ITN 2024019 Form D - Price Sheet.xlsx
XLSX spreadsheet 118 KB Posted
- Solicitation number
- ITN-09512
- Issued by
- Leon County, Florida
About this file
This document is a solicitation for Petroleum Contamination Site Response Action Services issued by the Florida Department of Environmental Protection (DEP). The DEP is requesting proposals from qualified vendors to provide a variety of services related to petroleum contamination site response actions across the state of Florida, including Leon County and the City of Tallahassee. The services requested include activities such as file reviews, site assessments, monitoring well installation and sampling, soil and water analysis, remediation system installation and operation, and reporting. The initial contract term is for 5 years, with the possibility of 5 additional renewal years.
The solicitation provides detailed pricing information and pay item descriptions for the various services requested. Vendors must submit pricing for all pay items in accordance with the provided instructions. The pricing will be used to evaluate and score proposals. The solicitation does not mention any specific set-asides or incumbent contractors. Funding for the services will come from state sources, but the specific budget amounts are not provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITN 2024019 Form D - Price Sheet.xlsx | XLSX spreadsheet | |
| ITN 2024019.pdf | ||
| A3 - Revised Attachment 3 - SOW Appendix.pdf | ||
| Addendum No. 1 DEP Solicitation No. 2024019.pdf | ||
| A2 - Revised Form D - Price Sheet.xlsx | XLSX spreadsheet | |
| A2 - Revised Att 1 Draft Contract - T&Cs.pdf | ||
| ITN 2024019 Attachment 4.xlsx | XLSX spreadsheet | |
| Addendum No. 2 - Q&A and Modifications.pdf | ||
| Attachment 1 - Draft Contract.pdf | ||
| Addendum No. 4 - Revised ITN 2024019.pdf | ||
| Addendum No. 2 - Revised ITN 2024019.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions State of Florida Department of Environmental Protection Instructions for Completion of Form D - Price Sheet Solicitation # 2024019
The Price Sheet consists of three tabs.
The first tab of the Price Sheet is the Instructions Tab - review this tab closely and follow the guidance on populating other tabs. Nothing should be entered on the Instructions Tab.
Respondent will complete data entry in accordance with the instructions below on both the Initial Rates Statewide Tab and the Renewal Rates Statewide Tab in order to be considered Responsive.
Enter Vendor Name in cell B1 on both the Initial Rates Statewide Tab and the Renewal Rates Statewide Tab. Enter a rate for each pay item for each year on both the Initial Rates Statewide Tab and the Renewal Rates Statewide Tab. The rates provided are for statewide work. The Price Sheet must contain complete responses for all items. Rates submitted are ceiling rates that may be quoted at a lower rate per task assignment or purchase order. To be considered for the Award, Vendor must be able to provide all Services across the state for the rates submitted.
If the entered rate is Zero (0) or left blank, then the Price Sheet will be deemed Non-Responsive. The only exception is that a rate of Zero (0) is allowed for Pay Item 8-72 where the lower limit is listed as $0.00.
A lower limit for each line item is shown in column "E" titled Lower Limit All Years. This lower limit is applicable to all years. If a rate is entered below this amount for the corresponding line item in any year, then the Price Sheet will be deemed to be Non-Responsive.
An upper limit is provided for each line item for each year. The upper limit for the line item for each year is shown in the cell immediately left of the cell for which the rate is being entered and is titled Upper Limit Year X, where X = the Year of the contract term. If a rate is entered above the amount shown in the cell immediately to the left of the cell where the rate is being entered, then the Price Sheet will be deemed to be Non-Responsive.
Enter a rate to exactly two (2) decimal places for each line item for each year and do not adjust the format of the Price Sheet in any way. If the rate entered is more than or less than two decimal places, or the formatting of the Price Sheet is altered in any way, then the Price Sheet will be deemed to be Non-Responsive. Manual entry of rates is recommended as scripts or pasting data may change formatting which would cause the Price Sheet to be deemed Non-Responsive.
The pricing for Professional Engineer and Professional Geologist identified as Pay Items 20-1 through 20-36 in the Form D Price Sheet will not be used for an award but will be considered during the negotiation.
Reimbursable items and the 6% Handling Fee are not included in the Price Sheet as rates are not required for these items.
The Price Sheet (both the Initial Rates Statewide Tab and the Renewal Rates Statewide Tab) must be included in both the electronic response (original Excel format) and the hard copy response (the print area is already pre-set for this worksheet). Failure to include the fully completed Initial Rates Statewide Tab and the Renewal Rates Statewide tab fully completed in accordance with guidance above in both the electronic and hard copy format will result in the Price Sheet being deemed Non-Responsive.
Form D - Price Sheet ITN 2024019 Petroleum Contamination Site Response Action Services
Initial Rates Statewide
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Price Sheet
Form D
| Vendor Name: | FORM D - Initial Contract Term Pay Item Price for Statewide Work (5 years) | |||||||||||||||
| Price Sheet for Initial Term (5 Years) | UNIT | Weight | Lower | |||||||||||||
| Limit | Upper | |||||||||||||||
| Limit | Enter Rates between Upper & Lower Limit | Upper | ||||||||||||||
| Limit | Enter Rates between Upper & Lower Limit | Upper | ||||||||||||||
| Limit | Enter Rates between Upper & Lower Limit | Upper | ||||||||||||||
| Limit | Enter Rates between Upper & Lower Limit | Upper | ||||||||||||||
| Limit | Enter Rates between Upper & Lower Limit | TOTAL | ||||||||||||||
| PAY ITEM | PAY ITEM DESCRIPTION | All Years | 1st Year | 1st Year | 2nd Year | 2nd Year | 3rd Year | 3rd Year | 4th Year | 4th Year | 5th Year | 5th Year | ||||
| 1-1. | File Review | Per Review | 3 | $ 523.62 | $ 872.70 | $ 900.30 | $ 930.49 | $ 965.58 | $ 999.26 | $ - 0 | ||||||
| 1-2. | Site Health & Safety Plan | Per Site | 3 | $ 290.90 | $ 484.83 | $ 500.00 | $ 516.88 | $ 536.14 | $ 554.40 | $ - 0 | ||||||
| 1-2.a. | Updated Site Health & Safety Plan for Continued Work (no cost to DEP) | Per Site | 0 | $ - 0 | ||||||||||||
| 1-3. | Notice of Discovery of Contamination Package (initial or TPOC) | Per Package | 3 | $ 275.74 | $ 459.57 | $ 474.10 | $ 490.29 | $ 509.14 | $ 526.33 | $ - 0 | ||||||
| 1-5. | Obtaining Off-Site Property Access Agreement, ROW Access Agreement or Permit | Per Agreement | 3 | $ 383.22 | $ 638.71 | $ 658.42 | $ 680.56 | $ 705.71 | $ 729.61 | $ - 0 | ||||||
| 1-8 | Map and Table Generation | Per Site | 3 | $ 734.14 | $ 1,223.56 | $ 1,261.24 | $ 1,303.35 | $ 1,354.10 | $ 1,399.06 | $ - 0 | ||||||
| 2-1. | Site Reconnaissance/Field Measurement Visit | Per Visit | 3 | $ 545.74 | $ 909.57 | $ 939.19 | $ 973.66 | $ 1,011.06 | $ 1,046.36 | $ - 0 | ||||||
