About this file

This document is a solicitation for Petroleum Contamination Site Response Action Services issued by the Florida Department of Environmental Protection (DEP). The DEP is requesting proposals from qualified vendors to provide a variety of services related to petroleum contamination site response actions across the state of Florida, including Leon County and the City of Tallahassee. The services requested include activities such as file reviews, site assessments, monitoring well installation and sampling, soil and water analysis, remediation system installation and operation, and reporting. The initial contract term is for 5 years, with the possibility of 5 additional renewal years.

The solicitation provides detailed pricing information and pay item descriptions for the various services requested. Vendors must submit pricing for all pay items in accordance with the provided instructions. The pricing will be used to evaluate and score proposals. The solicitation does not mention any specific set-asides or incumbent contractors. Funding for the services will come from state sources, but the specific budget amounts are not provided.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions State of Florida Department of Environmental Protection Instructions for Completion of Form D - Price Sheet Solicitation # 2024019

The Price Sheet consists of three tabs.

The first tab of the Price Sheet is the Instructions Tab - review this tab closely and follow the guidance on populating other tabs. Nothing should be entered on the Instructions Tab.

Respondent will complete data entry in accordance with the instructions below on both the Initial Rates Statewide Tab and the Renewal Rates Statewide Tab in order to be considered Responsive.

Enter Vendor Name in cell B1 on both the Initial Rates Statewide Tab and the Renewal Rates Statewide Tab. Enter a rate for each pay item for each year on both the Initial Rates Statewide Tab and the Renewal Rates Statewide Tab. The rates provided are for statewide work. The Price Sheet must contain complete responses for all items. Rates submitted are ceiling rates that may be quoted at a lower rate per task assignment or purchase order. To be considered for the Award, Vendor must be able to provide all Services across the state for the rates submitted.

If the entered rate is Zero (0) or left blank, then the Price Sheet will be deemed Non-Responsive. The only exception is that a rate of Zero (0) is allowed for Pay Item 8-72 where the lower limit is listed as $0.00.

A lower limit for each line item is shown in column "E" titled Lower Limit All Years. This lower limit is applicable to all years. If a rate is entered below this amount for the corresponding line item in any year, then the Price Sheet will be deemed to be Non-Responsive.

An upper limit is provided for each line item for each year. The upper limit for the line item for each year is shown in the cell immediately left of the cell for which the rate is being entered and is titled Upper Limit Year X, where X = the Year of the contract term. If a rate is entered above the amount shown in the cell immediately to the left of the cell where the rate is being entered, then the Price Sheet will be deemed to be Non-Responsive.

Enter a rate to exactly two (2) decimal places for each line item for each year and do not adjust the format of the Price Sheet in any way. If the rate entered is more than or less than two decimal places, or the formatting of the Price Sheet is altered in any way, then the Price Sheet will be deemed to be Non-Responsive. Manual entry of rates is recommended as scripts or pasting data may change formatting which would cause the Price Sheet to be deemed Non-Responsive.

The pricing for Professional Engineer and Professional Geologist identified as Pay Items 20-1 through 20-36 in the Form D Price Sheet will not be used for an award but will be considered during the negotiation.

Reimbursable items and the 6% Handling Fee are not included in the Price Sheet as rates are not required for these items.

The Price Sheet (both the Initial Rates Statewide Tab and the Renewal Rates Statewide Tab) must be included in both the electronic response (original Excel format) and the hard copy response (the print area is already pre-set for this worksheet). Failure to include the fully completed Initial Rates Statewide Tab and the Renewal Rates Statewide tab fully completed in accordance with guidance above in both the electronic and hard copy format will result in the Price Sheet being deemed Non-Responsive.

Form D - Price Sheet ITN 2024019 Petroleum Contamination Site Response Action Services

