J-0200000-09 ELINs.xlsx
XLSX spreadsheet 84 KB Posted
- Solicitation number
- N4008522R2662
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINs Base Year Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-D-1135 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Recurring Services - Base Period | ||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN A001 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Frequency | Unit of Issue | Unit Price | Total |
| A001 | Provide all Labor, Material and Equipment specified, to transport Oily Water and Waste Oil from the dock at Naval Station Norfolk to the Dock at Craney Island Fuel Depot including loading and off loading as the specification indicates. Three trips per week will be scheduled as the requirement for the Recurring workload. | 1 | 12 | MO | $ - 0 |
TOTAL RECURRING WORK
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs Base Period Non-Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-D-1135 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Non-Recurring Services - Base Period | |||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES NON- RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A701 through A706 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| A701 | Oily Water / Waste Oil Transport | Provide all Labor, Material and Equipment specified, to transport Oily Water and Waste Oil from the dock at Naval Station Norfolk to the Dock at Craney Island Fuel Depot including loading and off loading as the specification indicates. | 30 | EA | $ - 0 | ||
| A702 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 1000 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 1000 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| A703 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 5000 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 5000 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| A704 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 11,600 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 11,600 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| A705 | Composite Hour Labor Rate - Subject to the Service Contract Act (SCA) | The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain fails, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. | |||||
| Estimated hours and completion time will be established with each task order per negotiations. Shall be negotiated by the Contracting Officer. | 1,000 | HR | $ - 0 | ||||
| A706 | Materials and Equipment | ||||||
| All materials and equipment costs required to perform work requested by the Government not identified in the Non-Recuuring ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate. Completion time will be established per task order. Shall be negotiated by the Contracting Officer. | $20,000 | NTE | $ - 0 | $20,000 |
TOTAL NON-RECURRING WORK
ELINs Option Year 1 Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-D-1135 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0003 Recurring Services- Option Year 1 | ||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN B001 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Frequency | Unit of Issue | Unit Price | Total |
| B001 | Provide all Labor, Material and Equipment specified, to transport Oily Water and Waste Oil from the dock at Naval Station Norfolk to the Dock at Craney Island Fuel Depot including loading and off loading as the specification indicates. Three trips per week will be scheduled as the requirement for the Recurring workload. | 1 | 12 | MO | $ - 0 |
TOTAL RECURRING WORK
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs Option One Non-Recur
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-D-1135 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0004 Non-Recurring Services - Option Year 1 | |||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES NON- RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs B701 through B706 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| B701 | Oily Water / Waste Oil Transport | Provide all Labor, Material and Equipment specified, to transport Oily Water and Waste Oil from the dock at Naval Station Norfolk to the Dock at Craney Island Fuel Depot including loading and off loading as the specification indicates. | 30 | EA | $ - 0 | ||
| B702 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 1000 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 1000 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| B703 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 5000 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 5000 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| B704 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 11,600 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 11,600 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| B705 | Composite Hour Labor Rate - Subject to the Service Contract Act (SCA) | The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain fails, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. | |||||
| Estimated hours and completion time will be established with each task order per negotiations. Shall be negotiated by the Contracting Officer. | 1,000 | HR | $ - 0 | ||||
| B706 | Materials and Equipment | ||||||
| All materials and equipment costs required to perform work requested by the Government not identified in the Non-Recuuring ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate. Completion time will be established per task order. Shall be negotiated by the Contracting Officer. | $20,000 | NTE | $ - 0 | $20,000 |
TOTAL NON-RECURRING WORK
ELINs Option Year 2 Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-D-1135 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0005 Recurring Services- Option Year 2 | ||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN C001 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Frequency | Unit of Issue | Unit Price | Total |
| C001 | Provide all Labor, Material and Equipment specified, to transport Oily Water and Waste Oil from the dock at Naval Station Norfolk to the Dock at Craney Island Fuel Depot including loading and off loading as the specification indicates. Three trips per week will be scheduled as the requirement for the Recurring workload. | 1 | 12 | MO | $ - 0 |
TOTAL RECURRING WORK
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs Option Two Non-Recur
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-D-1135 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0006 Non-Recurring Services - Option Year 2 | |||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES NON- RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs C701 through C706 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| C701 | Oily Water / Waste Oil Transport | Provide all Labor, Material and Equipment specified, to transport Oily Water and Waste Oil from the dock at Naval Station Norfolk to the Dock at Craney Island Fuel Depot including loading and off loading as the specification indicates. | 30 | EA | $ - 0 | ||