| 2-2. | Receptor Survey and Exposure Pathway Identification | Per Survey | 2 | $ 517.40 | $ 862.34 | $ 891.32 | $ 923.07 | $ 958.14 | $ 992.17 | $ - 0 | ||||||
| 2-4. | Contractor Oversight for Non-Price Schedule Activities | Per Day | 3 | $ 758.32 | $ 1,263.87 | $ 1,302.56 | $ 1,349.30 | $ 1,398.58 | $ 1,446.09 | $ - 0 | ||||||
| 3-1. | Light Duty Vehicle (car or 1/2 ton truck) Mobilization | Per Round Trip | 4 | $ 666.69 | $ 1,111.15 | $ 1,150.17 | $ 1,193.40 | $ 1,242.12 | $ 1,289.43 | $ - 0 | ||||||
| 3-2. | Heavy Duty/Stake Bed Truck (3/4 ton +) Mobilization | Per Round Trip | 3 | $ 792.63 | $ 1,321.04 | $ 1,369.53 | $ 1,422.89 | $ 1,481.62 | $ 1,539.81 | $ - 0 | ||||||
| 3-3. | Work Trailer Mobilization | Per Round Trip | 3 | $ 336.63 | $ 561.06 | $ 579.69 | $ 602.46 | $ 627.56 | $ 652.52 | $ - 0 | ||||||
| 3-4. | DPT Rig and Support Vehicles Mobilization | Per Round Trip | 4 | $ 1,107.77 | $ 1,846.28 | $ 1,923.77 | $ 2,013.33 | $ 2,104.04 | $ 2,193.74 | $ - 0 | ||||||
| 3-5. | Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) | Per Round Trip | 4 | $ 1,632.76 | $ 2,721.27 | $ 2,833.70 | $ 2,956.19 | $ 3,086.06 | $ 3,220.88 | $ - 0 | ||||||
| 3-6. | Excavator Mobilization | Per Round Trip | 3 | $ 833.93 | $ 1,389.88 | $ 1,445.65 | $ 1,506.51 | $ 1,570.04 | $ 1,634.69 | $ - 0 | ||||||
| 3-7. | LDA Rig and Support Vehicles Mobilization | Per Round Trip | 3 | $ 8,519.99 | $ 14,199.98 | $ 14,710.14 | $ 15,288.56 | $ 15,895.49 | $ 16,518.15 | $ - 0 | ||||||
| 3-8. | Loader/Backhoe Mobilization | Per Round Trip | 3 | $ 680.67 | $ 1,134.45 | $ 1,178.51 | $ 1,226.16 | $ 1,276.56 | $ 1,327.69 | $ - 0 | ||||||
| 3-9. | Mini Excavator/Loader Mobilization | Per Round Trip | 3 | $ 548.84 | $ 914.73 | $ 950.00 | $ 988.32 | $ 1,028.88 | $ 1,069.89 | $ - 0 | ||||||
| 3-10. | Drum Compactor Mobilization | Per Round Trip | 2 | $ 414.47 | $ 690.79 | $ 715.31 | $ 742.56 | $ 771.57 | $ 800.94 | $ - 0 | ||||||
| 4-1.a. | Split Spoon Sampling – 2 foot (during boring) < 50 feet | Per Spoon | 4 | $ 34.21 | $ 57.01 | $ 59.26 | $ 61.71 | $ 64.32 | $ 66.99 | $ - 0 | ||||||
| 4-1.b. | Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet | Per Spoon | 3 | $ 39.44 | $ 65.73 | $ 68.00 | $ 70.79 | $ 73.77 | $ 76.81 | $ - 0 | ||||||
| 4-1.c. | Split Spoon Sampling – 2 foot (during boring) > 100 feet | Per Spoon | 1 | $ 42.39 | $ 70.65 | $ 73.11 | $ 76.11 | $ 79.31 | $ 82.56 | $ - 0 | ||||||
| 4-1.d. | Sonic Core Sampling - 5 or 10 foot (during boring) | Per Core | 4 | $ 135.68 | $ 226.13 | $ 235.05 | $ 244.79 | $ 255.27 | $ 265.99 | $ - 0 | ||||||
| 4-2. | Hand Auger Boring ≤ 10 foot total depth | Per Boring | 4 | $ 173.01 | $ 288.35 | $ 299.64 | $ 311.84 | $ 325.16 | $ 338.48 | $ - 0 | ||||||
| 4-3. | Direct Push Technology (DPT) Rig and Equipment | Full Day | 4 | $ 2,670.03 | $ 4,450.06 | $ 4,626.12 | $ 4,818.46 | $ 5,022.01 | $ 5,231.87 | $ - 0 | ||||||
| 4-4. | DPT Membrane Interface Probe (MIP) Equipped with PID and ECD | |||||||||||||||
| (add-on cost to DPT base rate) | Full Day | 1 | $ 2,248.73 | $ 3,747.88 | $ 3,878.10 | $ 4,019.51 | $ 4,168.63 | $ 4,322.90 | $ - 0 | |||||||
| 4-5. | HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth | Per Foot | 3 | $ 30.25 | $ 50.41 | $ 52.41 | $ 54.57 | $ 56.88 | $ 59.18 | $ - 0 | ||||||
| 4-6. | HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth | Per Foot | 3 | $ 32.25 | $ 53.75 | $ 55.88 | $ 58.18 | $ 60.61 | $ 63.09 | $ - 0 | ||||||
| 4-7. | HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth | Per Foot | 2 | $ 34.59 | $ 57.65 | $ 59.97 | $ 62.44 | $ 65.05 | $ 67.70 | $ - 0 | ||||||
| 4-8. | HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth | Per Foot | 3 | $ 34.93 | $ 58.22 | $ 60.52 | $ 63.10 | $ 65.65 | $ 68.33 | $ - 0 | ||||||
| 4-9. | HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth | Per Foot | 2 | $ 37.90 | $ 63.17 | $ 65.67 | $ 68.45 | $ 71.23 | $ 74.13 | $ - 0 | ||||||
| 4-10. | HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth | Per Foot | 2 | $ 44.35 | $ 73.91 | $ 76.87 | $ 80.05 | $ 83.43 | $ 86.84 | $ - 0 | ||||||
| 4-11. | HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth | Per Foot | 2 | $ 45.12 | $ 75.20 | $ 78.20 | $ 81.42 | $ 84.83 | $ 88.32 | $ - 0 | ||||||
| 4-12. | HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth | Per Foot | 2 | $ 48.96 | $ 81.61 | $ 84.88 | $ 88.40 | $ 92.14 | $ 95.93 | $ - 0 | ||||||
| 4-13. | HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth | Per Foot | 2 | $ 57.17 | $ 95.29 | $ 99.07 | $ 103.15 | $ 107.50 | $ 111.87 | $ - 0 | ||||||
| 4-14. | Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth | Per Foot | 3 | $ 34.22 | $ 57.04 | $ 59.28 | $ 61.71 | $ 64.27 | $ 66.91 | $ - 0 | ||||||
| 4-15. | Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth | Per Foot | 3 | $ 37.56 | $ 62.60 | $ 65.07 | $ 67.73 | $ 70.56 | $ 73.45 | $ - 0 | ||||||
| 4-16. | Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth | Per Foot | 2 | $ 42.25 | $ 70.42 | $ 73.24 | $ 76.25 | $ 79.48 | $ 82.74 | $ - 0 | ||||||
| 4-17. | Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth | Per Foot | 2 | $ 40.91 | $ 68.18 | $ 70.83 | $ 73.73 | $ 76.80 | $ 79.92 | $ - 0 | ||||||
| 4-18. | Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth | Per Foot | 2 | $ 45.82 | $ 76.37 | $ 79.39 | $ 82.63 | $ 86.09 | $ 89.62 | $ - 0 | ||||||
| 4-19. | Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth | Per Foot | 2 | $ 50.62 | $ 84.37 | $ 87.74 | $ 91.37 | $ 95.21 | $ 99.12 | $ - 0 | ||||||
| 4-20. | Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth | Per Foot | 2 | $ 53.37 | $ 88.96 | $ 92.46 | $ 96.20 | $ 100.28 | $ 104.33 | $ - 0 | ||||||
| 4-21. | Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth | Per Foot | 2 | $ 60.08 | $ 100.13 | $ 104.11 | $ 108.33 | $ 112.87 | $ 117.47 | $ - 0 | ||||||
| 4-22. | Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth | Per Foot | 2 | $ 69.29 | $ 115.48 | $ 120.07 | $ 124.94 | $ 130.19 | $ 135.48 | $ - 0 | ||||||
| 5-1. | Well Installation - 1 inch diameter (vertical) | Per Foot | 3 | $ 28.78 | $ 47.96 | $ 49.95 | $ 52.11 | $ 54.40 | $ 56.74 | $ - 0 | ||||||
| 5-2.a. | Well Installation - 2 inch diameter (vertical) | Per Foot | 4 | $ 35.00 | $ 58.34 | $ 60.75 | $ 63.39 | $ 66.19 | $ 69.04 | $ - 0 | ||||||
| 5-2.b. | Horizontal Well Installation - 2 inch diameter (includes trenching) | Per Foot | 2 | $ 167.37 | $ 278.95 | $ 290.34 | $ 302.52 | $ 315.79 | $ 329.23 | $ - 0 | ||||||
| 5-3.a. | Well Installation - 4 inch diameter (vertical) | Per Foot | 3 | $ 44.50 | $ 74.17 | $ 77.19 | $ 80.47 | $ 83.93 | $ 87.47 | $ - 0 | ||||||
| 5-3.b. | Horizontal Well Installation - 4 inch diameter (includes trenching) | Per Foot | 2 | $ 192.64 | $ 321.07 | $ 334.61 | $ 349.14 | $ 364.62 | $ 380.32 | $ - 0 | ||||||
| 5-4. | Well Installation - 1.5 inch diameter (vertical) | Per Foot | 2 | $ 31.19 | $ 51.98 | $ 53.97 | $ 56.17 | $ 58.50 | $ 60.83 | $ - 0 | ||||||
| 5-5. | Well Installation - 6 inch diameter (vertical) | Per Foot | 2 | $ 53.87 | $ 89.78 | $ 93.32 | $ 97.22 | $ 101.35 | $ 105.60 | $ - 0 | ||||||
| 5-6. | Surface Casing - 6 inch diameter | Per Foot | 4 | $ 50.02 | $ 83.37 | $ 86.62 | $ 90.10 | $ 93.91 | $ 97.74 | $ - 0 | ||||||
