This is Addendum #2 to ITB 8393, issued by the City of Waterbury, Connecticut on October 27, 2025, regarding building slab and foundation removal and soil remediation services at 170 Freight Street in Waterbury. The addendum clarifies contract requirements through a series of questions and answers addressing contractor qualifications, material handling, and project procedures. Key clarifications include: crushed concrete from off-site locations is not permitted for backfill in bid items 15 and 16; contractors handling contaminated soil must be permitted under Connecticut General Statute 22a-454 (permitted spill cleanup contractors) or may subcontract such services; qualified waste haulers must be fully licensed and permitted; material designated for disposal may be live-loaded once waste characterization testing and approvals are completed; containment structures greater than 1,500 square feet require change order pricing; a new state sign is required on-site; existing perimeter fencing may remain in place if undamaged but can be removed and stored if necessary for project execution; and the anticipated project start date is early December 2025. The contractor is responsible for securing all necessary permits and licenses at no additional cost to the owner and must comply with all local, state, and federal laws and regulations.
The addendum includes detailed laboratory testing results for pit water samples (CT66305-1) showing contamination including PCBs, volatile organic compounds, and metals, which are appended for contractor reference. All proposals exceeding $50,000 must be accompanied by proposal security in the form of a certified check or bid bond equal to 10 percent of the total proposal price. The contract documents comprise an eight-sheet drawing set covering general notes, existing conditions, slab and foundation demolition plans, concrete slab sample locations and disposal areas, soil remediation areas, sedimentation and erosion control plans and details, and site restoration details. The project involves removal of contaminated concrete slabs, foundation demolition, soil excavation, and site restoration across approximately 3.13 acres, with construction anticipated to occur from fall 2025 through spring 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 8621- Wtby_Jan_28_26_solicitation_doc.pdf | ||
| ITB 8393 Addendum 3.pdf | ||
| ITB 8593 Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONNECTICUT
ADDENDUM #2
October 27, 2025
ITB 8393 170 Freight Street Slab Removal
Please Be Advised:
All proposals of the above captioned project are hereby notified that the Contract Documents for the above referenced project are amended as noted in this Addendum No. 2.
This Addendum shall be part of the Contract Documents for the above referenced project as provided in the Invitation to Bid.
The Contract Documents are hereby amended as follows:
1) See attached/posted files “170 Freight Street Full Set for Construction” and “02222 GCT66305-1 Water Attachment.pdf”.
Please refer to the questions and answers below.
Question: Can crushed concrete from an offsite location be used for backfill for bid item numbers 15 & 16?
Answer: Use of crushed concrete from off-site sources is not allowed.
Question: Contractors that handle contaminated soil are required to be permitted by the DEEP under section 22a-454. How does this requirement apply to this project?
Answer: Contractors who handle contaminated soil on this project must be permitted pursuant to Connecticut General Statute 22a-454, commonly referred to as the list of Permitted Spill Cleanup Contractors. If the prime Contractor does not meet this qualification, they may sub-contract such services. It is the Contractor’s responsibility to be aware of and comply with all local, State, and Federal laws and regulations.
Question: As A Demo/Haz mat Remediation contractor, we do not necessarily transport our own debris, particularly Haz-Mats. My question is if my hauler has CT Deep Waste Transporter and Clean up certs, can my company still bid on the project and list them as sub of ours?
Answer: Qualified demolition / hazardous materials remediation contractors are encouraged to bid on this project. All waste haulers used on this project must be fully licensed, permitted and
OFFICE OF THE DIRECTOR OF PURCHASING
MAUREEN McCAULEY
ASSISTANT DIRECTOR OF PURCHASING
235 GRAND STREET • WATERBURY, CONNECTICUT 06702 • PHONE: (203) 574-6749 • FAX: (203) 597-3437 otherwise qualified to transport the waste they are hauling. It is the Contractor’s responsibility to be aware of and comply with all local, State, and Federal laws and regulations.
Question: Can we live load the material or are we to stockpile the concrete and soils?
Answer: Material designated for disposal can be live loaded so long as all waste characterization testing has been completed and all necessary waste disposal profiles, approvals, and manifests are prepared prior to shipping.
Question: The water in the pits I did not see any testing that was done on it, please provide.
Answer: Lab report CGT66305 contains the pit water testing results. This report is included in Attachment L of the bid package and appended to this Addendum for convenience.
Question: On the bid form number 5 it does not say if its remediation or bulk waste, waste please advise.
Answer: The waste designation included in Base Bid Item 5 is “PCB, petroleum, and metals-contaminated concrete slabs as EPA/TSCA regulated PCB Remediation Waste (≥50 ppm)”
Question: O the unit prices what if the area is lagger than 1500 square feet we should have a larger containment, and you should be telling us how its going to be constructed.
Answer: If a containment greater than 1,500 square feet is required to conduct out of scope work the cost for which will be determined through the change order process. Determining means and methods for constructing such a containment would be the contractor’s responsibility.
Question: In the specs it shows we need a state sign but there was one on site do we need another state sign?
Answer: Contractor should assume that a new sign is required.
Question: The drawing shows a fence detail, but can't we use the parameter fence, or do we still need the fence for some reason?
Answer: The existing perimeter fence can be used to secure the site. Details are included in the event that additional fencing must be installed or to repair damaged fencing. Contractor is responsible for securing the work site at all times.
Question: On the drawing it shows use saving the fence but it the walk thru we were told to leave it please advise.
Answer: Fencing around the building footprint can remain in place so long as it is not damaged during the work. If fencing must be removed to facilitate the project, it shall be removed and stored in a manner that does not damage the fencing.
Question: Is there an estimated timeframe for project award and start date?
Answer: Once the bids are reviewed, it is anticipated the proposed bidder will start the project early December.
Question: Per the specs the proposed backfill is ordinary borrow. Is structural fill required for backfill purposes for this project?
Answer: Borrow material provided must meet the specifications included in the bid documents.
NOTE: Each Proposal over $50,000.00 submitted shall be accompanied by a Proposal Security (a Certified Check or Bid Bond) in the amount of ten (10) percent of the Total Proposal Price.
Thank you.
Maureen McCauley
Assistant Director of Purchasing – City of Waterbury
Pl ot te d
O n:
O ct
9, 5-
:2 1a m B y:
Z
Le po re La st S av ed
9/
/2
Ti gh e
B on d:
J
W
\W
\0
A
Fr ei gh t
S la b R em ov al
\D ra w in gs \A ut oC
A D
\W
-0
-G
-0
-C O
V
ER
.d w g
PREPARED BY:
SET OF 8 SHEETS
LOCATION MAP
SCALE: 1" = 1000'
PREPARED FOR:
CITY OF WATERBURY, CT
WATERBURY DEVELOPMENT CORPORATION
83 BANK STREET
WATERBURY, CT 06702
OCTOBER 14, 2025
BUILDING SLAB AND FOUNDATION REMOVAL
AND SOIL REMEDIATION
170 FREIGHT STREET
CITY OF WATERBURY, CT
INVITATION TO BID 8393
LIST OF DRAWINGS
SHEET NO. DRAWING NO. DRAWING TITLE
1 C-100 GENERAL NOTES, STANDARD ABBREVIATIONS, AND LEGEND
2 EX-1 EXISTING CONDITIONS PLAN
3 C-101 SLAB AND FOUNDATION DEMOLITION PLAN
4 REM-1 CONCRETE SLAB SAMPLE LOCATIONS AND DISPOSAL AREAS
5 REM-2 SOIL REMEDIATION AREAS
6 C-201 SEDIMENTATION AND EROSION CONTROL PLAN
7 C-202 SEDIMENTATION AND EROSION CONTROL DETAILS
8 C-301 SITE RESTORATION DETAILS
SITE LOCATION
C-100
GENERAL NOTES,
STANDARD ABBREVIATIONS,
AND LEGEND
AS SHOWN
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Waterbury, Connecticut
Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street
Waterbury Development Corporation
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
W1222-074A-C-100-GEN.dwg
W-1222-074A
SCALE:
ISSUED FOR
CONSTRUCTION
Pl ot te d
O n:
O ct
9, 5-
:2 2a m B y:
Z
Le po re La st S av ed
9/
/2
Ti gh e
B on d:
J:
\W \W
\0
A
Fr ei gh t
S la b R em ov al
\D ra w in gs \A ut oC
A D
\W
-0
A -C
-1
-G
EN
.d w g
ZJL
HAL
JTO
10/14/2025
GENERAL NOTES
1. UTILITY, STRUCTURE AND FACILITY LOCATIONS SHOWN HEREON WERE PLOTTED FROM INFORMATION SUPPLIED BY RESPECTIVE UTILITY COMPANIES AND DATA OBTAINED FROM FIELD SURVEYS AND AS-BUILT DRAWINGS. THE ACCURACY AND COMPLETENESS OF SUBSURFACE INFORMATION SHOWN ON THESE DRAWINGS IS NOT GUARANTEED. THE CONTRACTOR SHALL DETERMINE FOR THEMSELVES, THE
LOCATIONS AND ELEVATIONS OF ALL UTILITIES WHICH MAY AFFECT THEIR CONSTRUCTION
OPERATIONS. THE CONTRACTOR MUST ADEQUATELY PROTECT AND SUPPORT UTILITIES AND HE SHALL BE RESPONSIBLE FOR ALL DAMAGE INCURRED AT NO EXPENSE TO THE OWNER. ANYONE USING UTILITY INFORMATION AND DATA PROVIDED HEREIN SHALL CONTACT "CALL BEFORE YOU DIG", 1-800-922-4455 OR WWW.CBYD.COM, 72 HOURS IN ADVANCE TO VERIFY THE LOCATION OF UTILITIES PRIOR TO
STARTING CONSTRUCTION.
2. REFERENCE IS MADE TO PLAN ENTITLED "ZONING LOCATION SURVEY, PREPARED FOR MRT REALITY, 170 FREIGHT STREET, WATERBURY, CONNECTICUT" BY MEYERS ASSOCIATES P.C. DATED 11-9-17, REVISED 8-20-18.