Initial Rates Statewide

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Price Sheet

Form D

Vendor Name:FORM D - Initial Contract Term Pay Item Price for Statewide Work (5 years)
Price Sheet for Initial Term (5 Years)UNITWeightLower
LimitUpper
LimitEnter Rates between Upper & Lower LimitUpper
LimitEnter Rates between Upper & Lower LimitUpper
LimitEnter Rates between Upper & Lower LimitUpper
LimitEnter Rates between Upper & Lower LimitUpper
LimitEnter Rates between Upper & Lower LimitTOTAL
PAY ITEMPAY ITEM DESCRIPTIONAll Years1st Year1st Year2nd Year2nd Year3rd Year3rd Year4th Year4th Year5th Year5th Year
1-1.File ReviewPer Review3$ 523.62$ 872.70$ 900.30$ 930.49$ 965.58$ 999.26$ - 0
1-2.Site Health & Safety PlanPer Site3$ 290.90$ 484.83$ 500.00$ 516.88$ 536.14$ 554.40$ - 0
1-2.a.Updated Site Health & Safety Plan for Continued Work (no cost to DEP)Per Site0$ - 0
1-3.Notice of Discovery of Contamination Package (initial or TPOC)Per Package3$ 275.74$ 459.57$ 474.10$ 490.29$ 509.14$ 526.33$ - 0
1-5.Obtaining Off-Site Property Access Agreement, ROW Access Agreement or PermitPer Agreement3$ 383.22$ 638.71$ 658.42$ 680.56$ 705.71$ 729.61$ - 0
1-8Map and Table GenerationPer Site3$ 734.14$ 1,223.56$ 1,261.24$ 1,303.35$ 1,354.10$ 1,399.06$ - 0
2-1.Site Reconnaissance/Field Measurement VisitPer Visit3$ 545.74$ 909.57$ 939.19$ 973.66$ 1,011.06$ 1,046.36$ - 0
2-2.Receptor Survey and Exposure Pathway IdentificationPer Survey2$ 517.40$ 862.34$ 891.32$ 923.07$ 958.14$ 992.17$ - 0
2-4.Contractor Oversight for Non-Price Schedule ActivitiesPer Day3$ 758.32$ 1,263.87$ 1,302.56$ 1,349.30$ 1,398.58$ 1,446.09$ - 0
3-1.Light Duty Vehicle (car or 1/2 ton truck) MobilizationPer Round Trip4$ 666.69$ 1,111.15$ 1,150.17$ 1,193.40$ 1,242.12$ 1,289.43$ - 0
3-2.Heavy Duty/Stake Bed Truck (3/4 ton +) MobilizationPer Round Trip3$ 792.63$ 1,321.04$ 1,369.53$ 1,422.89$ 1,481.62$ 1,539.81$ - 0
3-3.Work Trailer MobilizationPer Round Trip3$ 336.63$ 561.06$ 579.69$ 602.46$ 627.56$ 652.52$ - 0
3-4.DPT Rig and Support Vehicles MobilizationPer Round Trip4$ 1,107.77$ 1,846.28$ 1,923.77$ 2,013.33$ 2,104.04$ 2,193.74$ - 0
3-5.Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic)Per Round Trip4$ 1,632.76$ 2,721.27$ 2,833.70$ 2,956.19$ 3,086.06$ 3,220.88$ - 0
3-6.Excavator MobilizationPer Round Trip3$ 833.93$ 1,389.88$ 1,445.65$ 1,506.51$ 1,570.04$ 1,634.69$ - 0
3-7.LDA Rig and Support Vehicles MobilizationPer Round Trip3$ 8,519.99$ 14,199.98$ 14,710.14$ 15,288.56$ 15,895.49$ 16,518.15$ - 0
3-8.Loader/Backhoe MobilizationPer Round Trip3$ 680.67$ 1,134.45$ 1,178.51$ 1,226.16$ 1,276.56$ 1,327.69$ - 0
3-9.Mini Excavator/Loader MobilizationPer Round Trip3$ 548.84$ 914.73$ 950.00$ 988.32$ 1,028.88$ 1,069.89$ - 0
3-10.Drum Compactor MobilizationPer Round Trip2$ 414.47$ 690.79$ 715.31$ 742.56$ 771.57$ 800.94$ - 0
4-1.a.Split Spoon Sampling – 2 foot (during boring) < 50 feetPer Spoon4$ 34.21$ 57.01$ 59.26$ 61.71$ 64.32$ 66.99$ - 0
4-1.b.Split Spoon Sampling – 2 foot (during boring) 50 to 100 feetPer Spoon3$ 39.44$ 65.73$ 68.00$ 70.79$ 73.77$ 76.81$ - 0
4-1.c.Split Spoon Sampling – 2 foot (during boring) > 100 feetPer Spoon1$ 42.39$ 70.65$ 73.11$ 76.11$ 79.31$ 82.56$ - 0
4-1.d.Sonic Core Sampling - 5 or 10 foot (during boring)Per Core4$ 135.68$ 226.13$ 235.05$ 244.79$ 255.27$ 265.99$ - 0
4-2.Hand Auger Boring ≤ 10 foot total depthPer Boring4$ 173.01$ 288.35$ 299.64$ 311.84$ 325.16$ 338.48$ - 0
4-3.Direct Push Technology (DPT) Rig and EquipmentFull Day4$ 2,670.03$ 4,450.06$ 4,626.12$ 4,818.46$ 5,022.01$ 5,231.87$ - 0
4-4.DPT Membrane Interface Probe (MIP) Equipped with PID and ECD
(add-on cost to DPT base rate)Full Day1$ 2,248.73$ 3,747.88$ 3,878.10$ 4,019.51$ 4,168.63$ 4,322.90$ - 0
4-5.HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depthPer Foot3$ 30.25$ 50.41$ 52.41$ 54.57$ 56.88$ 59.18$ - 0
4-6.HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depthPer Foot3$ 32.25$ 53.75$ 55.88$ 58.18$ 60.61$ 63.09$ - 0
4-7.HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depthPer Foot2$ 34.59$ 57.65$ 59.97$ 62.44$ 65.05$ 67.70$ - 0
4-8.HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depthPer Foot3$ 34.93$ 58.22$ 60.52$ 63.10$ 65.65$ 68.33$ - 0
4-9.HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depthPer Foot2$ 37.90$ 63.17$ 65.67$ 68.45$ 71.23$ 74.13$ - 0
4-10.HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depthPer Foot2$ 44.35$ 73.91$ 76.87$ 80.05$ 83.43$ 86.84$ - 0
4-11.HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depthPer Foot2$ 45.12$ 75.20$ 78.20$ 81.42$ 84.83$ 88.32$ - 0
4-12.HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depthPer Foot2$ 48.96$ 81.61$ 84.88$ 88.40$ 92.14$ 95.93$ - 0
4-13.HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depthPer Foot2$ 57.17$ 95.29$ 99.07$ 103.15$ 107.50$ 111.87$ - 0
4-14.Sonic Boring, ≤ 6 inch diameter, < 50 foot total depthPer Foot3$ 34.22$ 57.04$ 59.28$ 61.71$ 64.27$ 66.91$ - 0
4-15.Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depthPer Foot3$ 37.56$ 62.60$ 65.07$ 67.73$ 70.56$ 73.45$ - 0
4-16.Sonic Boring, ≤ 6 inch diameter, > 100 foot total depthPer Foot2$ 42.25$ 70.42$ 73.24$ 76.25$ 79.48$ 82.74$ - 0
4-17.Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depthPer Foot2$ 40.91$ 68.18$ 70.83$ 73.73$ 76.80$ 79.92$ - 0
4-18.Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depthPer Foot2$ 45.82$ 76.37$ 79.39$ 82.63$ 86.09$ 89.62$ - 0
4-19.Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depthPer Foot2$ 50.62$ 84.37$ 87.74$ 91.37$ 95.21$ 99.12$ - 0
4-20.Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depthPer Foot2$ 53.37$ 88.96$ 92.46$ 96.20$ 100.28$ 104.33$ - 0