| 5-7. | Surface Casing - 8 inch diameter | Per Foot | 3 | $ 58.79 | $ 97.99 | $ 101.74 | $ 105.85 | $ 110.25 | $ 114.78 | $ - 0 | ||||||
| 5-8. | Surface Casing - 10 inch diameter | Per Foot | 2 | $ 68.45 | $ 114.09 | $ 118.57 | $ 123.37 | $ 128.53 | $ 133.82 | $ - 0 | ||||||
| 5-9. | Surface Casing - 12 inch diameter | Per Foot | 2 | $ 81.58 | $ 135.96 | $ 141.28 | $ 146.97 | $ 153.19 | $ 159.49 | $ - 0 | ||||||
| 5-10.a. | Additional Well Screen > 20 feet - 1 inch diameter | Per Foot | 3 | $ 15.13 | $ 25.22 | $ 26.20 | $ 27.26 | $ 28.43 | $ 29.61 | $ - 0 | ||||||
| 5-10.b. | Additional Well Screen > 20 feet - 2 inch diameter | Per Foot | 3 | $ 17.42 | $ 29.04 | $ 30.15 | $ 31.37 | $ 32.68 | $ 34.04 | $ - 0 | ||||||
| 5-10.c. | Additional Well Screen > 20 feet - 4 inch diameter | Per Foot | 3 | $ 22.08 | $ 36.81 | $ 38.21 | $ 39.74 | $ 41.43 | $ 43.11 | $ - 0 | ||||||
| 5-10.d. | Additional Well Screen > 20 feet - 6 inch diameter | Per Foot | 3 | $ 26.73 | $ 44.55 | $ 46.22 | $ 48.07 | $ 50.08 | $ 52.12 | $ - 0 | ||||||
| 5-11. | Above Grade Well Completion | Per Well | 3 | $ 286.67 | $ 477.78 | $ 495.86 | $ 515.38 | $ 536.04 | $ 557.11 | $ - 0 | ||||||
| 5-12. | Installation of Well Vault - 2 x 2 x 2 foot | Per Vault | 4 | $ 1,201.55 | $ 2,002.59 | $ 2,082.30 | $ 2,169.90 | $ 2,263.11 | $ 2,360.07 | $ - 0 | ||||||
| 5-13. | Installation of Well Vault - 4 x 4 x 2 foot | Per Vault | 3 | $ 2,409.48 | $ 4,015.80 | $ 4,184.59 | $ 4,367.37 | $ 4,557.78 | $ 4,752.28 | $ - 0 | ||||||
| 5-14. | Well Redevelopment | Per Well | 2 | $ 193.53 | $ 322.55 | $ 334.99 | $ 348.43 | $ 363.03 | $ 377.78 | $ - 0 | ||||||
| 5-15. | Removal and Reinstallation of 8-inch Manhole and Well Pad | Per Well | 2 | $ 314.51 | $ 524.19 | $ 544.29 | $ 566.35 | $ 589.92 | $ 613.92 | $ - 0 | ||||||
| 5-16. | Removal and Reinstallation of 12-inch Manhole and Well Pad | Per Well | 1 | $ 370.80 | $ 618.00 | $ 640.91 | $ 666.10 | $ 693.60 | $ 721.32 | $ - 0 | ||||||
| 5-17. | Prepacked Screen | Per Foot | 3 | $ 54.74 | $ 91.23 | $ 95.41 | $ 99.87 | $ 104.74 | $ 109.73 | $ - 0 | ||||||
| 6-1. | Grout and Abandon Well, 1 to 2 inch diameter | Per Foot | 4 | $ 17.84 | $ 29.74 | $ 30.92 | $ 32.19 | $ 33.55 | $ 34.94 | $ - 0 | ||||||
| 6-2. | Grout and Abandon Well, > 2 to 4 inch diameter | Per Foot | 4 | $ 21.27 | $ 35.44 | $ 36.88 | $ 38.42 | $ 40.06 | $ 41.73 | $ - 0 | ||||||
| 6-3. | Grout and Abandon Well, > 4 to 6 inch diameter | Per Foot | 3 | $ 27.13 | $ 45.21 | $ 46.97 | $ 48.86 | $ 50.92 | $ 53.01 | $ - 0 | ||||||
| 6-4. | Grout and Abandon Well, > 6 inch diameter | Per Foot | 2 | $ 32.33 | $ 53.89 | $ 55.96 | $ 58.19 | $ 60.64 | $ 63.10 | $ - 0 | ||||||
| 6-5. | Removal of Well Vault - 2 x 2 x 2 foot | Per Vault | 3 | $ 692.30 | $ 1,153.84 | $ 1,195.76 | $ 1,241.84 | $ 1,292.21 | $ 1,343.33 | $ - 0 | ||||||
| 6-6. | Removal of Well Vault - 4 x 4 x 2 foot | Per Vault | 3 | $ 924.07 | $ 1,540.11 | $ 1,594.79 | $ 1,654.57 | $ 1,719.81 | $ 1,785.49 | $ - 0 | ||||||
| 6-7. | Removal of Well Pad and Manhole | Per Well | 3 | $ 188.39 | $ 313.98 | $ 326.15 | $ 339.27 | $ 353.14 | $ 367.28 | $ - 0 | ||||||
| 7-1. | Monitoring Well Sampling with Water Level, ≤ 100 foot depth | Per Well | 4 | $ 192.29 | $ 320.49 | $ 330.74 | $ 342.04 | $ 354.74 | $ 367.46 | $ - 0 | ||||||
| 7-2. | Monitoring Well Sampling with Water Level, > 100 foot depth | Per Well | 2 | $ 215.78 | $ 359.64 | $ 371.04 | $ 383.65 | $ 397.72 | $ 411.89 | $ - 0 | ||||||
| 7-3. | Domestic Water Well Sampling | Per Well | 2 | $ 76.72 | $ 127.87 | $ 132.03 | $ 136.54 | $ 141.48 | $ 146.55 | $ - 0 | ||||||
| 7-4. | Other Water Sampling | Per Sample | 2 | $ 74.90 | $ 124.83 | $ 128.93 | $ 133.41 | $ 138.31 | $ 143.37 | $ - 0 | ||||||
| 7-5. | Free Product Sample Collection | Per Sample | 2 | $ 69.25 | $ 115.41 | $ 118.92 | $ 122.86 | $ 127.29 | $ 131.78 | $ - 0 | ||||||
| 7-6. | Soil/Sediment Sample Collection | Per Sample | 3 | $ 67.31 | $ 112.18 | $ 115.91 | $ 120.02 | $ 124.53 | $ 129.16 | $ - 0 | ||||||
| 7-7. | Water Level/Free Product Gauging | Per Well | 4 | $ 23.31 | $ 38.85 | $ 40.07 | $ 41.43 | $ 42.95 | $ 44.52 | $ - 0 | ||||||
| 7-8. | Free Product Gauging and Bailing | Per Well | 3 | $ 88.24 | $ 147.06 | $ 151.68 | $ 156.79 | $ 162.58 | $ 168.08 | $ - 0 | ||||||
| 7-9. | Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or equivalent) | Per Sample | 3 | $ 44.46 | $ 74.10 | $ 76.48 | $ 79.10 | $ 81.90 | $ 84.68 | $ - 0 | ||||||
| 7-10. | Vapor/Ambient Air Sample Collection - SUMMATM Canister (or equivalent) | Per Sample | 2 | $ 68.28 | $ 113.80 | $ 117.28 | $ 121.12 | $ 125.33 | $ 129.56 | $ - 0 | ||||||
| 7-11. | Electronic Data Deliverables (EDD) | Per Sampling Event | 3 | $ 89.94 | $ 149.90 | $ 155.66 | $ 160.88 | $ 166.52 | $ 172.03 | $ - 0 | ||||||
| 7-12. | Survey Latitude/Longitude of Existing Monitor Wells | Per Well | 2 | $ 38.85 | $ 64.76 | $ 66.80 | $ 69.01 | $ 71.47 | $ 73.86 | $ - 0 | ||||||
| 7-13. | Survey Latitude/Longitude of New Monitor Wells | Per Well | 2 | $ 39.64 | $ 66.06 | $ 68.14 | $ 70.40 | $ 73.01 | $ 75.44 | $ - 0 | ||||||
| 7-14. | Encore (25 gram) | Per Sample | 3 | $ 17.39 | $ 28.98 | $ 29.88 | $ 31.09 | $ 32.11 | $ 33.29 | $ - 0 | ||||||
| 8-1. | Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods) | Per Sample | 3 | $ 404.03 | $ 673.39 | $ 696.89 | $ 720.32 | $ 745.99 | $ 771.82 | $ - 0 | ||||||
| 8-2. | Soil, BTEX + MTBE (EPA 8021 or EPA 8260) | Per Sample | 4 | $ 52.21 | $ 87.01 | $ 90.83 | $ 95.35 | $ 99.93 | $ 104.71 | $ - 0 | ||||||
| 8-3. | Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260) | Per Sample | 3 | $ 50.27 | $ 83.78 | $ 86.61 | $ 90.04 | $ 93.40 | $ 96.76 | $ - 0 | ||||||
| 8-4. | Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260) | Per Sample | 3 | $ 65.72 | $ 109.53 | $ 112.81 | $ 117.14 | $ 121.03 | $ 124.92 | $ - 0 | ||||||
| 8-5. | Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) | Per Sample | 4 | $ 74.52 | $ 124.20 | $ 128.07 | $ 132.96 | $ 137.61 | $ 142.42 | $ - 0 | ||||||
| 8-6. | Soil, Priority Pollutant Volatile Organics (EPA 8260) | Per Sample | 3 | $ 69.04 | $ 115.06 | $ 118.53 | $ 123.14 | $ 127.53 | $ 131.95 | $ - 0 | ||||||
| 8-7. | Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270]) | Per Sample | 2 | $ 251.27 | $ 418.78 | $ 430.67 | $ 446.64 | $ 460.89 | $ 475.23 | $ - 0 | ||||||
| 8-8. | Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) | Per Sample | 4 | $ 57.50 | $ 95.83 | $ 99.45 | $ 103.78 | $ 108.07 | $ 112.46 | $ - 0 | ||||||
| 8-8.a. | Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) | Per Sample | 3 | $ 209.80 | $ 349.66 | $ 360.43 | $ 374.28 | $ 386.93 | $ 399.52 | $ - 0 | ||||||
| 8-9. | Soil, PCBs [or Aroclors] (EPA 8082) | Per Sample | 2 | $ 57.11 | $ 95.19 | $ 98.60 | $ 102.72 | $ 106.73 | $ 110.77 | $ - 0 | ||||||
| 8-10. | Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) | Per Sample | 3 | $ 68.52 | $ 114.20 | $ 117.59 | $ 122.03 | $ 126.09 | $ 130.18 | $ - 0 | ||||||
| 8-11. | Soil, Arsenic (EPA 6010 or EPA 6020) | Per Sample | 3 | $ 14.31 | $ 23.85 | $ 24.79 | $ 25.95 | $ 27.08 | $ 28.27 | $ - 0 | ||||||
| 8-12. | Soil, Cadmium (EPA 6010 or EPA 6020) | Per Sample | 2 | $ 12.99 | $ 21.64 | $ 22.36 | $ 23.28 | $ 24.14 | $ 25.03 | $ - 0 | ||||||
