J-1 - Weed Spray SOW_Final-1-25-2024.pdf
PDF 2 MB Posted
- Attached to
- Weed Control Services for FAA Denver Airport Group Facilities at Denver International Airport
- Solicitation number
- 697DCK-24-R-00154
About this file
This document includes a statement of work and related federal contract opportunity solicitation for weed control services. The statement of work outlines the scope of work to be provided at various Federal Aviation Administration facilities located at Denver International Airport and surrounding areas. Services will include soil sterilization and control of vegetation less than 12 inches in height through herbicide application. The contractor must coordinate activities, use EPA approved products, and meet all regulatory requirements. The related solicitation provides additional details such as the solicitation number, small business set-aside designation, NAICS code, pre-bid site visit details, question submission process, and response deadline of March 7, 2024. Evaluation of proposals will be conducted by Leonard Newman Unlimited, a private contractor to the government.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Weed Control
Federal Aviation Administration Denver Airport Group Denver TRACON 26705 E 68th Ave, Denver, CO 80249
1.1 Location of Work
All work in scope to be performed at:
Facilities maintained by the Denver Airport Group on the grounds of Denver International Airport, Colorado Space Port, and outlying facilities supporting airport operations.
Control Facility:
Denver TRACON 26705 E 68th Ave Denver, CO 80249
1.2 Background
Per FAA requirements there are both annual and ongoing requirements to control vegetation growth at facilities maintained by the FAA. Ground cover, weed control, include ground sterilization are measures taken to properly maintain facilities. Steps taken in these maintenance activities are to ensure proper operation of equipment. More stringent requirement is for navigational equipment: Vegetation should not be permitted to exceed 12 inches in height in the ILS critical area within 2000 feet (600 m) of the LOC and 800 feet (240 m) of GS antennas. Action must be initiated when observed vegetation growth exceeds this height.
1.3 Scope of Work
The Contractor shall provide all labor, materials, services, equipment, supervision, and insurance required to sterilize (Herbicide) the soil in the areas specified in the Appendices with one solid application to bare ground annually and touch-ups to bare ground as required to maintain inhibition of growth during the contract year. All applications will have greater than 90% kill rate within 30 days of application. If the application does not achieve greater than 90% kill rate, then the Contractor will reapply application at no cost to Government. Solid application and touch-ups will be timely spaced during the growing season with Solid application in spring timeframe as growth emerges. The Contractor shall be responsible for using materials and application procedures that comply with local, state, and federal regulations.
Sites in the appendices are both on the 52 square miles inside the Denver International fence line as well as many supporting facilities that support airport air traffic operations off facility.
Sites include:
• 4 Radar Sites: Two ASR, ASDE and TDWR
• 3 RU Sites
• 3 RBPM Sites
• 15 Localizer Sites with an Additional EG Shelter
• 15 Glide Slope Sites with an Additional EG Shelter
• 5 RTR Sites
• 5 RVR Sites
• 4 FFM Sites
• 31 LLWAS Sites
• 10 MALSR Sites with Associated Equipment Buildings
• 4 ALSF Sites with Associated Equipment Buildings
• 12 PAPI Sites
• 1 Storage Lot
Contractor must:
• Coordinate at least a week in advance operations with the COR and facility representative so appropriate outages for work to be performed can be scheduled and appropriate personnel are available to coordinate outages and provide escort.
• FAA sponsorship may be required, and DEN airport badging may be necessary.
• Apply products in accordance with manufacturer’s instructions and with prior approval of product use by the COR.
• Be aware that DEN Airport operations may cancel equipment or runway outages required to perform contracted services without notice.
• Treat fenced facilities to include an area extending past the fence line no less than two feet past the fence line.
Additional Information:
• MALSR sites consist of light lane in the safety area consisting of approximately 8400 sq ft and five flasher stations outside the safety area that are approximately 600 sq ft each.