4-21.Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depthPer Foot2$ 60.08$ 100.13$ 104.11$ 108.33$ 112.87$ 117.47$ - 0
4-22.Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depthPer Foot2$ 69.29$ 115.48$ 120.07$ 124.94$ 130.19$ 135.48$ - 0
5-1.Well Installation - 1 inch diameter (vertical)Per Foot3$ 28.78$ 47.96$ 49.95$ 52.11$ 54.40$ 56.74$ - 0
5-2.a.Well Installation - 2 inch diameter (vertical)Per Foot4$ 35.00$ 58.34$ 60.75$ 63.39$ 66.19$ 69.04$ - 0
5-2.b.Horizontal Well Installation - 2 inch diameter (includes trenching)Per Foot2$ 167.37$ 278.95$ 290.34$ 302.52$ 315.79$ 329.23$ - 0
5-3.a.Well Installation - 4 inch diameter (vertical)Per Foot3$ 44.50$ 74.17$ 77.19$ 80.47$ 83.93$ 87.47$ - 0
5-3.b.Horizontal Well Installation - 4 inch diameter (includes trenching)Per Foot2$ 192.64$ 321.07$ 334.61$ 349.14$ 364.62$ 380.32$ - 0
5-4.Well Installation - 1.5 inch diameter (vertical)Per Foot2$ 31.19$ 51.98$ 53.97$ 56.17$ 58.50$ 60.83$ - 0
5-5.Well Installation - 6 inch diameter (vertical)Per Foot2$ 53.87$ 89.78$ 93.32$ 97.22$ 101.35$ 105.60$ - 0
5-6.Surface Casing - 6 inch diameterPer Foot4$ 50.02$ 83.37$ 86.62$ 90.10$ 93.91$ 97.74$ - 0
5-7.Surface Casing - 8 inch diameterPer Foot3$ 58.79$ 97.99$ 101.74$ 105.85$ 110.25$ 114.78$ - 0
5-8.Surface Casing - 10 inch diameterPer Foot2$ 68.45$ 114.09$ 118.57$ 123.37$ 128.53$ 133.82$ - 0
5-9.Surface Casing - 12 inch diameterPer Foot2$ 81.58$ 135.96$ 141.28$ 146.97$ 153.19$ 159.49$ - 0
5-10.a.Additional Well Screen > 20 feet - 1 inch diameterPer Foot3$ 15.13$ 25.22$ 26.20$ 27.26$ 28.43$ 29.61$ - 0
5-10.b.Additional Well Screen > 20 feet - 2 inch diameterPer Foot3$ 17.42$ 29.04$ 30.15$ 31.37$ 32.68$ 34.04$ - 0
5-10.c.Additional Well Screen > 20 feet - 4 inch diameterPer Foot3$ 22.08$ 36.81$ 38.21$ 39.74$ 41.43$ 43.11$ - 0
5-10.d.Additional Well Screen > 20 feet - 6 inch diameterPer Foot3$ 26.73$ 44.55$ 46.22$ 48.07$ 50.08$ 52.12$ - 0
5-11.Above Grade Well CompletionPer Well3$ 286.67$ 477.78$ 495.86$ 515.38$ 536.04$ 557.11$ - 0
5-12.Installation of Well Vault - 2 x 2 x 2 footPer Vault4$ 1,201.55$ 2,002.59$ 2,082.30$ 2,169.90$ 2,263.11$ 2,360.07$ - 0
5-13.Installation of Well Vault - 4 x 4 x 2 footPer Vault3$ 2,409.48$ 4,015.80$ 4,184.59$ 4,367.37$ 4,557.78$ 4,752.28$ - 0
5-14.Well RedevelopmentPer Well2$ 193.53$ 322.55$ 334.99$ 348.43$ 363.03$ 377.78$ - 0
5-15.Removal and Reinstallation of 8-inch Manhole and Well PadPer Well2$ 314.51$ 524.19$ 544.29$ 566.35$ 589.92$ 613.92$ - 0
5-16.Removal and Reinstallation of 12-inch Manhole and Well PadPer Well1$ 370.80$ 618.00$ 640.91$ 666.10$ 693.60$ 721.32$ - 0
5-17.Prepacked ScreenPer Foot3$ 54.74$ 91.23$ 95.41$ 99.87$ 104.74$ 109.73$ - 0
6-1.Grout and Abandon Well, 1 to 2 inch diameterPer Foot4$ 17.84$ 29.74$ 30.92$ 32.19$ 33.55$ 34.94$ - 0
6-2.Grout and Abandon Well, > 2 to 4 inch diameterPer Foot4$ 21.27$ 35.44$ 36.88$ 38.42$ 40.06$ 41.73$ - 0
6-3.Grout and Abandon Well, > 4 to 6 inch diameterPer Foot3$ 27.13$ 45.21$ 46.97$ 48.86$ 50.92$ 53.01$ - 0
6-4.Grout and Abandon Well, > 6 inch diameterPer Foot2$ 32.33$ 53.89$ 55.96$ 58.19$ 60.64$ 63.10$ - 0
6-5.Removal of Well Vault - 2 x 2 x 2 footPer Vault3$ 692.30$ 1,153.84$ 1,195.76$ 1,241.84$ 1,292.21$ 1,343.33$ - 0
6-6.Removal of Well Vault - 4 x 4 x 2 footPer Vault3$ 924.07$ 1,540.11$ 1,594.79$ 1,654.57$ 1,719.81$ 1,785.49$ - 0
6-7.Removal of Well Pad and ManholePer Well3$ 188.39$ 313.98$ 326.15$ 339.27$ 353.14$ 367.28$ - 0
7-1.Monitoring Well Sampling with Water Level, ≤ 100 foot depthPer Well4$ 192.29$ 320.49$ 330.74$ 342.04$ 354.74$ 367.46$ - 0
7-2.Monitoring Well Sampling with Water Level, > 100 foot depthPer Well2$ 215.78$ 359.64$ 371.04$ 383.65$ 397.72$ 411.89$ - 0
7-3.Domestic Water Well SamplingPer Well2$ 76.72$ 127.87$ 132.03$ 136.54$ 141.48$ 146.55$ - 0
7-4.Other Water SamplingPer Sample2$ 74.90$ 124.83$ 128.93$ 133.41$ 138.31$ 143.37$ - 0
7-5.Free Product Sample CollectionPer Sample2$ 69.25$ 115.41$ 118.92$ 122.86$ 127.29$ 131.78$ - 0
7-6.Soil/Sediment Sample CollectionPer Sample3$ 67.31$ 112.18$ 115.91$ 120.02$ 124.53$ 129.16$ - 0
7-7.Water Level/Free Product GaugingPer Well4$ 23.31$ 38.85$ 40.07$ 41.43$ 42.95$ 44.52$ - 0
7-8.Free Product Gauging and BailingPer Well3$ 88.24$ 147.06$ 151.68$ 156.79$ 162.58$ 168.08$ - 0
7-9.Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or equivalent)Per Sample3$ 44.46$ 74.10$ 76.48$ 79.10$ 81.90$ 84.68$ - 0
7-10.Vapor/Ambient Air Sample Collection - SUMMATM Canister (or equivalent)Per Sample2$ 68.28$ 113.80$ 117.28$ 121.12$ 125.33$ 129.56$ - 0
7-11.Electronic Data Deliverables (EDD)Per Sampling Event3$ 89.94$ 149.90$ 155.66$ 160.88$ 166.52$ 172.03$ - 0
7-12.Survey Latitude/Longitude of Existing Monitor WellsPer Well2$ 38.85$ 64.76$ 66.80$ 69.01$ 71.47$ 73.86$ - 0
7-13.Survey Latitude/Longitude of New Monitor WellsPer Well2$ 39.64$ 66.06$ 68.14$ 70.40$ 73.01$ 75.44$ - 0
7-14.Encore (25 gram)Per Sample3$ 17.39$ 28.98$ 29.88$ 31.09$ 32.11$ 33.29$ - 0
8-1.Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)Per Sample3$ 404.03$ 673.39$ 696.89$ 720.32$ 745.99$ 771.82$ - 0
8-2.Soil, BTEX + MTBE (EPA 8021 or EPA 8260)Per Sample4$ 52.21$ 87.01$ 90.83$ 95.35$ 99.93$ 104.71$ - 0
8-3.Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)Per Sample3$ 50.27$ 83.78$ 86.61$ 90.04$ 93.40$ 96.76$ - 0
8-4.Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)Per Sample3$ 65.72$ 109.53$ 112.81$ 117.14$ 121.03$ 124.92$ - 0
8-5.Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)Per Sample4$ 74.52$ 124.20$ 128.07$ 132.96$ 137.61$ 142.42$ - 0
8-6.Soil, Priority Pollutant Volatile Organics (EPA 8260)Per Sample3$ 69.04$ 115.06$ 118.53$ 123.14$ 127.53$ 131.95$ - 0