| 8-13. | Soil, Chromium (EPA 6010 or EPA 6020) | Per Sample | 2 | $ 13.52 | $ 22.53 | $ 23.24 | $ 24.21 | $ 25.07 | $ 25.96 | $ - 0 | ||||||
| 8-14. | Soil, Lead (EPA 6010 or EPA 6020) | Per Sample | 3 | $ 14.08 | $ 23.46 | $ 24.24 | $ 25.23 | $ 26.13 | $ 27.09 | $ - 0 | ||||||
| 8-15. | Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311) | Per Sample | 3 | $ 36.47 | $ 60.78 | $ 62.70 | $ 65.16 | $ 67.44 | $ 69.71 | $ - 0 | ||||||
| 8-16. | Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA 1312) | Per Sample | 3 | $ 37.46 | $ 62.43 | $ 64.54 | $ 67.12 | $ 69.62 | $ 72.13 | $ - 0 | ||||||
| 8-17. | Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black) | Per Sample | 2 | $ 51.03 | $ 85.06 | $ 87.31 | $ 90.49 | $ 93.20 | $ 95.97 | $ - 0 | ||||||
| 8-18. | Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or ASTM D2937-10) | Per Sample | 2 | $ 54.03 | $ 90.04 | $ 92.61 | $ 96.14 | $ 99.20 | $ 102.21 | $ - 0 | ||||||
| 8-19. | Soil, Moisture Content (ASTM D2216-10) | Per Sample | 2 | $ 17.56 | $ 29.26 | $ 30.17 | $ 31.44 | $ 32.57 | $ 33.70 | $ - 0 | ||||||
| 8-20. | Soil, Texture, (See Gee 7 Bauder [1966]) | Per Sample | 1 | $ 86.15 | $ 143.58 | $ 147.36 | $ 152.89 | $ 157.31 | $ 161.52 | $ - 0 | ||||||
| 8-21. | Soil, Cumene (Isopropyl benzene), 1,2,4-Trimethylbenzene and 1,3,5-Trimethylbenzene (EPA 8260) | Per Sample | 2 | $ 58.21 | $ 97.01 | $ 100.03 | $ 104.03 | $ 107.55 | $ 111.08 | $ - 0 | ||||||
| 8-22. | Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods) | Per Sample | 3 | $ 217.94 | $ 363.23 | $ 374.68 | $ 389.30 | $ 402.68 | $ 416.89 | $ - 0 | ||||||
| 8-23. | Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods) | Per Sample | 3 | $ 403.61 | $ 672.68 | $ 694.57 | $ 722.54 | $ 749.41 | $ 776.43 | $ - 0 | ||||||
| 8-24. | Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260) | Per Sample | 4 | $ 41.13 | $ 68.55 | $ 70.93 | $ 73.82 | $ 76.63 | $ 79.46 | $ - 0 | ||||||
| 8-25. | Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260) | Per Sample | 3 | $ 48.78 | $ 81.30 | $ 84.17 | $ 87.60 | $ 90.94 | $ 94.31 | $ - 0 | ||||||
| 8-26. | Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260) | Per Sample | 3 | $ 65.92 | $ 109.87 | $ 113.33 | $ 117.87 | $ 122.21 | $ 126.65 | $ - 0 | ||||||
| 8-27. | Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310) | Per Sample | 4 | $ 73.99 | $ 123.31 | $ 127.31 | $ 132.30 | $ 137.13 | $ 142.09 | $ - 0 | ||||||
| 8-28. | Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011) | Per Sample | 3 | $ 40.52 | $ 67.53 | $ 69.69 | $ 72.45 | $ 75.13 | $ 77.84 | $ - 0 | ||||||
| 8-29. | Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM) | Per Sample | 2 | $ 43.33 | $ 72.22 | $ 74.54 | $ 77.54 | $ 80.47 | $ 83.44 | $ - 0 | ||||||
| 8-30. | Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624) | Per Sample | 3 | $ 66.28 | $ 110.46 | $ 114.08 | $ 118.69 | $ 123.06 | $ 127.53 | $ - 0 | ||||||
| 8-31. | Water, Priority Pollutant Volatile Organics (EPA 8260) | Per Sample | 3 | $ 66.67 | $ 111.11 | $ 114.64 | $ 119.24 | $ 123.61 | $ 128.06 | $ - 0 | ||||||
| 8-32. | Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625]) | Per Sample | 2 | $ 239.25 | $ 398.75 | $ 410.72 | $ 426.63 | $ 440.74 | $ 454.79 | $ - 0 | ||||||
| 8-33. | Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270) | Per Sample | 2 | $ 248.54 | $ 414.24 | $ 426.71 | $ 442.99 | $ 457.76 | $ 472.64 | $ - 0 | ||||||
| 8-34. | Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO) | Per Sample | 4 | $ 53.66 | $ 89.43 | $ 92.56 | $ 96.27 | $ 99.94 | $ 103.65 | $ - 0 | ||||||
| 8-35. | Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) | Per Sample | 1 | $ 54.44 | $ 90.73 | $ 93.47 | $ 96.95 | $ 100.12 | $ 103.33 | $ - 0 | ||||||
| 8-36. | Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) | Per Sample | 3 | $ 14.31 | $ 23.85 | $ 24.68 | $ 25.71 | $ 26.69 | $ 27.68 | $ - 0 | ||||||
| 8-37. | Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) | Per Sample | 2 | $ 13.36 | $ 22.27 | $ 23.04 | $ 24.01 | $ 24.93 | $ 25.86 | $ - 0 | ||||||
| 8-38. | Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) | Per Sample | 2 | $ 13.34 | $ 22.24 | $ 23.01 | $ 23.98 | $ 24.90 | $ 25.83 | $ - 0 | ||||||
| 8-39. | Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) | Per Sample | 3 | $ 13.77 | $ 22.96 | $ 23.78 | $ 24.77 | $ 25.73 | $ 26.69 | $ - 0 | ||||||
| 8-40. | Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380) | Per Sample | 2 | $ 28.45 | $ 47.41 | $ 48.94 | $ 50.94 | $ 52.83 | $ 54.73 | $ - 0 | ||||||
| 8-41. | Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470) | Per Sample | 2 | $ 20.35 | $ 33.91 | $ 35.05 | $ 36.43 | $ 37.75 | $ 39.09 | $ - 0 | ||||||
| 8-42. | Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020) | Per Sample | 2 | $ 12.81 | $ 21.36 | $ 22.08 | $ 23.00 | $ 23.87 | $ 24.75 | $ - 0 | ||||||
| 8-43. | Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020) | Per Sample | 2 | $ 13.55 | $ 22.58 | $ 23.37 | $ 24.35 | $ 25.28 | $ 26.22 | $ - 0 | ||||||
| 8-44. | Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380) | Per Sample | 3 | $ 28.86 | $ 48.10 | $ 49.67 | $ 51.70 | $ 53.62 | $ 55.56 | $ - 0 | ||||||
| 8-45. | Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020) | Per Sample | 2 | $ 12.88 | $ 21.46 | $ 22.20 | $ 23.13 | $ 24.01 | $ 24.90 | $ - 0 | ||||||
| 8-46. | Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) | Per Sample | 2 | $ 12.88 | $ 21.47 | $ 22.21 | $ 23.14 | $ 24.02 | $ 24.91 | $ - 0 | ||||||
| 8-47. | Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020) | Per Sample | 2 | $ 12.98 | $ 21.63 | $ 22.38 | $ 23.31 | $ 24.20 | $ 25.10 | $ - 0 | ||||||
| 8-48. | Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020) | Per Sample | 2 | $ 12.92 | $ 21.53 | $ 22.28 | $ 23.21 | $ 24.10 | $ 24.99 | $ - 0 | ||||||
| 8-49. | Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B) | Per Sample | 2 | $ 16.06 | $ 26.77 | $ 27.57 | $ 28.65 | $ 29.61 | $ 30.64 | $ - 0 | ||||||
| 8-50. | Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H) | Per Sample | 2 | $ 17.93 | $ 29.89 | $ 30.87 | $ 32.12 | $ 33.31 | $ 34.52 | $ - 0 | ||||||
| 8-51. | Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E) | Per Sample | 2 | $ 15.99 | $ 26.64 | $ 27.53 | $ 28.65 | $ 29.72 | $ 30.79 | $ - 0 | ||||||
| 8-52. | Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C) | Per Sample | 2 | $ 18.94 | $ 31.57 | $ 32.53 | $ 33.77 | $ 34.93 | $ 36.07 | $ - 0 | ||||||
| 8-53. | Water, Nitrate [as N] (EPA 300.0 or EPA 353.2) | Per Sample | 2 | $ 15.80 | $ 26.33 | $ 27.28 | $ 28.43 | $ 29.52 | $ 30.63 | $ - 0 | ||||||
| 8-54. | Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F) | Per Sample | 2 | $ 16.49 | $ 27.48 | $ 28.40 | $ 29.56 | $ 30.64 | $ 31.77 | $ - 0 | ||||||
| 8-55. | Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F) | Per Sample | 2 | $ 15.82 | $ 26.36 | $ 27.31 | $ 28.46 | $ 29.56 | $ 30.67 | $ - 0 | ||||||
| 8-56. | Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060) | Per Sample | 2 | $ 23.07 | $ 38.44 | $ 39.64 | $ 41.15 | $ 42.59 | $ 44.01 | $ - 0 | ||||||
| 8-57. | Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE or SM 4500-PF) | Per Sample | 2 | $ 15.72 | $ 26.20 | $ 27.14 | $ 28.27 | $ 29.36 | $ 30.44 | $ - 0 | ||||||
