ITB FM-25-610 Specs.docx

DOCX document 42 KB Posted

Attached to
Purchase of current model Mobil shower trailer with 4 stations
Solicitation number
FM-25-610
Issued by
California

About this file

This is a technical specification document for ITB FM-25-610 issued by the City of Long Beach for the purchase of a current model, California-compliant mobile shower trailer with four stations (three standard 32"x32" shower rooms and one ADA-compliant 60"x36" shower room). The trailer must meet minimum specifications including a 12,000-pound GVWR, 24-foot length, 96-inch width, 98-inch interior height, and include a utility room, generator, air conditioning unit, and comprehensive water and sanitation systems. The unit must be delivered by December 15, 2025, and bidders must submit a complete response indicating compliance or exceptions to all specifications. The document requires vendors to provide all necessary documentation including serial numbers, recommended stock part lists, and operating/service manuals for all major components upon delivery.

Pricing shall be submitted electronically and include line items for the vehicle cost, tire tax, delivery, and sales tax at the current California rate of 10.25%, with the total purchase price calculated accordingly. The manufacturer must provide a three-year warranty from the date the unit is placed in service and maintain an approved repair facility within 25 miles of Long Beach City Hall, with service required within one working day of notification. The project is funded through Urban Areas Security Initiative (UASI) grant funding. Vendors may propose approved equal items in lieu of specified brand names only if written approval is obtained from the City at least seven working days prior to bid opening. The trailer must be white in color, constructed of A-36 structural steel, and comply with all applicable California Vehicle Code, California Code of Regulations, SAE Standards, Federal Motor Vehicle Standards, and Cal OSHA provisions.

View the file

Other files

File Type Posted
Seller_Guidance_Final.pdf PDF
FM-25-610_Bid Results.pdf PDF
NOI ITB FM-25-610.pdf PDF
ITB FM-25-610 Shower Trailer.pdf PDF
Addendum 1 Q A .docx.pdf PDF
07-26-13-ebo~7.pdf PDF
Debarment Attachment~7.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF LONG BEACH

TECHNICAL SPECIFICATION ITB FM 25-610

CURRENT MODEL, 4- STATION SHOWER TRAILER

HEALTH-UASI-23

Instructions:

State comments and or exceptions in the blank spaces provided for each section regarding the vehicle or equipment offered corresponding to the specifications set forth. FAILURE TO COMPLETE ALL BLANK SPACES WILL OTHERWISE BE DETERMINED AS VENDOR MEETING SPECIFICATIONS MINIMUMS.

General Conditions:

The trailers and chassis, shall be completely equipped as specified and shall be ready for service upon delivery. The complete unit shall comply with the latest editions of the California Vehicle code, California Code of Regulations, SAE Standards, Federal Motor Vehicle Standards, and provisions of Cal OSHA. The omission from the specifications of any standard feature as shown in the manufacturer’s brochure shall not alleviate the successful bidder from the responsibility of furnishing an enclosed trailer, with all of the manufacturer’s latest improvements in current production unless specifically deleted in the specifications. The complete unit and all components shall be standard and cataloged by major manufacturers.

Brand Names:

Whenever in the specifications any material or process is indicated or specified by patent or proprietary name and/or by name of manufacturer, such specifications shall be used for the purpose of facilitating descriptions of the material and/or process desired and shall be deemed to be followed by the words "or approved equal".

The contractor may offer any material or process which shall be equal in every respect to that so indicated or specified, provided however, that if the material, process or article offered by the contractor is not, in the opinion of the City of Long Beach, equal in every respect to that specified, then the contractor must furnish the material, process or article specified or one that in the opinion of the City of Long Beach is the equal thereof in every respect.

If bidder desires to bid an “approved equal” item, the bidder shall submit a request to do so to the City in writing no later than seven (7) working days before bid opening. The request shall include all data necessary to substantiate that the item is equal. The City will notify the bidder, in writing, of approval or disapproval of the equivalent item no later than three (3) working days before bid opening.

Customer Signature:

General:

Shall be current model (California compliant) shower tailer with three (3) regular and one (1) ADA compliance shower trailer.

GVWR:

Shall be at least 12, 000.lbs.

Axle:

Shall be a minimum capacity 6,000 lbs. (each)

Overall Length:

Shall be a minimum 24’ feet.

Overall Width:

Shall be a minimum 96” inches.

Interior Height:

Shall be a minimum 98” inches

Tongue Length:

Shall be per Manufacturer recommendations.

Hitch Weight:

Shall be a minimum of 2,800 lb. required at maximum payload

Tongue Jack:

Shall be a Retractable, crank type with 3,500 lbs rated

Stabilizer jacks on the front and rear of the trailer

Safety Chain:

Shall have Two high test chain with safety cable rated at 7,000 lbs each.

Street Side Doors:

Shall have a side door on the front S.S, per Manufacturer recommendations with assisting entry step.

All Doors:

shall have entry assistance.

Shower rooms:

1. Shall have a (3) 32” X 32” shower rooms with lockable door entry (key alike)

2. Shall have one (1) ADA 60” X 36” compliance shower with lockable door entry (key alike).

3. Utility room 40” W X 7’with door lockable door entry (key alike)

4. Shall installed LED light fixtures with light switch next to the door frame.

5. Shall installed shower room vents 14”X14” with sealing recommended by manufacturer.

6. Shal have paper towel dispensers in each shower room.

7. 12 V LED interior lighting

8. Aluminum steps and handrails

9. Vinyl transit grade flooring

10. Four (4) power vents/skylight with cover

11. All showers shall have wall mounted sinks, liquid soap dispensers, vanity shatter proof mirror and mold resistant plastic curtains.

