QuestionsandAnswers.docx
DOCX document 23 KB Posted
- Attached to
- OMA ATCT - Roof and Fall Protection Upgrade
- Solicitation number
- 697DCK-22-R-00403
About this file
This document contains questions and responses pertaining to solicitation number 697DCK-22-R-00403 from the Federal Aviation Administration for upgrades to the roof and fall protection at the Air Traffic Control Tower on Eppley Airfield in Omaha, Nebraska. Key details include that the work includes a full roof replacement with a fully adhered system carrying a 30-year warranty, removal and reinstallation of concrete pavers, and confirmation that Carlisle EPDM roof systems would be considered as an acceptable alternate if warranty and installation requirements are met. Site visits are scheduled for June 29th and questions are due by July 5th, with proposals due on July 22nd.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 697DCK-22-R-00403-0002.pdf | ||
| 697DCK-22-R-00403 - 0001.pdf | ||
| 697DCK-22-R-00403Final.pdf | ||
| J-3 Past Performance Questionnaire.pdf | ||
| J-1 Specifications.pdf | ||
| J-2 Wage Determination.txt | TXT text file | |
| J-1a Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMA Roof and Fall Protection Upgrade
697DCK-22-R-00403
Questions and Responses
1. Is the architect recommending that we tear out the light weight concrete under the roofing on the 6th Floor? (3A on Page 8) FAA Response: No
1. What is the elevation of the CAB roof?
FAA Response: Ground elevation shown at 976’ ’MSL. Cab Roof elevation shown at 1064’ MSL, Top of Structure w/ antennas approximately 1076’ MSL
1. Is the insulation to be fastened down or adhered down? Or will either work?
FAA Response: The design calls for a fully-adhered system along with the warranty and other requirements.
1. I noticed pavers in the picture on page 13 of the plans, Who removes pavers and are they to be reinstalled?
FAA Response: Patrick J. Response: No known existing concrete pavers. Contract does include the removal and installation of walkpads to match the existing configuration.
1. There are places on the plans and specs where 80 Mil TPO is called out. I assume these are misprints. Page 6 on the plans and page 2 on the specifications.
FAA Response: Roof replacement does not include TPO.
1. Due to the ongoing fluctuations and market uncertainty and to limit potential windfalls and disasters (ref. Administration of Government Contracts by Cibnic, Nash & Nagle a part of the George Washington University Library as to our logic behind this clause – “They will have no windfalls and no disasters. The Government benefits from more accurate bidding, without inflation for risks which may not eventuate.”) we are requesting that this contract be subject to AMS Clause 3.2.4-4. This will allow the proposals to not include potential material escalation factors which change daily and can be in excess of 30-40% or more of the materials pricing at times. Contractors will be able to provide an accurate proposal knowing that should factors outside of our control (i.e. material cost increases) impact the project the contracting team will allow for adequate compensatory amounts to account for the cost impacts. Please confirm if these clauses will be included with the subsequent award of this proposal or if we should factor in these discretionary multipliers to absorb the potential risk.
FAA Response: The FAA will not be adding clause 3.2.4-4 into this solicitation. All proposed prices should reflect current bid prices and the ability to provide documentation if requested.
1. Will Carlisle EPDM Roof System be considered an acceptable alternate?
FAA Response: Carlisle substitutions will be accepted as long as they meet the following:
· Fully-adhered system
· The full system carries a 30-year warranty back by manufacturer’s corporate assets
· Warranty with no dollar limitation and leak repair caused by
· Ordinary wear and tear of the elements
· Manufacturer defects
· Defective installation workmanship
· Damage due to winds up to 100 mph
· Damage due to hail up to 2” diameter
· System with Factory Mutual Corp (FM) Roof Assembly Classification, FM DS 1-28 and 1-29, and meeting minimum requirements of FM 1-90 wind uplift rating
· Carlisle approved installer with minimum of ten (10) years of experience in installing the specified system
· Minimum slope of ¼ “ per foot via deck and/or tapered insulation
· Substitution does not affect the execution of the other non-roof replacement work
· All other aspects of the contract specification apply