3. ELEVATIONS REFER TO NGVD OF 1929 DATUM.
4. IT IS THE RESPONSIBILITY OF EACH BIDDER IN EVALUATING THESE PLANS TO MAKE EXAMINATIONS IN THE FIELD BY VARIOUS METHODS AND OBTAIN NECESSARY INFORMATION FROM AVAILABLE RECORDS, UTILITY COMPANIES, AND INDIVIDUALS AS TO THE LOCATION OF SUBSURFACE STRUCTURES.
5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND
SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE DRAWINGS, SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNER'S REPRESENTATIVE IN WRITING PRIOR TO THE START OF CONSTRUCTION.
FAILURE BY THE CONTRACTOR TO NOTIFY THE OWNER'S REPRESENTATIVE SHALL CONSTITUTE
ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES.
6. AS CONSTRUCTION IS COMPLETED, THE CONTRACTOR SHALL REMOVE ALL EXCESS PROJECT
GENERATED MATERIAL, DEBRIS, ETC. AND RESTORE OR REPLACE ANY DAMAGE TO LANDSCAPING AS
DIRECTED BY OWNER'S REPRESENTATIVE.
7. AREAS OUTSIDE THE PROJECT LIMIT LINE DISTURBED BY CONSTRUCTION SHALL BE RETURNED TO THEIR ORIGINAL CONDITION OR BETTER AND SHALL BE GRADED TO MEET PROPOSED CONSTRUCTION AS DIRECTED BY THE OWNER'S REPRESENTATIVE, UNLESS PRIOR APPROVAL IS PROVIDED BY THE THE OWNER'S REPRESENTATIVE THAT RESTORATION IS NOT REQUIRED. COST FOR THIS WORK SHALL BE
BORNE BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
8. THE CONTRACTOR SHALL PROCURE ALL THE NECESSARY PERMITS AND LICENSES, AT THE TIME
REQUIRED, PAY ALL THE CHARGES AND FEES, AND GIVE NOTICES AS NECESSARY AND DUE IN
CONNECTION WITH THE LAWFUL EXECUTION OF THE WORK AT NO ADDITIONAL COST TO THE OWNER.
9. ALL UTILITY BOXES, FRAMES, AND GRATES, ETC. AFFECTED BY THE CONSTRUCTION ACTIVITIES AND THAT ARE NOT BEING DEMOLISHED OR ABANDONED SHALL BE RESET/RECONSTRUCTED TO THE PROPER GRADE. ALL COST RELATED TO SUCH WORK SHALL BE CONSIDERED INCLUDED IN THE BID PRICE.
10. EXCAVATION OF ANY TYPE SHALL BE ACCOMPLISHED IN SUCH A MANNER THAT UNDERGROUND
UTILITIES OR STRUCTURES ARE NOT DAMAGED. IT SHALL BE THE CONTRACTOR'S SOLE
RESPONSIBILITY FOR ANY DAMAGES INCURRED DURING EXCAVATION OPERATIONS. ALL EXCAVATION
SHALL BE IN CONFORMANCE WITH THE LATEST OSHA REQUIREMENTS.
11. THE CONTRACTOR SHALL SUFFICIENTLY COVER ALL DISTURBED AREAS AT THE END OF EACH WORK DAY TO AVOID ANY RISK OF INJURY TO PEDESTRIAN OR VEHICULAR TRAFFIC. THE CONTRACTOR SHALL INSTALL TEMPORARY SUPPORT SYSTEMS OVER TRENCH EXCAVATIONS THAT ARE TAMPER RESISTANT AND SAFE FOR VEHICULAR AND PEDESTRIAN TRAFFIC. THE CONTRACTOR SHALL INSTALL BARRICADES TO PROTECT AGAINST PEDESTRIAN ACCESS. THE CONTRACTOR SHALL OBTAIN APPROVAL OF THE
TEMPORARY SAFETY MEASURES BY THE OWNER'S REPRESENTATIVE. ALL MAINTENANCE AND
PROTECTION OF BOTH PEDESTRIAN AND VEHICULAR TRAFFIC ARE INCLUDED IN THE LUMP SUM BID
PRICE FOR THIS PROJECT.
12. THE CONTRACTOR SHALL RECORD THE LOCATIONS OF ALL UNDERGROUND UTILITIES CAPPED AND/OR
ABANDONED OR FOUND DURING CONSTRUCTION. THE UTILITIES SHALL BE MEASURED FROM
PERMANENT SURFACE FEATURES AND COMPILED BY THE CONTRACTOR ON RECORD DRAWINGS.
13. THE CONTRACTOR SHALL COMPLETE ALL WORK SO THAT ANY MATERIALS WHICH ARE TO REMAIN IN PLACE OR WHICH ARE TO REMAIN THE PROPERTY OF THE OWNER, WILL NOT BE DAMAGED. IF THE
CONTRACTOR DAMAGES ANY MATERIALS WHICH ARE TO REMAIN, OR WHICH ARE TO REMAIN THE
PROPERTY OF THE OWNER, THE DAMAGED MATERIALS SHALL BE REPLACED TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE AT THE EXPENSE OF THE CONTRACTOR, UNLESS PRIOR APPROVAL IS
PROVIDED BY THE THE OWNER'S REPRESENTATIVE THAT RESTORATION IS NOT REQUIRED.
14. THE CONTRACTOR SHALL ANTICIPATE IN THEIR BID THAT THE AREA OF THEIR PROPOSED WORK MAY BE ENCUMBERED BY UTILITY COMPANIES FOR THE REMOVAL/RELOCATION/ADJUSTMENT/CONSTRUCTION OF UTILITIES. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE REQUIRED NOTIFICATIONS. THE CONTRACTOR SHALL COORDINATE ALL ASPECTS OF THEIR WORK WITH SAID UTILITY COMPANIES.
15. ALL PROPOSED WORK MAY BE VARIED IN THE FIELD BY THE OWNER'S REPRESENTATIVE TO MEET
EXISTING CONDITIONS.
INC INCORPORATED
INV INVERT
L LENGTH OF CURVE
LT LEFT
LOC LOCATION
LP LIGHT POLE
MAX MAXIMUM
MIN MINIMUM
MH MANHOLE
MISC MISCELLANEOUS
MON MONUMENT
NIC NOT IN CONTRACT
N NORTH
CATV CABLE TELEVISION
NTS NOT TO SCALE
N/A NOT APPLICABLE
N/F NOW OR FORMERLY
OH OVERHEAD
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
PCPP PERFORATED CORRUGATED POLYETHYLENE PIPE
PED PEDESTRIAN
PI POINT OF INTERSECTION
PT POINT OF TANGENCY
PRC POINT OF REVERSE CURVATURE
PS PARKING SPACES
PVC POLYVINYL CHLORIDE
R RADIUS
REV REVISION
ROW RIGHT OF WAY
RT RIGHT
SAN SANITARY
SCH SCHEDULE
SF SQUARE FEET
S SOUTH
STA STATION
STD STANDARD
STRM STORM
T TANGENT LENGTH/TEL-DATA
TEL TEL-DATA
TF TOP OF FRAME
TYP TYPICAL
TC TOP OF CURB
TW TOP OF WALL
W WATER
WG/WV WATER GATE/VALVE
XFMR TRANSFORMER
& AND
STANDARD ABBREVIATIONS
@ AT
ABDN('D) ABANDON(ED)
AC ACRE/AIR CONDITIONING
AOBE AS ORDERED BY THE ENGINEER
BSMT BASEMENT
BCLC BITUMINOUS CONCRETE LIP CURBING
BOW BACK OF WALK
BL BASELINE
BW BOTTOM OF WALL
BIT BITUMINOUS
BC BOTTOM OF CURB
BLDG BUILDING
BOT BOTTOM
CATV CABLE TELEVISION
CIP CAST IRON PIPE
CB CATCH BASIN
CL CENTERLINE
CLF CHAIN LINK FENCE
CL&P CONNECTICUT LIGHT & POWER
CTDEEP CONNECTICUT DEPT. OF ENERGY & ENV. PROTECTION
CTDOT CONNECTICUT DEPT. OF TRANSPORTATION
CONC CONCRETE
CO CLEAN-OUT
CPP CORRUGATED POLYETHYLENE PIPE
CY CUBIC YARDS
DIP DUCTILE IRON PIPE
DWG DRAWING
E EAST/ELECTRIC
EOP EDGE OF PAVEMENT
ELEC ELECTRIC
EL/ELEV ELEVATION
EMH ELECTRIC MANHOLE
EX/EXIST EXISTING
EG EXISTING GRADE
FF FIRST FLOOR
G GAS
GEN GENERATOR
GG GAS GATE
GRC GALVANIZED RIGID CONDUIT
HC HANDICAP
HYD HYDRANT
IN INCHES
DESCRIPTION EXISTING PROPOSED
PROPERTY LINE
ADJACENT PROPERTY LINE
PROJECT LIMIT LINE
REMOVE PIPE/STRUCTURE
ASPHALT PATCH
SILT SACK
HAYBALE INLET PROTECTION
GEOTEXTILE SILT FENCE
HAYBALE BARRIER
EROSION CONTROL BLANKET
SOIL STOCKPILE AREA
CONSTRUCTION ENTRANCE
CONSTRUCTION FENCE
CONSTRUCTION GATE
EDGE OF ROAD
EDGE OF ROAD (CURBED)
RETAINING WALL
CONCRETE WALK
HANDICAP RAMP
EXTERIOR STAIRS
BUILDING
CHAIN LINK FENCE
STORM SEWER
STORM MANHOLE
CATCH BASIN
SANITARY SEWER
SANITARY MANHOLE
WATER MAIN/SERVICE
WATER VALVE
HYDRANT
GAS MAIN
GAS GATE
ELECTRIC - BURIED
ELECTRIC MANHOLE
LIGHT POLE
LEGEND
X X X
CFCF
S.S.
Soil Stockpile
Area
X X X
SHEET 1 OF 8
GENERAL NOTES (CONTINUED)
21. THE ENTIRE SITE IS LOCATED WITHIN ZONE X, AREAS OF 0.2% ANNUAL CHANCE FLOOD (500-YEAR), BASED UPON FLOOD INSURANCE RATE MAP NUMBER 09009C0116H, EFFECTIVE DATE DECEMBER 17, 2010. THE 500-YEAR FLOOD ELEVATION IS APPROXIMATELY 275.5 (NAVD 88) BASED UPON NAUGATUCK
RIVER FLOOD PROFILE FROM THE FLOOD INSURANCE STUDY NUMBER 09009CV008D, NEW HAVEN
COUNTY, CONNECTICUT, VOLUME 8 OF 10, REVISED MAY 16, 2017. ELEVATION 275.5 (NAVD 88)
CONVERTS TO APPROXIMATELY ELEVATION 276.4 (NGVD 29).
22. NO BUOYANT, HAZARDOUS, FLAMMABLE, EXPLOSIVE, SOLUBLE, EXPANSIVE, OR ANY OTHER MATERIALS WHICH COULD BE INJURIOUS TO HUMAN, ANIMAL OR PLANT LIFE IN THE EVENT OF FLOOD SHALL BE STORED WITHIN THE SITE (500-YEAR FLOODPLAIN) AT ANY TIME. DEBRIS GENERATED DURING DEMOLITION SHALL BE ACTIVELY MANAGED FOR REMOVAL FROM THE SITE FOR LEGAL DISPOSAL.
23. PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR WILL SUBMIT TO THE ENGINEER A WRITTEN FLOOD CONTINGENCY PLAN. THE PLAN SHALL INCLUDE A DESCRIPTION OF THE MEANS BY WHICH THE CONTRACTOR WILL REMOVE FROM WITHIN THE FLOODPLAIN, ALL MATERIALS, EQUIPMENT AND PERSONNEL PRIOR TO A PREDICTED MAJOR STORM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING LOCAL WEATHER CONDITIONS AND SECURING THE WORK SITE BEFORE PREDICTED MAJOR STORMS. A MAJOR STORM SHALL BE DEFINED AS A STORM PREDICTED BY THE N.O.A.A.
WEATHER SERVICE WITH WARNING OF FLOODING, SEVERE THUNDERSTORMS OR SIMILARLY SEVERE
WEATHER CONDITIONS OR EFFECTS.
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Waterbury, Connecticut
Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street
Waterbury Development Corporation
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
W1222-074A-EX-1.dwg
W-1222-074A
SCALE:
ISSUED FOR
CONSTRUCTION
Pl ot te d
O n:
O ct
9, 5-
:2 6a m B y:
Z
Le po re La st S av ed
9/
8/
Ti gh e
B on d:
J:
\W \W
\0
A
Fr ei gh t
S la b R em ov al
\D ra w in gs \A ut oC
A D
\W
-0
A -E
X -1
.d w g
ZJL
HAL
JTO
10/14/2025
00 40' 80'
SCALE: 1" = 40' EX-1
EXISTING CONDITIONS
SHEET 2 OF 8
AS SHOWN
N
MAP REFERENCES
1. "ZONING LOCATION SURVEY FOR 170 FREIGHT STREET,
WATERBURY, CONECTICUT", BY MEYERS ASSCIATES P.C.,
PREAPRED FOR MRT REALITY, DATED AUGUST 20, 2018.
2. ORTHOPHOTOGRAPY, PROVIDED BY NEARMAP, DATED
SEPTEMBER 1, 2022.
LEGEND
PROPERTY LINE
ADJACENT PROPERTY LINE
EDGE OF ROAD
EDGE OF ROAD (CURBED)
RETAINING WALL
CONCRETE WALK
CONCRETE PAD
HANDICAP RAMP
EXTERIOR STAIRS
BUILDING
CHAIN LINK FENCE
STORM SEWER
STORM SEWER LATERAL
CATCH BASIN
STORM MANHOLE
SANITARY SEWER
SANITARY MANHOLE
WATER MAIN
WATER VALVE
WATER MANHOLE
HYDRANT
GAS MAIN
GAS MANHOLE
ELECTRIC - BURIED
ELECTRICAL MANHOLE
LIGHT POLE
CJC
FORMER BUILDING 1 AREA
FORMER BUILDING 3 AREA
FORMER BUILDING 2 AREA
00 40' 80'
SCALE: 1" = 40' C-101
SLAB AND FOUNDATION
DEMOLITION PLAN
AS SHOWN
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Waterbury, Connecticut
Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street
Waterbury Development Corporation
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
W1222-074A-C-101-DEMO.dwg
W-1222-074A
SCALE:
ISSUED FOR
CONSTRUCTION
Pl ot te d
O n:
O ct
9, 5-
:2 7a m B y:
Z
Le po re La st S av ed
9/
8/
Ti gh e
B on d:
J:
\W \W
\0
A
Fr ei gh t
S la b R em ov al
\D ra w in gs \A ut oC
A D
\W
-0
A -C
-1
-D
EM
O .d w g
ZJL
HAL
JTO
10/14/2025
SLAB AND FOUNDATION DEMOLITION PLAN NOTES
1. UTILITY, STRUCTURE AND FACILITY LOCATIONS SHOWN HEREON WERE PLOTTED
FROM INFORMATION SUPPLIED BY RESPECTIVE UTILITY COMPANIES AND DATA
OBTAINED FROM FIELD SURVEYS AND AS-BUILT DRAWINGS. THE ACCURACY AND
COMPLETENESS OF SUBSURFACE INFORMATION SHOWN ON THESE DRAWINGS IS
NOT GUARANTEED. THE CONTRACTOR SHALL DETERMINE FOR HIMSELF, THE
LOCATIONS AND ELEVATIONS OF ALL UTILITIES WHICH MAY AFFECT HIS
CONSTRUCTION OPERATIONS. THE CONTRACTOR MUST ADEQUATELY PROTECT
AND SUPPORT UTILITIES AND HE SHALL BE RESPONSIBLE FOR ALL DAMAGE
INCURRED AT NO EXPENSE TO THE OWNER. ANYONE USING UTILITY
INFORMATION AND DATA PROVIDED HEREIN SHALL CONTACT "CALL BEFORE YOU
DIG", 1-800-922-4455 OR WWW.CBYD.COM, 72 HOURS IN ADVANCE TO VERIFY
THE LOCATION OF UTILITIES PRIOR TO STARTING CONSTRUCTION.
2. REFERENCE IS MADE TO PLAN ENTITLED "ZONING LOCATION SURVEY, PREPARED
FOR MRT REALITY, 170 FREIGHT STREET, WATERBURY, CONNECTICUT" BY
MEYERS ASSOCIATES P.C. DATED 11-9-17, REVISED 8-20-18.
3. ELEVATIONS REFER TO NGVD OF 1929 DATUM.
4. REFER TO C-100 GENERAL NOTE 18, REGARDING FEMA FLOOD ELEVATIONS AND
RESTRICTIONS FOR MATERIAL STORAGE AT THE SITE.
5. THE CONTRACTOR SHALL OBTAIN CITY OF WATERBURY STREET OPENING PERMIT
PERMITS PRIOR TO ANY WORK BEING PERFORMED WITHIN CITY of WATERBURY
RIGHT-OF-WAY.
6. THE CONTRACTOR SHALL FILE ALL APPLICABLE PERMIT APPLICATIONS AND
NOTICES WITH THE CITY OF WATERBURY WITHIN THE REQUIRED TIMEFRAMES TO
RECEIVE APPROVALS PRIOR TO THE START OF DEMOLITION ACTIVITIES.
7. ANY AND ALL WORK PERFORMED ON THE CITY OF WATERBURY RIGHT-OF-WAY
SHALL BE REQUIRED TO MEET THE CITY STANDARDS.
8. THE CONTRACTOR SHALL TAKE EXTREME CARE TO PROTECT ALL EXISTING
STRUCTURES, SURFACE IMPROVEMENTS, LANDSCAPING, ETC. OUTSIDE THE
PROJECT LIMIT LINE AND SHALL RESTORE ANY DAMAGE TO THESE ITEMS TO
PRE-DAMAGE CONDITION OR BETTER, UNLESS PRIOR APPROVAL IS PROVIDED BY
THE OWNER'S REPRESENTATIVE THAT RESTORATION IS NOT REQUIRED.
9. THE CONTRACTOR SHALL SAWCUT EXISTING PAVEMENT AND SIDEWALK AREAS
AS REQUIRED BY THE CONTRACT DRAWINGS OR THE OWNER'S REPRESENTATIVE
PRIOR TO THE START OF ANY EXCAVATION AND AT ALL LOCATIONS WHERE THE
PROPOSED PAVEMENT/CONCRETE WALK MEET EXISTING PAVEMENT/CONCRETE
WALK.
10. THE CONTRACTOR SHALL DEMOLISH, REMOVE, AND LEGALLY DISPOSE OF
OFF-SITE ALL ITEMS INDICATED TO BE REMOVED WITHIN PROJECT LIMIT LINE.
11. THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES AND UTILITY
STRUCTURES NOT IDENTIFIED FOR REMOVAL DURING UTILITY AND SURFACE
DEMOLITION OPERATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE INCURRED TO EXISTING UTILITY STRUCTURES AND SHALL REPAIR OR
REPLACE THE EXISTING UTILITY STRUCTURES TO PRE-DAMAGED CONDITION OR
BETTER TO THE SATISFACTION OF THE OWNER AND AT NO ADDITIONAL COST TO
THE OWNER.
12. THE PLAN IS PROVIDED TO SHOW THE GENERAL EXTENT OF THE SLAB AND
FOUNDATION DEMOLITION. NOT ALL ITEMS REQUIRING REMOVAL MAY BE SHOWN
OR CALLED OUT. THE CONTRACTOR IS RESPONSIBLE TO REMOVE AND PROPERLY
DISPOSE OF ALL ITEMS ON THE SITE (ABOVE GROUND OR BELOW GROUND)
WHICH ARE NOT REQUIRED TO BE SAVED OR PROTECTED AND WHICH WILL NOT
BE INCORPORATED INTO THE FINAL CONSTRUCTION, INCLUDING ANY EQUIPMENT
OR OTHER ITEMS LOCATED ON OUTDOOR CONCRETE PADS.
13. THE PROVISIONS OF WORKER SAFETY AND/OR HEALTH PROTOCOLS THAT
ADDRESS COMPLIANCE WITH THE RULES, LAWS AND REGULATIONS PERTAINING
TO CONSTRUCTION SAFETY AND/OR THE POTENTIAL AND/OR ACTUAL RISK OF
EXPOSURE TO SITE SPECIFIC PHYSICAL OR CHEMICAL HAZARDS POSED TO THE
CONTRACTOR'S EMPLOYEES IS SOLELY THE RESPONSIBILITY OF THE
CONTRACTOR. REFER TO APPLICABLE HEALTH AND SAFETY SPECIFICATIONS
14. ALL ITEMS IDENTIFIED FOR REMOVAL/DEMOLITION SHALL BE DISPOSED OF
LEGALLY OFF-SITE. ALL COSTS SHALL BE INCLUDED AS REQUESTED ON THE BID
FORM.
15. CONTRACTOR TO COMPLY WITH THE REQUIREMENTS FOR EROSION AND
SEDIMENTATION CONTROL, SEE C-301 AND C-302.
16. THE CONTRACTOR SHALL PROTECT ALL CONCRETE SIDEWALKS, APRONS,
CURBING, BITUMINOUS CONCRETE PAVEMENT, PEDESTRIAN RAMPS, FENCING,
DRAINAGE STRUCTURES, MANHOLES, PIPING, UTILITIES, UTILITY POLES,
SIGNAGE, HYDRANTS, ETC., OUTSIDE PROJECT LIMIT LINE, AND WITHIN CITY
RIGHT-OF-WAY.
17. INSTALL CONSTRUCTION SIGNS, CONSTRUCTION FENCING AND OTHER
TEMPORARY CONTROLS AS REQUIRED PRIOR TO INITIATING DEMOLITION
ACTIVITIES.
18. SLAB REMOVAL SHALL BE CONDUCTED IN CONFORMANCE WITH THE
REMEDIATION PLAN AND DEMOLITION SPECIFICATIONS, INCLUDING ALL
REGULATORY AND REPORTING REQUIREMENTS. DISPOSE OF ALL MATERIALS IN
ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL LAWS AND
REGULATIONS AND IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS.
19. AS AN ALTERNATE PAY ITEM, CONTRACTOR CAN PROPOSE TO CRUSH AND REUSE
AS BACKFILL MATERIAL NON-CONTAMINATED MASONRY DEBRIS. IF THIS
ALTERNATE IS PROPOSED AND ELECTED, CONTRACTOR MUST CRUSH
NON-CONTAMINATED CONCRETE TO A THREE INCH (3-INCH) MINUS GRADATION
OR OTHER SIZING APPROVED BY ENGINEER.
20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ACCESS TO OR
SUPPLYING WATER DURING CONSTRUCTION.
21. UTILITY CONNECTIONS IDENTIFIED AT THE FORMER BUILDING WERE
TERMINATED PRIOR TO BUILDING DEMOLITION. UTILITY LOCATIONS SHOWN ARE
APPROXIMATE. ADDITIONAL CONNECTIONS TO BUILDING FOUNDATION MAY BE
PRESENT. CONTRACTOR MUST IDENTIFY AND CUT, CAP, OR OTHERWISE
ABANDON ALL UTILITIES THAT MAY STILL BE CONNECTED TO THE BUILDING
FOUNDATION IN ACCORDANCE WITH ALL REQUIREMENTS OF THE CITY AND THE
UTILITY OWNER.
22. CONTAMINATED SOILS ABUTTING FOUNDATION WALLS ARE KNOWN OR
SUSPECTED TO BE PRESENT. IF ENCOUNTERED, THESE SOILS MUST REMAIN IN
PLACE AND NOT BE ALLOWED TO ERODE INTO THE FOUNDATION CAVITY, TO THE
EXTENTS PRACTICAL. IF CONTAMINATED SOILS ERODE INTO THE CAVITY,
ENGINEER MAY REQUIRE THAT THEY BE PLACED BACK IN THEIR ORIGINAL
LOCATION PRIOR TO BACKFILLING THE CAVITY.
23. ALL CONTAMINATED CONCRETE AND SOIL SHOWN ON DRAWINGS REM-1 AND
REM-2 MUST BE REMOVED PRIOR TO STARTING DEMOLITION AND PROCESSING
OF NON-REGULATED MASONRY DEBRIS. ENGINEER WILL NOTIFY CONTRACTOR
ONCE ALL CONTAMINATED MATERIAL IS REMOVED.
24. AREAS NOT DESIGNATED FOR DISPOSAL AS REGULATED WASTE WILL BE
MANAGED AND DISPOSED OF AS NON-REGULATED MASONRY DEBRIS OR
CRUSHED AND USED AS BACKFILL AS AN ALTERNATE BID ITEM.
TEST PITS AND OTHER EXPLORATORY ACTIVITIES WERE COMPLETED TO
OBSERVE THE EXISTING CONDITION OF THE CONCRETE SLABS AND
FOUNDATION COMPONENTS. NOTABLE FINDINGS FROM THESE
ACTIVITIES ARE LISTED BELOW FOR INFORMATIONAL PURPOSES.
1. THE GREEN SHADED BASEMENT SLAB AREA WAS OBSERVED TO BE EIGHT TO
NINE INCHES THICK, ON AVERAGE. FORMER EQUIPMENT LOCATIONS WERE
IDENTIFIED TO HAVE SLABS AS THICK AS 15 INCHES.
2. A SUBSTANTIAL AMOUNT OF CONCRETE PIERS AND OTHER CONCRETE BLOCKS
AND DEBRIS WAS IDENTIFIED BENEATH THE GREEN SHADED BASEMENT AREA
SLABS.
3. THE TAN SHADED ELEVATED SLAB AREA WAS OBSERVED TO BE EIGHT TO TEN
INCHES THICK, ON AVERAGE.
4. MULTIPLE CONCRETE PARTITION WALLS, SUPPORTS, AND OTHER FEATURES WERE
OBSERVED BENEATH THE TAN SHADED ELEVATED SLAB AREA.
5. A SECOND CONCRETE SLAB WAS OBSERVED APPROXIMATELY NINE FEET BENEATH
MOST OF THE TAN SHADED ELEVATED SLAB AREA. THE TOP OF THE SECOND SLAB
WAS IDENTIFIED AT THE SAME APPROXIMATE ELEVATION AS THE GREEN SHADED
BASEMENT AREA. THIS SECOND SLAB WAS NOT IDENTIFIED BENEATH THE
BUILDING 3 BASEMENT.
6. THE VOID SPACE BETWEEN THE ELEVATED SLAB AND THE LOWER SLAB WAS
OBSERVED TO BE FILLED WITH SANDY FILL MATERIAL INTERMIXED WITH
VARIOUS DEBRIS. SOME SPACES / FORMER ROOMS MAY REMAIN AS OPEN
UN-FILLED VOID SPACES.
7. FOOTINGS WERE OBSERVED AT THE BASE OF PERIMETER AND INTERIOR WALLS.
THESE FOOTINGS WERE OBSERVED TO BE VARIOUS SIZES AND EXTENDING FROM
12 INCHES TO FOUR FEET BENEATH THE WALLS.
PROTECT
EXISTING STORM
DRAINAGE LINE
CUT AND CAP EXISTING WATER SERVICES CJC
PROTECT EXISTING STORM
DRAINAGE THAT MAY RUN
BENEATH THE FOUNDATION,
TO REMAIN (TYP.)
SHEET 3 OF 8
ABANDON ELECTRICAL VAULT
N
SLAB AND FOUNDATION DEMOLITION LEGEND
PROJECT LIMIT LINE
REMOVE STRUCTURE
ABANDON SERVICE LINE
CUT AND CAP PIPE
STORM SEWER
STORM SEWER LATERAL
CATCH BASIN
STORM MANHOLE
SANITARY SEWER
SANITARY MANHOLE
WATER MAIN
WATER VALVE
WATER MANHOLE
HYDRANT
GAS MAIN
GAS MANHOLE
ELECTRIC - BURIED
ELECTRICAL MANHOLE
LIGHT POLE
DEMOLISH BASEMENT SLABS AND
FOUNDATION WALLS AND FOOTINGS
AND DISPOSE IN ACCORDANCE WITH
THE WASTE DISPOSAL PLANS SHOWN
ON DRAWING REM-1 AND AS
DESCRIBED IN THE DIVISION 2 AND 13
SPECIFICATIONS
DEMOLISH ABOVE-GRADE SLABS,
FOUNDATION WALLS AND FOOTINGS
AND POTENTIAL BASEMENT SLABS AND
DISPOSE IN ACCORDANCE WITH THE
WASTE DISPOSAL PLANS SHOWN ON
DRAWING REM-1 AND AS DESCRIBED
IN THE DIVISION 2 AND 13
SPECIFICATIONS
DEMOLISH SLABS AND DISPOSE IN
ACCORDANCE WITH THE WASTE
DISPOSAL PLANS SHOWN ON DRAWING
REM-1 AND AS DESCRIBED IN THE
DIVISION 2 AND 13 SPECIFICATIONS
PROJECT LIMIT LINE
PROTECT EXISTING
WATER/FIRE
PROTECTION PIPING
(TYP.)
PROTECT EXISTING
WATER/FIRE
PROTECTION PIPING
(TYP.)
PROTECT EXISTING
WATER/FIRE PROTECTION PIPING
(TYP.)
DISASSEMBLE AND SALVAGE
FOR POTENTIAL REUSE CHAIN
LINK FENCE SURROUNDING THE
PROJECT AREA.
FORMER BUILDING 1 AREA
FORMER BUILDING 3 AREA
FORMER BUILDING 2 AREA
PROTECT EXISTING
STORM DRAINAGE
INFRASTRUCTURE
(TYP.)