| 8-58. | Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C) | Per Sample | 2 | $ 14.93 | $ 24.88 | $ 25.67 | $ 26.72 | $ 27.69 | $ 28.66 | $ - 0 | ||||||
| 8-59. | Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D) | Per Sample | 2 | $ 15.20 | $ 25.33 | $ 26.20 | $ 27.29 | $ 28.30 | $ 29.35 | $ - 0 | ||||||
| 8-60. | Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C) | Per Sample | 2 | $ 15.92 | $ 26.54 | $ 27.49 | $ 28.65 | $ 29.75 | $ 30.87 | $ - 0 | ||||||
| 8-61. | Water, Heterotrophic Plate Count (SM 9215 B or SIMPLATE) | Per Sample | 2 | $ 40.88 | $ 68.13 | $ 70.61 | $ 73.55 | $ 76.38 | $ 79.25 | $ - 0 | ||||||
| 8-62. | Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0) | Per Sample | 2 | $ 832.67 | $ 1,387.79 | $ 1,437.26 | $ 1,490.84 | $ 1,543.23 | $ 1,597.21 | $ - 0 | ||||||
| 8-63. | Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0) | Per Sample | 2 | $ 853.58 | $ 1,422.63 | $ 1,473.99 | $ 1,528.32 | $ 1,581.15 | $ 1,635.37 | $ - 0 | ||||||
| 8-64. | Water, BTEX/MTBE + Naphthalene (EPA 8260) | Per Sample | 2 | $ 56.54 | $ 94.24 | $ 97.16 | $ 101.05 | $ 104.47 | $ 107.88 | $ - 0 | ||||||
| 8-65. | Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260) | Per Sample | 1 | $ 48.21 | $ 80.36 | $ 83.12 | $ 86.46 | $ 89.74 | $ 93.04 | $ - 0 | ||||||
| 8-66. | Water, Methane (EPA SOP RSK-175) | Per Sample | 3 | $ 82.76 | $ 137.93 | $ 142.08 | $ 147.74 | $ 152.55 | $ 157.40 | $ - 0 | ||||||
| 8-67. | Water, Cumene (Isopropyl benzene), 1,2,4-Trimethylbenzene and 1,3,5-Trimethylbenzene (EPA 8260) | Per Sample | 2 | $ 58.02 | $ 96.70 | $ 99.68 | $ 103.65 | $ 107.14 | $ 110.61 | $ - 0 | ||||||
| 8-68. | Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3) | Per Sample | 4 | $ 80.74 | $ 134.56 | $ 139.18 | $ 144.89 | $ 150.34 | $ 155.90 | $ - 0 | ||||||
| 8-69. | Air, Volatile Organic Aromatics (EPA Method TO-15) | Per Sample | 2 | $ 230.26 | $ 383.77 | $ 394.83 | $ 410.38 | $ 423.58 | $ 436.82 | $ - 0 | ||||||
| 8-70. | Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13) | Per Sample | 2 | $ 344.43 | $ 574.05 | $ 592.11 | $ 614.52 | $ 636.47 | $ 656.48 | $ - 0 | ||||||
| 8-71. | Air, Volatile Organic Compounds (EPA Method TO-17) | Per Sample | 2 | $ 250.51 | $ 417.52 | $ 431.40 | $ 447.84 | $ 464.96 | $ 480.80 | $ - 0 | ||||||
| 8-72. | Additional Laboratory charge for 7 Day Turnaround. This is an additional charge (percentage) above the normal rate for expedited turnaround by the laboratory for an analysis. For Example: entering 0.05 is a 5% surcharge for 7 Day Turnaround above the rate for normal turnaround. | % Surcharge | 3 | $ 0.00 | $ 0.13 | $ 0.13 | $ 0.13 | $ 0.13 | $ 0.13 | $ - 0 | ||||||
| 8-73. | Additional Laboratory charge for 3 Day Turnaround. This is an additional charge (percentage) above the normal rate for expedited turnaround by the laboratory for an analysis. For Example: entering 0.50 is a 50% surcharge for 3 Day Turnaround above the rate for normal turnaround. | % Surcharge | 2 | $ 0.38 | $ 0.63 | $ 0.63 | $ 0.63 | $ 0.63 | $ 0.63 | $ - 0 | ||||||
| 8-74. | Additional Laboratory charge for 1 Day Turnaround. This is an additional charge (percentage) above the normal rate for expedited turnaround by the laboratory for an analysis. For Example: entering 1.00 is a 100% surcharge for 1 Day Turnaround above the rate for normal turnaround. | % Surcharge | 2 | $ 0.75 | $ 1.25 | $ 1.25 | $ 1.25 | $ 1.25 | $ 1.25 | $ - 0 | ||||||
| 9-1.a. | Sheet Piling Installation for ≤ 20 feet deep Excavation | Per Sq. Foot | 2 | $ 29.03 | $ 48.38 | $ 50.09 | $ 52.00 | $ 54.07 | $ 56.15 | $ - 0 | ||||||
| 9-1.b. | Sheet Piling Rental for ≤ 20 feet deep Excavation | Per Sq. Foot/Day | 2 | $ 4.33 | $ 7.21 | $ 7.47 | $ 7.73 | $ 8.03 | $ 8.33 | $ - 0 | ||||||
| 9-1.c. | Sheet Piling Rental for ≤ 20 feet deep Excavation | Per Sq. Foot/Week | 2 | $ 8.51 | $ 14.19 | $ 14.65 | $ 15.20 | $ 15.78 | $ 16.37 | $ - 0 | ||||||
| 9-1.d. | Sheet Piling Rental for ≤ 20 feet deep Excavation | Per Sq. Foot/Month | 2 | $ 14.25 | $ 23.76 | $ 24.55 | $ 25.43 | $ 26.41 | $ 27.38 | $ - 0 | ||||||
| 9-2.a. | Sheet Piling Installation for > 20 feet deep Excavation | Per Sq. Foot | 3 | $ 38.01 | $ 63.35 | $ 65.60 | $ 68.14 | $ 70.86 | $ 73.66 | $ - 0 | ||||||
| 9-2.b. | Sheet Piling Rental for > 20 feet deep Excavation | Per Sq. Foot/Day | 2 | $ 5.58 | $ 9.31 | $ 9.62 | $ 9.96 | $ 10.34 | $ 10.73 | $ - 0 | ||||||
| 9-2.c. | Sheet Piling Rental for > 20 feet deep Excavation | Per Sq. Foot/Week | 2 | $ 10.66 | $ 17.76 | $ 18.35 | $ 19.05 | $ 19.78 | $ 20.54 | $ - 0 | ||||||
| 9-2.d. | Sheet Piling Rental for > 20 feet deep Excavation | Per Sq. Foot/Month | 2 | $ 16.04 | $ 26.73 | $ 27.65 | $ 28.67 | $ 29.80 | $ 30.92 | $ - 0 | ||||||
| 9-3. | Conventional Soil Excavation and Loading ≤ 300 cubic yards | Per Cubic Yard | 3 | $ 42.24 | $ 70.40 | $ 72.97 | $ 75.90 | $ 79.04 | $ 82.20 | $ - 0 | ||||||
| 9-4. | Conventional Soil Excavation and Loading > 300 cubic yards | Per Cubic Yard | 4 | $ 35.71 | $ 59.52 | $ 61.68 | $ 64.17 | $ 66.81 | $ 69.49 | $ - 0 | ||||||
| 9-5. | LDA Excavation and Loading Without Casing ≤ 300 cubic yards | Per Cubic Yard | 3 | $ 115.46 | $ 192.43 | $ 198.99 | $ 206.43 | $ 214.26 | $ 222.55 | $ - 0 | ||||||
| 9-6. | LDA Excavation and Loading Without Casing > 300 cubic yards | Per Cubic Yard | 4 | $ 99.28 | $ 165.47 | $ 171.01 | $ 177.38 | $ 184.21 | $ 191.16 | $ - 0 | ||||||
| 9-7.a | LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards | Per Cubic Yard | 2 | $ 158.12 | $ 263.53 | $ 272.55 | $ 282.77 | $ 293.68 | $ 304.77 | $ - 0 | ||||||
| 9-7.b. | LDA Excavation and Loading With Driven Casing ≤ 300 cubic yards | Per Cubic Yard | 2 | $ 219.32 | $ 365.53 | $ 377.95 | $ 391.82 | $ 406.86 | $ 421.99 | $ - 0 | ||||||
| 9-8.a. | LDA Excavation and Loading With Surface Casing > 300 cubic yards | Per Cubic Yard | 3 | $ 138.63 | $ 231.05 | $ 238.93 | $ 247.83 | $ 257.39 | $ 267.05 | $ - 0 | ||||||
| 9-8.b. | LDA Excavation and Loading With Driven Casing > 300 cubic yards | Per Cubic Yard | 3 | $ 189.44 | $ 315.74 | $ 326.47 | $ 338.41 | $ 351.33 | $ 364.33 | $ - 0 | ||||||
| 9-9 | Flowable Fill Concrete and Installation | Per Cubic Yard | 4 | $ 134.53 | $ 224.22 | $ 232.13 | $ 240.84 | $ 250.41 | $ 259.94 | $ - 0 | ||||||
| 9-10. | Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards | Per Cubic Yard | 4 | $ 40.71 | $ 67.85 | $ 70.38 | $ 73.14 | $ 76.16 | $ 79.30 | $ - 0 | ||||||
| 9-11. | Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards | Per Cubic Yard | 4 | $ 36.55 | $ 60.92 | $ 63.15 | $ 65.76 | $ 68.53 | $ 71.38 | $ - 0 | ||||||
| 9-12.a. | Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards | Per Cubic Yard | 3 | $ 21.26 | $ 35.44 | $ 36.79 | $ 38.29 | $ 40.00 | $ 41.65 | $ - 0 | ||||||
| 9-12.b. | Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards | Per Cubic Yard | 2 | $ 19.57 | $ 32.61 | $ 33.86 | $ 35.25 | $ 36.70 | $ 38.21 | $ - 0 | ||||||
| 9-13. | Pea Gravel | Per Ton | 3 | $ 62.92 | $ 104.87 | $ 108.68 | $ 113.04 | $ 117.53 | $ 122.19 | $ - 0 | ||||||
| 9-14. | #57 Stone | Per Ton | 3 | $ 61.47 | $ 102.44 | $ 106.22 | $ 110.50 | $ 114.99 | $ 119.62 | $ - 0 | ||||||
| 9-15. | Dewatering System, up to 12 well points (includes installation) | Per Day | 3 | $ 3,339.82 | $ 5,566.37 | $ 5,759.55 | $ 5,976.10 | $ 6,205.42 | $ 6,442.20 | $ - 0 | ||||||
