
0.060" THICK EPDM
ACCESS OPENING
-3 /4
C E
N T
E R C
O L
U M
N C
A V
IT
Y
" O
P E
N
IN
G
IN
T O
2 3/4"
ROOF PANEL ASSEMBLY
SUPPLY AND INSTALL NEW EPDM ROOF
SYSTEM COMPLETE WITH DRAINS,
INSTALLATION, BOOTS, MEMBRANE
AND FLASHINGS IN ACCORDANCE
WITH THE CONTRACT SPECIFICATION.
6"
U N
IT
B
45 1/2"
/2
U N
IT
A
13"
/2
"7"
/2
/8
REROOF AND FALL PROTECTION
CIC CAB (AIR-A-PLANE)
ROOFING DETAILS
OMA-D-ATCT-A018
a -d -a tc t-a .d g n
N S
T R
U C
T
IO
N
BELOW.
OF BOARD ARE STAGGERED FROM THE JOINTS OF INSULATION
AND TAPERED INSULATION INTO STEEL ROOF DECK. JOINTS
INSULATION W/TAPDEK MECHANICAL FASTENERS THRU BOARD
3. 1/2" THICK LAYER OF WOOD FIBERBOARD OVER TAPERED
(FIRESTONE RUBBER MANUFACTURER).
2. 60 MIL THICKNESS FULLY ADHERED EPDM MEMBRANE
REQUIREMENTS OF THE MEMBRANE MANUFACTURER.
INSULATION WAS MECHANICALLY ATTACHED IN PLACE PER
POSITIVE DRAINAGE WILL BE ATTAINED TO THE ROOF DRAINS.
INSULATION WITH NECESSARY CRICKETS AND SLOPES SO
1-3/8" THICKNESS AT DRAINS AND ROOF EDGES. INSTALL
SPEC. HH-1-1972 WITH 1/4" PER FOOT MINIMUM AND A MIN.
1. TAPERED POLYISOCYANURATE INSULATION MEETING FEDERAL
NOTES:
GENERAL CROSS SECTION
NOT TO SCALE
o m a -d -a tc t-a .d g n
/1
/2
:0
:2
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
SCALE: 3" = 1'-0"
9"6"3"3" 0DETAIL AT ROOF DRAIN
SCALE: 3"=1'-0"
DETAIL AT PARAPET
SCALE: 3"=1'-0"
EPDM MEMBRANE, PER NOTE 2
TAPERED INSULATION, PER NOTE 1
WOOD FIBERBOARD SUBSTRATE, PER NOTE 3
IN ACCORDANCE WITH THE CONTRACT SPECIFICATION.
INSTALLATION, BOOTS, MEMBRANE AND FLASHINGS
ROOF SYSTEM COMPLETE WITH DRAINS,
SUPPLY AND INSTALL NEW EPDM
2 PLACES
GASKET, NEOPRENE SHEET, .060" THICK
JOINT CAP, SEE AX959-0157C
NO. 14 X 1/2 CRES WITH SEAL WASHER
HEX HEAD SCREW, TYPE "Z"
CONDUIT (TYP. 2 PLACES)
TO PARAPET JUSTBEFORE ENTRANCE TO
DOWN CONDUCTOR FASTENED AND BONDED
EVERY 3' TO TRIM (TYP. 2 PLACES)
1" PVC WITH DOWN CONDUCTOR, FASTENED
MOUNT/RACEWAY SYSTEM
NEW CAB ROOF ANTENNA
PROTECTION SYSTEM TO
REINSTALL LIGHTNING
ROOF DRAIN
2" DRAIN TUBE
SCALE: 1-1/2" = 1'-0"
3"6"9"1' 0 1'
DETAIL AT PENTHOUSE WALL
SCALE: 1-1/2"=1'-0"
TERMINATOR BAR FOR EPDM FLASHING
SUBSTRATE PER NOTE 3
WOOD FIBERBOARD
PER NOTE 2
EPDM MEMBRANE
PER NOTE 1
TAPERED INSULATION
1' 2'01'
SCALE: 1" = 1'-0"
FRONT ELEVATION SIDE ELEVATION
CAB PENTHOUSE
INTAKE HOOD ON EMERGENCY VENT LOUVERS
DEATAIL
SCALE: 1" = 1'-0"
OF CAULKING
SET BED IN HOOD
WITH NO. 6 SHEET METAL SCREWS
FASTENED ON 6" CENTERS
1-1/2" FLANGE (TYP.)
UNIT B, 20GA GALV.
UNIT A, 20GA GALV.
DRAWING CE-D-7252-A5-1, REVISION 3, DATED 3/22/93
DRAWING OMA-A-ATCT-A018, DATED 06/10/21, SUPERSEDES
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O
TYP.
3/16
PRIOR TO WORK COMMENCEMENT.
WELD TO PIPE WITH WEATHER-TIGHT WELDS
CAP PLATE x 1/4 LESS THAN PIPE I.D.
PIPE SCH. 40 (3" I.D.) WITH CAB
10'-0" LONG BY 3" DIA. FIBERGLASS
WITH STD. NUT AND WASHER, TYP.
3/8" DIA STAINLESS STEEL
BOLTED CONNECTION USING
PLATE 1/2" WITH 2-1/2" DIA. HOLE TYP.
SCH. 40 PIPE (2.88" O.D.)
PROVIDE CLOSURE PLATE
SCH. 40 PIPE (2.88" O.D.)
2-1/2" 6061-T6 ALUMINUM
CAB ROOF GUARDRAIL SYSTEM
OMA-D-ATCT-A019
a -d -a tc t-a .d g n
N S
T R
U C
T
IO
N o m a -d -a tc t-a .d g n
/1
/2
:0
:2
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
PENTHOUSE STEP SYSTEM
NOT TO SCALE
E A5A
A
SCALE: 3" = 1'-0"
9"6"3"3" 0
1' 2'01'
SCALE: 1" = 1'-0"
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O
| 01 - Cover Page - Roof and Fall Protection Upgrade - OMA ATCT |
| 02 - oma-d-atct-d016 |
| oma-d-atct-d016 |
| 03 - oma-d-atct-d017 |
| oma-d-atct-d017 |
| 04 - oma-d-atct-d018 |
| oma-d-atct-d018 |
| 05 - Sketch - Third Level Roof Fall Protection |
| 06 - ce_oma_7252_a4a_s0_rf |
| ce_oma_7252_a4a_s0_rf |
| 07 - ce_oma_7252_a5a_s0_rj |
| ce_oma_7252_a5a_s0_rj |
| 08 - ce_oma_7252_a13_s0_re |
| ce_oma_7252_a13_s0_re |
| 09 - oma-d-atct-a016 |
| oma-d-atct-a016 |
| 10 - oma-d-atct-a017 |
| oma-d-atct-a017 |
| 11 - oma-d-atct-a018 |
| oma-d-atct-a018 |
| 12 - oma-d-atct-a019 |
| oma-d-atct-a019 |
13 - ce-d-7252-s-3
File details come from the government source that posted it. Updated .