CONCRETE PITS (FORMERLY FILLED
WITH SAND AND DEBRIS)
TRENCH
B-4/MW-3
B-5
B-6/MW-4
TB-CS-46
TB-CS-44
TB-CS-23
TB-CS-45
TB-CS-40
TB-CS-32
TB-CS-33 TB-CS-34
TB-CS-28
TB-CS-24
CLEAN SAND
TB-CS-21
TB-CS-48
TB-CS-42
TB-CS-43
TB-CS-20
TB-CS-47
TB-CS-38
TB-CS-36 TB-CS-35
TB-CS-29
TB-CS-27
TB-SB-60
NO BASEMENT AREA
TB-CS-22
TB-CS-15
TB-CS-14
TB-CS-13
TB-CS-11
TB-CS-10
TB-CS-12
TB-CS-09
TB-CS-44
TB-CS-49
TB-CS-39
TB-CS-41
TB-CS-50
TB-CS-100
TB-CS-101
TB-CS-103
TB-CS-105
TB-CS-106
TB-CS-107
TB-CS-108
TB-CS-109
TB-CS-111
TB-CS-112
TB-CS-113
TB-CS-114
TB-CS-115
TB-CS-116
TB-CS-117
TB-CS-119
TB-CS-120
TB-CS-121
TB-CS-122
TB-CS-123
TB-CS-125
TB-CS-124
TB-CS-127
TB-CS-128
TB-CS-129
TB-CS-131
TB-CS-132
TB-CS-133
TB-CS-134
TB-CS-135
TB-CS-136 TB-CS-137
TB-CS-139
TB-CS-140
TB-CS-141
TB-CS-31
TB-CS-30
TB-CS-37
TB-CS-130
TB-CS-25
TB-CS-26
TB-CS-126
TB-CS-138
BASEMENT
ACCESS
TB-CS-01
TB-CS-02TB-CS-04
TB-CS-03
TB-CS-05
TB-CS-06
LEGEND
APPROXIMATE PROPERTY BOUNDARY
EDGE OF PAVEMENT/ROADWAY
SIDEWALK/CONCRETE
BUILDING
FORMER BUILDING
INTERIOR BUILDING FEATURES
RAILROAD TRACK
CONCRETE SAMPLE LOCATION
TIGHE & BOND SAMPLE LOCATIONS
CONCRETE SAMPLE WITH PCBs >1 PPM
BROKEN CONCRETE SLAB
APPROXIMATE CATCH BASIN LOCATION]
CONCRETE DISPOSAL LEGEND
CONCRETE WASTE STREAM No. 1- PCB
CONTAMINATED CONCRETE - MANAGE AND
DISPOSE OF CONCRETE AS NON-TSCA CT DEEP
REGULATED <50 PPM PCB WASTE IN ACCORDANCE
WITH STATE AND FEDERAL REGULATIONS AND
REQUIREMENTS SPECIFIED IN THE CONTRACT
DOCUMENTS. WASTE CHARACTERIZATION SAMPLES
CS-5-COMP AND CS-5-GRAB ARE REPRESENTATIVE
OF THIS WASTE STREAM.
CONCRETE WASTE STREAM No. 2 - PCB AND
PETROLEUM CONTAMINATED CONCRETE - MANAGE
AND DISPOSE OF CONCRETE AS MIXED EPA
REGULATED >50 PPM PCB REMEDIATION WASTE
WITH PETROLEUM CONTAMINATION IN
ACCORDANCE WITH STATE AND FEDERAL
REGULATIONS AND REQUIREMENTS SPECIFIED IN
THE CONTRACT DOCUMENTS. WASTE
CHARACTERIZATION SAMPLES CS-1-COMP AND
CS-1-GRAB ARE REPRESENTATIVE OF THIS WASTE
STREAM.
CONCRETE WASTE STREAM No. 3 - PETROLEUM
AND/OR METALS CONTAMINATED CONCRETE -
MANAGE AND DISPOSE OF CONCRETE IN
ACCORDANCE WITH STATE AND FEDERAL
REGULATIONS AND REQUIREMENTS SPECIFIED IN
THE CONTRACT DOCUMENTS. WASTE
CHARACTERIZATION SAMPLES CS-6-COMP AND
CS-6-GRAB ARE REPRESENTATIVE OF THIS WASTE
STREAM.
CONCRETE WASTE STREAM No. 4 - PITS A AND B -
PCB, VOC, AND METALS CONTAMINATED CONCRETE
- MANAGE AND DISPOSE OF CONCRETE AS MIXED
EPA REGULATED >50 PPM PCB REMEDIATION
WASTE, VOC AND METALS CONTAMINATED WASTE
IN ACCORDANCE WITH STATE AND FEDERAL
REGULATIONS AND REQUIREMENTS SPECIFIED IN
THE CONTRACT DOCUMENTS
CONCRETE WASTE STREAM No. 5 - PCB, PETROLEUM, AND METALS CONTAMINATED
CONCRETE - MANAGE AND DISPOSE OF CONCRETE
AS EPA REGULATED >50 PPM PCB REMEDIATION
WASTE, AND PETROLEUM AND METALS
CONTAMINATED WASTE IN ACCORDANCE WITH
STATE AND FEDERAL REGULATIONS AND
REQUIREMENTS SPECIFIED IN THE CONTRACT
DOCUMENTS. WASTE CHARACTERIZATION SAMPLES
CS-2 AND 4-COMP AND CS-2 AND 4-GRAB ARE
REPRESENTATIVE OF THIS WASTE STREAM.
CONCRETE DEMOLITION AND DISPOSAL NOTES
1. THE EXTENT OF CONTAMINATED CONCRETE REMOVAL WILL BE
DETERMINED BY THE ENGINEER THROUGH ANALYTICAL
TESTING AFTER REMOVAL OF MATERIAL TO THE LIMITS SHOWN
ON THIS DRAWING. ADDITIONAL REMOVAL MAY BE REQUIRED
BASED ON ANALYTICAL RESULTS REPORTED FOR
POST-REMOVAL SAMPLES.
2. ALL CONTAMINATED CONCRETE AND SOIL SHOWN ON
DRAWINGS REM-1 AND REM-2 MUST BE REMOVED PRIOR TO
STARTING DEMOLITION AND PROCESSING OF NON-REGULATED
MASONRY DEBRIS. ENGINEER WILL NOTIFY CONTRACTOR ONCE
ALL CONTAMINATED MATERIAL IS REMOVED.
3. AREAS NOT DESIGNATED FOR DISPOSAL AS REGULATED
WASTE WILL BE MANAGED AND DISPOSED OF AS
NON-REGULATED MASONRY DEBRIS UNDER THE BASE
CONTRACT OR CRUSHED AND USED AS BACKFILL AS AN
ALTERNATE BID ITEM.
4. PITS A AND B ACCUMULATE SEVERAL FEET OF STANDING
WATER THAT MUST BE PUMPED OUT AND DISPOSED OF PRIOR
TO DEMOLISHING THE PITS. WATER PREVIOUSLY
ACCUMULATED IN THE PITS WAS CHARACTERIZED AS D AND F
LISTED HAZARDOUS WASTE.WASTE CHARACTERIZATON
SAMPLES PIT-A/B-WC, PIT-A-WC, AND PIT-B-WC ARE
REPRESENTATIVE OF THIS WASTE STREAM.
5. LABORATORY ANALYTICAL REPORTS FOR THE WASTE
CHARACTERIZATION SAMPLES REFERENCED ABOVE ARE
INCLUDED WITH SECTION 02222 SLAB AND FOUNDATION
DEMOLITION. REM-1
CONCRETE SLAB SAMPLE
LOCATIONS & DISPOSAL
AREAS
N
00 30' 60'
SCALE: 1" = 30'
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
W-1222-053-B-SP - QAPP Figures.dwg
10/14/2025
SCALE:
ISSUED FOR
CONSTRUCTION
Pl ot te d
O n:
O ct
9, 5-
:3 2a m B y:
Z
Le po re La st S av ed
9/
/2
Ti gh e
B on d:
J:
\W \W
\0
-1
F re ig ht
S tr ee t
Ph as e
II
H
B M
A \D ra w in gs
_F ig ur es
\A ut oC A D
\W -1
2-
3-
B -S
P
Q A
PP
F ig ur es
.d w g
HAL
JTO
ZJL
Waterbury, Connecticut
Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street
Waterbury Development Corporation
6X6 OPENING
FLOOR DRAIN
MANHOLE
TRENCH
CLEAN SAND
PIT D
PIT E
PIT C
TRENCH
CONCRETE WALL
FORMER CHIMNEYS
BROKEN CONCRETE SLAB
RAMP
3x3 TRENCH
FORMER TRANSFORMER ROOM
(CONCRETE FLOOR REMOVED)
VAULT
CONCRETE CURB
FLOOR DRAIN
400 SF
400 SF
400 SF
400 SF
400 SF
4,500 SF
400 SF
400 SF
750 SF
400 SF
1,150 SF
2,100 SF
400 SF
4,000 SF
16,100 SF
PIT A PIT B
W-1222-074A
W-1222-074A-HM-001.dwg
SHEET 4 OF 8
POTENTIAL SEQUENCE FOR SLAB, FOUNDATION, AND SOIL REMOVAL. CONTRACTOR MUST INCLUDE THESE STEPS IN THE CONSTRUCTION SCHEDULE SUBMITTAL SPECIFIED IN SECTION 01325 SCHEDULING OF CONSTRUCTION.
CONTRACTOR MAY SUGGEST AN ALTERNATIVE SEQUENCE IN THE SCHEDULE SUBMITTAL. IT IS EXPECTED THAT
SOME TASKS WILL OVERLAP FOR EFFICIENCY PURPOSES.
1. REMOVE CONTAMINATED CONCRETE FROM AREAS AND LIMITS IDENTIFIED ON DRAWING REM-1. ENGINEER WILL COLLECT POST REMOVAL CONCRETE SAMPLES TO DETERMINE IF THE REMEDIAL OBJECTIVE HAS BEEN MET. ADDITIONAL
REMOVAL MAY BE REQUIRED BASED ON RESULTS OF THESE SAMPLES.
2. REMOVE CONTAMINATED SOIL FROM AREAS AND LIMITS IDENTIFIED ON DRAWING REM-2. ENGINEER WILL COLLECT POST REMOVAL CONCRETE SAMPLES TO DETERMINE IF THE REMEDIAL OBJECTIVE HAS BEEN MET. ADDITIONAL
REMOVAL MAY BE REQUIRED BASED ON RESULTS OF THESE SAMPLES.
3. REMOVE NON-CONTAMINATED ELEVATED CONCRETE SLAB TO EXPOSE UNDERLYING FILL MATERIAL LOCATED BETWEEN THE ELEVATED SLAB AND UNDERLYING SECONDARY SLAB. EXCAVATE TEST PITS AS DIRECTED BY ENGINEER TO ASSESS FILL MATERIAL FOR POTENTIAL ON-SITE REUSE AND/OR DISPOSAL REQUIREMENTS. ENGINEER WILL IDENTIFY AREAS
OF FILL MATERIAL FOR ON-SITE REUSE AND/OR DISPOSAL.