| 9-16. | Additional Dewatering System Well Points (2) (includes installation) | Per Day | 3 | $ 260.16 | $ 433.60 | $ 448.86 | $ 466.00 | $ 484.15 | $ 502.63 | $ - 0 | ||||||
| 9-17. | Dewatering System, up to 12 well points (includes installation) | Per Week | 3 | $ 6,930.26 | $ 11,550.44 | $ 11,951.87 | $ 12,401.84 | $ 12,888.32 | $ 13,381.35 | $ - 0 | ||||||
| 9-18. | Additional Dewatering System Well Points (2) (includes installation) | Per Week | 3 | $ 342.55 | $ 570.92 | $ 591.15 | $ 613.68 | $ 637.47 | $ 661.90 | $ - 0 | ||||||
| 9-19. | Dewatering System, up to 12 well points (includes installation) | Per Month | 3 | $ 12,327.46 | $ 20,545.77 | $ 21,255.05 | $ 22,043.07 | $ 22,895.36 | $ 23,753.61 | $ - 0 | ||||||
| 9-20. | Additional Dewatering System Well Points (2) (includes installation) | Per Month | 3 | $ 455.69 | $ 759.49 | $ 785.58 | $ 815.11 | $ 846.14 | $ 878.21 | $ - 0 | ||||||
| 10-1. | Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity | Per Tank | 2 | $ 4,142.86 | $ 6,904.77 | $ 6,946.18 | $ 7,368.04 | $ 7,633.95 | $ 7,901.97 | $ - 0 | ||||||
| 10-2. | Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity | Per Tank | 2 | $ 5,579.41 | $ 9,299.02 | $ 9,597.61 | $ 9,928.32 | $ 10,287.27 | $ 10,651.99 | $ - 0 | ||||||
| 10-3. | Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity | Per Tank | 2 | $ 7,483.08 | $ 12,471.81 | $ 12,874.33 | $ 13,318.43 | $ 13,800.33 | $ 14,287.79 | $ - 0 | ||||||
| 10-4. | Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity | Per Tank | 2 | $ 9,623.21 | $ 16,038.69 | $ 16,406.54 | $ 16,998.18 | $ 17,595.83 | $ 18,195.67 | $ - 0 | ||||||
| 11-1. | Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness | Per Square Foot | 4 | $ 5.18 | $ 8.64 | $ 8.94 | $ 9.29 | $ 9.66 | $ 10.02 | $ - 0 | ||||||
| 11-2. | Additional Removal/Loading Cost for Concrete - > 4 inch thickness | Per Square Foot | 2 | $ 4.21 | $ 7.01 | $ 7.25 | $ 7.52 | $ 7.82 | $ 8.11 | $ - 0 | ||||||
| 11-3. | Loading, Transport and Disposal/Recycle Clean Overburden | Per Ton | 4 | $ 44.44 | $ 74.07 | $ 76.78 | $ 79.79 | $ 82.95 | $ 86.21 | $ - 0 | ||||||
| 11-4. | Transport and Disposal of Clean Concrete | Per Ton | 3 | $ 37.78 | $ 62.96 | $ 65.37 | $ 68.00 | $ 70.79 | $ 73.63 | $ - 0 | ||||||
| 11-5. | Transport and Disposal of Mixed Debris | Per Ton | 3 | $ 49.99 | $ 83.32 | $ 86.42 | $ 89.84 | $ 93.59 | $ 97.32 | $ - 0 | ||||||
| 11-6. | Transport and Disposal of Petroleum Impacted Soil (includes drum) | Per Drum | 4 | $ 180.95 | $ 301.59 | $ 312.12 | $ 323.68 | $ 336.37 | $ 349.04 | $ - 0 | ||||||
| 11-7. | Transport Petroleum Impacted Soil (bulk) ≤ 100 miles | Per Ton | 4 | $ 28.61 | $ 47.68 | $ 49.44 | $ 51.43 | $ 53.57 | $ 55.69 | $ - 0 | ||||||
| 11-8. | Transport Petroleum Impacted Soil (bulk) > 100 miles | Per Ton | 4 | $ 37.72 | $ 62.86 | $ 65.18 | $ 67.75 | $ 70.54 | $ 73.37 | $ - 0 | ||||||
| 11-9. | Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons | Per Ton | 4 | $ 33.90 | $ 56.50 | $ 58.61 | $ 60.94 | $ 63.49 | $ 65.99 | $ - 0 | ||||||
| 11-10. | Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons | Per Ton | 4 | $ 33.39 | $ 55.65 | $ 57.73 | $ 58.97 | $ 62.54 | $ 65.00 | $ - 0 | ||||||
| 11-11. | Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons | Per Ton | 3 | $ 40.61 | $ 67.68 | $ 69.82 | $ 72.15 | $ 74.71 | $ 77.34 | $ - 0 | ||||||
| 11-12. | Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons | Per Ton | 3 | $ 39.73 | $ 66.22 | $ 68.31 | $ 69.52 | $ 73.07 | $ 75.64 | $ - 0 | ||||||
| 11-13. | Transport and Disposal of Petroleum Contact Water (includes drum) | Per Drum | 3 | $ 180.82 | $ 301.37 | $ 311.70 | $ 322.93 | $ 335.32 | $ 347.64 | $ - 0 | ||||||
| 11-14. | Transport and Disposal of Petroleum Contact Water (bulk) | Per Gallon | 3 | $ 1.27 | $ 2.11 | $ 2.21 | $ 2.29 | $ 2.39 | $ 2.48 | $ - 0 | ||||||
| 11-16. | Transport and Disposal of Petroleum Product (includes drum) | Per Drum | 3 | $ 195.59 | $ 325.99 | $ 337.40 | $ 349.99 | $ 364.16 | $ 377.88 | $ - 0 | ||||||
| 11-17. | Transport and Disposal of Petroleum Product (bulk) | Per Gallon | 2 | $ 1.39 | $ 2.31 | $ 2.41 | $ 2.50 | $ 2.61 | $ 2.71 | $ - 0 | ||||||
| 11-18. | Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container | Per Week | 3 | $ 837.36 | $ 1,395.60 | $ 1,444.78 | $ 1,497.80 | $ 1,554.84 | $ 1,612.51 | $ - 0 | ||||||
| 11-19. | Additional Rental of 20 Cubic Yard Roll-Off Container | Per Week | 3 | $ 248.37 | $ 413.95 | $ 428.62 | $ 445.23 | $ 462.96 | $ 480.89 | $ - 0 | ||||||
| 12-1. | Asphalt Paving - 2 inch thickness (includes sub-base) | Per Square Foot | 4 | $ 10.31 | $ 17.18 | $ 17.78 | $ 18.48 | $ 19.25 | $ 20.02 | $ - 0 | ||||||
| 12-2. | Asphalt Paving - additional 1 inch thickness | Per Square Foot | 3 | $ 3.29 | $ 5.49 | $ 5.69 | $ 5.92 | $ 6.16 | $ 6.41 | $ - 0 | ||||||
| 12-3. | Concrete Paving - 4 inch thickness (includes sub-base) | Per Square Foot | 4 | $ 10.48 | $ 17.47 | $ 18.11 | $ 18.84 | $ 19.61 | $ 20.40 | $ - 0 | ||||||
| 12-4. | Concrete Paving - additional 1 inch thickness | Per Square Foot | 3 | $ 3.22 | $ 5.37 | $ 5.58 | $ 5.81 | $ 6.04 | $ 6.31 | $ - 0 | ||||||
| 12-5. | Crushed Lime Rock Cover - 2 inch thickness | Per Square Foot | 3 | $ 3.40 | $ 5.66 | $ 5.88 | $ 6.11 | $ 6.36 | $ 6.60 | $ - 0 | ||||||
| 12-6. | Grass - Sod | Per Square Foot | 3 | $ 1.89 | $ 3.15 | $ 3.26 | $ 3.38 | $ 3.52 | $ 3.65 | $ - 0 | ||||||
| 12-7. | Grass - Seed and Mulch | Per Square Foot | 3 | $ 1.05 | $ 1.76 | $ 1.82 | $ 1.89 | $ 1.97 | $ 2.05 | $ - 0 | ||||||
| 13-1. | Direct Push Boring with In-Situ Injection | Per Day | 3 | $ 4,425.69 | $ 7,376.16 | $ 7,570.44 | $ 7,866.97 | $ 8,173.57 | $ 8,485.41 | $ - 0 | ||||||
| 13-2. | In-Situ Injection Into Existing Well/Treatment Point | Per Day | 3 | $ 3,797.77 | $ 6,329.62 | $ 6,472.49 | $ 6,721.12 | $ 6,979.13 | $ 7,243.38 | $ - 0 | ||||||
| 13-4. | Groundwater Injection System (not by direct push) | Per Week | 2 | $ 4,194.81 | $ 6,991.34 | $ 7,239.52 | $ 7,516.82 | $ 7,808.68 | $ 8,107.51 | $ - 0 | ||||||
| 13-5. | Groundwater Injection System (not by direct push) | Per Month | 2 | $ 7,715.02 | $ 12,858.36 | $ 13,310.22 | $ 13,811.39 | $ 14,340.33 | $ 14,885.42 | $ - 0 | ||||||
| 14-1.a. | Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench | Per Linear Foot of | ||||||||||||||
| Trench | 4 | $ 83.63 | $ 139.39 | $ 144.78 | $ 150.35 | $ 156.46 | $ 162.54 | $ - 0 | ||||||||
| 14-1.b. | Trenching and Installation of 11 - 20 Lines | Per Linear Foot of | ||||||||||||||
| Trench | 3 | $ 91.27 | $ 152.11 | $ 157.96 | $ 164.03 | $ 170.69 | $ 177.40 | $ - 0 | ||||||||
| 14-1.c. | Trenching and Installation of 21 - 30 Lines | Per Linear Foot of | ||||||||||||||
| Trench | 2 | $ 97.33 | $ 162.21 | $ 168.01 | $ 173.99 | $ 181.20 | $ 188.11 | $ - 0 | ||||||||
| 14-1.d. | Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines | Per Linear Foot of | ||||||||||||||
| Trench | 2 | $ 65.78 | $ 109.63 | $ 113.58 | $ 117.93 | $ 122.71 | $ 127.49 | $ - 0 | ||||||||
| 14-2. | Installation of Plumbing (and Electrical) Lines Above Ground | Per Foot | 2 | $ 27.29 | $ 45.49 | $ 47.19 | $ 49.03 | $ 51.11 | $ 53.10 | $ - 0 | ||||||
