| INDEPENDENT GOVERNMENT ESTIMATE / SCOPE SHEET | |
| CONTRACT: | PUMPS AND MOTORS CONTINGENCY |
| SHIP: | USS BOXER (LHD-4) |
| LOCATION: | NAVY REGION SOUTHWEST |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE03-3472 | 02-33-9-Q, VANEAXIAL FAN MOTOR ASSEMBLY R02-33-1 | 1 | | |
| | ITEMIZED PRICING 0001 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (OFFLOAD AND ONLOAD), CRANE SUPPORT AND TRANSPORTATION OF THE EXISTING DISASSEMBLED VANEAXIAL FAN ASSEMBLY FROM THE ELECTRICAL-SHOP, 2-89-1-Q TO THE SHOP AND BACK TO THE FAN ROOM 02-33-9-Q IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK (SEE NOTE 1) | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE03-3472 | 02-33-9-Q, VANEAXIAL FAN MOTOR ASSEMBLY R02-33-1 | 1 | | |
| | ITEMIZED PRICING 0002 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO MECHANICALLY RE-INSTALL THE VANEAXIAL FAN ASSEMBLY IN ACCORDANCE WITH THE CONTRACT | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE03-3455 | 01-55-2-Q, VANIEAXIAL FAN MOTOR ASSEMBLY R01-55-2 | 1 | | |
| | ITEMIZED PRICING 0003 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (OFFLOAD AND ONLOAD), CRANE SUPPORT AND TRANSPORTATION OF THE EXISTING VANEAXIAL FAN MOTOR ASSEMBLY FROM THE SHIP AND TRASPORT TO THE SHOP AND BACK TO THE FAN ROOM, 01-55-2-Q IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK (SEE NOTE 1) | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE03-3455 | 01-55-2-Q, VANEAXIAL FAN MOTOR ASSEMBLY R01-55-2 | 1 | | |
| | ELIN 0004 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO DISCONNECT AND REMOVE VANEAXIAL FAN, MECHANICAL COMPONENTS, VENT DUCT AND OTHER INTERFERENCES. AFTER REPAIR, RE-INSTALL THE VANEAXIAL FAN, MECHANICAL COMPONENTS, VENT DUCT AND OTHER INTERFERENCES IN ACCORDANCE WITH THE CONTRACT | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE03-3472 | 02-33-9-Q, VANEAXIAL FAN MOTOR ASSEMBLY R02-33-1 | 1 | | |
| EE03-3455 | 01-55-2-Q, VANEAXIAL FAN MOTOR ASSEMBLY R01-55-2 | | | |
| ITEMIZED PRICING 0005 | | | |
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE VENT FAN MOTOR UNIT IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-113 TO INCLUDE THE INSTALLATION OF NEW BEARINGS, SEALS, O-RINGS, GASKETS, FITTINGS, LOCK WASHERS, LOCKNUTS, FLEXIBLE CONNECTORS, FLEXIBLE CONDUIT AND GROUND STRAPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
(SEE NOTES 1 , 2 AND 3) 1 $0.00
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE03-3472 | 02-33-9-Q, VANEAXIAL FAN MOTOR ASSEMBLY R02-33-1 | 1 | | |
| EE03-3455 | 01-55-2-Q, VANEAXIAL FAN MOTOR ASSEMBLY R01-55-2 | | | |
| | ELIN 0003 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE ALIGNMENT AND ADJUSTMENTS OF THE VANEAXIAL FAN MOTOR ASSEMBLY AND THE IMPELLER ASSEMBLY IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-15 | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE03-3472 | 02-33-9-Q, VANEAXIAL FAN MOTOR ASSEMBLY R02-33-1 | 1 | | |
| EE03-3455 | 01-55-2-Q, VANEAXIAL FAN MOTOR ASSEMBLY R01-55-2 | | | |
| | ELIN 0004 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP OPTEST OF THE VANEAXIAL FAN MOTOR ASSEMBLY AND IMPELLER AND MOTOR IN ACCORDANCE WITH THE CONTRACT AND THE STATEMENT OF WORK | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE03-3455 | 01-55-2-Q, VANEAXIAL FAN MOTOR ASSEMBLY R01-55-2 | 1 | | |
| EE03-3472 | 02-33-9-Q, VANEAXIAL FAN MOTOR ASSEMBLY R02-33-1 | | | |
| | ITEMIZED PRICING 0005 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE REPAIR AND REPLACEMENT OF NEW AND DISTURBED LAGGING AND INSULATION IN ACCORDANCE WITH NAVY STANDARD ITEM 009-11 | 1 | | $0.00 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EE03-3455 | 01-55-2-Q, VANEAXIAL FAN MOTOR ASSEMBLY R01-55-2 | 1 | | |
| | ELIN 0006 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PRESERVATION OF NEW AND DISTURBED LAGGING AND SURFACES IN ACCORDANCE WITH NAVY STANDARD ITEM 009-32 | 1 | | $0.00 | | |
PAUL DAMIAN, SBS TOTAL $0.00
| OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of a modification to the purchase order. | ESTIMATED AMOUNT | UNIT OF ISSUE | FBLR for ELIN 0009. MATERIAL HANDLING RATE FOR ELIN 0010 | TOTAL |
| ELIN 0008 | ADDITIONAL WORK - LABOR Estimated Straight Time (ST) Man-hours - 100 HRS | | | | |
ST Fully Burdened Labor Hour Rate $________
| NOTE: The offeror’s proposed fully burdened labor rate (FBLR) is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 40 | HR | $0.00 |
| ELIN 0009 | ADDITIONAL WORK - MATERIALS | |
| Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a purchase order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. | 10,000.00 | DOLLARS, US | 0% |
| MILESTONE EVENT | DATE |
| 1. Delivery Order Start | 10-Feb-2023 |
| 2. Removal of Vaneaxial Fan Motor Assembly. Rigging and crane offload. | 10-16-Feb-2023 |
| 3. Vaneaxial Fan Motor Assembly dissasembly, overhaul, assembly and shop testing. | 16 -Feb to 13 Mar-2023 |
| 4. Crane and rigging. Vaneaxial Fan Motor Assembly installation onto foundation. | 13-17- Mar-2023 |
| 5. Delivery Order End | 17-Mar-2023 |
| NOTES: |
| 1. Remove existing Vaneaxial Fan Motor Assembly Fan Room 01-55-2-Q. Refer to technical manual S9512-BX-MMA-010 REV 8, VANEAXIAL FANS (STANDARD PRESSURE) for detailed procedures on the removal and installation of the Vaneaxial Fan Motor Assembly to include Shop testing only. |
| 2. Remove existing disassembled Vaneaxial Fan Motor Assembly the Electrical Shop 2-89-1-Q. Refer to technical manual S9512-BX-MMA-010 REV 8, VANEAXIAL FANS (STANDARD PRESSURE) for repair and installation of the Vaneaxial Fan Motor Assembly to include Shop testing only. Install repair Vaneaxial Fan Motor Assembly onto foundation in Fan Room 02-33-9-Q |
| 3. The motor is Sealed Insulated and may or may not required a rewind after inspection. The KTR shall make recommendation invoking 009-113 or 009-17 to proceed with the repair. |
Sheet2