12. Interior upgrade must be white RFP panels

13. Shall have vacant/occupied indicator

14. Fiberglass subfloor

Sanitation:

1. Shall install Roto-molded Poly 225-gallon freshwater tank.

2. Shall install Roto-molded Poly 450-gallon rotationally waste tank

3. Shall installed pressure pump with holding tank monitor.

4. Shall have a RV style dump water system

5. Dual 100# propane tanks mounted on the tongue

6. Tikogi 199,000 BTU LP on demand water heater.

7. Floor drain to the ground.

8. Commercial PEX water lines

9. Water pressure shall be 15-150 psi at ¾”

Generator:

Shall have a 5.5 kw generator with enclosed compartment on the front of the tongue, (location will be determined at time of built) with ventilation door, the compartment shall have insulated walls.

Shall have a 20-gallon fuel tank capacity, with drain. Store dry.

Shall installed automatic transfer switch for shoreline and generator with 25’ shoreline cord Shall installed one (1) water proof 110-Volt receptacle

Battery shall be in protected aluminum box

Air Conditioning:

Shall have roof mounted GE 13.5K BTU AC unit with heat trips as per manufacturer installation recommendation.

Structural:

Shall be Constructed of A-36 structural grade steel and engineered to exceed the rated capacity, the deck material shall be sub flooring plywood

Brakes:

Shall have an Electric brake system and must have emergency break-away protection.

.Wheels:

Manufacturer shall provide five (5) per specifications by manufacturer

Tires:

Manufacturer shall provide five (5) BSW A/S tires. All wheels and tires shall be statically and dynamically balanced tubeless type.

Electrical:

1. Shall be twelve (12) volt, DOT standards, all wiring must be inside a wire loom and secure.

2. Shall installed 30 AMP panel with 25’ cord.

3. Shall installed power distribution center with 12V battery charger

4. Shall installed (2) 12V batteries with aluminum box protection as per manufacturer recommendations.

5. Shall installed (4) 110V duplex outlets as follow below

a. 1-Outlet on each wall inside of trailer above sink

b. 1-Outlet outside of trailer each side 2 Total.

6. Shall install (1) 110V wall switches at each side entry.

7. Shall installed (4) 4” LED Flood Lights Exterior with switch located at side entry door.

Frame:

Shall be compatible to GVWR. Welding or cutting of frame is unacceptable unless company is a certified body builder for the OEM manufacture. No Exceptions

Shall be All Steel wall framing.

Additional:

1. RV plug

2. Hitch 7-pole plug.

3. Walls and roof Insulated body

4. Chip resistant undercoating

5. 3” waste connections.

6. HD tube framed doors and hydraulic closures

7. One piece aluminum seamless roof

8. Vendor shall provide recommended stock part list

9. Vendor shall provide information on all S/N of the enclosed trailer to include, frame, axles, etc.

Warranty:

1. Manufacturer shall identify a single point warranty, and repair facility approved by the City of Long Beach within a 25-mile of Long Beach City Hall.

2. The Contractor shall guarantee the complete enclosed trailer furnished under these specifications against defects in material and workmanship for a period of 3 years from date unit is placed in service.

3. The Contractor shall repair or replace any such item(s) necessary during the warranty period at its own cost and expense, without cost to the City.

4. Warranty shall begin when the City of Long Beach places the unit in service.

All transportation of trailers for warranty repairs shall be at the expense of the manufacturer unless prior agreement is approved for each instance with the City of Long Beach.

Warranty Performance:

1. The contractor shall be required to provide service within one (1) working day after notification by telephone.

2. If the contractor does not acknowledge after two (2) working days, it shall be assumed as approval for the City to repair the trailer or obtain warranty outside vendor repair facility.

3. The City shall be paid an area average hourly rate for labor inclusive of transportation and parts replaced one for one repairs from component manufacturers.

4. The trailer manufacturer shall furnish all warranty documentation to the City upon delivery.

5. Defective parts shall be labeled and retained by the City until parts are replaced.

6. Contractor shall take full responsibility for returning any defective parts to his supplier.

7. Outside vendor repair facility parts and labor billing to go directly to manufacturer.

Manuals/Operating Service:

Successful bidder shall provide a full set of operating/service manuals (CD if available) for every major component installed in trailer including frame, electrical schematics, hydraulic schematics, and a complete parts manual. All manuals and schematics shall be delivered with each unit.

Acceptable Mke:

Color:

Shall be Manufacturer White.

Grant:

Urban Areas Security Initiative (UASI) funding will be use for the purchase of this shower trailer, the deadline for delivery to the City of Long Beach is December 15,2025.

Availability of State of California SPCM (Special Purpose Commercial Modular)

CITY OF LONG BEACH

TECHNICAL SPECIFICATION ITB FM 25-610

COMPLY

YES NO SPECIFICATION EXCEPTIONS / COMMENTS

CURRENT MODEL, 4-STATION SHOWER TRAILER

HEALTH-UASI-23

Shower Trailer Page 8 of 8

BID SECTION

COST FOR VEHICLE $ Input Price Electronically

TIRE TAX $ Input Price Electronically

DELIVERY $ Input Price Electronically

SALES TAX (10.25%) $ Input Price Electronically

TOTAL COST PER VEHICLE $ Input Price Electronically

TOTAL PURCHASE PRICE $ Input Price Electronically

ESTIMATED DAY OF DELIVERY ___________________

PAYMENT TERMS ___________________

(discounts offered)

File details come from the government source that posted it. Updated .