| 14-4.a. | System Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment Points | Per Startup | 3 | $ 12,729.40 | $ 21,215.67 | $ 21,899.80 | $ 22,648.61 | $ 23,507.05 | $ 24,347.87 | $ - 0 | ||||||
| 14-4.b. | System Installation/Integration/Startup - 1 Technology Component - 11-20 Recovery/Treatment Points | Per Startup | 3 | $ 15,238.17 | $ 25,396.95 | $ 26,213.32 | $ 27,098.89 | $ 28,119.87 | $ 29,123.37 | $ - 0 | ||||||
| 14-4.c. | System Installation/Integration/Startup - 1 Technology Component - 21-30 Recovery/Treatment Points | Per Startup | 2 | $ 18,158.00 | $ 30,263.33 | $ 31,212.05 | $ 32,245.20 | $ 33,420.60 | $ 34,585.10 | $ - 0 | ||||||
| 14-4.d. | System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This tem is used in conjunction with 14.4.c when needed) | Per Startup | 2 | $ 4,056.13 | $ 6,760.21 | $ 7,004.20 | $ 7,268.27 | $ 7,558.25 | $ 7,852.52 | $ - 0 | ||||||
| 14-5. | System Installation/Integration/Startup – Addition of 1 Technology Component | Per Additional Tech | ||||||||||||||
| Component | 4 | $ 2,415.88 | $ 4,026.46 | $ 4,163.32 | $ 4,308.71 | $ 4,473.72 | $ 4,632.89 | $ - 0 | ||||||||
| 15-1. | Groundwater Recovery System Pilot Test - 8 hours | Per Test | 2 | $ 3,577.58 | $ 5,962.63 | $ 6,140.32 | $ 6,348.35 | $ 6,565.99 | $ 6,784.11 | $ - 0 | ||||||
| 15-2. | Groundwater Recovery System Pilot Test - Additional Time | Per 2 Hrs | 2 | $ 456.24 | $ 760.40 | $ 785.01 | $ 811.93 | $ 841.68 | $ 870.50 | $ - 0 | ||||||
| 15-3. | Air Sparging or Biosparging Pilot Test - 8 hours | Per Test | 3 | $ 3,220.56 | $ 5,367.60 | $ 5,542.76 | $ 5,737.94 | $ 5,950.19 | $ 6,159.99 | $ - 0 | ||||||
| 15-4. | Air Sparging or Biosparging Pilot Test - Additional Time | Per 2 Hrs | 2 | $ 446.42 | $ 744.03 | $ 769.17 | $ 796.93 | $ 827.21 | $ 857.02 | $ - 0 | ||||||
| 15-5. | Vapor Extraction Pilot Test - 8 hours | Per Test | 3 | $ 3,198.57 | $ 5,330.96 | $ 5,504.93 | $ 5,697.94 | $ 5,908.61 | $ 6,116.58 | $ - 0 | ||||||
| 15-6. | Vapor Extraction Pilot Test - Additional Time | Per 2 Hrs | 2 | $ 443.21 | $ 738.69 | $ 763.57 | $ 790.85 | $ 820.52 | $ 849.77 | $ - 0 | ||||||
| 15-7. | Vapor Extraction/Aquifer Pumping Test - 8 hours | Per Test | 3 | $ 3,480.56 | $ 5,800.93 | $ 5,993.42 | $ 6,205.95 | $ 6,432.71 | $ 6,661.21 | $ - 0 | ||||||
| 15-8. | Vapor Extraction/Aquifer Pumping Test - Additional Time | Per 2 Hrs | 2 | $ 469.91 | $ 783.18 | $ 808.97 | $ 837.15 | $ 867.87 | $ 898.08 | $ - 0 | ||||||
| 15-9. | Air Sparging/Vapor Extraction Pilot Test - 8 hours | Per Test | 4 | $ 3,793.97 | $ 6,323.28 | $ 6,530.38 | $ 6,764.48 | $ 7,011.80 | $ 7,261.50 | $ - 0 | ||||||
| 15-10. | Air Sparging/Vapor Extraction Pilot Test - Additional Time | Per 2 Hrs | 3 | $ 476.11 | $ 793.52 | $ 820.87 | $ 850.81 | $ 883.18 | $ 915.33 | $ - 0 | ||||||
| 15-11. | Multi-Phase Pilot Test - 8 hours | Per Test | 3 | $ 3,970.20 | $ 6,617.01 | $ 6,827.99 | $ 7,063.22 | $ 7,317.58 | $ 7,571.44 | $ - 0 | ||||||
| 15-12. | Multi-Phase Pilot Test - Additional Time | Per 2 Hrs | 2 | $ 481.14 | $ 801.91 | $ 828.27 | $ 857.10 | $ 888.70 | $ 919.62 | $ - 0 | ||||||
| 15-13. | Air Sparging/Multiphase Extraction Pilot Test - 8 hours | Per Test | 3 | $ 4,167.00 | $ 6,945.00 | $ 7,164.51 | $ 7,410.97 | $ 7,676.31 | $ 7,942.19 | $ - 0 | ||||||
| 15-14. | Air Sparging/Multiphase Extraction Pilot Test - Additional Time | Per 2 Hours | 2 | $ 520.32 | $ 867.19 | $ 895.52 | $ 926.52 | $ 960.30 | $ 993.56 | $ - 0 | ||||||
| 15-15. | In-Situ Chemical Oxidation (including Ozone) Pilot Test - 8 hours | Per Test | 3 | $ 4,122.30 | $ 6,870.51 | $ 7,091.17 | $ 7,340.08 | $ 7,597.93 | $ 7,865.68 | $ - 0 | ||||||
| 15-16. | In-Situ Chemical Oxidation (including Ozone) Pilot Test - Additional Time | Per 2 Hrs | 2 | $ 499.88 | $ 833.13 | $ 860.47 | $ 891.29 | $ 923.13 | $ 956.56 | $ - 0 | ||||||
| 15-17. | Groundwater Treatment System Package - Medium | Per Day | 3 | $ 3,322.54 | $ 5,537.56 | $ 5,722.60 | $ 5,927.83 | $ 6,148.56 | $ 6,368.42 | $ - 0 | ||||||
| 15-18. | Groundwater Treatment System Package - Medium | Per Week | 3 | $ 7,564.74 | $ 12,607.91 | $ 13,021.74 | $ 13,489.71 | $ 13,976.90 | $ 14,481.43 | $ - 0 | ||||||
| 15-19. | Air Sparge System Package - Medium | Per Day | 3 | $ 2,354.36 | $ 3,923.93 | $ 4,052.27 | $ 4,194.59 | $ 4,344.39 | $ 4,498.20 | $ - 0 | ||||||
| 15-20. | Air Sparge System Package - Medium | Per Week | 3 | $ 5,433.05 | $ 9,055.08 | $ 9,351.09 | $ 9,686.89 | $ 10,039.06 | $ 10,404.13 | $ - 0 | ||||||
| 15-21. | AS/SVE System Package - Medium | Per Day | 3 | $ 2,980.82 | $ 4,968.03 | $ 5,132.47 | $ 5,313.75 | $ 5,503.53 | $ 5,704.10 | $ - 0 | ||||||
| 15-22. | AS/SVE System Package - Medium | Per Week | 4 | $ 6,817.16 | $ 11,361.94 | $ 11,742.34 | $ 12,163.41 | $ 12,609.36 | $ 13,065.07 | $ - 0 | ||||||
| 15-23. | MPE System Package - Medium | Per Day | 3 | $ 3,051.45 | $ 5,085.75 | $ 5,251.88 | $ 5,435.78 | $ 5,629.04 | $ 5,827.54 | $ - 0 | ||||||
| 15-24. | MPE System Package - Medium | Per Week | 3 | $ 6,451.20 | $ 10,752.01 | $ 11,107.95 | $ 11,504.19 | $ 11,921.61 | $ 12,351.94 | $ - 0 | ||||||
| 15-25. | AS/MPE System Package - Medium | Per Day | 2 | $ 3,674.70 | $ 6,124.50 | $ 6,329.22 | $ 6,556.29 | $ 6,796.37 | $ 7,043.81 | $ - 0 | ||||||
| 15-26. | AS/MPE System Package - Medium | Per Week | 2 | $ 7,510.21 | $ 12,517.01 | $ 12,929.61 | $ 13,390.14 | $ 13,878.06 | $ 14,380.68 | $ - 0 | ||||||
| 15-27. | SVE System Package - Medium | Per Day | 2 | $ 2,786.98 | $ 4,644.97 | $ 4,799.91 | $ 4,970.17 | $ 5,150.00 | $ 5,334.48 | $ - 0 | ||||||
| 15-28. | SVE System Package - Medium | Per Week | 2 | $ 5,857.12 | $ 9,761.87 | $ 10,094.96 | $ 10,461.88 | $ 10,850.61 | $ 11,252.07 | $ - 0 | ||||||
| 15-29. | In-Situ Chemical Oxidation (including Ozone) Package – Medium | Per Day | 2 | $ 3,638.60 | $ 6,064.33 | $ 6,265.36 | $ 6,488.57 | $ 6,722.48 | $ 6,962.13 | $ - 0 | ||||||
| 15-30. | In-Situ Chemical Oxidation (including Ozone) Package – Medium | Per Week | 2 | $ 6,510.95 | $ 10,851.58 | $ 11,222.65 | $ 11,632.24 | $ 12,063.68 | $ 12,506.52 | $ - 0 | ||||||
| 16-1. | System O&M Package (excludes system) - Small | Per Month | 3 | $ 2,289.88 | $ 3,816.46 | $ 3,937.34 | $ 4,072.69 | $ 4,221.04 | $ 4,367.22 | $ - 0 | ||||||
| 16-2. | System O&M Package (excludes system) - Medium | Per Month | 4 | $ 2,682.81 | $ 4,471.35 | $ 4,610.52 | $ 4,766.24 | $ 4,941.57 | $ 5,109.62 | $ - 0 | ||||||
| 16-3. | System O&M Package (excludes system) - Large | Per Month | 3 | $ 3,079.87 | $ 5,133.12 | $ 5,291.74 | $ 5,469.58 | $ 5,670.77 | $ 5,862.92 | $ - 0 | ||||||
| 16-4. | System O&M Package (excludes system) - Extra Large | Per Month | 2 | $ 3,437.79 | $ 5,729.64 | $ 5,904.76 | $ 6,101.57 | $ 6,325.19 | $ 6,538.16 | $ - 0 | ||||||
| 16-5. | Supplemental System O&M Package - Add Thermox or Catox Treatment | Per Month | 3 | $ 474.03 | $ 790.04 | $ 811.28 | $ 838.07 | $ 868.04 | $ 896.69 | $ - 0 | ||||||
| 17-1. | Medium Holding Tank - 2,000 to 6,000 gal. capacity - Short Term ≤ 6 mos. | Per Month | 3 | $ 451.29 | $ 752.14 | $ 774.68 | $ 799.99 | $ 828.99 | $ 855.97 | $ - 0 | ||||||
| 17-2. | Medium Holding Tank - 2,000 to 6,000 gal. capacity - Long Term > 6 mos. | Per Month | 2 | $ 369.47 | $ 615.78 | $ 634.39 | $ 655.09 | $ 678.22 | $ 700.42 | $ - 0 | ||||||