8-7.Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])Per Sample2$ 251.27$ 418.78$ 430.67$ 446.64$ 460.89$ 475.23$ - 0
8-8.Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO)Per Sample4$ 57.50$ 95.83$ 99.45$ 103.78$ 108.07$ 112.46$ - 0
8-8.a.Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)Per Sample3$ 209.80$ 349.66$ 360.43$ 374.28$ 386.93$ 399.52$ - 0
8-9.Soil, PCBs [or Aroclors] (EPA 8082)Per Sample2$ 57.11$ 95.19$ 98.60$ 102.72$ 106.73$ 110.77$ - 0
8-10.Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])Per Sample3$ 68.52$ 114.20$ 117.59$ 122.03$ 126.09$ 130.18$ - 0
8-11.Soil, Arsenic (EPA 6010 or EPA 6020)Per Sample3$ 14.31$ 23.85$ 24.79$ 25.95$ 27.08$ 28.27$ - 0
8-12.Soil, Cadmium (EPA 6010 or EPA 6020)Per Sample2$ 12.99$ 21.64$ 22.36$ 23.28$ 24.14$ 25.03$ - 0
8-13.Soil, Chromium (EPA 6010 or EPA 6020)Per Sample2$ 13.52$ 22.53$ 23.24$ 24.21$ 25.07$ 25.96$ - 0
8-14.Soil, Lead (EPA 6010 or EPA 6020)Per Sample3$ 14.08$ 23.46$ 24.24$ 25.23$ 26.13$ 27.09$ - 0
8-15.Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)Per Sample3$ 36.47$ 60.78$ 62.70$ 65.16$ 67.44$ 69.71$ - 0
8-16.Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA 1312)Per Sample3$ 37.46$ 62.43$ 64.54$ 67.12$ 69.62$ 72.13$ - 0
8-17.Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black)Per Sample2$ 51.03$ 85.06$ 87.31$ 90.49$ 93.20$ 95.97$ - 0
8-18.Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or ASTM D2937-10)Per Sample2$ 54.03$ 90.04$ 92.61$ 96.14$ 99.20$ 102.21$ - 0
8-19.Soil, Moisture Content (ASTM D2216-10)Per Sample2$ 17.56$ 29.26$ 30.17$ 31.44$ 32.57$ 33.70$ - 0
8-20.Soil, Texture, (See Gee 7 Bauder [1966])Per Sample1$ 86.15$ 143.58$ 147.36$ 152.89$ 157.31$ 161.52$ - 0
8-21.Soil, Cumene (Isopropyl benzene), 1,2,4-Trimethylbenzene and 1,3,5-Trimethylbenzene (EPA 8260)Per Sample2$ 58.21$ 97.01$ 100.03$ 104.03$ 107.55$ 111.08$ - 0
8-22.Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)Per Sample3$ 217.94$ 363.23$ 374.68$ 389.30$ 402.68$ 416.89$ - 0
8-23.Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)Per Sample3$ 403.61$ 672.68$ 694.57$ 722.54$ 749.41$ 776.43$ - 0
8-24.Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)Per Sample4$ 41.13$ 68.55$ 70.93$ 73.82$ 76.63$ 79.46$ - 0
8-25.Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)Per Sample3$ 48.78$ 81.30$ 84.17$ 87.60$ 90.94$ 94.31$ - 0
8-26.Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)Per Sample3$ 65.92$ 109.87$ 113.33$ 117.87$ 122.21$ 126.65$ - 0
8-27.Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)Per Sample4$ 73.99$ 123.31$ 127.31$ 132.30$ 137.13$ 142.09$ - 0
8-28.Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)Per Sample3$ 40.52$ 67.53$ 69.69$ 72.45$ 75.13$ 77.84$ - 0
8-29.Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)Per Sample2$ 43.33$ 72.22$ 74.54$ 77.54$ 80.47$ 83.44$ - 0
8-30.Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)Per Sample3$ 66.28$ 110.46$ 114.08$ 118.69$ 123.06$ 127.53$ - 0
8-31.Water, Priority Pollutant Volatile Organics (EPA 8260)Per Sample3$ 66.67$ 111.11$ 114.64$ 119.24$ 123.61$ 128.06$ - 0
8-32.Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])Per Sample2$ 239.25$ 398.75$ 410.72$ 426.63$ 440.74$ 454.79$ - 0
8-33.Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)Per Sample2$ 248.54$ 414.24$ 426.71$ 442.99$ 457.76$ 472.64$ - 0
8-34.Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO)Per Sample4$ 53.66$ 89.43$ 92.56$ 96.27$ 99.94$ 103.65$ - 0
8-35.Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)Per Sample1$ 54.44$ 90.73$ 93.47$ 96.95$ 100.12$ 103.33$ - 0
8-36.Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)Per Sample3$ 14.31$ 23.85$ 24.68$ 25.71$ 26.69$ 27.68$ - 0
8-37.Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)Per Sample2$ 13.36$ 22.27$ 23.04$ 24.01$ 24.93$ 25.86$ - 0
8-38.Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)Per Sample2$ 13.34$ 22.24$ 23.01$ 23.98$ 24.90$ 25.83$ - 0
8-39.Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)Per Sample3$ 13.77$ 22.96$ 23.78$ 24.77$ 25.73$ 26.69$ - 0
8-40.Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)Per Sample2$ 28.45$ 47.41$ 48.94$ 50.94$ 52.83$ 54.73$ - 0
8-41.Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)Per Sample2$ 20.35$ 33.91$ 35.05$ 36.43$ 37.75$ 39.09$ - 0
8-42.Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020)Per Sample2$ 12.81$ 21.36$ 22.08$ 23.00$ 23.87$ 24.75$ - 0
8-43.Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)Per Sample2$ 13.55$ 22.58$ 23.37$ 24.35$ 25.28$ 26.22$ - 0
8-44.Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)Per Sample3$ 28.86$ 48.10$ 49.67$ 51.70$ 53.62$ 55.56$ - 0
8-45.Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020)Per Sample2$ 12.88$ 21.46$ 22.20$ 23.13$ 24.01$ 24.90$ - 0
8-46.Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)Per Sample2$ 12.88$ 21.47$ 22.21$ 23.14$ 24.02$ 24.91$ - 0
8-47.Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)Per Sample2$ 12.98$ 21.63$ 22.38$ 23.31$ 24.20$ 25.10$ - 0
8-48.Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)Per Sample2$ 12.92$ 21.53$ 22.28$ 23.21$ 24.10$ 24.99$ - 0
8-49.Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)Per Sample2$ 16.06$ 26.77$ 27.57$ 28.65$ 29.61$ 30.64$ - 0
8-50.Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)Per Sample2$ 17.93$ 29.89$ 30.87$ 32.12$ 33.31$ 34.52$ - 0
8-51.Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E)Per Sample2$ 15.99$ 26.64$ 27.53$ 28.65$ 29.72$ 30.79$ - 0
8-52.Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)Per Sample2$ 18.94$ 31.57$ 32.53$ 33.77$ 34.93$ 36.07$ - 0
8-53.Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)Per Sample2$ 15.80$ 26.33$ 27.28$ 28.43$ 29.52$ 30.63$ - 0
8-54.Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)Per Sample2$ 16.49$ 27.48$ 28.40$ 29.56$ 30.64$ 31.77$ - 0
8-55.Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)Per Sample2$ 15.82$ 26.36$ 27.31$ 28.46$ 29.56$ 30.67$ - 0
8-56.Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)Per Sample2$ 23.07$ 38.44$ 39.64$ 41.15$ 42.59$ 44.01$ - 0
8-57.Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE or SM 4500-PF)Per Sample2$ 15.72$ 26.20$ 27.14$ 28.27$ 29.36$ 30.44$ - 0
8-58.Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)Per Sample2$ 14.93$ 24.88$ 25.67$ 26.72$ 27.69$ 28.66$ - 0
8-59.Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)Per Sample2$ 15.20$ 25.33$ 26.20$ 27.29$ 28.30$ 29.35$ - 0
8-60.Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C)Per Sample2$ 15.92$ 26.54$ 27.49$ 28.65$ 29.75$ 30.87$ - 0
8-61.Water, Heterotrophic Plate Count (SM 9215 B or SIMPLATE)Per Sample2$ 40.88$ 68.13$ 70.61$ 73.55$ 76.38$ 79.25$ - 0
8-62.Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0)Per Sample2$ 832.67$ 1,387.79$ 1,437.26$ 1,490.84$ 1,543.23$ 1,597.21$ - 0
8-63.Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0)Per Sample2$ 853.58$ 1,422.63$ 1,473.99$ 1,528.32$ 1,581.15$ 1,635.37$ - 0
8-64.Water, BTEX/MTBE + Naphthalene (EPA 8260)Per Sample2$ 56.54$ 94.24$ 97.16$ 101.05$ 104.47$ 107.88$ - 0
8-65.Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)Per Sample1$ 48.21$ 80.36$ 83.12$ 86.46$ 89.74$ 93.04$ - 0
8-66.Water, Methane (EPA SOP RSK-175)Per Sample3$ 82.76$ 137.93$ 142.08$ 147.74$ 152.55$ 157.40$ - 0
8-67.Water, Cumene (Isopropyl benzene), 1,2,4-Trimethylbenzene and 1,3,5-Trimethylbenzene (EPA 8260)Per Sample2$ 58.02$ 96.70$ 99.68$ 103.65$ 107.14$ 110.61$ - 0
8-68.Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)Per Sample4$ 80.74$ 134.56$ 139.18$ 144.89$ 150.34$ 155.90$ - 0
8-69.Air, Volatile Organic Aromatics (EPA Method TO-15)Per Sample2$ 230.26$ 383.77$ 394.83$ 410.38$ 423.58$ 436.82$ - 0
8-70.Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)Per Sample2$ 344.43$ 574.05$ 592.11$ 614.52$ 636.47$ 656.48$ - 0
8-71.Air, Volatile Organic Compounds (EPA Method TO-17)Per Sample2$ 250.51$ 417.52$ 431.40$ 447.84$ 464.96$ 480.80$ - 0
8-72.Additional Laboratory charge for 7 Day Turnaround. This is an additional charge (percentage) above the normal rate for expedited turnaround by the laboratory for an analysis. For Example: entering 0.05 is a 5% surcharge for 7 Day Turnaround above the rate for normal turnaround.% Surcharge3$ 0.00$ 0.13$ 0.13$ 0.13$ 0.13$ 0.13$ - 0
8-73.Additional Laboratory charge for 3 Day Turnaround. This is an additional charge (percentage) above the normal rate for expedited turnaround by the laboratory for an analysis. For Example: entering 0.50 is a 50% surcharge for 3 Day Turnaround above the rate for normal turnaround.% Surcharge2$ 0.38$ 0.63$ 0.63$ 0.63$ 0.63$ 0.63$ - 0
8-74.Additional Laboratory charge for 1 Day Turnaround. This is an additional charge (percentage) above the normal rate for expedited turnaround by the laboratory for an analysis. For Example: entering 1.00 is a 100% surcharge for 1 Day Turnaround above the rate for normal turnaround.% Surcharge2$ 0.75$ 1.25$ 1.25$ 1.25$ 1.25$ 1.25$ - 0
9-1.a.Sheet Piling Installation for ≤ 20 feet deep ExcavationPer Sq. Foot2$ 29.03$ 48.38$ 50.09$ 52.00$ 54.07$ 56.15$ - 0
9-1.b.Sheet Piling Rental for ≤ 20 feet deep ExcavationPer Sq. Foot/Day2$ 4.33$ 7.21$ 7.47$ 7.73$ 8.03$ 8.33$ - 0
9-1.c.Sheet Piling Rental for ≤ 20 feet deep ExcavationPer Sq. Foot/Week2$ 8.51$ 14.19$ 14.65$ 15.20$ 15.78$ 16.37$ - 0
9-1.d.Sheet Piling Rental for ≤ 20 feet deep ExcavationPer Sq. Foot/Month2$ 14.25$ 23.76$ 24.55$ 25.43$ 26.41$ 27.38$ - 0
9-2.a.Sheet Piling Installation for > 20 feet deep ExcavationPer Sq. Foot3$ 38.01$ 63.35$ 65.60$ 68.14$ 70.86$ 73.66$ - 0
9-2.b.Sheet Piling Rental for > 20 feet deep ExcavationPer Sq. Foot/Day2$ 5.58$ 9.31$ 9.62$ 9.96$ 10.34$ 10.73$ - 0
9-2.c.Sheet Piling Rental for > 20 feet deep ExcavationPer Sq. Foot/Week2$ 10.66$ 17.76$ 18.35$ 19.05$ 19.78$ 20.54$ - 0
9-2.d.Sheet Piling Rental for > 20 feet deep ExcavationPer Sq. Foot/Month2$ 16.04$ 26.73$ 27.65$ 28.67$ 29.80$ 30.92$ - 0
9-3.Conventional Soil Excavation and Loading ≤ 300 cubic yardsPer Cubic Yard3$ 42.24$ 70.40$ 72.97$ 75.90$ 79.04$ 82.20$ - 0
9-4.Conventional Soil Excavation and Loading > 300 cubic yardsPer Cubic Yard4$ 35.71$ 59.52$ 61.68$ 64.17$ 66.81$ 69.49$ - 0
9-5.LDA Excavation and Loading Without Casing ≤ 300 cubic yardsPer Cubic Yard3$ 115.46$ 192.43$ 198.99$ 206.43$ 214.26$ 222.55$ - 0
9-6.LDA Excavation and Loading Without Casing > 300 cubic yardsPer Cubic Yard4$ 99.28$ 165.47$ 171.01$ 177.38$ 184.21$ 191.16$ - 0
9-7.aLDA Excavation and Loading With Surface Casing ≤ 300 cubic yardsPer Cubic Yard2$ 158.12$ 263.53$ 272.55$ 282.77$ 293.68$ 304.77$ - 0
9-7.b.LDA Excavation and Loading With Driven Casing ≤ 300 cubic yardsPer Cubic Yard2$ 219.32$ 365.53$ 377.95$ 391.82$ 406.86$ 421.99$ - 0
9-8.a.LDA Excavation and Loading With Surface Casing > 300 cubic yardsPer Cubic Yard3$ 138.63$ 231.05$ 238.93$ 247.83$ 257.39$ 267.05$ - 0
9-8.b.LDA Excavation and Loading With Driven Casing > 300 cubic yardsPer Cubic Yard3$ 189.44$ 315.74$ 326.47$ 338.41$ 351.33$ 364.33$ - 0
9-9Flowable Fill Concrete and InstallationPer Cubic Yard4$ 134.53$ 224.22$ 232.13$ 240.84$ 250.41$ 259.94$ - 0
9-10.Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yardsPer Cubic Yard4$ 40.71$ 67.85$ 70.38$ 73.14$ 76.16$ 79.30$ - 0
9-11.Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yardsPer Cubic Yard4$ 36.55$ 60.92$ 63.15$ 65.76$ 68.53$ 71.38$ - 0
