This document is the Bridge Tenders Manual and Training Guide (Exhibit A) for Pinellas County Public Works, specifically for Bridge Tending Services. The manual provides comprehensive operational instructions for bridge tenders managing drawbridges, with detailed procedures for bridge operation, safety protocols, emergency responses, and administrative requirements. The document covers critical aspects of bridge tender responsibilities, including signaling procedures, jurisdictional regulations, bridge mechanism operations for specific bridges (Park Boulevard and Dunedin Causeway), and various operational scenarios such as maintenance, inspections, and civil defense emergencies.
The manual includes multiple appendices with forms and checklists for bridge tenders, such as monthly equipment checks, daily logs, accident reports, and auxiliary power unit weekly assessments. It emphasizes strict adherence to U.S. Coast Guard regulations, proper communication protocols with vessel operators, and maintaining safety for both maritime and highway traffic. The document outlines specific operational sequences, emergency procedures, and the expectation that bridge tenders will be constantly alert, properly trained, and capable of handling complex bridge opening and closing scenarios while prioritizing public safety and equipment preservation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bridge_Tending_Services_(Addendum_#4_Revision).pdf | ||
| Non-Competitive_Oversight_Committee_Justification_Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A
BRIDGE TENDERS MANUAL
AND
TRAINING GUIDE
(rev. September 2018 lmt) bcc20060 Typewritten Text Bid No.: 189-0265-B(RO) Bid Title: Bridge Tending Services
TABLE OF CONTENTS
A. FORWARD
B. PURPOSE
C. A NOTE TO THE BRIDGE TENDER
D. BRIDGE TENDER REQUIREMENTS
1. RESPONSIBILITY
2. CONDUCT
3. SANITATION, ORDER AND CLEANLINES
4. ACCIDENT REPORTS
5. EMERGENCIES
6. ENCROACHMENT
7. HIGHWAY TRAFFIC
8. SAFETY
E. JURISDICTION
F. SIGNALS
1. GENERAL
2. VESSEL SIGNALS FOR BRIDGE OPENING REQUEST
3. BRIDGE TENDER'S RESPONSE SIGNALS
G. NATURAL DISASTERS
H. SPECIAL REGULATIONS
I. INSTRUCTION FOR BRIDGE MECHANISM OPERATION
1. General Procedure
2. Bypass Procedure
3. Safety Interlock Bypass Selector Switches
4. Auxiliary Power Unit Procedure
5. Navigation Traffic Lights Selector Switch
6. Specific Bridge Operation (Raise/Lower)
6.a. Park Blvd Routine Sequence Of Operation 6.b. Dunedin Causeway Routine Sequence Of Operation
J. LIGHTING
K. DRAWBRIDGE OPERATION DURING CIVIL DEFENSE EMERGENCIES
L. BRIDGE MAINTENANCE/INSPECTION
M. MANUAL OPERATIONS
1. Hand Cranking of the Traffic Control Gates
2. Hand Cranking of Span Lock Drive Pins
3. Hand Cranking of Bascule Spans
N. SUMMARY
APPENDIX A
U.S. COAST GUARD REGULATIONS
APPENDIX B
APPENDIX B FORMS
APPENDIX B-1 INSTRUCTIONS & GUIDES FOR COMPLETING FORMS
APPENDIX B-2 BRIDGE TENDER'S REPORT ON UNNECESSARY BRIDGE OPENING
APPENDIX B-3 MONTHLY EQUIPMENT CHECK LIST
APPENDIX B-4JOB KNOWLEDGE FOR QUARTERLY REVIEW
APPENDIX B-5 TELEPHONE LOG
APPENDIX B-6 PROPERTY DAMAGE & INJURY/ILLESS REPORTS
APPENDIX B-7 DAILY CHECKLIST
APPENDIX B-8 AUXILIARY POWER UNIT WEEKLY CHECKLIST
APPENDIX B-9 BRIDGE SIGN-IN LOG
APPENDIX B-10 MONTHLY REPORT OF DRAWBRIDGE OPENINGS
APPENDIX B-11 DAILY BRIDGE LOG
APPENDIX C
ACKNOWLEDGMENT OF READING BRIDGE TENDER MANUAL
A. FORWARD
1. This Manual has been prepared by Pinellas County to describe the duties and responsibilities of bridge tenders. Those bridge tenders who are hired under contract need to contact the designated person they are working for when referred by the manual to the Bridge Supervisor he shall in turn contact the Contract Manager or the County Representative.
2. The procedures for bridge operation are intended to lessen the likelihood of damage to persons or property.
B. PURPOSE
To serve as a guide to assist the bridge tenders in understanding their duties and responsibilities in the proper and safe operation of drawbridges.
C. A NOTE TO THE BRIDGE TENDER
1. Pinellas County has entrusted to your care thousands of lives and a valuable piece of machinery, the proper operation and care of which is of primary importance to the people using the highways and waterways of Florida. It is your duty to conduct all operations of the bridge in accordance with the regulations of the United States Coast Guard, the State of Florida Statutes, and with Pinellas County policies and procedures;
to adhere to the policies and instructions as given in this Manual, which may be supplemented by additional instructions from your supervisor; to take such actions as will be required to maintain safe bridge operation;
to maintain cleanliness on the bridge and in the bridge tender house; and to call local police when necessary to maintain order on or near the bridge.
2. You are to be courteous and responsive at all times. Under no circumstances are you to participate in arguments with marine traffic operators or users of the bridge.
3. You are required and directed to familiarize yourself with the contents of this Manual and any special regulation pertaining to the bridge or bridges which you operate. You are responsible for operating the bridge in strict compliance with this Manual, and any other special instructions that you might receive from your supervisor.
