Item Description - Vertical Storage Carousel.pdf

PDF 54 KB Posted

Attached to
Vertical Storage Carousel
Solicitation number
W50SLF-23-X-0001
Issued by

About this file

This document outlines requirements for a vertical storage carousel system and related maintenance services to be provided under a federal contract opportunity. The contractor shall furnish and install a new vertical storage carousel system with a maximum size of 28'H x 8'1.5" W x 4'2.1" D, minimum 36 carriers, 1-3 levels, and 400-150 plastic totes. The system must support a maximum weight of 9,000 lbs and load capacity of 32,000 lbs with manual override, 480v 3-phase power, and minimum two-year warranty and preventative maintenance contract. The installation will take place at Building 2145-H, Joint Base Pearl Harbor-Hickam, Hawaii, with an estimated required delivery date of 120 days after receipt of order. The related federal contract opportunity is solicitation number W50SLF-23-X-0001 for a vertical storage carousel issued by the Department of the Army National Guard.

View the file

Other files

File Type Posted
Questions Answers Vertical Storage Carousel.pdf PDF
_Provisions and Clauses_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Description Vertical Storage Carousel System

Vertical Storage Carousel System

Quantity: 1 each

Maximum overall size: 28’H x 8’1.5” W x 4’2.1” D

Material: Metal

Color: Grey or Beige

Minimum # of carriers and/or trays or equivalent: 36, minimum # of levels: 1 on 12 carriers, 2 on 12 carriers w/tray, 3 on 12 carriers w/tray.

Minimum size dimensions of carriers and/or trays: (72”W, 20’H, and 48”D (Max 48”D)

Minimum # of totes or equivalent: 16”x4”x4” w/2 dividers per tote (400ea), 16”x8”x4” w/2 dividers per tote (150ea)

Maximum Weight: 9,000 lbs.

Maximum Load Capacity: 32,000 lbs.

Manual Hand-crank override for emergency access during power outage

Power Requirements: Minimum 480v 3 Phase Power

Parts & Labor Unit Warranty Minimum (2 Years)

Minimum Two Year Semi-Annual Preventative Maintenance Contract/Service

Description of Services: The contractor shall furnish all labor, parts, tools, materials, equipment, transportation, personnel, management, supervision, and incidentals necessary to design, measure, procure, and install a new Vertical Storage Carousel System in Bldg. 2145-H, JBPH-Hickam, HI.

Set the Schedule. Prior to commencement of work, the contractor shall coordinate the date and time for setup and installation with the POC.

Working Days/Hours. The contractor shall perform services between the hours of 8:00am – 4:30pm., Monday through Friday excluding federal holidays.

The Vertical Storage Carousel configuration and installation will be in Bldg. 2145- H.

Vertical Storage Carousel and assembly: The Vertical Storage Carousel installation shall be in accordance with manufacturer's specifications, industry standards, and commercial business practices. The installation shall include the placement, set-up, removal of packaging debris, clean-up, and training on maintenance and upkeep of the Vertical Storage Carousel system.

Delivery Location: Bldg. 2145-H (KC-135 Simulator)

POC (name, phone no.): Krisella Oka, 808-286-9811, 154th OSS/COR

Address:

395 Mamiya Ave, Bldg. 2145-H

JBPH-Hickam, HI 96853-5000

Estimated Required Delivery Date: 120 days after receipt of order (ARO)

File details come from the government source that posted it. Updated .