4. REMOVE AND SEGREGATE FILL MATERIAL FROM BENEATH THE ELEVATED SLAB AS DIRECTED BY ENGINEER.
NON-CONTAMINATED FILL MATERIAL MAY BE USED TO BACKFILL SOIL EXCAVATION AREAS. CONTAMINATED FILL
MATERIAL MAY BE STOCKPILED AND/OR LIVE LOADED FOR DISPOSAL.
5. DEMOLISH AND REMOVE CONCRETE PARTITION WALLS FROM BETWEEN THE ELEVATED AND SECONDARY SLAB AREAS.
ENGINEER WILL ASSESS CONCRETE FOR POTENTIAL CONTAMINATION AND IDENTIFY WHAT CONCRETE CAN BE SET
ASIDE FOR POTENTIAL CRUSHING AND ON-SITE REUSE AND WHAT WILL BE DISPOSED.
6. ENGINEER WILL ASSESS SECONDARY CONCRETE SLAB FOR POTENTIAL CONTAMINATION AND IDENTIFY WHAT CONCRETE CAN BE SET ASIDE FOR POTENTIAL CRUSHING AND ON-SITE REUSE AND WHAT WILL BE DISPOSED.
CONTRACTOR MAY BE DIRECTED TO CRACK SLAB TO PROMOTE DRAINAGE AND LEAVE SOME OR ALL SLAB IN PLACE.
7. DEMOLISH, MANAGE, REMOVE, AND CRUSH FOR ON-SITE REUSE OR DISPOSE OF REMAINING NON-CONTAMINATED
SLABS AND FOUNDATIONS.
8. BACKFILL FOUNDATION OPENINGS.
CONCRETE PITS (FORMERLY FILLED
WITH SAND AND DEBRIS)
TRENCH
CLEAN SANDTB-SB-53
NO BASEMENT AREA
TB-SB-68
TB-SB-65
TB-SB-64
TB-SB-63
TB-SB-62
TB-SB-57
TB-SB-59
TB-SB-56
TB-SB-49
TB-SB-53
TB-SB-55
TB-SB-61
TB-SB-60
TB-SB-48
TB-SB-46
TB-SB-44
TB-SB-42
TB-SB-41
TB-SB-45TB-SB-47
TB-SB-66
TB-SB-02
TB-SB-03
TB-SB-04
TB-SB-05
TB-SB-06
TB-SB-07
TB-SB-08
TB-SB-09
TB-SB-10
TB-SB-11
TB-SB-12
TB-SB-13TB-SB-14
TB-SB-15
TB-SB-39
TB-SB-40
TB-SB-38
TB-SB-37
TB-SB-18
TB-SB-19
TB-SB-20
TB-SB-21
TB-SB-22
TB-SB-23
TB-SB-24
TB-SB-25
TB-SB-26
TB-SB-27
TB-SB-28
TB-SB-29
TB-SB-30
TB-SB-31
TB-SB-32
TB-SB-33
TB-SB-35
TB-SB-36
TB-SB-34
TB-SB-76
TB-SB-77
TB-SB-75
TB-SB-116 TB-SB-117 TB-SB-118 TB-SB-119
TB-SB-72
TB-SB-79
TB-SB-80
TB-SB-115
TB-SB-114
TB-SB-89
TB-SB-102
TB-SB-103
TB-SB-100
TB-SB-101
TB-SB-104
TB-SB-105
TB-SB-106
TB-SB-94
TB-SB-96
TB-SB-95
TB-SB-97
TB-SB-81 TB-SB-82
TB-SB-121
TB-SB-109
TB-SB-98TB-SB-99
TB-SB-113
TB-SB-111
TB-SB-110
TB-SB-107
TB-SB-108
TB-SB-112
TB-SB-83
TB-SB-84
TB-SB-85
TB-SB-87
TB-SB-86
TB-SB-70
TB-SB-120TB-SB-91
TB-SB-92
TB-SB-93
TB-SB-71
TB-SB-73
TB-SB-74
TB-SB-78
TB-SB-01
BASEMENT
ACCESS
TP-9
TP-23
TP-24
TP-25
TP-21
TP-20
TP-19
TP-22
TP-1 TP-2
TP-18
TP-17
TP-3
TP-16 TP-4
TP-15
TP-14
TP-5
TP-6
TP-7
TP-13
TP-12
TP-8
TP-10
TP-11
TB-SB-50
TB-SB-16
TB-SB-17
TB-SB-90
TB-SB-88
TB-SB-52TB-SB-54
LEGEND
APPROXIMATE PROPERTY BOUNDARY
EDGE OF PAVEMENT/ROADWAY
SIDEWALK/CONCRETE
BUILDING
FORMER BUILDING
INTERIOR BUILDING FEATURES
RAILROAD TRACK
BROKEN CONCRETE SLAB
APPROXIMATE CATCH BASIN LOCATION]
SOIL REMEDIATION LEGEND
SOIL WASTE STREAM No. 1 - PCB
CONTAMINATED SOIL - MANAGE AND DISPOSE
OF SOIL AS NON-TSCA CT DEEP REGULATED <50
PPM PCB WASTE IN ACCORDANCE WITH STATE
AND FEDERAL REGULATIONS AND
REQUIREMENTS SPECIFIED IN THE CONTRACTS
DOCUMENTS. WASTE CHARACTERIZATION
SAMPLES WC-COMP-4 AND WC-GRAB-4 ARE
REPRESENTATIVE OF THIS WASTE STREAM.
SOIL WASTE STREAM No. 2 - PCB
CONTAMINATED SOIL - MANAGE AND DISPOSE
OF SOIL AS EPA REGULATED >50 PPM PCB
REMEDIATION WASTE IN ACCORDANCE WITH
STATE AND FEDERAL REGULATIONS AND
REQUIREMENTS SPECIFIED IN THE CONTRACT
DOCUMENTS.
WASTE CHARACTERIZATION SAMPLES
WC-COMP-1 AND WC-GRAB-1 ARE
REPRESENTATIVE OF THIS WASTE STREAM THAT
WILL BE GENERATED FROM THE SOIL
REMEDIATION OUTSIDE THE NORTHWEST
CORNER OF THE BUILDING FOOTPRINT.
WASTE CHARACTERIZATION SAMPLES
WC-COMP-3 AND WC-GRAB-3 ARE
REPRESENTATIVE OF THIS WASTE STREAM THAT
WILL BE GENERATED FROM THE SOIL
REMEDIATION AT THE FORMER TRANSFORMER
ROOM.
WASTE CHARACTERIZATION SAMPLES
WC-COMP-2 AND WC-GRAB-2 ARE
REPRESENTATIVE OF THE WASTE STREAM THAT
WILL BE GENERATED FROM SOIL AROUND PITS A
AND B.
SOIL WASTE STREAM No. 3 - PCB, VOC, AND
METALS CONTAMINATED SOIL - MANAGE AND
DISPOSE OF SOIL AS MIXED EPA REGULATED
>50 PPM PCB REMEDIATION WASTE,
VOC AND METALS CONTAMINATED WASTE IN
ACCORDANCE WITH STATE AND FEDERAL
REGULATIONS AND REQUIREMENTS SPECIFIED
IN THE CONTRACT DOCUMENTS.
WASTE CHARACTERIZATION SAMPLES
WC-COMP-3 AND WC-GRAB-3 ARE
REPRESENTATIVE OF THIS WASTE STREAM. SOIL
DIRECTLY NEXT TO AND BENEATH THE PITS MAY
HAVE HIGHER CONTAMINANT CONCENTRATIONS.
SOIL DISPOSAL NOTES
1. CONTAMINATED SOIL WILL BE EXCAVATED TO THE INITIAL
DEPTHS IDENTIFIED FOR EACH AREA, TO THE TOP OF THE
GROUNDWATER TABLE, OR OTHER DEPTHS AS DIRECTED BY
ENGINEER. USE OF EXCAVATION SUPPORTS OTHER THAN
POTENTIALLY A TRENCH BOX IS NOT ANTICIPATED.
EXCAVATION DEWATERING IS NOT ANTICIPATED.
2. THE EXTENT OF CONTAMINATED SOIL REMOVAL WILL BE
DETERMINED BY THE ENGINEER THROUGH ANALYTICAL
TESTING AFTER REMOVAL OF MATERIAL TO THE LIMITS
SHOWN ON THIS DRAWING. ADDITIONAL REMOVAL MAY BE
REQUIRED BASED ON ANALYTICAL RESULTS REPORTED FOR
POST-REMOVAL SAMPLES.
3. ALL CONTAMINATED CONCRETE SHOWN ON DRAWING
HM-001 MUST BE REMOVED PRIOR TO STARTING
CONTAMINATED SOIL EXCAVATION WITHIN A GIVEN
REMEDIATION AREA. ENGINEER WILL NOTIFY CONTRACTOR
ONCE ALL CONTAMINATED MATERIAL IS REMOVED.
4. BACKFILL EXCAVATION AREAS TO PRE-EXISTING GRADE
PRIOR TO DEMOLISHING NON-REGULATED SLABS AND
FOUNDATION COMPONENTS.
TIGHE & BOND SAMPLE LOCATIONS
SOIL BORING LOCATION
TEST PIT LOCATION
REM-2
SOIL REMEDIATION AREAS
N
00 30' 60'
SCALE: 1" = 30'
DESIGNED/CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
W-1222-053-B-SP - QAPP Figures.dwg
10/14/2025
SCALE:
ISSUED FOR
CONSTRUCTION
Pl ot te d
O n:
O ct
9, 5-
:3 3a m B y:
Z
Le po re La st S av ed
9/
/2
Ti gh e
B on d:
J:
\W \W
\0
-1
F re ig ht
S tr ee t
Ph as e
II
H
B M
A \D ra w in gs
_F ig ur es
\A ut oC A D
\W -1
2-
3-
B -S
P
Q A
PP
F ig ur es
.d w g
HAL
JTO
ZJL
Waterbury, Connecticut
Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street
Waterbury Development Corporation
6X6 OPENING
FLOOR DRAIN
MANHOLE
TRENCH
CLEAN SAND
PIT D
PIT E
PIT C
TRENCH
CONCRETE WALL
FORMER CHIMNEYS
BROKEN CONCRETE SLAB
RAMP
3x3 TRENCH
PIT A PIT B
FORMER TRANSFORMER ROOM
(CONCRETE FLOOR REMOVED)
VAULT
CONCRETE CURB
FLOOR DRAIN
REMOVE MATERIAL FROM AROUND AND
BENEATH PITS A AND B. EXCAVATION IS
ANTICIPATED TO BE 8 TO 10 FEET BENEATH
SLAB OR AS DEEP AS IS REASONABLE
WITHOUT DEWATERING.