4. You or another competent bridge tender shall be on duty at all times for the purpose of operating the drawbridge.
D. BRIDGE TENDER REQUIREMENTS
1. RESPONSIBILITY
a. Unauthorized persons shall not be permitted in the control house at any time. Fire hazard inspection authorities, properly identified, may enter the bridge tender house at any time to perform their duties. He may, in writing, permit others. No County personnel may enter the bridge tender house unless he presents proper identification. A person's presence in the bridge tender house can be justified only if it is required for County or contracted functions.
b. The bridge tender shall not permit any person to operate the bridge except: persons authorized by the Bridge Supervisor; assigned and properly trained bridge tenders; or persons in training to become a bridge tender. Such trainees should never be left alone to operate the bridge.
c. All bridge tenders must remain on duty until relieved, in the tower, by a qualified bridge tender, unless other specific instructions have been issued by their supervisor. Personal safety is of paramount importance to the County. The bridge tender must employ his own judgment in considering whether or not to abandon the bridge tender house when he feels his personal safety is in jeopardy. Careful consideration and good judgment is required since abandonment of a bridge tender house is a serious matter to the County and to the Coast Guard. The bridge tender may be called upon to justify his abandonment and discipline by Pinellas County and prosecution by the State and Federal Governments may follow.
d. The bridge tender will maintain a current record, or log, on forms approved by the Pinellas County, of the following:
Exhibit A - Page 1
1) Boat passage, bridge openings and incidental items.
2) The results of required inspections.
3) Malfunction of any equipment or bridge mechanism.
4) Any unusual happenings that might be of interest to the County.
5) Accidents (even if there is no apparent damage to bridge).
6) All emergency telephone calls.
7) All individuals entering non-public areas of the bridge.
8) Affirmation that navigational lights work.
9) Unnecessary openings.
10) Weekly emergency generator checklist.
11) EQUIPMENT CHECKLIST form shall be turned in every week.
e. The bridge tender shall report immediately any failure, disorder or breakage which will, in any way, affect the efficient operation of the bridge, its fender system, safety devices or other appurtenances, to the Bridge Supervisor. The bridge tender's report should, whenever possible, include full information as to what repairs or replacements can be made without delay.
f. The bridge tender shall not sleep while on duty. Any bridge tender who does not remain alert and watchful at all times, is subject to disciplinary action by Pinellas County and prosecution by the State and the Federal Governments. Contracted bridge tenders shall be subject to the terms of the current contract.
g. The bridge tender shall not engage in private business while on duty or on County property.
h. The bridge tender shall not have unnecessary conversations with boaters.
i. All telephone calls will be limited to official business and/or emergencies.
j. The bridge tender is not permitted to have any appliances or furniture placed in the bridge tender house without prior approval from the Bridge Tender Supervisor or County Representative.
k. No one is permitted to fish or loiter from the bridge fender system or draw span or in any way hinder the operation of the drawbridge. The bridge tender should use reasonable control, efforts and prudence to discourage fishing or loitering from the bridge fender system or draw span. The bridge tender shall contact local police for assistance when reasonable control efforts fail.
l. Boats shall not be permitted to be tied or moored to the bridge fender system or the bascule piers.
Small craft may be allowed to anchor or moor to the bridge if they place themselves at least one span from the bridge fender system and/or the bascule piers. The bridge tender shall contact local police for assistance when reasonable control efforts fail.
m. At dusk, the bridge tender shall check each day to ascertain that ALL navigation lights are working and shall affirm this by making a note in the DAILY BRIDGE LOG (form Appendix B-11). Any malfunctioning lights shall be replaced according to this manual and logged. If unable to replace the bulbs or lights are still malfunctioning, they shall be reported immediately to the Bridge Supervisor.
n. The bridge tender shall not fish during official duty hours. Fishing equipment shall not be stored in the tender house.
o. The bridge tender shall not operate the structure for anyone other than authorized County officials without prior approval from the Bridge Supervisor.
p. No pets are allowed in the bridge tender house.
Exhibit A - Page 2
2. CONDUCT
a. All bridge tenders are required to conduct themselves so as not to discredit themselves or Pinellas County while on duty. Any bridge tender who acts in an improper manner shall be subject to disciplinary action and/or dismissal by Pinellas County.
b. No alcoholic beverages or illegal drugs may be brought into the bridge tender house. The bridge tender shall not report to work under the influence of alcohol or illegal drugs and shall not consume alcohol or use illegal drugs while on duty. Bridge tenders that fail to comply shall be subject to disciplinary action and/or dismissal by Pinellas County.
c. The bridge tender shall wear appropriate dress for this position. Specific uniform dress may be directed by Pinellas County.
3. SANITATION, ORDER AND CLEANLINESS
a. The bridge tender house shall be kept in a state of order and cleanliness at all items. The bridge tender is responsible for the following:
1) All floors of the bridge tender house shall be swept and mopped every morning between the hours of 6:30 a.m. and 7:30 a.m. and more frequently if necessary.
2) All windows shall be washed when dirty or in any event not less than once each Monday between 12 pm and 8 am, to insure clear visibility to the waterway and roadway. Special care should be taken with tinted windows to avoid scratches. No abrasive cleaners or rags shall be used and only water shall be used.
3) Cleaning of the bathroom and check and clean the air conditioners filter each day between
4 pm and 12 pm.
4) The control console is to be kept clean and in order at all times. No papers will be stored inside or on the control console.
5) No papers or other fire hazards are to be stored in the bridge tender house, except those papers and forms used to report bridge operation.
6) Walkways and sidewalks are to be checked and cleared of debris and trash each shift.
4. ACCIDENT REPORTS
a. Vessel Accident Report - Immediately after an accident occurs and you have contacted the marine patrol, the bridge tender shall call his supervisor and report the accident and its apparent seriousness. As soon as possible thereafter, the bridge tender shall submit an ACCIDENT Property Damage) REPORT FORM (Appendix B-6) to his supervisor.
b. Vehicular Accident Report - Immediately after an accident occurs and you have called 911 and the County, the bridge tender shall call his supervisor and report the accident and its apparent seriousness. As soon as possible thereafter, the bridge tender shall submit an ACCIDENT (Property Damage) REPORT FORM to his supervisor and the County.
