ITEMIZED PRICE LIST.pdf
PDF 205 KB Posted
- Attached to
- USS ASHLAND (LSD48) - PUMPS AND MOTORS
- Solicitation number
- N5523623Q0191
About this file
This itemized price list document outlines pricing for a contingency contract to provide pump and motor overhaul services for the USS Ashland (LSD-48). The contractor will be responsible for removing, transporting, overhauling, testing and reinstalling the NR-2 fuel oil purifier motor onboard the ship. Services include rigging, crane support, transportation to and from the shop, disassembly and inspection, repair or replacement of parts, machining of housing or shaft if needed, operational testing at the shop, preparation and painting, and reinstallation of the motor. Pricing is provided on a firm fixed price basis for the labor hours and materials required to complete the scope of work in accordance with the contract and statement of work. Key milestones include removal of the existing motor by September 6th, delivery of the overhauled motor back to the ship by October 4th, and contract completion by October 10th. The solicitation was issued by the Department of the Navy Naval Sea Systems Command for the USS Ashland.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF18.pdf | ||
| N5523623Q0191_RFC.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT: PUMP AND MOTOR CONTINGENCY
CONTRACTOR: TBD
PURCHASE
ORDER:
TBD
SHIP: USS ASHLAND (LSD-48)
LOCATION: NAVY REGION SOUTHWEST
ITEM NO CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
COMMERCIAL INDUSTRIAL SERVICES (CIS) PUMPS
AND MOTORS CONTRACT IS TO PROVIDE LABOR,
RIGGING SERVICES, CRANE, TRANSPORTATION,
EQUIPMENT, AND MATERIALS FOR THE REMOVAL,
OVERHAUL, REASSEMBLY, SHOP TEST, DELIVERY,
ALIGNMENT AND ADJUSTMENTS OF THE NR-2 FUEL
OIL PURIFIER MOTOR ONBOARD THE USS ASHLAND
(LSD-48)
1 LOT
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS
FOR THE RIGGING (OFFLOAD AND ONLOAD), CRANE
SUPPORT AND TRANSPORTATION OF THE NR-2 FUEL OIL
PURIFIER MOTOR FROM THE SHIP TO THE SHOP FOR
REPAIRS AND DELIVER THE OVERHAULD NR-2 FUEL OIL
PURIFIER MOTOR BACK TO THE MOTOR FOUNDATION IN
ACCORDANCE WITH THE REQUIREMENTS OF THE
CONTRACT AND THE STATEMENT OF WORK (SEE NOTE 4)
ACCOMPLISH THE OVERHAUL OF THE NR-2 FUEL OIL
PURIFIER MOTOR IN ACCORDANCE WITH NAVSEA
STANDARD ITEM 009-33 TO INCLUDE THE INSTALLATION
OF NEW BEARINGS, THERMISTORS, SEALS, O-RINGS,
GASKETS, FITTINGS, LOCK WASHERS, LOCKNUTS,
FLEXIBLE CONNECTORS, CONDUIT BOX, SHAFT BUILD-
UP, SHAFT ALIGNMENT,REFURBISHMENT AND PAINTING
FLEXIBLE CONDUIT AND GROUND STRAPS IN
ACCORDANCE WITH THE REQUIREMENTS OF THE
CONTRACT AND THE STATEMENT OF WORK. ADDITIONAL
WORK ALSO COVERS THE BUILD-UP AND MACHINING OF
THE BEARING HOUSINGS OR MOTOR SHAFT WHEN
REQUIRED.
(SEE NOTE 3)
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS
FOR THE SHOP TEST OPERATIONAL OF THE OVERHAULED
NR-2 FUEL OIL PURIFIER MOTOR
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS
FOR THE PREPARATION AND PAINTING OF THE NR-2 FUEL
OIL PURIFIER MOTOR IN ACCORDANCE WITH NAVSEA
STANDARD ITEMS 009-32
PROVIDE LABOR (40 HOURS), SERVICES, EQUIPMENT, AND
MATERIALS FOR THE MACHINING HOURS (IF REQUIRED)
IN ACCORDANCE WITH THE REQUIREMENTS OF THE
CONTRACT AND THE STATEMENT OF WORK
(SEE NOTE 3)
NET AMT $0.00
MILESTONE EVENT
ITEMIZED PRICE LIST
3. Repair and Shop Test
1. Purchase Order Start Date
2. Remove and transport to shop
01-Sep-26
1-6-Sep-23
6-Sep to 4-Oct-23
4. Delivery to ship 4-10-Oct-23
4. Remove existing NR-2 FUEL OIL PURIFIER MOTOR from the motor foundation and install the repaired Motor back onto the foundation.
5. Purchase Order End Date
NOTES:
1. In the event the requirements stated in the SOW has changed from NAVSEA Standard Item 009-33 to 009-17 as a result of the disassembly inspection, the Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR listing the recommendations of repair requirements to the SBS. The change in scope will require the Contractor to submit a revised estimated cost towards the performance of the new repair recommendation.
2. Refer to Technical Manual S9541-AM-MMA-010, Technical Manual for Fuel Oil Purifier Assembly for detailed procedures on the overhaul of the Fuel Oil Purfier Motor to include shop operational testing.
3. If machining hours are required, submit CFR to the SUPERVISOR with the result of UNSAT measurement not conforming in accordance with the Technical Manual S9541-AM-MMA-010.
10-Oct-23
File details come from the government source that posted it. Updated .