| 17-3. | Large Holding Tank > 6,000 to 10,000 gal. capacity - Short Term ≤ 6 mos. | Per Month | 2 | $ 991.20 | $ 1,652.00 | $ 1,702.89 | $ 1,760.58 | $ 1,822.09 | $ 1,885.79 | $ - 0 | ||||||
| 17-4. | Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos. | Per Month | 2 | $ 793.36 | $ 1,322.27 | $ 1,362.01 | $ 1,406.21 | $ 1,454.94 | $ 1,502.09 | $ - 0 | ||||||
| 17-5. | Groundwater Treatment System - Stand Alone Small - Short Term ≤ 6 mos. | Per Month | 3 | $ 4,648.77 | $ 7,747.94 | $ 7,991.37 | $ 8,273.37 | $ 8,572.34 | $ 8,878.29 | $ - 0 | ||||||
| 17-6. | Groundwater Treatment System - Stand Alone Small - Long Term > 6 mos. | Per Month | 3 | $ 3,761.73 | $ 6,269.55 | $ 6,470.29 | $ 6,699.83 | $ 6,942.93 | $ 7,189.77 | $ - 0 | ||||||
| 17-7. | Groundwater Treatment System - Stand Alone Medium - Short Term ≤ 6 mos. | Per Month | 3 | $ 6,894.12 | $ 11,490.21 | $ 11,855.87 | $ 12,271.47 | $ 12,714.26 | $ 13,156.26 | $ - 0 | ||||||
| 17-8. | Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos. | Per Month | 3 | $ 5,258.40 | $ 8,764.00 | $ 9,042.22 | $ 9,358.13 | $ 9,694.38 | $ 10,036.15 | $ - 0 | ||||||
| 17-9. | Groundwater Treatment System - Stand Alone Large - Short Term ≤ 6 mos. | Per Month | 3 | $ 9,004.57 | $ 15,007.62 | $ 15,497.91 | $ 16,044.28 | $ 16,626.78 | $ 17,220.20 | $ - 0 | ||||||
| 17-10. | Groundwater Treatment System - Stand Alone Large - Long Term > 6 mos. | Per Month | 3 | $ 7,314.90 | $ 12,191.51 | $ 12,574.99 | $ 13,019.64 | $ 13,492.75 | $ 13,972.17 | $ - 0 | ||||||
| 17-11. | Air Sparge System - Small - Short Term ≤ 6 mos. | Per Month | 3 | $ 2,412.85 | $ 4,021.42 | $ 4,150.12 | $ 4,293.70 | $ 4,446.25 | $ 4,602.68 | $ - 0 | ||||||
| 17-12. | Air Sparge System - Small - Long Term > 6 mos. | Per Month | 3 | $ 2,016.59 | $ 3,360.98 | $ 3,476.19 | $ 3,603.53 | $ 3,739.19 | $ 3,877.86 | $ - 0 | ||||||
| 17-13. | Air Sparge System - Medium - Short Term ≤ 6 mos. | Per Month | 3 | $ 2,710.48 | $ 4,517.47 | $ 4,663.60 | $ 4,825.31 | $ 4,997.37 | $ 5,173.48 | $ - 0 | ||||||
| 17-14. | Air Sparge System - Medium - Long Term > 6 mos. | Per Month | 3 | $ 2,626.76 | $ 4,377.93 | $ 4,510.99 | $ 4,657.65 | $ 4,813.82 | $ 4,973.07 | $ - 0 | ||||||
| 17-15. | Air Sparge System - Large - Short Term ≤ 6 mos. | Per Month | 3 | $ 3,675.54 | $ 6,125.89 | $ 6,324.15 | $ 6,546.42 | $ 6,780.34 | $ 7,022.17 | $ - 0 | ||||||
| 17-16. | Air Sparge System - Large - Long Term > 6 mos. | Per Month | 3 | $ 3,071.07 | $ 5,118.45 | $ 5,293.58 | $ 5,488.01 | $ 5,696.03 | $ 5,907.74 | $ - 0 | ||||||
| 17-17. | AS/SVE System - Small - Short Term ≤ 6 mos. | Per Month | 4 | $ 4,041.50 | $ 6,735.84 | $ 6,957.77 | $ 7,205.77 | $ 7,470.61 | $ 7,741.46 | $ - 0 | ||||||
| 17-18. | AS/SVE System - Small - Long Term > 6 mos. | Per Month | 4 | $ 3,318.22 | $ 5,530.37 | $ 5,719.69 | $ 5,931.05 | $ 6,156.71 | $ 6,386.44 | $ - 0 | ||||||
| 17-19. | AS/SVE System - Medium - Short Term ≤ 6 mos. | Per Month | 4 | $ 4,559.15 | $ 7,598.58 | $ 7,849.49 | $ 8,129.15 | $ 8,428.33 | $ 8,733.36 | $ - 0 | ||||||
| 17-20. | AS/SVE System - Medium - Long Term > 6 mos. | Per Month | 4 | $ 3,917.87 | $ 6,529.79 | $ 6,748.01 | $ 6,996.68 | $ 7,262.30 | $ 7,531.82 | $ - 0 | ||||||
| 17-21. | AS/SVE System - Large - Short Term ≤ 6 mos. | Per Month | 3 | $ 5,501.73 | $ 9,169.55 | $ 9,471.59 | $ 9,812.64 | $ 10,177.36 | $ 10,550.41 | $ - 0 | ||||||
| 17-22. | AS/SVE System - Large - Long Term > 6 mos. | Per Month | 4 | $ 4,837.73 | $ 8,062.89 | $ 8,339.12 | $ 8,648.07 | $ 8,978.03 | $ 9,314.00 | $ - 0 | ||||||
| 17-23. | MPE System - Small - Short Term ≤ 6 mos. | Per Month | 3 | $ 3,376.74 | $ 5,627.90 | $ 5,801.94 | $ 5,996.22 | $ 6,205.56 | $ 6,417.70 | $ - 0 | ||||||
| 17-24. | MPE System - Small - Long Term > 6 mos. | Per Month | 3 | $ 2,705.73 | $ 4,509.56 | $ 4,658.10 | $ 4,821.48 | $ 4,997.73 | $ 5,176.39 | $ - 0 | ||||||
| 17-25. | MPE System - Medium - Short Term ≤ 6 mos. | Per Month | 3 | $ 4,155.37 | $ 6,925.61 | $ 7,142.95 | $ 7,384.40 | $ 7,644.50 | $ 7,907.92 | $ - 0 | ||||||
| 17-26. | MPE System - Medium - Long Term > 6 mos. | Per Month | 4 | $ 3,522.56 | $ 5,870.93 | $ 6,064.67 | $ 6,279.74 | $ 6,511.76 | $ 6,746.73 | $ - 0 | ||||||
| 17-27. | MPE System - Large - Short Term ≤ 6 mos. | Per Month | 3 | $ 5,206.54 | $ 8,677.56 | $ 8,950.99 | $ 9,254.35 | $ 9,583.34 | $ 9,915.09 | $ - 0 | ||||||
| 17-28. | MPE System - Large - Long Term > 6 mos. | Per Month | 3 | $ 4,462.34 | $ 7,437.24 | $ 7,680.08 | $ 7,951.18 | $ 8,244.30 | $ 8,541.06 | $ - 0 | ||||||
| 17-29. | Groundwater Treatment - Add On - Small - Short Term ≤ 6 mos. | Per Month | 3 | $ 3,055.51 | $ 5,092.51 | $ 5,273.22 | $ 5,474.03 | $ 5,689.41 | $ 5,912.57 | $ - 0 | ||||||
| 17-30. | Groundwater Treatment - Add On - Medium - Short Term ≤ 6 mos. | Per Month | 3 | $ 2,954.63 | $ 4,924.38 | $ 5,089.94 | $ 5,274.05 | $ 5,471.28 | $ 5,673.95 | $ - 0 | ||||||
| 17-31. | Groundwater Treatment - Add On - Large - Short Term ≤ 6 mos. | Per Month | 3 | $ 4,560.95 | $ 7,601.58 | $ 7,864.25 | $ 8,152.68 | $ 8,461.52 | $ 8,779.27 | $ - 0 | ||||||
| 17-32. | Groundwater Treatment - Add On - Small - Long Term > 6 mos. | Per Month | 3 | $ 3,058.55 | $ 5,097.59 | $ 5,273.91 | $ 5,471.91 | $ 5,683.69 | $ 5,902.30 | $ - 0 | ||||||
| 17-33. | Groundwater Treatment - Add On - Medium - Long Term > 6 mos. | Per Month | 3 | $ 3,844.16 | $ 6,406.94 | $ 6,623.28 | $ 6,866.74 | $ 7,124.08 | $ 7,389.93 | $ - 0 | ||||||
| 17-34. | Groundwater Treatment - Add On - Large - Long Term > 6 mos. | Per Month | 3 | $ 4,678.19 | $ 7,796.98 | $ 8,062.73 | $ 8,365.08 | $ 8,682.01 | $ 9,012.38 | $ - 0 | ||||||
| 17-35. | Carbon Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos. | Per Month | 4 | $ 634.11 | $ 1,056.85 | $ 1,095.45 | $ 1,138.10 | $ 1,182.76 | $ 1,228.88 | $ - 0 | ||||||
| 17-36. | Carbon Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos. | Per Month | 4 | $ 918.35 | $ 1,530.58 | $ 1,586.11 | $ 1,647.25 | $ 1,711.38 | $ 1,777.14 | $ - 0 | ||||||
| 17-37. | Carbon Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos. | Per Month | 4 | $ 1,344.56 | $ 2,240.94 | $ 2,322.17 | $ 2,411.91 | $ 2,506.18 | $ 2,602.91 | $ - 0 | ||||||
| 17-38. | Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos. | Per Month | 3 | $ 325.54 | $ 542.57 | $ 562.49 | $ 584.41 | $ 607.40 | $ 631.15 | $ - 0 | ||||||
| 17-39. | Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos. | Per Month | 4 | $ 476.12 | $ 793.53 | $ 822.31 | $ 854.16 | $ 887.41 | $ 921.82 | $ - 0 | ||||||
| 17-40. | Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos. | Per Month | 3 | $ 708.75 | $ 1,181.24 | $ 1,223.27 | $ 1,270.25 | $ 1,319.45 | $ 1,369.89 | $ - 0 | ||||||
| 17-41. | Thermox/Catox Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos. | Per Month | 3 | $ 2,750.67 | $ 4,584.45 | $ 4,737.61 | $ 4,908.61 | $ 5,091.22 | $ 5,279.29 | $ - 0 | ||||||
| 17-42. | Thermox/Catox Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos. | Per Month | 3 | $ 3,309.47 | $ 5,515.78 | $ 5,701.91 | $ 5,909.47 | $ 6,129.92 | $ 6,357.90 | $ - 0 | ||||||
| 17-43. | Thermox/Catox Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos. | Per Month | 3 | $ 4,597.39 | $ 7,662.32 | $ 7,919.94 | $ 8,207.24 | $ 8,512.66 | $ 8,828.45 | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .