This document is a project drawing for the BEAR CREEK DRIVE WATERLINE SEISMIC RETROFIT project managed by the City of Ashland, Oregon. The project involves installing 24-inch diameter restraints and fittings within the public Right-of-Way or easement along Bear Creek Drive to increase the seismic resiliency of the existing water main. Key work items include temporary traffic controls, potholing to identify existing mechanical restraints, installing split bell restraint harnesses on unrestrained joints, and installing two flexible expansion joints. Contractors must be prequalified and bids are due by 2:00 PM PST on August 22, 2024, with the project required to be completed within 60 calendar days of receiving the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder.

This project is estimated to cost over $250,000 and is funded in part by the American Rescue Plan Act (ARPA) and the State and Local Fiscal Recovery Funds (SLFRF) program. There are no set-asides or restrictions on the types of organizations that can respond, and the City of Ashland has not identified any incumbent vendors or current contractors for this project. The project is subject to additional federal compliance requirements outlined in the provided ARPA Mandatory Clauses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

f

TBKLLC

485 BEAR CREEK DR

381W09DA • 3000

r=====�g ��L TV

.!. isl;' Bf:d'.AP ����£<Hee::" -9!Bl::'!f"1l! .... _>

Bear Creek Drive

UMPQUABANK

404NMAINST

381W09DD. 300

I

I

I

I

I

I

UMPQUABANK

404NMAIN5T

381W09DD-400

HOLDEN LEONE /

457 BEAR CR DR I

A -4400

- - -- - - d------------

I MHl!t StorM Dro.ln Vo.ult RIM EL=l490.20 IE=l486.05 20' CNC <SV>

IE =1485,35 24' Nl2 <ND ,suMp=l482.50

STATE OF OREloN

BEAR CR DR

381W10CC-100

MHl61 So.nlto.ry Sewer - - - - -

-------;7 MHl71 Storr> Oro.In

RIM EL=l495,25 IE=l489.65 12' Nl2 <NV>

IE=l489.IO 20' CNC <SW)

IE=1488,95 20' CNC <ND

MHl81 So.nito.ry Sewer

RIM EL= 14 96.62

IE=l488.52 8' PVC <SD

IE=1487.57 12' VCP (SW)

IE=1487.37 12' VCP <ND

I

I

I

I

I

PLAN VIEW

r � 20·-o·

I

I

I

/7 f

RIM EL=l491.66 IE=l480.16 VCP (SW IE=l480.M vtP �

,(;' ,f-ll J<

/q

I

I

I

I

I

I

PHOENIX URBAN

FlENEWI\I-AGENCY

BEAR CR DR

381W09DD • 600

GENERAL NOTES 11

1) THE INTENT OF THIS PROJECT IS TO RETROFIT THE EXISTING

24' DI WATERLINE WITH JOINT RESTRAINTS SUCH THAT THE

ENTIRE SECTION OF WATERLINE ALONG BEAR CREEK DRIVE IS

CONTINUOUSLY RESTRAINED. THE SECTIONS OF PIPELINE

INDICATED TO BE RETROFITTED IN THESE PLANS ARE BASED

UPON THE ORIGINAL DESIGN DRAWINGS FOR THE

TALENT-ASHLAND-PHOENIX WATER INTERTIES PIPELINE AND

WATER SYSTEM IMPROVEMENTS, DATED JULY 14TH, 2000,

PREPARED BY MONTGOMERY WATSON. THE ORIGINAL DESIGN

DRAWING ARE INCLUDED AS AN APPENDIX TO THE BID

PACKAGE FOR REFERENCE, THE EXACT LENGTHS OF

EXISTING UNRESTRAINED PIPE, AND ANY STATED QUANTITIES

OF JOINT RESTRAINTS REQUIRED TO RESTRAIN THE PIPE,

ARE ESTIMATED BASED SOLELY ON THE ORIGINAL

CONSTRUCTION DRAWINGS. QUANTITIES WILL CHANGE

DEPENDING ON ACTUAL CONDITIONS FOUND IN THE FIELD

DURING POTHOLING BY THE CONTRACTOR.

2) RESTORE TRENCH PER DETAIL 1 ON SHEET D01.

3) WATER MAIN KEYNOTE 1 SHOWS THE APPROX LENGTH OF

PIPE TO RESTRAIN. AT EACH WORK LOCATION SHOWN ON

THESE PLANS, THE CONTRACTOR SHALL CONTINUE TO

EXCAVATE PIPE, IN BOTH DIRECTIONS BEYOND THE BOUNDS

SHOWN , UNTIL EXISTING RESTRAINTS ARE FOUND, TO

ENSURE ENTIRE PIPE IS RESTRAINED AT COMPLETION OF

PROJECT.

4) THE EX 24" DI TAP LINE IS COVERED IN CEMENT TREATED SOIL

OF VARIABLE DEPTH, WITH AN EXPECTED STRENGTH OF

APPROX 3000 PSI. AN APPROX 6' LAYER OF AC COVERS THE

CEMENT TREATED SOIL. THE CONTRACTOR SHALL BE AWARE

OF AND TAKE THIS INFORMATION INTO ACCOUNT WHEN

PERFORMING SAWCUTTING AND EXCAVATION WORK.

REMOVED FOR SPLIT BELL RESTRAINT OR FLEXIBLE 4

5) CONTRACTOR SHALL REPLACE ANY POL YWRAPPING @

EXPANSION JOINT INSTALLATION WITH NEW DOI

POL YWRAPPING MATERIAL. REFER TO DETAILS AND

SPECIFICATIONS FOR MORE DETAIL

WATER MAIN KEYNOTES

RETROflT EX 24' DI PIPE 111TH JOINT RESTRAINTS 2 0 FROM APPROX STA :;+06 TO 6+82· @ APPROX (10) SPLIT BEil RESTRAINTS. REFER TO DETAIL DOI r,;\ FROM APPROX STA 5+06 TO 6+82 PROY}()E:

� (1) - FLfXIBLE EXPANSION JOINT. CONTRACTOR LU

SHALL EXCAVATE AT THE ENGINEER'S DIRECTION � AND EXACT LOCATION \\1LL BE DETERMINED BY THE

ENGINEER DURING CONSTRUCTIOU. REF£R TO DETAIL

EXPIRES: 1213112025

a: t:: <( LL wO m a:

I-en w I- a:

C Zu z

W-

:3 w en o w :::c a: en en a. w <( 2�- ..J

C")

LL.

'I""'

I-w w :::c en

LL. 2 a:

0 w w I- � en en w z

:3 a.

(J a: > w- I- a:

<( C z

� ::ii:::

a. ww � a: u

:a:

a:

w I-

••<( I[� =�.. "1

I lo

< � 0 iii u

I � !a a a:

File details come from the government source that posted it. Updated .