REMOVE 8 FEET OF MATERIAL FROM
EXISTING BASEMENT FLOOR LEVEL
OR AS DEEP AS IS REASONABLE
WITHOUT DEWATERING.
REMOVE 6 INCHES OF MATERIAL
FROM BENEATH SLAB.
REMOVE 6 INCHES OF
MATERIAL FROM BENEATH
SLAB.
REMOVE 6 INCHES OF
MATERIAL FROM BENEATH
FIRST FLOOR CONCRETE.
REMOVE 4 FEET OF
MATERIAL FROM
BENEATH ASPHALT
GROUND SURFACE.
REMOVE 6 INCHES
OF MATERIAL FROM
BENEATH ASPHALT
AND CONCRETE.
W-1222-074A
W-1222-074A-REM-2.dwg
SHEET 5 OF 8
REMOVE 6 INCHES
OF MATERIAL FROM
BENEATH SLAB.
FILE:
APPROVED BY:
Waterbury, Connecticut
Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street
Waterbury Development Corporation
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
W1222-074A-C-201-SEC.dwg
W-1222-074A
SCALE:
ISSUED FOR
CONSTRUCTION
Pl ot te d
O n:
O ct
9, 5-
:3 5a m B y:
Z
Le po re La st S av ed
9/
/2
Ti gh e
B on d:
J:
\W \W
\0
A
Fr ei gh t
S la b R em ov al
\D ra w in gs \A ut oC
A D
\W
-0
A -C
-2
-S
EC
.d w g
ZJL
HAL
JTO
10/14/2025
00 40' 80'
SCALE: 1" = 40' C-201
SITE GRADING, DRAINAGE,
AND SEDIMENTATION AND
EROSION CONTROL PLAN
SHEET 6 OF 8
AS SHOWN
N
SEDIMENTATION AND SOIL EROSION CONTROL PLAN NOTES
1. UNDERGROUND UTILITIES, STRUCTURES AND FACILITY LOCATIONS DEPICTED HEREON HAVE
BEEN COMPILED, IN PART, FROM RECORD MAPPING AND OTHER DATA SUPPLIED BY THE
RESPECTIVE UTILITY COMPANIES, GOVERNMENTAL AGENCIES AND/OR OTHER SOURCES.
THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE IN NATURE. ADDITIONALLY,
OTHER SUCH DATA MAY EXIST ON SITE, THE EXISTENCE OF WHICH ARE UNKNOWN TO
TIGHE & BOND. THE EXISTENCE, SIZE AND LOCATION OF ALL SUCH FEATURES MUST BE
DETERMINED AND VERIFIED IN THE FIELD BY APPROPRIATE AUTHORITIES PRIOR TO
CONSTRUCTION @ CALL-BEFORE-YOU-DIG 1-800-922-4455.
2. ALL SEDIMENTATION AND EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH
THE STANDARDS AND SPECIFICATIONS OF THE "2002 CONNECTICUT GUIDELINES FOR SOIL
EROSION AND SEDIMENT CONTROL" DEP BULLETIN NO 34, AND ALL AMENDMENTS AND
ADDENDA THERETO AS PUBLISHED BY THE CONNECTICUT DEPARTMENT OF ENVIRONMENTAL
PROTECTION.
3. LAND DISTURBANCE SHALL BE KEPT TO THE MINIMUM NECESSARY FOR CONSTRUCTION.
4. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AS SHOWN ON THE PLANS AND
ELSEWHERE AS ORDERED BY THE OWNER'S REPRESENTATIVE, THE CITY OF WATERBURY OR
THE OWNER.
5. ALL CATCH BASINS SHALL BE PROTECTED WITH SILT SACKS, HAYBALE RING, SILT FENCE OR
BLOCK AND STONE INLET PROTECTION THROUGHOUT THE CONSTRUCTION PERIOD AND
UNTIL ALL DISTURBED AREAS ARE THOROUGHLY STABILIZED.
6. WHEREVER POSSIBLE, EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED
PRIOR TO CONSTRUCTION.
7. ADDITIONAL CONTROL MEASURES SHALL BE INSTALLED DURING CONSTRUCTION PERIOD AS
ORDERED BY THE OWNER'S REPRESENTATIVE, THE CITY OF WATERBURY, OR THE OWNER.
8. ALL SEDIMENTATION AND EROSION CONTROL MEASURES SHALL BE MAINTAINED IN
EFFECTIVE CONDITION THROUGHOUT THE CONSTRUCTION PERIOD.
9. SEDIMENT REMOVED SHALL BE DISPOSED OF LEGALLY OFFSITE.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION AND MAINTENANCE OF ALL
EROSION CONTROL MEASURES THROUGHOUT THE CONSTRUCTION PERIOD.
11. THE CONTRACTOR SHALL MAINTAIN A SUPPLY OF SILT FENCE/HAYBALES AND
ANTI-TRACKING CRUSHED STONE ON-SITE FOR EMERGENCY REPAIRS.
12. THE CONTRACTOR SHALL UTILIZE APPROVED METHODS/MATERIALS FOR PREVENTING THE
BLOWING AND MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND DEMOLITION
DEBRIS ONTO ADJACENT PROPERTIES AND SITE AREAS.
13. ALL DRAINAGE STRUCTURES SHALL BE INSPECTED WEEKLY BY THE CONTRACTOR AND
CLEANED TO PREVENT THE BUILD-UP OF SILT.
14. THE CONTRACTOR SHALL CAREFULLY COORDINATE THE PLACEMENT OF EROSION CONTROL
MEASURES WITH THE PHASING OF CONSTRUCTION.
15. KEEP ALL PAVED ROADWAYS CLEAN. SWEEP BEFORE FORECASTED STORMS OR WEEKLY AS
NECESSARY.
16. ALL TRUCKS LEAVING THE SITE MUST BE COVERED.
17. ALL SEDIMENTATION AND EROSION CONTROLS SHALL BE CHECKED WEEKLY AND AFTER
EACH RAINFALL EVENT. NECESSARY REPAIRS SHALL BE MADE WITHOUT DELAY.
18. PRIOR TO ANY FORECASTED RAINFALL, EROSION AND SEDIMENT CONTROLS SHALL BE
INSPECTED AND REPAIRED AS NECESSARY.
19. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, EROSION CONTROLS MAY BE
REMOVED ONCE AUTHORIZATION TO DO SO HAS BEEN SECURED FROM THE OWNER'S
REPRESENTATIVE AND CITY OF WATERBURY.
20. TRUCK TRAFFIC MUST BE LIMITED TO PAVED SURFACES TO THE EXTENTS POSSIBLE. IF
TRUCKS DRIVE OVER UNPAVED SURFACES OR IF TRACKING IS OBSERVED OUTSIDE OF THE
WORK AREA, ANTI-TRACKING PADS MUST BE INSTALLED AT THE LOCATIONS SHOWN ON
THIS DRAWING OR OTHER AREAS AS APPROPRIATE AND APPROVED BY ENGINEER.
21. BACKFILL FOUNDATION OPENING TO MATCH EXISTING NEARBY ELEVATIONS. MAINTAIN AT
LEAST A ONE PERCENT SLOPE TO PROMOTE DRAINAGE TOWARDS EXISTING ON-SITE
DRAINAGE STRUCTURES AND AWAY FROM JACKSON AND FREIGHT STREET.
22. PROVIDE AND INSTALL CLEAN CRUSHED CONCRETE FOR BACKFILL OF THE EXCAVATIONS
AND/OR FOUNDATION CAVITY IF ALTERNATE ITEM NUMBER 1 IS AWARDED. PROVIDE AND
INSTALL CLEAN ORDINARY BORROW MATERIAL AS NEEDED TO SUPPLEMENT THE CRUSHED
CONCRETE.
23. PROVIDE AND INSTALL No. 3 CRUSHED STONE AS DEFINED IN SECTION 02320 BORROW
MATERIAL FOR BACKFILL OF THE TOP SIX INCHES OF THE FOUNDATION CAVITY.
24. RECLAIMED MATERIAL OR MATERIAL WITH A HIGH MICA CONTENT WILL NOT BE ALLOWED
FOR USE ON THIS SITE.
S.S. S.S.
S.S. S.S. S.S. S.S.
S.S.
S.S.
S.S.
S.S.
S.S. S.S.
S.S.
S.S.
S.S.
S.S.
S.S.
S.S.
S.S.
S.S.
S.S. S.S.
S.S.
S.S.
SEDIMENTATION AND SOIL EROSION CONTROL PLAN LEGEND
PROJECT LIMIT LINE
SILT SACK
SILT FENCE
HAYBALE BARRIER/STRAW WATTLE
ANTI-TRACKING PAD
CONSTRUCTION FENCE
CONSTRUCTION GATE
X X X X
CFCF
XXXXXXXXXXXX
X
ANTI-TRACKING
PAD
ANTI-TRACKING PAD
HAYBALE BARRIER/STRAW WATTLE
(TYP)
HAYBALE BARRIER/
STRAW WATTLE
(TYP)
SILT FENCE
S.S.
CJC
HAYBALE BARRIER/
STRAW WATTLE
(TYP)
FORMER BUILDING SLABS / FOUNDATIONS
BACKFILL FOUNDATION OPENING
TO MATCH EXISTING NEARBY
ELEVATIONS. MAINTAIN AT LEAST A
ONE PERCENT SLOPE TOWARDS
EXISTING ON-SITE DRAINAGE
STRUCTURES AND AWAY FROM
JACKSON AND FREIGHT STREET.