9-12.a.Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yardsPer Cubic Yard3$ 21.26$ 35.44$ 36.79$ 38.29$ 40.00$ 41.65$ - 0
9-12.b.Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yardsPer Cubic Yard2$ 19.57$ 32.61$ 33.86$ 35.25$ 36.70$ 38.21$ - 0
9-13.Pea GravelPer Ton3$ 62.92$ 104.87$ 108.68$ 113.04$ 117.53$ 122.19$ - 0
9-14.#57 StonePer Ton3$ 61.47$ 102.44$ 106.22$ 110.50$ 114.99$ 119.62$ - 0
9-15.Dewatering System, up to 12 well points (includes installation)Per Day3$ 3,339.82$ 5,566.37$ 5,759.55$ 5,976.10$ 6,205.42$ 6,442.20$ - 0
9-16.Additional Dewatering System Well Points (2) (includes installation)Per Day3$ 260.16$ 433.60$ 448.86$ 466.00$ 484.15$ 502.63$ - 0
9-17.Dewatering System, up to 12 well points (includes installation)Per Week3$ 6,930.26$ 11,550.44$ 11,951.87$ 12,401.84$ 12,888.32$ 13,381.35$ - 0
9-18.Additional Dewatering System Well Points (2) (includes installation)Per Week3$ 342.55$ 570.92$ 591.15$ 613.68$ 637.47$ 661.90$ - 0
9-19.Dewatering System, up to 12 well points (includes installation)Per Month3$ 12,327.46$ 20,545.77$ 21,255.05$ 22,043.07$ 22,895.36$ 23,753.61$ - 0
9-20.Additional Dewatering System Well Points (2) (includes installation)Per Month3$ 455.69$ 759.49$ 785.58$ 815.11$ 846.14$ 878.21$ - 0
10-1.Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacityPer Tank2$ 4,142.86$ 6,904.77$ 6,946.18$ 7,368.04$ 7,633.95$ 7,901.97$ - 0
10-2.Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacityPer Tank2$ 5,579.41$ 9,299.02$ 9,597.61$ 9,928.32$ 10,287.27$ 10,651.99$ - 0
10-3.Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacityPer Tank2$ 7,483.08$ 12,471.81$ 12,874.33$ 13,318.43$ 13,800.33$ 14,287.79$ - 0
10-4.Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacityPer Tank2$ 9,623.21$ 16,038.69$ 16,406.54$ 16,998.18$ 17,595.83$ 18,195.67$ - 0
11-1.Removal and Loading of Asphalt and/or Concrete - up to 4 inch thicknessPer Square Foot4$ 5.18$ 8.64$ 8.94$ 9.29$ 9.66$ 10.02$ - 0
11-2.Additional Removal/Loading Cost for Concrete - > 4 inch thicknessPer Square Foot2$ 4.21$ 7.01$ 7.25$ 7.52$ 7.82$ 8.11$ - 0
11-3.Loading, Transport and Disposal/Recycle Clean OverburdenPer Ton4$ 44.44$ 74.07$ 76.78$ 79.79$ 82.95$ 86.21$ - 0
11-4.Transport and Disposal of Clean ConcretePer Ton3$ 37.78$ 62.96$ 65.37$ 68.00$ 70.79$ 73.63$ - 0
11-5.Transport and Disposal of Mixed DebrisPer Ton3$ 49.99$ 83.32$ 86.42$ 89.84$ 93.59$ 97.32$ - 0
11-6.Transport and Disposal of Petroleum Impacted Soil (includes drum)Per Drum4$ 180.95$ 301.59$ 312.12$ 323.68$ 336.37$ 349.04$ - 0
11-7.Transport Petroleum Impacted Soil (bulk) ≤ 100 milesPer Ton4$ 28.61$ 47.68$ 49.44$ 51.43$ 53.57$ 55.69$ - 0
11-8.Transport Petroleum Impacted Soil (bulk) > 100 milesPer Ton4$ 37.72$ 62.86$ 65.18$ 67.75$ 70.54$ 73.37$ - 0
11-9.Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tonsPer Ton4$ 33.90$ 56.50$ 58.61$ 60.94$ 63.49$ 65.99$ - 0
11-10.Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tonsPer Ton4$ 33.39$ 55.65$ 57.73$ 58.97$ 62.54$ 65.00$ - 0
11-11.Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tonsPer Ton3$ 40.61$ 67.68$ 69.82$ 72.15$ 74.71$ 77.34$ - 0
11-12.Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tonsPer Ton3$ 39.73$ 66.22$ 68.31$ 69.52$ 73.07$ 75.64$ - 0
11-13.Transport and Disposal of Petroleum Contact Water (includes drum)Per Drum3$ 180.82$ 301.37$ 311.70$ 322.93$ 335.32$ 347.64$ - 0
11-14.Transport and Disposal of Petroleum Contact Water (bulk)Per Gallon3$ 1.27$ 2.11$ 2.21$ 2.29$ 2.39$ 2.48$ - 0
11-16.Transport and Disposal of Petroleum Product (includes drum)Per Drum3$ 195.59$ 325.99$ 337.40$ 349.99$ 364.16$ 377.88$ - 0
11-17.Transport and Disposal of Petroleum Product (bulk)Per Gallon2$ 1.39$ 2.31$ 2.41$ 2.50$ 2.61$ 2.71$ - 0
11-18.Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off ContainerPer Week3$ 837.36$ 1,395.60$ 1,444.78$ 1,497.80$ 1,554.84$ 1,612.51$ - 0
11-19.Additional Rental of 20 Cubic Yard Roll-Off ContainerPer Week3$ 248.37$ 413.95$ 428.62$ 445.23$ 462.96$ 480.89$ - 0
12-1.Asphalt Paving - 2 inch thickness (includes sub-base)Per Square Foot4$ 10.31$ 17.18$ 17.78$ 18.48$ 19.25$ 20.02$ - 0
12-2.Asphalt Paving - additional 1 inch thicknessPer Square Foot3$ 3.29$ 5.49$ 5.69$ 5.92$ 6.16$ 6.41$ - 0
12-3.Concrete Paving - 4 inch thickness (includes sub-base)Per Square Foot4$ 10.48$ 17.47$ 18.11$ 18.84$ 19.61$ 20.40$ - 0
12-4.Concrete Paving - additional 1 inch thicknessPer Square Foot3$ 3.22$ 5.37$ 5.58$ 5.81$ 6.04$ 6.31$ - 0
12-5.Crushed Lime Rock Cover - 2 inch thicknessPer Square Foot3$ 3.40$ 5.66$ 5.88$ 6.11$ 6.36$ 6.60$ - 0
12-6.Grass - SodPer Square Foot3$ 1.89$ 3.15$ 3.26$ 3.38$ 3.52$ 3.65$ - 0
12-7.Grass - Seed and MulchPer Square Foot3$ 1.05$ 1.76$ 1.82$ 1.89$ 1.97$ 2.05$ - 0
13-1.Direct Push Boring with In-Situ InjectionPer Day3$ 4,425.69$ 7,376.16$ 7,570.44$ 7,866.97$ 8,173.57$ 8,485.41$ - 0
13-2.In-Situ Injection Into Existing Well/Treatment PointPer Day3$ 3,797.77$ 6,329.62$ 6,472.49$ 6,721.12$ 6,979.13$ 7,243.38$ - 0
13-4.Groundwater Injection System (not by direct push)Per Week2$ 4,194.81$ 6,991.34$ 7,239.52$ 7,516.82$ 7,808.68$ 8,107.51$ - 0
13-5.Groundwater Injection System (not by direct push)Per Month2$ 7,715.02$ 12,858.36$ 13,310.22$ 13,811.39$ 14,340.33$ 14,885.42$ - 0
14-1.a.Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in TrenchPer Linear Foot of
Trench4$ 83.63$ 139.39$ 144.78$ 150.35$ 156.46$ 162.54$ - 0
14-1.b.Trenching and Installation of 11 - 20 LinesPer Linear Foot of
Trench3$ 91.27$ 152.11$ 157.96$ 164.03$ 170.69$ 177.40$ - 0
14-1.c.Trenching and Installation of 21 - 30 LinesPer Linear Foot of
Trench2$ 97.33$ 162.21$ 168.01$ 173.99$ 181.20$ 188.11$ - 0
14-1.d.Trenching and Installation of Additional 1-10 Lines Greater Than 30 LinesPer Linear Foot of