In both cases, the Bridge Supervisor shall provide the accident report to the County Representative for further handling within 24 hours of the incident.
c. The bridge tender shall not discuss with anyone other than officials of the County or law enforcement officers the details of any vessel or vehicular accident.
Exhibit A - Page 3
5. EMERGENCIES
a. If for any reason the bridge cannot be safely operated, the bridge tender shall immediately call his supervisor. Emergencies warranting such a call include, but are not limited to, power failure and structural damage to the bridge.
b. When the bridge tender is informed by a reliable source that an emergency vehicle is due to cross the draw, the bridge tender shall take all reasonable measures to have the draw closed at the time the emergency vehicle arrives at the bridge.
c. A law enforcement officer may not order a bridge opened or closed unless one of the following circumstances exist: an emergency vehicle is approaching; public safety will be served; a major disaster has occurred or is occurring; a Civil Defense emergency exists.
d. Bridge tenders shall not comply with any request to raise the bridge they are operating for the purpose of forming a roadblock. Any requests shall be referred to the bridge supervisor.
6. ENCROACHMENT
The bridge tender shall promptly report to his supervisor any trespass on the Pinellas County right of way within the vicinity of the bridge for violations such as: erection of buildings, cutting timber, removing sand or other materials, digging ditches, using the banks of the waterway as loading points where the use is clearly of a commercial nature.
7. HIGHWAY TRAFFIC
a. The bridge tender shall not permit vehicles of any description, including bicycles, to park on the bridge approaches between the end of the spans and the safety gates at any time.
b. The bridge tender shall report illegal or questionable vehicles, which might cause damage to the bridge, to his supervisor as soon as possible.
8. SAFETY
a. The bridge tender is expected to conduct himself in a manner that is safe for himself, others and property.
b. Any water standing around electrical switchgear will be mopped dry and a rubber floor mat put in place before electrical gear is operated.
c. First aid kits are for emergency use only and shall be refilled after use.
E. JURISDICTION
1. Primary jurisdiction to regulate drawbridges over the navigable waters of the United States is vested in the United States Coast Guard. The regulations are presented in the Code of Federal Regulations, Title 33 -Navigation and Navigable Waters, hereinafter referred to as CFR 33. Such bridges owned and operated by Pinellas County have been constructed and are maintained and operated by permit from the United States Coast Guard. All rules for Pinellas County to operate the bridge shall be issued by the County.
2. If any person knowingly fails to comply with any regulation or rule issued or order given under the provisions of CFR 33, or knowingly obstructs or interferes with the exercise of any power conferred by CFR 33, he may be punished by imprisonment for not more than ten (10) years and may, at the discretion of the court, be fined not more than $10,000.00. Pinellas County shall train and educate his bridge tenders accordingly. The contractor will be responsible for the conduct of its employees.
F. SIGNALS
1. GENERAL
a. The operator of each vessel requesting a drawbridge to open shall signal the bridge tender and the bridge tender shall acknowledge that signal. The vessel operator shall repeat the signal until the bridge tender has acknowledged in some manner. The vessel shall not approach the bridge until he received the bridge tender's acknowledgement.
Exhibit A - Page 4
b. The authorized signal devices and order of preference to be used to request an opening and to acknowledge a request shall be communication by radio telephone, sound signals, or visual signals. Whatever signals are used, they must be sufficient to alert the person being signaled.
c. All acknowledging signals given by the bridge tender shall follow the requesting signal by no more than 30 seconds.
d. Common sense is to be used if a boat does not properly signal. The boat should not be sitting there while the bridge tender refuses to open, waiting for the proper signal.
2. VESSEL SIGNALS FOR BRIDGE OPENING REQUEST
a. Communication by Radio telephone.
Communication by radio telephone may be used to request the bridge opening, however, when the contact cannot be initiated or maintained, sound or visual signals shall be used. Channel 16 shall always be monitored but should not be used for communications, use the operating channel assigned to the bridge instead. If the tender receives an opening request on channel 16, he should briefly communicate to the requesting party to switch to the bridge operating channel (9) to continue the communication.
b. Sound Signals.
Sound signals shall be made by whistle, horn, megaphone, hailer or other device capable of producing the prescribed signals. A "prolonged blast" is 4 to 6 seconds in duration; a "short blast" is about 1 second duration. The sound signal to request the opening of a drawbridge is one prolonged blast followed (within 3 seconds) by one short blast. During scheduled closure periods, a vessel for which the draw is required to open (e.g., a public vessel of the U.S., vessel in tow or a vessel in distress), identifies its special status and requests draw opening by sounding five (5) short blasts in rapid succession.
c. Visual Signals.
Visual signaling to request the opening of a drawbridge is accomplished by vertically raising and lowering a white flag or vertically raising and lowering a white, amber or green light.
3. BRIDGE TENDER'S RESPONSE SIGNALS
a. Communication by Radio telephone. If the request for bridge opening has been made by radio telephone, the response will normally be completed by this method. In the event contact cannot be maintained, sound or visual signals will be used. Channel 16 shall always be monitored but should not be used for communications, use the bridge operating channel (9) instead.
b. Sound Signals
Sound signals shall be made by activating the horn mounted on the bridge tender house. When the bridge can be opened immediately, the sound signal to acknowledge a request to open the bridge is one prolonged blast followed by one short blast (as defined above). When the bridge cannot be opened immediately or is open and must be closed promptly, the sound signal to acknowledge a request to open the bridge is five short blasts sounded in rapid succession. The signal shall be repeated until acknowledged in some manner by the requesting vessel. If the vessel does not continue its approach, this can be interpreted by the bridge tender as the vessel operator's acknowledgement and the bridge tender can cease his signal.
c. Visual Signals
When the bridge can be opened immediately, the visual signal to acknowledge a request to open the bridge is one of the following:
1) A white flag raised or lowered vertically or
2) A white, amber or green light raised and lowered vertically or
3) A fixed or flashing white, amber or green light or lights.
When the draw cannot be opened immediately or is open and must be closed promptly, the visual signal to acknowledge a request to open the bridge is one of the following:
Exhibit A - Page 5
1) A red flag or red light swung back and forth horizontally in full sight of the vessel or
2) A fixed or flashing red light or lights.
The signal shall be repeated until acknowledged in some manner by the requesting vessel. If the vessel does not continue its approach, this can be interpreted by the bridge tender as the vessel operator's acknowledgment and the bridge tender can cease his signal.
d. Visual Sight
Common sense is to be used if a boat does not properly signal. The boat should not be sitting there while the Tender refuses to open, waiting for the proper signal.
G. NATURAL DISASTERS
1. Federal regulations authorized drawbridges to remain closed during a natural disaster such as a hurricane unless the Coast Guard specifically directs otherwise. The regulations do not permit closure in anticipation of a disaster without prior Coast Guard approval.
2. Authorities desiring to temporarily cease or restrict drawbridge openings to facilitate evacuation of land traffic before the arrival of a hurricane must obtain authorization from Commander, Seventh Coast Guard District.
3. This must be done by County Representative ONLY!!!! Call (305) 536-6546 between 7:30 a.m. and 4:00 p.m., Monday through Friday. At all other times call the Coast Guard Duty Officer at (305) 536- 5611. The Duty Officer will relay the request and furnish a response within minutes. Temporary closures are approved on a case by case basis and only if operation of the bridge impedes evacuation.
Specific regulations may exist for certain bridges which require opening on signal during periods of storm warning or alerts.
4. High winds may make a drawbridge inoperable or subject it to damage. Drawbridges are authorized to remain closed while experiencing steady winds of 34 knots (39 mph) or more if the Pinellas County has determined that closure is required to prevent damage to the bridge. When this condition exists, notations must be made in the DAILY BRIDGE LOG, including wind speed and direction. Requests to close drawbridges at wind speeds less than 34 knots (39 mph) to prevent damage will be considered by the Coast Guard. Such requests should be accompanied by an engineering analysis showing the maximum wind the bridge could be expected to experience without damage while in an opened or partially opened position. Closure of a bridge because of high winds should be reported to the Coast Guard immediately as well as the Bridge Supervisor and noted in DAILY BRIDGE LOG.
H. SPECIAL REGULATIONS
1. In the absence of specific regulations specifying otherwise, a drawbridge is required to open promptly on signal. Notwithstanding such approved schedules; when a bridge tender is informed by a reliable source than an emergency vehicle is due to cross the draw or if he sees or hears an emergency vehicle approaching, the bridge tender shall take all reasonable measures to have the draw closed at the time the emergency vehicle arrives at the bridge. The bridge tender shall give appropriate signals to any approaching vessels under the circumstances.
2. Except as provided by particular bridge opening schedules, drawbridges shall be opened promptly and fully for the passage of vessels when a request to open has been given in accordance with the signaling procedures established. Under no circumstances is the bridge tender to question the vessel operator as to his right for a bridge opening based on the height of his vessel, the bridge tender shall, in all cases, open the draw span if the pilot signals for a bridge opening. If a bridge tender is required to open a drawbridge for a vessel because of non-structural fixture on that vessel, which in his opinion, is not essential to navigation or which is easily lowered, he is to complete the BRIDGE TENDER'S REPORT ON UNNECESSARY BRIDGE OPENING (Form Appendix B-2) and submit it to his supervisor.
3. The County may obtain permission from the United States Coast Guard to temporarily alter the schedule or to temporarily close a bridge. When permission is obtained, the supervisor will inform the bridge tender and the bridge tender is required to comply with the temporary conditions.
Exhibit A - Page 6
I. INSTRUCTION FOR BRIDGE MECHANISM OPERATION
The following general procedures shall be followed by bridge tenders in operating the drawbridge spans owned by Pinellas County. All of the bridges in the County have electrical equipment interlocked so that a definite sequencing of operation is necessary in order to operate the spans.
Specific instructions on specific bridge operation are in Section I-6.
1. General Procedure
a. Return signal to vessel for opening. Pinellas County requires an audible signal before any opening, which will also alert maintenance personnel, pedestrians, fishermen, etc.
b. Initiate opening sequence.
1) Check the roadway for vehicles or pedestrians approaching so closely as to be endangered by lowering the traffic gates.
2) Turn ON the highway traffic bell signals and warning lights and/or traffic lights to stop oncoming traffic.
3) Recheck the roadway for vehicles or pedestrians approaching so closely as to be endangered by lowering the traffic gates.
4) Lower the traffic safety gates to keep the traffic from advancing towards the draw span.
Oncoming gates shall be lowered first.
5) Insure that pedestrians are clear of the opening span(s), (Dunedin Bridge tenders must physically cross the bridge span to the south side and check the trail to insure that pedestrians are clear of the opening span), then release span locks.
6) Then release the motor brakes.
7) Operate the controller to open the span(s) to its fully open position using extreme care in the final opening operation to prevent any damage to the bridge.
8) Set motor brakes.
c. As the vessel passes, observe and log the name or number and type of vessel, direction of travel, date and time of passage, and initial entry on the MONTHLY REPORT OF DRAWBRIDGE OPENINGS (Form Appendix B-10).
d. After the vessel has cleared the bridge, check to make sure no other vessels are approaching. If none are approaching, signal for bridge closure.
e. Initiate closing sequence.
1) Release motor brakes.
2) Operate the controller to close the span(s) using extreme care in the final closing operation to prevent any damage to the bridge.
3) Operate the lock motors to close the span locks.
4) Set motor brakes.
5) Raise the traffic safety gates, the oncoming gates shall be opened last, stop traffic bells and warning signals, switch traffic lights to green and permit highway traffic to precede.
f. In the event that the bridge fails to operate, you are to note it in the DAILY BRIDGE LOG (form
Appendix B-11). In all cases, first advise the bridge supervisor of the problem by phone.
g. All bypass switches are provided with seals. In the event it becomes necessary to utilize the bypasses, first Notify your supervisor, by phone, of the problem, for remedy and approval to break the seal must be given by Pinellas County Representative. A notation shall be made on the DAILY BRIDGE LOG indicating the reasons and the person authorizing by pass use. Failure to do so will result in disciplinary action. The bridge supervisor shall be notified immediately of any broken bypass seals. See bypass procedure below.
Exhibit A - Page 7
2. Bypass Procedure
a. If malfunction occurs call Pinellas County Roadway Maintenance, 464-8900. There is a person answering this number 24 hours a day. If you are unable to reach someone leave a message and call the Bridge Emergency Number 727-580-6273 or 727-580-2391.
b. DO NOT cut bypass seal without permission from Pinellas County Bridge Tender Supervisor.
c. When authorization has been given to cut bypass seal you will:
1) Log it on your DAILY BRIDGE LOG, date & time, seal was cut and why it had to be cut and the name of the person authorizing it to be cut.
2) When the problem has been corrected by Pinellas County and the seal has been replaced, log it on your DAILY BRIDGE LOG, date and time, bypass was resealed and who performed the repair.
3. Safety Interlock Bypass Selector Switches
CAUTION: Extreme care should be exercised when utilizing these switches, as serious damage to machinery and personnel may result.
a. There are three safety interlock bypass switches for the bridge leafs. The purpose of these switches are to enable qualified Pinellas County maintenance personnel the ability to bypass the limit switches which indicate the position of various mechanical parts in case of their failure as is necessary in an emergency situation.
1) GATE BYPASS When this switch is in the ON position; all safety interlocks for the traffic gates are bypassed. The span locks may be pulled without the traffic gates being fully lowered. The traffic lights may be turned green without the traffic gates being fully raised.
2) SPAN LOCK BYPASS When this switch is in the ON position; all safety interlocks for the span locks are bypassed. The bridge leaves may be raised or lowered without the span locks being fully pulled. The traffic gates may be raised without the span locks being fully driven.
3) SPAN BYPASS When this switch is in the ON position; all safety interlocks for the bridge leaves are bypassed. The span locks may be driven without the bridge leaves being fully lowered. The navigation lights may be turned green without the bridge leaves being fully raised.
4. Auxiliary Power Unit Procedure
a. Automatic Auxiliary Power Unit Procedure In case of an electrical power failure, an emergency generator is available to provide back-up power failure; an emergency generator is available to provide back-up power. Generator power is selected by turning the generator switch located on the control console to the TEST position. If it is desired to run the generator only, without having generator power supplied, the generator switch may be turned to the RUN position. In all other instances, the generator switch should be in the AUTOMATIC position.
5. Navigation Traffic Lights Selector Switch
a. The navigation light selector switch is located on the CONTROL CONSOLE.
It has three positions which may be selected. When MANUAL MODE is selected, the navigation lights remain on and operational at all times. When AUTOMATIC MODE is selected, the navigation lights will turn on and operate during night hours only. When OFF is selected, the navigation lights remain off and in operational.
6. Specific Bridge Operation
a. Park Blvd.
b. Dunedin
Exhibit A - Page 8
6.a. Park Blvd. Routine Sequence of Operation
Raise Sequence
1) Navigation lights are turned on.
2) Answer boat signals by pulling out HORN push-button (1-long & 1short)
3) Depress RED TRAFFIC/SIGNALS push-button. Normal GREEN INDICATING light out, RED INDICATING light on. Traffic lights turn red to stop traffic. RED GATE ARM lights come on and bell rings. Check for pedestrian traffic.
4) Depress ROADWAY GATE LOWER push-buttons. (Note: These are spring return buttons and they must be held down until gates are fully lowered.) To stop the gates in an emergency, release the buttons. (The pedestrian gate operates with the east gate).
5) Release EMERGENCY BRAKE; both leafs.
6) Depress NOSE LOCK DRAW push-button. (The Control locks in).
7) Advance SPAN MASTER CONTROLLERS slowly in RAISE direction successively through Points D, 1, 2, 3, 4, 5, and 6. Spans accelerate to speed corresponding to leaf controller positions.
8) Spans approach NEARLY OPEN positions. Return span controllers to Raise Points 5, 4, 3, 2 and 1, pausing briefly at each point. (Spans decelerate and approach the NEARLY OPEN positions at reduced speed. Spans stop in NEARLY OPEN position by action of SPAN LIMIT SWITCH. Spans shown at NEARLY OPEN position by amber light.)
9) Spans are at NEARLY OPEN positions. Return the span controllers to the OFF position.
Advance span controllers toward Raise Points 1, 2, or 3 (Note: Do not advance span controller past Point 3). Spans advance to FULLY OPEN positions at reduced speed. Spans stopped at FULLY OPEN position by span limit switch circuits to de-energize the leaf motors and set the brakes. Red indication lights come On to show FULLY OPEN position. Red Navigation lights go Out and green light comes On through span limit switch contact action.
10) Spans are at FULLY OPEN positions. Return span controllers to the OFF positions. You are now ready for water traffic.
Lower Sequence
1) When Boat traffic has cleared the bridge and you ready to start the lowering sequence, give the signal that the Bridge is closing by 5 SHORT BLASTS on the horn.
2) Advance SPAN MASTER CONTROLLERS slowly in Lower direction successively through Points D, 1, 2, 3, 4, 5, and 6. Spans accelerate to speed corresponding to each controller position. Navigation lights change from green to red.
3) Return span controllers to Lower Points 5, 4, 3, 2, and 1 pausing briefly at each point. (Spans decelerate and approach the NEARLY CLOSED positions at reduced speed. Spans stop in NEARLY CLOSED positions by action of span limit switch. Spans shown in NEARLY CLOSED positions by amber indicating lights.
4) Return the SPAN CONTROLLERS to the OFF position. Advance SPAN CONTROLLERS toward Lower Points 1, 2, or 3 at a reduced speed. Spans reach FULLY CLOSED positions when end stops are reached and span Fully Closed limit switches close to light green FULLY CLOSED indication lights. When FULLY CLOSED lights come On, depress FOOT SWITCH to set the service brakes while holding the MASTER CONTROLLERS in Lower Points 1, 2, or 3 to keep power on the motors while the brakes set. After the brakes set, return the MASTER CONTROLLER to the OFF position. Be sure the FULLY CLOSED green indicating lights remain lighted. Permissive to drive NOSE LOCKS.
5) Set EMERGENCY BRAKE till Green Light in ON. (Both leafs) Lock mechanisms operate automatically under control of their limit switches. Locks are shown in DRIVEN position by Green Light. Permissive to raise Roadway Gates.
Exhibit A - Page 9
6) Depress ROADWAY GATE RAISE pushbuttons (the control locks in) do not hold down the button. Roadway Gates raise and Limit Switches open to stop gates. Green Gate Raised Lights come ON.
7) Depress GREEN TRAFFIC SIGNALS pushbutton. Gate Arm lights and bells are turned OFF.
Traffic lights turn green. Normal green light is ON, red light is OFF.
8) ROAD TRAFFIC RESUMES.
6.b. Dunedin Causeway Routine Sequence Of Operation
Raise Sequence
1) Before any of the control functions can be executed, power must be turned on by depressing the CONTROL POWER push-button. The LEVER must be returned to its neutral position.
Power on will be verified by illumination of the CONTROL POWER ON indicator light.
2) The horn is to be sounded at this time by depressing the manual HORN push-button. (One long and one short blast)
3) Before initiating the raise sequence of operation, the advance warning lights are to be turned on and the traffic signals will be turned from green to red by turning the TRAFFIC SIGNAL selector switch to the ON position. The advance warning light will warn the oncoming traffic that the bridge is about to open before the traffic lights are visible and traffic signals will automatically turn from green to yellow, and after approximately 10 seconds, the traffic lights will turn from yellow to red.
4) The far oncoming traffic gate may then be lowered by depressing the FAR ONCOMING TRAFFIC GATE LOWER push-button. This push-button must be held depressed in order for motion to occur. Release of this push-button will stop the gate from moving. As the far oncoming gate is being lowered, the FAR ONCOMING TRAFFIC GATE RAISED indicator light will go out. Once the far oncoming traffic gate is fully lowered, the FAR ONCOMING TRAFFIC GATE LOWER indicator light will be illuminated, the bell on the far oncoming traffic gate will stop ringing, and the near off going traffic gate will be enabled.
CAUTION: The operator must inspect the bridge before lowering the near off going traffic gate to be sure that there are no vehicles still present on the bridge.
5) The near off going traffic gate may then be lower by depressing the NEAR OFF GOING TRAFFIC GATE LOWER push-button. As in the operation of the FAR ONCOMING TRAFFIC GATE LOWER push-button, this push-button must be held depressed in order for motion to occur. Release of this push-button will stop the gate from moving.
As the near off going traffic gate is being lowered, the NEAR OFF GOING TRAFFIC GATE RAISED indicator light will go out. Once the near off going traffic gate is fully lowered, the NEAR OFF GOING TRAFFIC GATE LOWERED indicator light will illuminate.
6) The near oncoming traffic gate may then be lowered by depressing the NEAR ONCOMING TRAFFIC GATE LOWER push-button. This push-button must be held depressed in order for motion to occur. Release of this push-button will stop the gate from moving. As the near oncoming traffic gate is being lowered, the NEAR ONCOMING TRAFFIC GATE RAISED indicator light will go out. Once the near oncoming traffic gate is fully lowered, the NEAR ONCOMING TRAFFIC GATE LOWER indicator light will be illuminated, the bell on the near oncoming traffic gate will stop ringing, and the far off going traffic gate will be enabled.
CAUTION: The operator must inspect the bridge before lowering the far off going traffic gate to be sure that there are no vehicles still present on the bridge.
7) The far off going traffic gate may then be lowered by depressing the FAR OFF GOING TRAFFIC GATE LOWER push-button. As in the operation of the NEAR ONCOMING TRAFFIC GATE RAISE push-button, this push-button must be held depressed in order for motion to occur. Release of this push-button will stop the gate from moving.
As the far off going traffic gate is being lowered, the FAR OFF GOING TRAFFIC GATE RAISED indicator light will go out. Once the far off going traffic gate is fully lowered, the FAR OFF GOING TRAFFIC GATE LOWERED indicator light will illuminate.
Exhibit A - Page 10
8) The normal sequence of operation of the traffic gates may be suspended at any time by releasing the appropriate TRAFFIC GATE LOWER push-button. The sequence of operation may then be resumed by pulling out the appropriate TRAFFIC GATE LOWER push-button, or the sequence may be aborted by pulling out the appropriate TRAFFIC GATE RAISE push-button.
9) Once all of the traffic gates are lowered, the span locks will be enabled. At this time the tender must cross to the south side of the bridge to check the trail to insure pedestrians are clear of the opening spans.
10) The span locks may then be retracted by pulling out the SPAN LOCKS PULL push-button. As the span locks are being retracted, the SPAN LOCKS DRIVEN indicator light will go out. Once the span locks are fully retracted, the SPAN LOCKS PULLED indicator light will illuminate, and the raise sequence is enabled.
11) The normal sequence of operation of the span locks may be suspended at any time by pulling out the STOP push-button. The sequence of operation may then be resumed by pulling out the SPAN LOCKS PULL push-button, or the sequence may be aborted by pulling out the SPAN LOCKS DRIVE push-button.
12) Prior to raising the bridge, you may sound the horn again by depressing the HORN push-button one time long and one time short. Each bridge leaf may then be raised by turning the corresponding LEVER, near span is turned clockwise and far span is turned counter clockwise. The LEVER has six maintained positions which correspond to six various speeds.
The farther the LEVER is turned, the faster the bridge leaf will rise.
13) While a bridge leaf is in motion, the BRAKE SET indicator light will go out, and the BRAKE RELEASE indicator light will illuminate, indicating that the brake motor is running and has released the bridge leaf motor. When the bridge leaf motor stops, the brake motor stops, the BRAKE RELEASE indicator light will go out, and the BRAKE SET indicator light will illuminate.
14) As a bridge leaf is being raised, the FULLY CLOSED indicator light will immediately go out.
Once a bridge leaf has risen far enough to break contact with its respective nearly closed limit switch, the NEARLY CLOSED indicator light will go out. Once a bridge leaf has risen far enough to make contact with its respective nearly open limit switch, the NEARLY OPEN indicator light will illuminate, and the bridge leaf will automatically rise at a slower speed. The bridge leaf will continue at that slower speed until it makes contact with its respective fully open limit switch, at which time the FULLY OPEN indicator light will also illuminate, and the bridge leaf will automatically stop.
15) The raising sequence of either of the bridge leaves may be suspended at any time by slowly turning the corresponding LEVER, near span is turned counter clockwise and far span is turned clockwise, to its slow speed position.
16) When the LEVER is slowly turned to its slow speed position, the bridge leaf will decelerate to a controlled stop. The raise sequence may then be resumed by pulling the LEVER, near span is turned clockwise and far span is turned counter clockwise or the sequence may be aborted (the bridge leaf lowered) by turning the LEVER near span is turned counter clockwise and far span is turned clockwise. The farther the LEVER is turned, the faster the bridge leaf will lower.
17) While the bridge leaves are in motion the LEVER may be returned to its neutral position, to stop the leafs abruptly. This will cause excessive wear and damage to the mechanical parts, however, and should therefore be used only in emergency situations. The raise sequence of operation may then be resumed by turning the LEVER, near span is turned clockwise and far span is turned counter clockwise or the sequence may be aborted (the bridge leaf lowered) by turning the LEVER near span is turned counter clockwise and far span is turned clockwise.
The farther the LEVER is turned, the faster the bridge leaf will lower.
18) While the bridge leaves are in motion, the CONTROL POWER OFF push-button may be depressed, to stop the leaves abruptly. This will cause excessive wear and damage to the mechanical parts, however, and should therefore be used only in emergency situations.
The raise sequence of the operation may then be resumed by turning the LEVER back to its neutral position, pulling out the CONTROL POWER ON push-button and turning the LEVER, near span is turned clockwise and far span is turned counter clockwise, or the sequence may
Exhibit A - Page 11 be aborted (the bridge leaf lowered) by turning the LEVER, near span is turned counter clockwise and far span is turned clockwise. The farther the LEVER is turned, the faster the bridge leaf will lower.
19) Once both bridge leaves are in their fully open position, the navigation lights will automatically turn from red to green, providing the NAVIGATION LIGHTS SELECTOR SWITCH is turned to the ON position.
Lower Sequence
1) Prior to lowering the bridge, the horn should be sounded by pulling out the HORN push-button five short consecutive times. You should also verify all boat traffic has cleared the spans.
2) Each bridge leaf may then be lowered by turning the corresponding LEVER, near span is turned counter clockwise and far span is turned clockwise. The LEVER has six maintained positions which correspond to six various speeds. The farther the LEVER is turned, near span is turned counter clockwise and far span is turned clockwise, the faster the bridge leaf will lower.
3) While a bridge leaf is in motion, the BRAKE SET indicator light will go out, and the BRAKE RELEASE indicator light will illuminate, indicating the brake motor is running and has released the bridge leaf motor. When the bridge leaf motor stops, the brake motor stops, the BRAKE RELEASE indicator light will go out, and the BRAKE SET indicator light will illuminate.
4) As a bridge leaf is being lowered, the FULLY OPEN indicator light will immediately go out.
Once a bridge leaf has lowered far enough to break contact with its respective nearly open limit switch, the NEARLY OPEN indicator light will go out. Once a bridge leaf has lowered far enough to make contact with its respective nearly closed limit switch, the NEARLY CLOSED indicator light will illuminate, and the bridge leaf will automatically lower at the slower speed.
The bridge leaf will continue at that slower speed until it makes contact with its respective fully closed limit switch, at which time the FULLY CLOSED indicator light will illuminate, and the bridge leaf will automatically stop.
5) The lowering sequence of either of the bridge leaves may be suspended at any time by slowly pushing the corresponding LEVER, near span is turned counter clockwise and far span is turned clockwise, back to its slow speed position.
6) When the LEVER is slowly turned to its slow speed position, the bridge leaf will decelerate to a controlled stop. The lower sequence may then be resumed by turning the LEVER, the near span is turned counter clockwise and the far span is turned clockwise, or the sequence may be aborted (the bridge leaf raised) by turning the LEVER, near span is turned clockwise and far span is turned counter clockwise. The farther the LEVER is turned, the faster the bridge leaf will rise.
7) While the bridge leaves are in motion the LEVER may be returned to its neutral position, to stop the leaves abruptly. This will cause excessive wear and damage to the mechanical parts, however, and should therefore be used only in emergency situations. The lower sequence of operation may then be resumed by turning the LEVER, near span is turned counter clockwise and far span is turned counter clockwise, or the sequence may be aborted (the bridge leaf raised) by turning the LEVER near span is turned clockwise and far span is turned counter clockwise. The farther the LEVER is turned, the faster the bridge leaf will rise.
8) While the bridge leaves are in motion, the CONTROL POWER OFF push-button may be depressed to stop the leaves abruptly. This will cause excessive wear and damage to the mechanical parts, however, and should therefore be used only in emergency situations.
The lower sequence of operation may then be resumed by turning the LEVER back to its neutral position, pulling out the CONTROL POWER ON push-button and turning the LEVER near span is turned counter clockwise and far span is turned counter clockwise or the sequence may be aborted (the bridge leaf raised) by turning the LEVER, near span is turned clockwise and far span is turned counter clockwise. The farther the LEVER is turned, the faster the bridge leaf will rise.
CAUTION: Care should be taken in the special case of suspending the bridge lower sequence when the bridge leaf is within 5 degrees of being fully closed. If the FULLY CLOSED LIMIT SWITCH is improperly set, the switch may trip prematurely, and prevent
Exhibit A - Page 12 the bridge from fully closing. Should this happen, the bridge should be raised again until it is at least 15 degrees inclined, then lowered to set the leaves properly, and the following step followed.
9) Once both bridge leaves have fully closed, the bridge leaves may be seated by pulling out and holding in the SEAT push-button. As a leaf is being seated, the BRAKE SET indicator light will go out, the BRAKE RELEASE indicator light will illuminate, indicating the brake motor is running and has released the bridge leaf motor. The bridge leaf motor will then slowly lower the bridge leaf down into a fully seated position. Release of the SEAT push-button will stop the bridge leaf motor and brake motor. Once the brake motor stops, the BRAKE RELEASE indicator light will go out, and the BRAKE SET indicator light will illuminate.
10) Once both bridge leaves have fully closed, and both brakes set, the span locks will be enabled. The span locks may then be extended by pulling out the SPAN LOCKS DRIVE push-button. As the span locks are being driven, the SPAN LOCKS PULLED indicator light will go out. Once the span locks are fully driven, the SPAN LOCKS DRIVEN indicator light will illuminate, and the off going traffic gates are enabled.
11) The normal sequence of operation of the span locks may be suspended at any time by depressing the STOP push-button. The sequence of operation may then be resumed by depressing the SPAN LOCKS DRIVE push-button, or the sequence may be aborted by pulling out the SPAN LOCKS PULL push-button.
12) The far off going traffic gate may then be raised by depressing the FAR OFF GOING TRAFFIC GATE RAISE push-button. As the far off going traffic gate is being raised, the FAR OFF GOING TRAFFIC GATE LOWERED indicator light will go out. Once the far off going traffic gate raised, the FAR OFF GOING TRAFFIC GATE RAISED indicator light will illuminate, and the near oncoming traffic gate will be enabled.
13) The near oncoming traffic gate may then be raised by depressing the NEAR ONCOMING TRAFFIC GATE RAISE push-button. As the near oncoming traffic gate is being raised, the NEAR ONCOMING TRAFFIC GATE LOWERED indicator light will go out. Once the near oncoming traffic gate if fully raised, the NEAR ONCOMING TRAFFIC GATE RAISED indicator light will illuminate.
14) The near off going traffic gates may then be raised by depressing the NEAR OFF GOING TRAFFIC GATE RAISE push-button. As the near off going traffic gate is being raised, the NEAR OFF GOING TRAFFIC GATE LOWERED indicator light will go out. Once the near off going traffic gate is fully raised, the NEAR OFF GOING TRAFFIC GATE RAISED indicator light will illuminate, and the far oncoming traffic gates will be enabled.
15) The far oncoming traffic gates may then be raised by depressing the FAR ONCOMING TRAFFIC GATE RAISE push-button. As the far oncoming traffic gate is being raised, the FAR ONCOMING TRAFFIC GATE LOWERED indicator light will go out. Once the far oncoming traffic gate if fully raised, the FAR ONCOMING TRAFFIC GATE RAISED indicator light will illuminate.
16) The normal sequence of operation of the traffic gates may be suspended at any time by depressing the CONTROL POWER push-button. The sequence of operation may then be resumed by pulling out the CONTROL POWER ON push-button, and pulling out the appropriate TRAFFIC GATE RAISE push-button or the sequence may be aborted by pulling out the appropriate TRAFFIC GATE LOWER push-button.
17) Once all the traffic gates are fully raised, the traffic signals may be turned green by turning both the TRAFFIC SIGNAL selector switches to the GREEN position.
J. LIGHTING
1. After sunset the bridge tenders shall be constantly alert to see that all lights are burning. The bridge tender shall replace burned out lights, as required by the County, as soon as possible.
2. Each bridge tender on duty during the hours of darkness shall check the lights at the beginning of his shift or as soon as dusk arrives. A record of the results of this inspection shall be entered in the DAILY
BRIDGE LOG.
Exhibit A - Page 13
3. Battery operated lights shall be kept in readiness at all times and must be placed in their proper place when electrical power fails.
K. DRAWBRIDGE OPERATION DURING CIVIL DEFENSE EMERGENCIES
1. During Civil Defense emergencies, normal drawbridge openings will continue, except at the following times:
a. When it becomes necessary for the bridge tender, in the interest of his own personal safety, to evacuate the bridge. Before leaving the bridge, the bridge tender will make sure that the main power switch is turned off and that all doors are closed and locked.
b. When the bridge tender receives instructions from a Pinellas County official not to open…