FILE:
APPROVED BY:
Waterbury, Connecticut
Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street
Waterbury Development Corporation
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
W1222-074A-C-202-SEC-DETL.dwg
W-1222-074A
SCALE:
ISSUED FOR
CONSTRUCTION
Pl ot te d
O n:
O ct
9, 5-
:3 6a m B y:
Z
Le po re La st S av ed
9/
/2
Ti gh e
B on d:
J:
\W \W
\0
A
Fr ei gh t
S la b R em ov al
\D ra w in gs \A ut oC
A D
\W
-0
A -C
-2
-S
EC
-D
ET
L.
dw g
ZJL
HAL
JTO
10/14/2025
C-202
SEDIMENTATION AND
EROSION CONTROL DETAILS
SHEET 7 OF 8
NO SCALE
CONSTRUCTION ENTRANCE
NO SCALE
50' MIN.
(100' MIN IF TRACKED
SEDIMENT < 80% SAND)
CONSTRUCTION
ENTRANCE
ACCESS ROAD
TO WORK AREA
RADIUS TO ACCOMMODATE
TURNING MOVEMENTS
OF CONSTRUCTION
VEHICLES, AS NEEDED.
PA
V
ED
R O
A D
PAVED ROAD
6" CRUSHED STONE
CTDOT GRADING NO. 3
GEOTEXTILE, MIRAFI 600X OR APPROVED EQUAL
STRIPPED GROUND LINE
(REMOVE TOPSOIL AND ORGANICS)
ELEVATION
PLAN
MINIMUM 12' OR
WIDTH OF ACCESS ROAD
WHICHEVER IS GREATER
SESC NARRATIVE
THE CITY OF WATERBURY IS PROPOSING TO REMOVE THE CONCRETE SLAB AND BUILDING FOUNDATIONS LOCATED AT 170
FREIGHT STREET IN WATERBURY, CT.
THE PROJECT WILL INCLUDE THE DEMOLITION AND REMOVAL OF THE EXISTING SLABS AND FOUNDATIONS, EXCAVATION OF
CONTAMINATED SOIL, AND ABANDONING ANY FORMER BUILDING UTILITY SERVICES.
THE DISTURBED AREAS ARE PROPOSED TO BE RESTORED WITH BACKFILL AND GRADED TO DRAIN SIMILAR TO EXISTING
DRAINAGE PATTERNS.
THE PROJECT IS PROPOSED TO BE PERFORMED IN A SINGLE PHASE, IT IS ANTICIPATED THAT APPROXIMATELY 3.13 ACRES
WILL BE DISTURBED.
ANTICIPATED PROJECT CONSTRUCTION START: FALL 2025
ANTICIPATED PROJECT CONSTRUCTION END: SPRING 2026
SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL CONFORM TO THE STANDARDS OUTLINED IN THE CONNECTICUT DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION (CTDEEP), "2002 CONNECTICUT GUIDELINES FOR
SOIL EROSION AND SEDIMENT CONTROL", LATEST REVISION.
CONSTRUCTION SEQUENCE
1. FLAG THE LIMITS OF CONSTRUCTION NECESSARY TO FACILITATE THE PRECONSTRUCTION MEETING.
2. HOLD PRECONSTRUCTION MEETING. (NOTIFY CALL BEFORE YOU DIG 1-800-922-4455).
3. FLAG REMAINDER OF THE LIMITS OF CONSTRUCTION.
4. INSTALL THE CONSTRUCTION ENTRANCES.
5. INSTALL CONSTRUCTION FENCE GATES AND TEMPORARY 6' HIGH CHAIN LINK FENCE TO SECURE THE WORK AREA(S).
6. INSTALL PERIMETER EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE SESC PLAN.
7. ESTABLISH CONTRACTOR'S STAGING AREA.
8. DISCONNECT UTILITIES/COORDINATE WITH CITY AND RESPECTIVE UTILITY COMPANIES. CONTRACTOR TO OBTAIN ALL
NECESSARY PERMITS.
9. REMOVE EXISTING CONCRETE SLAB, FOUNDATIONS, AND ASSOCIATED FEATURES (E.G. CHIMNEYS, STEPS, LOADING
DOCKS, PITS, ETC.)
10. REMOVE AND/OR ABANDON SURFACE FEATURES AND UTILITIES AS IDENTIFIED IN THE CONTRACT DOCUMENTS.
11. EXCAVATE AND REMOVE SOIL AS IDENTIFIED IN THE CONTRACT DOCUMENTS.
12. BACKFILL AND GRADE AREAS OF THE SITE AS IDENTIFIED IN THE CONTRACT DOCUMENTS.
13. AFTER SITE IS STABILIZED, INCLUDING CLEARING OF CONTRACTOR STAGING/STORAGE AREA AND ANY OTHER REQUIRED RESTORATIONS, REMOVE TEMPORARY EROSION AND SEDIMENT CONTROLS (E.G. GEOTEXTILE SILT FENCES).
PROVIDE CRUSHED STONE,
CTDOT GRADING NO. 3
FORM 818, M.01.01, AS
REQUIRED TO PREVENT
MOVEMENT OF WATTLE
STRAW WATTLE
(12" TYPICAL)
EXISTING PAVEMENT OR
NON-NATIVE SOILS
STRAW WATTLE FOR USE IN PAVED AREAS
AND NON-NATIVE SOILS
NO SCALE
SILT FENCE
FLOW
GEOTEX 2130 OR EQUIVALENT
GEOTEXTILE SECURED TO
POSTS WITH METAL CLIPS
@ 4" O.C., ALTERNATING
ORIENTATION
ANCHOR FABRIC WITH
CRUSHED STONE OR
SOIL
1.5" SQUARE HARD WOOD
POSTS 8'-0" O.C.
MAXIMUM
6"
6"
DEPTH=2'
WIDTH=1.83'
LENGTH=2.73'
SILTSACK MANUFACTURED BY:
ACF ENFIRONMENTAL
2831 CARDWELL ROAD
RICHMOND, VIRGINIA 23237
DUMP STRAP
DUMP STRAP
1" REBAR FOR BAG
REMOVAL FROM INLET
SILTSACK ® OR
APPROVED EQUAL
SILTSACK
NO SCALE
2' M
IN
PLACEMENT AND CONSTRUCTION
OF HAYBALE BARRIER
1. EXCAVATE A TRENCH 4" DEEP AND
THE WIDTH OF THE HAYBALE
2. PLACE AND STAKE HAYBALES
TWO STAKES PER BALE
3. WEDGE LOOSE STRAW BETWEEN
BALES TO CREATE A CONTINUOUS
BARRIER
4. BACKFILL AND COMPACT EXCAVATED
SOIL ON THE UPHILL SIDE OF THE
BARRIER TO PREVENT PIPING
HAYBALESTAKE
BINDING WIRE
OR TWINE
COMPACTED BACKFILL
PACKED STRAW
TRENCH, WIDTH
OF BALE
CJC
FILE:
APPROVED BY:
Waterbury, Connecticut
Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street
Waterbury Development Corporation
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
W1222-074A-C-301-DETL.dwg
W-1222-074A
SCALE:
ISSUED FOR
CONSTRUCTION
Pl ot te d
O n:
O ct
9, 5-
:3 7a m B y:
Z
Le po re La st S av ed
9/
/2
Ti gh e
B on d:
J:
\W \W
\0
A
Fr ei gh t
S la b R em ov al
\D ra w in gs \A ut oC
A D
\W
-0
A -C
-3
-D
ET
L.
dw g
ZJL
HAL
JTO
10/14/2025
C-301
SITE RESTORATION
DETAILS
SHEET 8 OF 8
AS SHOWN
1/
O F
EX
PO
S
ED
P O
S T
H
EI
G H
T (M
IN
CHAIN LINK FENCE
NO SCALE
10'-0" (MAXIMUM)
BRACE TUBE AT
CORNER &
TERMINAL POSTS
(TYP)
TENSION BAR (TYP)
TERMINAL
STRAPS AT 12"
INTERVALS
CORNER POST OR
TERMINAL POST (3"
DIA)
TOP RAIL (XX" DIA)
TOP OF CHAIN LINK
EXPANSION SLEEVE
(TYP)
ALUMINUM ALLOY STEEL
TIE WIRES AT 15"
INTERVALS (TYP)
FABRIC 2.0" DIAMOND MESH
INTERWOVEN WIRE 9 GAUGE TOP
& BOTTOM SELVAGE TWISTED
SLOPE TOP OF
FOOTING TO DRAIN
(TYP)
LINE POST (2.5" DIA)
10'-0" (MAXIMUM)
A R O
U N
D F
O U
N D
A
TI
O N
4'
-0
M
IN
S
IT
E
PE
R
IM
ET
ER
6'
-0
(M
IN
2" (M
A X
BOTTOM
RAIL (1.66"
DIA)
GATE PLAN
NOTES:
1. GATES MAY BE MANUALLY OPERATED.
GATE POST
TENSION BAR (TYP)
WELD ALL JOINTS
CHAIN LINK FABRIC
GATE LATCH WITH
PROVISION FOR
PADLOCK
GATE POST
2"
(MAX)
18'-0" OPENING FACE TO FACE
3" 2 1/4" TYP
2 1/2"
POST TOP
DOUBLE SWING GATE
NO SCALE
CJC
CT66305 - CT66307
Thursday, July 10, 2025
Sample ID#s:
Attn: Harley Langford Tighe & Bond 213 Court St, Suite 1100 Middletown, CT 06457
SDG ID: GCT66305
Project ID: 3212220074A
Sincerely yours, Laboratory Director Phyllis Shiller
The contents of this report cannot be discussed with anyone other than the client listed above without their written consent.
NELAC - #NY11301
CT Lab Registration #PH-0618 MA Lab Registration #M-CT007 ME Lab Registration #CT-007 NH Lab Registration #213693-A,B
NJ Lab Registration #CT-003 NY Lab Registration #11301 PA Lab Registration #68-03530 RI Lab Registration #63 VT Lab Registration #VT11301
This laboratory is in compliance with the NELAC requirements of procedures used except where indicated.
This report contains results for the parameters tested, under the sampling conditions described on the Chain Of Custody, as received by the laboratory. This report is incomplete unless all pages indicated in the pagination at the bottom of the page are included.
A scanned version of the COC form accompanies the analytical report and is an exact duplicate of the original.
587 East Middle Turnpike, P.O. Box 370, Manchester, CT 06040
SDG Comments July 10, 2025
587 East Middle Turnpike, P.O.Box 370, Manchester, CT 06045 Tel. (860) 645-1102 Fax (860) 645-0823
Environmental Laboratories, Inc.
SDG I.D.: GCT66305
Vo…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .