J-03 GE Sims Bldg 52110 Remodel.pdf

PDF 476 KB Posted

Attached to
Remodel Training Facility BLDG. 52110 Federal contract opportunity
Solicitation number
W9124A23R0016
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This document outlines requirements for remodeling an Army training facility building. The scope of work includes removing security vault and mail room walls; repairing, cleaning, and sealing concrete floors; upgrading voice and data systems from 1959 equipment to current standards; painting walls and ceilings; installing 20 electrical drops, 4 air conditioning units, cubicles, and electrical and voice/data for cubicles in offices and classrooms. The related federal contract opportunity is a pre-solicitation for the remodeling of Training Facility BLDG. 52110 issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground with solicitation number W9124A23R0016. The document provides a concept design layout and details the required renovations.

View the file

Other files for this federal contract opportunity

Other files attached to Remodel Training Facility BLDG. 52110, newest first.
File Type Posted
J-05-asbestos-lead-report2.pdf PDF
J-07 52.204-9 Personnel Log.xlsx XLSX spreadsheet
B01 Pre-solicitation description.pdf PDF
J-06-asbestos-lead report3.pdf PDF
J-08 Map Ft Huachuca AZ.pptx PPTX presentation
J-04-asbestos-lead-report1.pdf PDF
J-02 Floorplan 52110 DRAFT.pdf PDF
B01 Pre-solicitation description.pdf PDF
J-06-asbestos-lead report3.pdf PDF
J-04-asbestos-lead-report1.pdf PDF
J-05-asbestos-lead-report2.pdf PDF
J-01 SOO_Remodel Training Facility-Bldg 52110-21JUNE2023 DRAFT.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work required in Bldg: 52110

Simulators:

• Security Vault walls needs to be removed

• Concrete floors will be repaired, cleaned, polished, and sealed

• Old 1959 roll-a-deck comms closet system will be remove

• Voice and Data will be upgraded to current standards

• Walls will be painted semi-gloss eggshell white

• Ceiling will be painted flat black

• 20 electrical drops will be installed to support UMS Simulators

• 4ea 12ton AC units will be installed to support cooling of UMS

• Install cubicles in rear offices

• Install electrical for cubicles

Admin & Classrooms:

• Mail room walls needs to be removed

• Old carpet needs to be removed

• Concrete floors will be repaired, cleaned, polished, and sealed

• Old 1959 roll-a-deck comms closet system will be remove

• Voice and Data will be upgraded to current standards

• Walls will be painted semi-gloss eggshell white

• Restrooms will be enlarged to accommodate population in facility

• Install cubicles in front offices

• Install electrical for cubicles

• Install voice & data for cubicles

Contractor will be required to submit a more detailed SOO/SOW to reflect work required.

Bldg. 52110 Current Layout

Loading Dock

SV

LT

JAN

SV

LT

JAN

SV

LT

JAN

SV

LT

AUX

Bath BathBathBath

TCC

TC

C

M ail R o o m

M ail R o o m

M ail R o o m

M ail R o o m

OfficeOffice Office Office Office Office Office OfficeLobby Lobby Lobby Lobby

STO STO STO STO

SV

LT

JAN

SV

LT

JAN

SV

LT

JAN

SV

LT

AUX

Bath BathBathBath

TCC

TC

C

Bldg. 52110

Remove Walls

Remove Walls

Remove Walls

Remove Walls

Remove Walls

Remove Walls

Remove Comms Closet

Remove Walls

Remove Walls Remove Comms Closet

SV

LT

JAN

SV

LT

JAN

SV

LT

JAN

SV

LT

AUX

Bath BathBathBath

TCC

TC

C

Bldg. 52110

Remove Walls Remove Walls Remove WallsRemove Walls

SDISDI

C O

M M

S

NEC

BR

BR

BR

BR

BR

Student Breakroom

Micro Market

Storage

Cadre/Admin

Cadre/Admin

Sim Room x5

Sim Room x6

Sim Room x6

Classroom 1 Classroom 2 Classroom 3

BR

BR

BR

BR

BR

Gray Eagle Sims Concept Design by Mr. Ortiz

Cadre Breakroom

Double Door Double DoorSingle Door

Sag LCD

Sag LCD

Sag LCD (Optional Sim Room x3)

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5

File details come from the government source that posted it. Updated .