Trench2$ 65.78$ 109.63$ 113.58$ 117.93$ 122.71$ 127.49$ - 0
14-2.Installation of Plumbing (and Electrical) Lines Above GroundPer Foot2$ 27.29$ 45.49$ 47.19$ 49.03$ 51.11$ 53.10$ - 0
14-4.a.System Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment PointsPer Startup3$ 12,729.40$ 21,215.67$ 21,899.80$ 22,648.61$ 23,507.05$ 24,347.87$ - 0
14-4.b.System Installation/Integration/Startup - 1 Technology Component - 11-20 Recovery/Treatment PointsPer Startup3$ 15,238.17$ 25,396.95$ 26,213.32$ 27,098.89$ 28,119.87$ 29,123.37$ - 0
14-4.c.System Installation/Integration/Startup - 1 Technology Component - 21-30 Recovery/Treatment PointsPer Startup2$ 18,158.00$ 30,263.33$ 31,212.05$ 32,245.20$ 33,420.60$ 34,585.10$ - 0
14-4.d.System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This tem is used in conjunction with 14.4.c when needed)Per Startup2$ 4,056.13$ 6,760.21$ 7,004.20$ 7,268.27$ 7,558.25$ 7,852.52$ - 0
14-5.System Installation/Integration/Startup – Addition of 1 Technology ComponentPer Additional Tech
Component4$ 2,415.88$ 4,026.46$ 4,163.32$ 4,308.71$ 4,473.72$ 4,632.89$ - 0
15-1.Groundwater Recovery System Pilot Test - 8 hoursPer Test2$ 3,577.58$ 5,962.63$ 6,140.32$ 6,348.35$ 6,565.99$ 6,784.11$ - 0
15-2.Groundwater Recovery System Pilot Test - Additional TimePer 2 Hrs2$ 456.24$ 760.40$ 785.01$ 811.93$ 841.68$ 870.50$ - 0
15-3.Air Sparging or Biosparging Pilot Test - 8 hoursPer Test3$ 3,220.56$ 5,367.60$ 5,542.76$ 5,737.94$ 5,950.19$ 6,159.99$ - 0
15-4.Air Sparging or Biosparging Pilot Test - Additional TimePer 2 Hrs2$ 446.42$ 744.03$ 769.17$ 796.93$ 827.21$ 857.02$ - 0
15-5.Vapor Extraction Pilot Test - 8 hoursPer Test3$ 3,198.57$ 5,330.96$ 5,504.93$ 5,697.94$ 5,908.61$ 6,116.58$ - 0
15-6.Vapor Extraction Pilot Test - Additional TimePer 2 Hrs2$ 443.21$ 738.69$ 763.57$ 790.85$ 820.52$ 849.77$ - 0
15-7.Vapor Extraction/Aquifer Pumping Test - 8 hoursPer Test3$ 3,480.56$ 5,800.93$ 5,993.42$ 6,205.95$ 6,432.71$ 6,661.21$ - 0
15-8.Vapor Extraction/Aquifer Pumping Test - Additional TimePer 2 Hrs2$ 469.91$ 783.18$ 808.97$ 837.15$ 867.87$ 898.08$ - 0
15-9.Air Sparging/Vapor Extraction Pilot Test - 8 hoursPer Test4$ 3,793.97$ 6,323.28$ 6,530.38$ 6,764.48$ 7,011.80$ 7,261.50$ - 0
15-10.Air Sparging/Vapor Extraction Pilot Test - Additional TimePer 2 Hrs3$ 476.11$ 793.52$ 820.87$ 850.81$ 883.18$ 915.33$ - 0
15-11.Multi-Phase Pilot Test - 8 hoursPer Test3$ 3,970.20$ 6,617.01$ 6,827.99$ 7,063.22$ 7,317.58$ 7,571.44$ - 0
15-12.Multi-Phase Pilot Test - Additional TimePer 2 Hrs2$ 481.14$ 801.91$ 828.27$ 857.10$ 888.70$ 919.62$ - 0
15-13.Air Sparging/Multiphase Extraction Pilot Test - 8 hoursPer Test3$ 4,167.00$ 6,945.00$ 7,164.51$ 7,410.97$ 7,676.31$ 7,942.19$ - 0
15-14.Air Sparging/Multiphase Extraction Pilot Test - Additional TimePer 2 Hours2$ 520.32$ 867.19$ 895.52$ 926.52$ 960.30$ 993.56$ - 0
15-15.In-Situ Chemical Oxidation (including Ozone) Pilot Test - 8 hoursPer Test3$ 4,122.30$ 6,870.51$ 7,091.17$ 7,340.08$ 7,597.93$ 7,865.68$ - 0
15-16.In-Situ Chemical Oxidation (including Ozone) Pilot Test - Additional TimePer 2 Hrs2$ 499.88$ 833.13$ 860.47$ 891.29$ 923.13$ 956.56$ - 0
15-17.Groundwater Treatment System Package - MediumPer Day3$ 3,322.54$ 5,537.56$ 5,722.60$ 5,927.83$ 6,148.56$ 6,368.42$ - 0
15-18.Groundwater Treatment System Package - MediumPer Week3$ 7,564.74$ 12,607.91$ 13,021.74$ 13,489.71$ 13,976.90$ 14,481.43$ - 0
15-19.Air Sparge System Package - MediumPer Day3$ 2,354.36$ 3,923.93$ 4,052.27$ 4,194.59$ 4,344.39$ 4,498.20$ - 0
15-20.Air Sparge System Package - MediumPer Week3$ 5,433.05$ 9,055.08$ 9,351.09$ 9,686.89$ 10,039.06$ 10,404.13$ - 0
15-21.AS/SVE System Package - MediumPer Day3$ 2,980.82$ 4,968.03$ 5,132.47$ 5,313.75$ 5,503.53$ 5,704.10$ - 0
15-22.AS/SVE System Package - MediumPer Week4$ 6,817.16$ 11,361.94$ 11,742.34$ 12,163.41$ 12,609.36$ 13,065.07$ - 0
15-23.MPE System Package - MediumPer Day3$ 3,051.45$ 5,085.75$ 5,251.88$ 5,435.78$ 5,629.04$ 5,827.54$ - 0
15-24.MPE System Package - MediumPer Week3$ 6,451.20$ 10,752.01$ 11,107.95$ 11,504.19$ 11,921.61$ 12,351.94$ - 0
15-25.AS/MPE System Package - MediumPer Day2$ 3,674.70$ 6,124.50$ 6,329.22$ 6,556.29$ 6,796.37$ 7,043.81$ - 0
15-26.AS/MPE System Package - MediumPer Week2$ 7,510.21$ 12,517.01$ 12,929.61$ 13,390.14$ 13,878.06$ 14,380.68$ - 0
15-27.SVE System Package - MediumPer Day2$ 2,786.98$ 4,644.97$ 4,799.91$ 4,970.17$ 5,150.00$ 5,334.48$ - 0
15-28.SVE System Package - MediumPer Week2$ 5,857.12$ 9,761.87$ 10,094.96$ 10,461.88$ 10,850.61$ 11,252.07$ - 0
15-29.In-Situ Chemical Oxidation (including Ozone) Package – MediumPer Day2$ 3,638.60$ 6,064.33$ 6,265.36$ 6,488.57$ 6,722.48$ 6,962.13$ - 0
15-30.In-Situ Chemical Oxidation (including Ozone) Package – MediumPer Week2$ 6,510.95$ 10,851.58$ 11,222.65$ 11,632.24$ 12,063.68$ 12,506.52$ - 0
16-1.System O&M Package (excludes system) - SmallPer Month3$ 2,289.88$ 3,816.46$ 3,937.34$ 4,072.69$ 4,221.04$ 4,367.22$ - 0
16-2.System O&M Package (excludes system) - MediumPer Month4$ 2,682.81$ 4,471.35$ 4,610.52$ 4,766.24$ 4,941.57$ 5,109.62$ - 0
16-3.System O&M Package (excludes system) - LargePer Month3$ 3,079.87$ 5,133.12$ 5,291.74$ 5,469.58$ 5,670.77$ 5,862.92$ - 0
16-4.System O&M Package (excludes system) - Extra LargePer Month2$ 3,437.79$ 5,729.64$ 5,904.76$ 6,101.57$ 6,325.19$ 6,538.16$ - 0
16-5.Supplemental System O&M Package - Add Thermox or Catox TreatmentPer Month3$ 474.03$ 790.04$ 811.28$ 838.07$ 868.04$ 896.69$ - 0
17-1.Medium Holding Tank - 2,000 to 6,000 gal. capacity - Short Term ≤ 6 mos.Per Month3$ 451.29$ 752.14$ 774.68$ 799.99$ 828.99$ 855.97$ - 0