• ALS sites consist of light lane in the safety area consisting of approximately 18000 sq ft and 14 flasher stations outside the safety area that are approximately 600 sq ft each.
• LOC sites include antenna array as well as equipment buildings.
All products, materials, and equipment to be used to accomplish work must be submitted to and approved by the FAA’s Contracting Officer Representative (COR) prior to commencement of work.
All work performed must meet NFPA, Federal, State, and local regulatory codes regardless of whether it is contained in this statement of work.
Any operations that could affect the operation of the facility or affect personnel such as noisy or dusty operations must be coordinated in advance with the FAA representative prior to commencement of work. Such operations must be planned and coordinated in a manner not to disrupt facility operations and personnel.
Contractor is presumed to be an expert in the specification, installation, and operation of this type of equipment and system. As such, the contractor is expected to make all recommendations regarding the use of specific equipment and/or control strategies prior to the acceptance of any proposal.
1.4 Working Hours
Work must be conducted Monday through Friday between the hours of 7:30AM and 4:00PM except for federal holidays. Any instances where work may be required during a time other than these hours or if work requires the FAA to obtain equipment outages to support the activity; must be coordinated with COR and local POC’s at no additional cost to the government. Work requiring a loss of service to the facility must be determined and controlled by Air Traffic operations.
1.5 Other Considerations
• Site survey, if required, is to be performed by a representative of the contracting company, at no additional cost to the FAA.
• Verification of all system components must be completed by the contractor.
• All materials such as paint, primer, stripper, glues, and adhesives must be a low VOC/odor and approved by an FAA representative.
• All applicable FAA standards and national, state, and local codes must apply.
• As a minimum all OSHA safety requirements must govern all activities.
• FAA personnel must operate all circuit breakers, switches, valves, etc. Coordinate operation through the Contracting Officer’s Representative (COR) or another designated FAA representative.
• FAA representative must be notified of personnel to be on site 24 hours prior to arrival and any person entering site may be subject to a security background check.
• Any work performed without FAA representation may be subject to removal and/or inspection at the cost of contractor.
• No FAA representative, other than the signatory Contracting Officer, is authorized to alter the scope of this project. Unauthorized work will not be accepted nor paid for.
• Construction power is available at work site.
• Contractor personnel must be always escorted by an FAA employee.
• Contractors are required to supply all tools, materials, services, and safety equipment required to perform this work. FAA does not provide tools, materials, or safety equipment for use by contractors.
1.6 Protecting Government Property
The Contractor must take all precautions necessary to protect the existing facilities, equipment, buildings, vegetation, etc., during construction. Any areas damaged by the Contractor or any subcontractors, must be repaired or replaced by the Contractor at no additional cost. Repairs must be approved by the Site Representative and must match the original finish. The Contractor must provide all temporary covers, enclosures, barricades, etc., required to protect the existing facilities.
1.7 Waste disposal and Cleanup
Contractor must maintain a clean work environment. Contractor should not expect to use FAA dumpsters. All materials requiring disposal during construction must be removed from the site by the contractor and recycled or disposed of in an approved, responsible manner.
1.8 Warranties
All installation work and equipment must be warranted against defects in workmanship;
manufacturing defects or deficiencies, and/or oversights in installation for a period of not less than
(1) one year. Warranties for components whose warranties extend beyond one year period must be provided.
1.9 Points of Contact
TBD
Airfield Northeast
Legend
1 mi
N
N
Northwest
Legend
1 mi
N
Southeast
Legend
Feature 1
J P Barrett Park
Platteville
1 mi
N
Southwest
Legend
1 mi
N
CFO Legend
1 mi
N
Untitled Map
GXY
40.22977 / -104.71863
Legend
Feature 1
J P Barrett Park
Platteville
4000 ft
N
DEN TDWR
39.7275 / -104.52667
Legend
Circle K
Feature 1
Rocky Mountain Sire Services
TDEN Terminal Doppler Weather Radar
1000 ft
N
File details come from the government source that posted it. Updated .