| C702 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 1000 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 1000 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| C703 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 5000 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 5000 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| C704 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 11,600 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 11,600 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| C705 | Composite Hour Labor Rate - Subject to the Service Contract Act (SCA) | The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain fails, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. | |||||
| Estimated hours and completion time will be established with each task order per negotiations. Shall be negotiated by the Contracting Officer. | 1,000 | HR | $ - 0 | ||||
| C706 | Materials and Equipment | ||||||
| All materials and equipment costs required to perform work requested by the Government not identified in the Non-Recuuring ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate. Completion time will be established per task order. Shall be negotiated by the Contracting Officer. | $20,000 | NTE | $ - 0 | $20,000 |
TOTAL NON-RECURRING WORK
ELINs Option Year 3 Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-D-1135 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0007 Recurring Services- Option Year 3 | ||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN D001 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Frequency | Unit of Issue | Unit Price | Total |
| D001 | Provide all Labor, Material and Equipment specified, to transport Oily Water and Waste Oil from the dock at Naval Station Norfolk to the Dock at Craney Island Fuel Depot including loading and off loading as the specification indicates. Three trips per week will be scheduled as the requirement for the Recurring workload. | 1 | 12 | MO | $ - 0 |
TOTAL RECURRING WORK
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs Option Three Non-Recur
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-D-1135 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0008 Non-Recurring Services - Option Year 3 | |||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES NON- RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs D701 through D706 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| D701 | Oily Water / Waste Oil Transport | Provide all Labor, Material and Equipment specified, to transport Oily Water and Waste Oil from the dock at Naval Station Norfolk to the Dock at Craney Island Fuel Depot including loading and off loading as the specification indicates. | 30 | EA | $ - 0 | ||
| D702 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 1000 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 1000 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| D703 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 5000 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 5000 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| D704 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 11,600 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 11,600 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| D705 | Composite Hour Labor Rate - Subject to the Service Contract Act (SCA) | The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain fails, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. | |||||
| Estimated hours and completion time will be established with each task order per negotiations. Shall be negotiated by the Contracting Officer. | 1,000 | HR | $ - 0 | ||||
| D706 | Materials and Equipment | ||||||
| All materials and equipment costs required to perform work requested by the Government not identified in the Non-Recuuring ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate. Completion time will be established per task order. Shall be negotiated by the Contracting Officer. | $20,000 | NTE | $ - 0 | $20,000 |
TOTAL NON-RECURRING WORK
ELINs Option Year 4 Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-D-1135 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0009 Recurring Services- Option Year 4 | ||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELIN E001 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Frequency | Unit of Issue | Unit Price | Total |
| E001 | Provide all Labor, Material and Equipment specified, to transport Oily Water and Waste Oil from the dock at Naval Station Norfolk to the Dock at Craney Island Fuel Depot including loading and off loading as the specification indicates. Three trips per week will be scheduled as the requirement for the Recurring workload. | 1 | 12 | MO | $ - 0 |
TOTAL RECURRING WORK
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs Option Four Non-Recu
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-D-1135 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0010 Non-Recurring Services - Option Year 4 | |||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES NON- RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs E701 through E706 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| E701 | Oily Water / Waste Oil Transport | Provide all Labor, Material and Equipment specified, to transport Oily Water and Waste Oil from the dock at Naval Station Norfolk to the Dock at Craney Island Fuel Depot including loading and off loading as the specification indicates. | 30 | EA | $ - 0 | ||
| E702 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 1000 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 1000 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| E703 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 5000 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 5000 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| E704 | Oil Water Separator Holding Tank Oily Waste Collection/Oil Water Separator Oily Waste Transport NTE 11,600 Gallons | Provide all Labor, Material, and Equipment to collect, contain, and transport Oily Waste and Waste Oil from various Oil Water Separator locations at Naval Station Norfolk in accordance with all Federal, State, and Local regulations to EPA approved processing facilities not to exceed 11,600 gallons. Work shall be completed within one business day after receipt of order. | 4 | EA | |||
| E705 | Composite Hour Labor Rate - Subject to the Service Contract Act (SCA) | The Composite Hour Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, miscellaneous equipment (e.g. weight lifting equipment, chain fails, small winch, jacks, rigging, pulleys, staging, timbers, etc.), equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. | |||||
| Estimated hours and completion time will be established with each task order per negotiations. Shall be negotiated by the Contracting Officer. | 1,000 | HR | $ - 0 | ||||
| E706 | Materials and Equipment | ||||||
| All materials and equipment costs required to perform work requested by the Government not identified in the Non-Recuuring ELINs. Reasonable costs for rental, shipping, and other incidentals may be included. Costs of materials shall be adjusted for refunds, rebates, and discounts. Pre-expended bin supplies and materials shall not be included in the material costs. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. Materials handling costs shall be built in the Composite Hourly Labor Rate. Completion time will be established per task order. Shall be negotiated by the Contracting Officer. | $20,000 | NTE | $ - 0 | $20,000 |
TOTAL NON-RECURRING WORK
File details come from the government source that posted it. Updated .