17-2.Medium Holding Tank - 2,000 to 6,000 gal. capacity - Long Term > 6 mos.Per Month2$ 369.47$ 615.78$ 634.39$ 655.09$ 678.22$ 700.42$ - 0
17-3.Large Holding Tank > 6,000 to 10,000 gal. capacity - Short Term ≤ 6 mos.Per Month2$ 991.20$ 1,652.00$ 1,702.89$ 1,760.58$ 1,822.09$ 1,885.79$ - 0
17-4.Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos.Per Month2$ 793.36$ 1,322.27$ 1,362.01$ 1,406.21$ 1,454.94$ 1,502.09$ - 0
17-5.Groundwater Treatment System - Stand Alone Small - Short Term ≤ 6 mos.Per Month3$ 4,648.77$ 7,747.94$ 7,991.37$ 8,273.37$ 8,572.34$ 8,878.29$ - 0
17-6.Groundwater Treatment System - Stand Alone Small - Long Term > 6 mos.Per Month3$ 3,761.73$ 6,269.55$ 6,470.29$ 6,699.83$ 6,942.93$ 7,189.77$ - 0
17-7.Groundwater Treatment System - Stand Alone Medium - Short Term ≤ 6 mos.Per Month3$ 6,894.12$ 11,490.21$ 11,855.87$ 12,271.47$ 12,714.26$ 13,156.26$ - 0
17-8.Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.Per Month3$ 5,258.40$ 8,764.00$ 9,042.22$ 9,358.13$ 9,694.38$ 10,036.15$ - 0
17-9.Groundwater Treatment System - Stand Alone Large - Short Term ≤ 6 mos.Per Month3$ 9,004.57$ 15,007.62$ 15,497.91$ 16,044.28$ 16,626.78$ 17,220.20$ - 0
17-10.Groundwater Treatment System - Stand Alone Large - Long Term > 6 mos.Per Month3$ 7,314.90$ 12,191.51$ 12,574.99$ 13,019.64$ 13,492.75$ 13,972.17$ - 0
17-11.Air Sparge System - Small - Short Term ≤ 6 mos.Per Month3$ 2,412.85$ 4,021.42$ 4,150.12$ 4,293.70$ 4,446.25$ 4,602.68$ - 0
17-12.Air Sparge System - Small - Long Term > 6 mos.Per Month3$ 2,016.59$ 3,360.98$ 3,476.19$ 3,603.53$ 3,739.19$ 3,877.86$ - 0
17-13.Air Sparge System - Medium - Short Term ≤ 6 mos.Per Month3$ 2,710.48$ 4,517.47$ 4,663.60$ 4,825.31$ 4,997.37$ 5,173.48$ - 0
17-14.Air Sparge System - Medium - Long Term > 6 mos.Per Month3$ 2,626.76$ 4,377.93$ 4,510.99$ 4,657.65$ 4,813.82$ 4,973.07$ - 0
17-15.Air Sparge System - Large - Short Term ≤ 6 mos.Per Month3$ 3,675.54$ 6,125.89$ 6,324.15$ 6,546.42$ 6,780.34$ 7,022.17$ - 0
17-16.Air Sparge System - Large - Long Term > 6 mos.Per Month3$ 3,071.07$ 5,118.45$ 5,293.58$ 5,488.01$ 5,696.03$ 5,907.74$ - 0
17-17.AS/SVE System - Small - Short Term ≤ 6 mos.Per Month4$ 4,041.50$ 6,735.84$ 6,957.77$ 7,205.77$ 7,470.61$ 7,741.46$ - 0
17-18.AS/SVE System - Small - Long Term > 6 mos.Per Month4$ 3,318.22$ 5,530.37$ 5,719.69$ 5,931.05$ 6,156.71$ 6,386.44$ - 0
17-19.AS/SVE System - Medium - Short Term ≤ 6 mos.Per Month4$ 4,559.15$ 7,598.58$ 7,849.49$ 8,129.15$ 8,428.33$ 8,733.36$ - 0
17-20.AS/SVE System - Medium - Long Term > 6 mos.Per Month4$ 3,917.87$ 6,529.79$ 6,748.01$ 6,996.68$ 7,262.30$ 7,531.82$ - 0
17-21.AS/SVE System - Large - Short Term ≤ 6 mos.Per Month3$ 5,501.73$ 9,169.55$ 9,471.59$ 9,812.64$ 10,177.36$ 10,550.41$ - 0
17-22.AS/SVE System - Large - Long Term > 6 mos.Per Month4$ 4,837.73$ 8,062.89$ 8,339.12$ 8,648.07$ 8,978.03$ 9,314.00$ - 0
17-23.MPE System - Small - Short Term ≤ 6 mos.Per Month3$ 3,376.74$ 5,627.90$ 5,801.94$ 5,996.22$ 6,205.56$ 6,417.70$ - 0
17-24.MPE System - Small - Long Term > 6 mos.Per Month3$ 2,705.73$ 4,509.56$ 4,658.10$ 4,821.48$ 4,997.73$ 5,176.39$ - 0
17-25.MPE System - Medium - Short Term ≤ 6 mos.Per Month3$ 4,155.37$ 6,925.61$ 7,142.95$ 7,384.40$ 7,644.50$ 7,907.92$ - 0
17-26.MPE System - Medium - Long Term > 6 mos.Per Month4$ 3,522.56$ 5,870.93$ 6,064.67$ 6,279.74$ 6,511.76$ 6,746.73$ - 0
17-27.MPE System - Large - Short Term ≤ 6 mos.Per Month3$ 5,206.54$ 8,677.56$ 8,950.99$ 9,254.35$ 9,583.34$ 9,915.09$ - 0
17-28.MPE System - Large - Long Term > 6 mos.Per Month3$ 4,462.34$ 7,437.24$ 7,680.08$ 7,951.18$ 8,244.30$ 8,541.06$ - 0
17-29.Groundwater Treatment - Add On - Small - Short Term ≤ 6 mos.Per Month3$ 3,055.51$ 5,092.51$ 5,273.22$ 5,474.03$ 5,689.41$ 5,912.57$ - 0
17-30.Groundwater Treatment - Add On - Medium - Short Term ≤ 6 mos.Per Month3$ 2,954.63$ 4,924.38$ 5,089.94$ 5,274.05$ 5,471.28$ 5,673.95$ - 0
17-31.Groundwater Treatment - Add On - Large - Short Term ≤ 6 mos.Per Month3$ 4,560.95$ 7,601.58$ 7,864.25$ 8,152.68$ 8,461.52$ 8,779.27$ - 0
17-32.Groundwater Treatment - Add On - Small - Long Term > 6 mos.Per Month3$ 3,058.55$ 5,097.59$ 5,273.91$ 5,471.91$ 5,683.69$ 5,902.30$ - 0
17-33.Groundwater Treatment - Add On - Medium - Long Term > 6 mos.Per Month3$ 3,844.16$ 6,406.94$ 6,623.28$ 6,866.74$ 7,124.08$ 7,389.93$ - 0
17-34.Groundwater Treatment - Add On - Large - Long Term > 6 mos.Per Month3$ 4,678.19$ 7,796.98$ 8,062.73$ 8,365.08$ 8,682.01$ 9,012.38$ - 0
17-35.Carbon Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos.Per Month4$ 634.11$ 1,056.85$ 1,095.45$ 1,138.10$ 1,182.76$ 1,228.88$ - 0
17-36.Carbon Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.Per Month4$ 918.35$ 1,530.58$ 1,586.11$ 1,647.25$ 1,711.38$ 1,777.14$ - 0
17-37.Carbon Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos.Per Month4$ 1,344.56$ 2,240.94$ 2,322.17$ 2,411.91$ 2,506.18$ 2,602.91$ - 0
17-38.Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.Per Month3$ 325.54$ 542.57$ 562.49$ 584.41$ 607.40$ 631.15$ - 0
17-39.Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.Per Month4$ 476.12$ 793.53$ 822.31$ 854.16$ 887.41$ 921.82$ - 0
17-40.Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.Per Month3$ 708.75$ 1,181.24$ 1,223.27$ 1,270.25$ 1,319.45$ 1,369.89$ - 0
17-41.Thermox/Catox Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos.Per Month3$ 2,750.67$ 4,584.45$ 4,737.61$ 4,908.61$ 5,091.22$ 5,279.29$ - 0
17-42.Thermox/Catox Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.Per Month3$ 3,309.47$ 5,515.78$ 5,701.91$ 5,909.47$ 6,129.92$ 6,357.90$ - 0
17-43.Thermox/Catox Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos.Per Month3$ 4,597.39$ 7,662.32$ 7,919.94$ 8,207.24$ 8,512.66$ 8,828.45$ - 0