ITB 8393 Addendum 2.pdf

PDF 4 MB Posted

Attached to
Purchase of a . 43 Acre Vacant Parcel Located at 36 Welton St. , Waterbury, CT
Solicitation number
RFP 8621- Wtby
Issued by
New Haven County, Connecticut

About this file

This is Addendum #2 to ITB 8393, issued by the City of Waterbury, Connecticut on October 27, 2025, regarding building slab and foundation removal and soil remediation services at 170 Freight Street in Waterbury. The addendum clarifies contract requirements through a series of questions and answers addressing contractor qualifications, material handling, and project procedures. Key clarifications include: crushed concrete from off-site locations is not permitted for backfill in bid items 15 and 16; contractors handling contaminated soil must be permitted under Connecticut General Statute 22a-454 (permitted spill cleanup contractors) or may subcontract such services; qualified waste haulers must be fully licensed and permitted; material designated for disposal may be live-loaded once waste characterization testing and approvals are completed; containment structures greater than 1,500 square feet require change order pricing; a new state sign is required on-site; existing perimeter fencing may remain in place if undamaged but can be removed and stored if necessary for project execution; and the anticipated project start date is early December 2025. The contractor is responsible for securing all necessary permits and licenses at no additional cost to the owner and must comply with all local, state, and federal laws and regulations.

The addendum includes detailed laboratory testing results for pit water samples (CT66305-1) showing contamination including PCBs, volatile organic compounds, and metals, which are appended for contractor reference. All proposals exceeding $50,000 must be accompanied by proposal security in the form of a certified check or bid bond equal to 10 percent of the total proposal price. The contract documents comprise an eight-sheet drawing set covering general notes, existing conditions, slab and foundation demolition plans, concrete slab sample locations and disposal areas, soil remediation areas, sedimentation and erosion control plans and details, and site restoration details. The project involves removal of contaminated concrete slabs, foundation demolition, soil excavation, and site restoration across approximately 3.13 acres, with construction anticipated to occur from fall 2025 through spring 2026.

View the file

Other files

File Type Posted
RFP 8621- Wtby_Jan_28_26_solicitation_doc.pdf PDF
ITB 8393 Addendum 3.pdf PDF
ITB 8593 Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONNECTICUT

ADDENDUM #2

October 27, 2025

ITB 8393 170 Freight Street Slab Removal

Please Be Advised:

All proposals of the above captioned project are hereby notified that the Contract Documents for the above referenced project are amended as noted in this Addendum No. 2.

This Addendum shall be part of the Contract Documents for the above referenced project as provided in the Invitation to Bid.

The Contract Documents are hereby amended as follows:

1) See attached/posted files “170 Freight Street Full Set for Construction” and “02222 GCT66305-1 Water Attachment.pdf”.

Please refer to the questions and answers below.

Question: Can crushed concrete from an offsite location be used for backfill for bid item numbers 15 & 16?

Answer: Use of crushed concrete from off-site sources is not allowed.

Question: Contractors that handle contaminated soil are required to be permitted by the DEEP under section 22a-454. How does this requirement apply to this project?

Answer: Contractors who handle contaminated soil on this project must be permitted pursuant to Connecticut General Statute 22a-454, commonly referred to as the list of Permitted Spill Cleanup Contractors. If the prime Contractor does not meet this qualification, they may sub-contract such services. It is the Contractor’s responsibility to be aware of and comply with all local, State, and Federal laws and regulations.

Question: As A Demo/Haz mat Remediation contractor, we do not necessarily transport our own debris, particularly Haz-Mats. My question is if my hauler has CT Deep Waste Transporter and Clean up certs, can my company still bid on the project and list them as sub of ours?

Answer: Qualified demolition / hazardous materials remediation contractors are encouraged to bid on this project. All waste haulers used on this project must be fully licensed, permitted and

OFFICE OF THE DIRECTOR OF PURCHASING

MAUREEN McCAULEY

ASSISTANT DIRECTOR OF PURCHASING

235 GRAND STREET • WATERBURY, CONNECTICUT 06702 • PHONE: (203) 574-6749 • FAX: (203) 597-3437 otherwise qualified to transport the waste they are hauling. It is the Contractor’s responsibility to be aware of and comply with all local, State, and Federal laws and regulations.

Question: Can we live load the material or are we to stockpile the concrete and soils?

Answer: Material designated for disposal can be live loaded so long as all waste characterization testing has been completed and all necessary waste disposal profiles, approvals, and manifests are prepared prior to shipping.

Question: The water in the pits I did not see any testing that was done on it, please provide.

Answer: Lab report CGT66305 contains the pit water testing results. This report is included in Attachment L of the bid package and appended to this Addendum for convenience.

Question: On the bid form number 5 it does not say if its remediation or bulk waste, waste please advise.

Answer: The waste designation included in Base Bid Item 5 is “PCB, petroleum, and metals-contaminated concrete slabs as EPA/TSCA regulated PCB Remediation Waste (≥50 ppm)”

Question: O the unit prices what if the area is lagger than 1500 square feet we should have a larger containment, and you should be telling us how its going to be constructed.

Answer: If a containment greater than 1,500 square feet is required to conduct out of scope work the cost for which will be determined through the change order process. Determining means and methods for constructing such a containment would be the contractor’s responsibility.

Question: In the specs it shows we need a state sign but there was one on site do we need another state sign?

Answer: Contractor should assume that a new sign is required.

Question: The drawing shows a fence detail, but can't we use the parameter fence, or do we still need the fence for some reason?

Answer: The existing perimeter fence can be used to secure the site. Details are included in the event that additional fencing must be installed or to repair damaged fencing. Contractor is responsible for securing the work site at all times.

Question: On the drawing it shows use saving the fence but it the walk thru we were told to leave it please advise.

Answer: Fencing around the building footprint can remain in place so long as it is not damaged during the work. If fencing must be removed to facilitate the project, it shall be removed and stored in a manner that does not damage the fencing.

Question: Is there an estimated timeframe for project award and start date?

Answer: Once the bids are reviewed, it is anticipated the proposed bidder will start the project early December.

Question: Per the specs the proposed backfill is ordinary borrow. Is structural fill required for backfill purposes for this project?

Answer: Borrow material provided must meet the specifications included in the bid documents.

NOTE: Each Proposal over $50,000.00 submitted shall be accompanied by a Proposal Security (a Certified Check or Bid Bond) in the amount of ten (10) percent of the Total Proposal Price.

Thank you.

Maureen McCauley

Assistant Director of Purchasing – City of Waterbury

Pl ot te d

O n:

O ct

9, 5-

:2 1a m B y:

Z

Le po re La st S av ed

9/

/2

Ti gh e

B on d:

J

W

\W

\0

A

Fr ei gh t

S la b R em ov al

\D ra w in gs \A ut oC

A D

\W

-0

-G

-0

-C O

V

ER

.d w g

PREPARED BY:

SET OF 8 SHEETS

LOCATION MAP

SCALE: 1" = 1000'

PREPARED FOR:

CITY OF WATERBURY, CT

WATERBURY DEVELOPMENT CORPORATION

83 BANK STREET

WATERBURY, CT 06702

OCTOBER 14, 2025

BUILDING SLAB AND FOUNDATION REMOVAL

AND SOIL REMEDIATION

170 FREIGHT STREET

CITY OF WATERBURY, CT

INVITATION TO BID 8393

LIST OF DRAWINGS

SHEET NO. DRAWING NO. DRAWING TITLE

1 C-100 GENERAL NOTES, STANDARD ABBREVIATIONS, AND LEGEND

2 EX-1 EXISTING CONDITIONS PLAN

3 C-101 SLAB AND FOUNDATION DEMOLITION PLAN

4 REM-1 CONCRETE SLAB SAMPLE LOCATIONS AND DISPOSAL AREAS

5 REM-2 SOIL REMEDIATION AREAS

6 C-201 SEDIMENTATION AND EROSION CONTROL PLAN

7 C-202 SEDIMENTATION AND EROSION CONTROL DETAILS

8 C-301 SITE RESTORATION DETAILS

SITE LOCATION

C-100

GENERAL NOTES,

STANDARD ABBREVIATIONS,

AND LEGEND

AS SHOWN

CHECKED BY:

DRAWN BY:

FILE:

APPROVED BY:

Waterbury, Connecticut

Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street

Waterbury Development Corporation

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

W1222-074A-C-100-GEN.dwg

W-1222-074A

SCALE:

ISSUED FOR

CONSTRUCTION

Pl ot te d

O n:

O ct

9, 5-

:2 2a m B y:

Z

Le po re La st S av ed

9/

/2

Ti gh e

B on d:

J:

\W \W

\0

A

Fr ei gh t

S la b R em ov al

\D ra w in gs \A ut oC

A D

\W

-0

A -C

-1

-G

EN

.d w g

ZJL

HAL

JTO

10/14/2025

GENERAL NOTES

1. UTILITY, STRUCTURE AND FACILITY LOCATIONS SHOWN HEREON WERE PLOTTED FROM INFORMATION SUPPLIED BY RESPECTIVE UTILITY COMPANIES AND DATA OBTAINED FROM FIELD SURVEYS AND AS-BUILT DRAWINGS. THE ACCURACY AND COMPLETENESS OF SUBSURFACE INFORMATION SHOWN ON THESE DRAWINGS IS NOT GUARANTEED. THE CONTRACTOR SHALL DETERMINE FOR THEMSELVES, THE

LOCATIONS AND ELEVATIONS OF ALL UTILITIES WHICH MAY AFFECT THEIR CONSTRUCTION

OPERATIONS. THE CONTRACTOR MUST ADEQUATELY PROTECT AND SUPPORT UTILITIES AND HE SHALL BE RESPONSIBLE FOR ALL DAMAGE INCURRED AT NO EXPENSE TO THE OWNER. ANYONE USING UTILITY INFORMATION AND DATA PROVIDED HEREIN SHALL CONTACT "CALL BEFORE YOU DIG", 1-800-922-4455 OR WWW.CBYD.COM, 72 HOURS IN ADVANCE TO VERIFY THE LOCATION OF UTILITIES PRIOR TO

STARTING CONSTRUCTION.

2. REFERENCE IS MADE TO PLAN ENTITLED "ZONING LOCATION SURVEY, PREPARED FOR MRT REALITY, 170 FREIGHT STREET, WATERBURY, CONNECTICUT" BY MEYERS ASSOCIATES P.C. DATED 11-9-17, REVISED 8-20-18.

3. ELEVATIONS REFER TO NGVD OF 1929 DATUM.

4. IT IS THE RESPONSIBILITY OF EACH BIDDER IN EVALUATING THESE PLANS TO MAKE EXAMINATIONS IN THE FIELD BY VARIOUS METHODS AND OBTAIN NECESSARY INFORMATION FROM AVAILABLE RECORDS, UTILITY COMPANIES, AND INDIVIDUALS AS TO THE LOCATION OF SUBSURFACE STRUCTURES.

5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND

SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE DRAWINGS, SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNER'S REPRESENTATIVE IN WRITING PRIOR TO THE START OF CONSTRUCTION.

FAILURE BY THE CONTRACTOR TO NOTIFY THE OWNER'S REPRESENTATIVE SHALL CONSTITUTE

ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES.

6. AS CONSTRUCTION IS COMPLETED, THE CONTRACTOR SHALL REMOVE ALL EXCESS PROJECT

GENERATED MATERIAL, DEBRIS, ETC. AND RESTORE OR REPLACE ANY DAMAGE TO LANDSCAPING AS

DIRECTED BY OWNER'S REPRESENTATIVE.

7. AREAS OUTSIDE THE PROJECT LIMIT LINE DISTURBED BY CONSTRUCTION SHALL BE RETURNED TO THEIR ORIGINAL CONDITION OR BETTER AND SHALL BE GRADED TO MEET PROPOSED CONSTRUCTION AS DIRECTED BY THE OWNER'S REPRESENTATIVE, UNLESS PRIOR APPROVAL IS PROVIDED BY THE THE OWNER'S REPRESENTATIVE THAT RESTORATION IS NOT REQUIRED. COST FOR THIS WORK SHALL BE

BORNE BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

8. THE CONTRACTOR SHALL PROCURE ALL THE NECESSARY PERMITS AND LICENSES, AT THE TIME

REQUIRED, PAY ALL THE CHARGES AND FEES, AND GIVE NOTICES AS NECESSARY AND DUE IN

CONNECTION WITH THE LAWFUL EXECUTION OF THE WORK AT NO ADDITIONAL COST TO THE OWNER.

9. ALL UTILITY BOXES, FRAMES, AND GRATES, ETC. AFFECTED BY THE CONSTRUCTION ACTIVITIES AND THAT ARE NOT BEING DEMOLISHED OR ABANDONED SHALL BE RESET/RECONSTRUCTED TO THE PROPER GRADE. ALL COST RELATED TO SUCH WORK SHALL BE CONSIDERED INCLUDED IN THE BID PRICE.

10. EXCAVATION OF ANY TYPE SHALL BE ACCOMPLISHED IN SUCH A MANNER THAT UNDERGROUND

UTILITIES OR STRUCTURES ARE NOT DAMAGED. IT SHALL BE THE CONTRACTOR'S SOLE

RESPONSIBILITY FOR ANY DAMAGES INCURRED DURING EXCAVATION OPERATIONS. ALL EXCAVATION

SHALL BE IN CONFORMANCE WITH THE LATEST OSHA REQUIREMENTS.

11. THE CONTRACTOR SHALL SUFFICIENTLY COVER ALL DISTURBED AREAS AT THE END OF EACH WORK DAY TO AVOID ANY RISK OF INJURY TO PEDESTRIAN OR VEHICULAR TRAFFIC. THE CONTRACTOR SHALL INSTALL TEMPORARY SUPPORT SYSTEMS OVER TRENCH EXCAVATIONS THAT ARE TAMPER RESISTANT AND SAFE FOR VEHICULAR AND PEDESTRIAN TRAFFIC. THE CONTRACTOR SHALL INSTALL BARRICADES TO PROTECT AGAINST PEDESTRIAN ACCESS. THE CONTRACTOR SHALL OBTAIN APPROVAL OF THE

TEMPORARY SAFETY MEASURES BY THE OWNER'S REPRESENTATIVE. ALL MAINTENANCE AND

PROTECTION OF BOTH PEDESTRIAN AND VEHICULAR TRAFFIC ARE INCLUDED IN THE LUMP SUM BID

PRICE FOR THIS PROJECT.

12. THE CONTRACTOR SHALL RECORD THE LOCATIONS OF ALL UNDERGROUND UTILITIES CAPPED AND/OR

ABANDONED OR FOUND DURING CONSTRUCTION. THE UTILITIES SHALL BE MEASURED FROM

PERMANENT SURFACE FEATURES AND COMPILED BY THE CONTRACTOR ON RECORD DRAWINGS.

13. THE CONTRACTOR SHALL COMPLETE ALL WORK SO THAT ANY MATERIALS WHICH ARE TO REMAIN IN PLACE OR WHICH ARE TO REMAIN THE PROPERTY OF THE OWNER, WILL NOT BE DAMAGED. IF THE

CONTRACTOR DAMAGES ANY MATERIALS WHICH ARE TO REMAIN, OR WHICH ARE TO REMAIN THE

PROPERTY OF THE OWNER, THE DAMAGED MATERIALS SHALL BE REPLACED TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE AT THE EXPENSE OF THE CONTRACTOR, UNLESS PRIOR APPROVAL IS

PROVIDED BY THE THE OWNER'S REPRESENTATIVE THAT RESTORATION IS NOT REQUIRED.

14. THE CONTRACTOR SHALL ANTICIPATE IN THEIR BID THAT THE AREA OF THEIR PROPOSED WORK MAY BE ENCUMBERED BY UTILITY COMPANIES FOR THE REMOVAL/RELOCATION/ADJUSTMENT/CONSTRUCTION OF UTILITIES. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE REQUIRED NOTIFICATIONS. THE CONTRACTOR SHALL COORDINATE ALL ASPECTS OF THEIR WORK WITH SAID UTILITY COMPANIES.

15. ALL PROPOSED WORK MAY BE VARIED IN THE FIELD BY THE OWNER'S REPRESENTATIVE TO MEET

EXISTING CONDITIONS.

INC INCORPORATED

INV INVERT

L LENGTH OF CURVE

LT LEFT

LOC LOCATION

LP LIGHT POLE

MAX MAXIMUM

MIN MINIMUM

MH MANHOLE

MISC MISCELLANEOUS

MON MONUMENT

NIC NOT IN CONTRACT

N NORTH

CATV CABLE TELEVISION

NTS NOT TO SCALE

N/A NOT APPLICABLE

N/F NOW OR FORMERLY

OH OVERHEAD

PC POINT OF CURVATURE

PCC POINT OF COMPOUND CURVATURE

PCPP PERFORATED CORRUGATED POLYETHYLENE PIPE

PED PEDESTRIAN

PI POINT OF INTERSECTION

PT POINT OF TANGENCY

PRC POINT OF REVERSE CURVATURE

PS PARKING SPACES

PVC POLYVINYL CHLORIDE

R RADIUS

REV REVISION

ROW RIGHT OF WAY

RT RIGHT

SAN SANITARY

SCH SCHEDULE

SF SQUARE FEET

S SOUTH

STA STATION

STD STANDARD

STRM STORM

T TANGENT LENGTH/TEL-DATA

TEL TEL-DATA

TF TOP OF FRAME

TYP TYPICAL

TC TOP OF CURB

TW TOP OF WALL

W WATER

WG/WV WATER GATE/VALVE

XFMR TRANSFORMER

& AND

STANDARD ABBREVIATIONS

@ AT

ABDN('D) ABANDON(ED)

AC ACRE/AIR CONDITIONING

AOBE AS ORDERED BY THE ENGINEER

BSMT BASEMENT

BCLC BITUMINOUS CONCRETE LIP CURBING

BOW BACK OF WALK

BL BASELINE

BW BOTTOM OF WALL

BIT BITUMINOUS

BC BOTTOM OF CURB

BLDG BUILDING

BOT BOTTOM

CATV CABLE TELEVISION

CIP CAST IRON PIPE

CB CATCH BASIN

CL CENTERLINE

CLF CHAIN LINK FENCE

CL&P CONNECTICUT LIGHT & POWER

CTDEEP CONNECTICUT DEPT. OF ENERGY & ENV. PROTECTION

CTDOT CONNECTICUT DEPT. OF TRANSPORTATION

CONC CONCRETE

CO CLEAN-OUT

CPP CORRUGATED POLYETHYLENE PIPE

CY CUBIC YARDS

DIP DUCTILE IRON PIPE

DWG DRAWING

E EAST/ELECTRIC

EOP EDGE OF PAVEMENT

ELEC ELECTRIC

EL/ELEV ELEVATION

EMH ELECTRIC MANHOLE

EX/EXIST EXISTING

EG EXISTING GRADE

FF FIRST FLOOR

G GAS

GEN GENERATOR

GG GAS GATE

GRC GALVANIZED RIGID CONDUIT

HC HANDICAP

HYD HYDRANT

IN INCHES

DESCRIPTION EXISTING PROPOSED

PROPERTY LINE

ADJACENT PROPERTY LINE

PROJECT LIMIT LINE

REMOVE PIPE/STRUCTURE

ASPHALT PATCH

SILT SACK

HAYBALE INLET PROTECTION

GEOTEXTILE SILT FENCE

HAYBALE BARRIER

EROSION CONTROL BLANKET

SOIL STOCKPILE AREA

CONSTRUCTION ENTRANCE

CONSTRUCTION FENCE

CONSTRUCTION GATE

EDGE OF ROAD

EDGE OF ROAD (CURBED)

RETAINING WALL

CONCRETE WALK

HANDICAP RAMP

EXTERIOR STAIRS

BUILDING

CHAIN LINK FENCE

STORM SEWER

STORM MANHOLE

CATCH BASIN

SANITARY SEWER

SANITARY MANHOLE

WATER MAIN/SERVICE

WATER VALVE

HYDRANT

GAS MAIN

GAS GATE

ELECTRIC - BURIED

ELECTRIC MANHOLE

LIGHT POLE

LEGEND

X X X

CFCF

S.S.

Soil Stockpile

Area

X X X

SHEET 1 OF 8

GENERAL NOTES (CONTINUED)

21. THE ENTIRE SITE IS LOCATED WITHIN ZONE X, AREAS OF 0.2% ANNUAL CHANCE FLOOD (500-YEAR), BASED UPON FLOOD INSURANCE RATE MAP NUMBER 09009C0116H, EFFECTIVE DATE DECEMBER 17, 2010. THE 500-YEAR FLOOD ELEVATION IS APPROXIMATELY 275.5 (NAVD 88) BASED UPON NAUGATUCK

RIVER FLOOD PROFILE FROM THE FLOOD INSURANCE STUDY NUMBER 09009CV008D, NEW HAVEN

COUNTY, CONNECTICUT, VOLUME 8 OF 10, REVISED MAY 16, 2017. ELEVATION 275.5 (NAVD 88)

CONVERTS TO APPROXIMATELY ELEVATION 276.4 (NGVD 29).

22. NO BUOYANT, HAZARDOUS, FLAMMABLE, EXPLOSIVE, SOLUBLE, EXPANSIVE, OR ANY OTHER MATERIALS WHICH COULD BE INJURIOUS TO HUMAN, ANIMAL OR PLANT LIFE IN THE EVENT OF FLOOD SHALL BE STORED WITHIN THE SITE (500-YEAR FLOODPLAIN) AT ANY TIME. DEBRIS GENERATED DURING DEMOLITION SHALL BE ACTIVELY MANAGED FOR REMOVAL FROM THE SITE FOR LEGAL DISPOSAL.

23. PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR WILL SUBMIT TO THE ENGINEER A WRITTEN FLOOD CONTINGENCY PLAN. THE PLAN SHALL INCLUDE A DESCRIPTION OF THE MEANS BY WHICH THE CONTRACTOR WILL REMOVE FROM WITHIN THE FLOODPLAIN, ALL MATERIALS, EQUIPMENT AND PERSONNEL PRIOR TO A PREDICTED MAJOR STORM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING LOCAL WEATHER CONDITIONS AND SECURING THE WORK SITE BEFORE PREDICTED MAJOR STORMS. A MAJOR STORM SHALL BE DEFINED AS A STORM PREDICTED BY THE N.O.A.A.

WEATHER SERVICE WITH WARNING OF FLOODING, SEVERE THUNDERSTORMS OR SIMILARLY SEVERE

WEATHER CONDITIONS OR EFFECTS.

CHECKED BY:

DRAWN BY:

FILE:

APPROVED BY:

Waterbury, Connecticut

Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street

Waterbury Development Corporation

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

W1222-074A-EX-1.dwg

W-1222-074A

SCALE:

ISSUED FOR

CONSTRUCTION

Pl ot te d

O n:

O ct

9, 5-

:2 6a m B y:

Z

Le po re La st S av ed

9/

8/

Ti gh e

B on d:

J:

\W \W

\0

A

Fr ei gh t

S la b R em ov al

\D ra w in gs \A ut oC

A D

\W

-0

A -E

X -1

.d w g

ZJL

HAL

JTO

10/14/2025

00 40' 80'

SCALE: 1" = 40' EX-1

EXISTING CONDITIONS

SHEET 2 OF 8

AS SHOWN

N

MAP REFERENCES

1. "ZONING LOCATION SURVEY FOR 170 FREIGHT STREET,

WATERBURY, CONECTICUT", BY MEYERS ASSCIATES P.C.,

PREAPRED FOR MRT REALITY, DATED AUGUST 20, 2018.

2. ORTHOPHOTOGRAPY, PROVIDED BY NEARMAP, DATED

SEPTEMBER 1, 2022.

LEGEND

PROPERTY LINE

ADJACENT PROPERTY LINE

EDGE OF ROAD

EDGE OF ROAD (CURBED)

RETAINING WALL

CONCRETE WALK

CONCRETE PAD

HANDICAP RAMP

EXTERIOR STAIRS

BUILDING

CHAIN LINK FENCE

STORM SEWER

STORM SEWER LATERAL

CATCH BASIN

STORM MANHOLE

SANITARY SEWER

SANITARY MANHOLE

WATER MAIN

WATER VALVE

WATER MANHOLE

HYDRANT

GAS MAIN

GAS MANHOLE

ELECTRIC - BURIED

ELECTRICAL MANHOLE

LIGHT POLE

CJC

FORMER BUILDING 1 AREA

FORMER BUILDING 3 AREA

FORMER BUILDING 2 AREA

00 40' 80'

SCALE: 1" = 40' C-101

SLAB AND FOUNDATION

DEMOLITION PLAN

AS SHOWN

CHECKED BY:

DRAWN BY:

FILE:

APPROVED BY:

Waterbury, Connecticut

Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street

Waterbury Development Corporation

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

W1222-074A-C-101-DEMO.dwg

W-1222-074A

SCALE:

ISSUED FOR

CONSTRUCTION

Pl ot te d

O n:

O ct

9, 5-

:2 7a m B y:

Z

Le po re La st S av ed

9/

8/

Ti gh e

B on d:

J:

\W \W

\0

A

Fr ei gh t

S la b R em ov al

\D ra w in gs \A ut oC

A D

\W

-0

A -C

-1

-D

EM

O .d w g

ZJL

HAL

JTO

10/14/2025

SLAB AND FOUNDATION DEMOLITION PLAN NOTES

1. UTILITY, STRUCTURE AND FACILITY LOCATIONS SHOWN HEREON WERE PLOTTED

FROM INFORMATION SUPPLIED BY RESPECTIVE UTILITY COMPANIES AND DATA

OBTAINED FROM FIELD SURVEYS AND AS-BUILT DRAWINGS. THE ACCURACY AND

COMPLETENESS OF SUBSURFACE INFORMATION SHOWN ON THESE DRAWINGS IS

NOT GUARANTEED. THE CONTRACTOR SHALL DETERMINE FOR HIMSELF, THE

LOCATIONS AND ELEVATIONS OF ALL UTILITIES WHICH MAY AFFECT HIS

CONSTRUCTION OPERATIONS. THE CONTRACTOR MUST ADEQUATELY PROTECT

AND SUPPORT UTILITIES AND HE SHALL BE RESPONSIBLE FOR ALL DAMAGE

INCURRED AT NO EXPENSE TO THE OWNER. ANYONE USING UTILITY

INFORMATION AND DATA PROVIDED HEREIN SHALL CONTACT "CALL BEFORE YOU

DIG", 1-800-922-4455 OR WWW.CBYD.COM, 72 HOURS IN ADVANCE TO VERIFY

THE LOCATION OF UTILITIES PRIOR TO STARTING CONSTRUCTION.

2. REFERENCE IS MADE TO PLAN ENTITLED "ZONING LOCATION SURVEY, PREPARED

FOR MRT REALITY, 170 FREIGHT STREET, WATERBURY, CONNECTICUT" BY

MEYERS ASSOCIATES P.C. DATED 11-9-17, REVISED 8-20-18.

3. ELEVATIONS REFER TO NGVD OF 1929 DATUM.

4. REFER TO C-100 GENERAL NOTE 18, REGARDING FEMA FLOOD ELEVATIONS AND

RESTRICTIONS FOR MATERIAL STORAGE AT THE SITE.

5. THE CONTRACTOR SHALL OBTAIN CITY OF WATERBURY STREET OPENING PERMIT

PERMITS PRIOR TO ANY WORK BEING PERFORMED WITHIN CITY of WATERBURY

RIGHT-OF-WAY.

6. THE CONTRACTOR SHALL FILE ALL APPLICABLE PERMIT APPLICATIONS AND

NOTICES WITH THE CITY OF WATERBURY WITHIN THE REQUIRED TIMEFRAMES TO

RECEIVE APPROVALS PRIOR TO THE START OF DEMOLITION ACTIVITIES.

7. ANY AND ALL WORK PERFORMED ON THE CITY OF WATERBURY RIGHT-OF-WAY

SHALL BE REQUIRED TO MEET THE CITY STANDARDS.

8. THE CONTRACTOR SHALL TAKE EXTREME CARE TO PROTECT ALL EXISTING

STRUCTURES, SURFACE IMPROVEMENTS, LANDSCAPING, ETC. OUTSIDE THE

PROJECT LIMIT LINE AND SHALL RESTORE ANY DAMAGE TO THESE ITEMS TO

PRE-DAMAGE CONDITION OR BETTER, UNLESS PRIOR APPROVAL IS PROVIDED BY

THE OWNER'S REPRESENTATIVE THAT RESTORATION IS NOT REQUIRED.

9. THE CONTRACTOR SHALL SAWCUT EXISTING PAVEMENT AND SIDEWALK AREAS

AS REQUIRED BY THE CONTRACT DRAWINGS OR THE OWNER'S REPRESENTATIVE

PRIOR TO THE START OF ANY EXCAVATION AND AT ALL LOCATIONS WHERE THE

PROPOSED PAVEMENT/CONCRETE WALK MEET EXISTING PAVEMENT/CONCRETE

WALK.

10. THE CONTRACTOR SHALL DEMOLISH, REMOVE, AND LEGALLY DISPOSE OF

OFF-SITE ALL ITEMS INDICATED TO BE REMOVED WITHIN PROJECT LIMIT LINE.

11. THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES AND UTILITY

STRUCTURES NOT IDENTIFIED FOR REMOVAL DURING UTILITY AND SURFACE

DEMOLITION OPERATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY

DAMAGE INCURRED TO EXISTING UTILITY STRUCTURES AND SHALL REPAIR OR

REPLACE THE EXISTING UTILITY STRUCTURES TO PRE-DAMAGED CONDITION OR

BETTER TO THE SATISFACTION OF THE OWNER AND AT NO ADDITIONAL COST TO

THE OWNER.

12. THE PLAN IS PROVIDED TO SHOW THE GENERAL EXTENT OF THE SLAB AND

FOUNDATION DEMOLITION. NOT ALL ITEMS REQUIRING REMOVAL MAY BE SHOWN

OR CALLED OUT. THE CONTRACTOR IS RESPONSIBLE TO REMOVE AND PROPERLY

DISPOSE OF ALL ITEMS ON THE SITE (ABOVE GROUND OR BELOW GROUND)

WHICH ARE NOT REQUIRED TO BE SAVED OR PROTECTED AND WHICH WILL NOT

BE INCORPORATED INTO THE FINAL CONSTRUCTION, INCLUDING ANY EQUIPMENT

OR OTHER ITEMS LOCATED ON OUTDOOR CONCRETE PADS.

13. THE PROVISIONS OF WORKER SAFETY AND/OR HEALTH PROTOCOLS THAT

ADDRESS COMPLIANCE WITH THE RULES, LAWS AND REGULATIONS PERTAINING

TO CONSTRUCTION SAFETY AND/OR THE POTENTIAL AND/OR ACTUAL RISK OF

EXPOSURE TO SITE SPECIFIC PHYSICAL OR CHEMICAL HAZARDS POSED TO THE

CONTRACTOR'S EMPLOYEES IS SOLELY THE RESPONSIBILITY OF THE

CONTRACTOR. REFER TO APPLICABLE HEALTH AND SAFETY SPECIFICATIONS

14. ALL ITEMS IDENTIFIED FOR REMOVAL/DEMOLITION SHALL BE DISPOSED OF

LEGALLY OFF-SITE. ALL COSTS SHALL BE INCLUDED AS REQUESTED ON THE BID

FORM.

15. CONTRACTOR TO COMPLY WITH THE REQUIREMENTS FOR EROSION AND

SEDIMENTATION CONTROL, SEE C-301 AND C-302.

16. THE CONTRACTOR SHALL PROTECT ALL CONCRETE SIDEWALKS, APRONS,

CURBING, BITUMINOUS CONCRETE PAVEMENT, PEDESTRIAN RAMPS, FENCING,

DRAINAGE STRUCTURES, MANHOLES, PIPING, UTILITIES, UTILITY POLES,

SIGNAGE, HYDRANTS, ETC., OUTSIDE PROJECT LIMIT LINE, AND WITHIN CITY

RIGHT-OF-WAY.

17. INSTALL CONSTRUCTION SIGNS, CONSTRUCTION FENCING AND OTHER

TEMPORARY CONTROLS AS REQUIRED PRIOR TO INITIATING DEMOLITION

ACTIVITIES.

18. SLAB REMOVAL SHALL BE CONDUCTED IN CONFORMANCE WITH THE

REMEDIATION PLAN AND DEMOLITION SPECIFICATIONS, INCLUDING ALL

REGULATORY AND REPORTING REQUIREMENTS. DISPOSE OF ALL MATERIALS IN

ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL LAWS AND

REGULATIONS AND IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS.

19. AS AN ALTERNATE PAY ITEM, CONTRACTOR CAN PROPOSE TO CRUSH AND REUSE

AS BACKFILL MATERIAL NON-CONTAMINATED MASONRY DEBRIS. IF THIS

ALTERNATE IS PROPOSED AND ELECTED, CONTRACTOR MUST CRUSH

NON-CONTAMINATED CONCRETE TO A THREE INCH (3-INCH) MINUS GRADATION

OR OTHER SIZING APPROVED BY ENGINEER.

20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ACCESS TO OR

SUPPLYING WATER DURING CONSTRUCTION.

21. UTILITY CONNECTIONS IDENTIFIED AT THE FORMER BUILDING WERE

TERMINATED PRIOR TO BUILDING DEMOLITION. UTILITY LOCATIONS SHOWN ARE

APPROXIMATE. ADDITIONAL CONNECTIONS TO BUILDING FOUNDATION MAY BE

PRESENT. CONTRACTOR MUST IDENTIFY AND CUT, CAP, OR OTHERWISE

ABANDON ALL UTILITIES THAT MAY STILL BE CONNECTED TO THE BUILDING

FOUNDATION IN ACCORDANCE WITH ALL REQUIREMENTS OF THE CITY AND THE

UTILITY OWNER.

22. CONTAMINATED SOILS ABUTTING FOUNDATION WALLS ARE KNOWN OR

SUSPECTED TO BE PRESENT. IF ENCOUNTERED, THESE SOILS MUST REMAIN IN

PLACE AND NOT BE ALLOWED TO ERODE INTO THE FOUNDATION CAVITY, TO THE

EXTENTS PRACTICAL. IF CONTAMINATED SOILS ERODE INTO THE CAVITY,

ENGINEER MAY REQUIRE THAT THEY BE PLACED BACK IN THEIR ORIGINAL

LOCATION PRIOR TO BACKFILLING THE CAVITY.

23. ALL CONTAMINATED CONCRETE AND SOIL SHOWN ON DRAWINGS REM-1 AND

REM-2 MUST BE REMOVED PRIOR TO STARTING DEMOLITION AND PROCESSING

OF NON-REGULATED MASONRY DEBRIS. ENGINEER WILL NOTIFY CONTRACTOR

ONCE ALL CONTAMINATED MATERIAL IS REMOVED.

24. AREAS NOT DESIGNATED FOR DISPOSAL AS REGULATED WASTE WILL BE

MANAGED AND DISPOSED OF AS NON-REGULATED MASONRY DEBRIS OR

CRUSHED AND USED AS BACKFILL AS AN ALTERNATE BID ITEM.

TEST PITS AND OTHER EXPLORATORY ACTIVITIES WERE COMPLETED TO

OBSERVE THE EXISTING CONDITION OF THE CONCRETE SLABS AND

FOUNDATION COMPONENTS. NOTABLE FINDINGS FROM THESE

ACTIVITIES ARE LISTED BELOW FOR INFORMATIONAL PURPOSES.

1. THE GREEN SHADED BASEMENT SLAB AREA WAS OBSERVED TO BE EIGHT TO

NINE INCHES THICK, ON AVERAGE. FORMER EQUIPMENT LOCATIONS WERE

IDENTIFIED TO HAVE SLABS AS THICK AS 15 INCHES.

2. A SUBSTANTIAL AMOUNT OF CONCRETE PIERS AND OTHER CONCRETE BLOCKS

AND DEBRIS WAS IDENTIFIED BENEATH THE GREEN SHADED BASEMENT AREA

SLABS.

3. THE TAN SHADED ELEVATED SLAB AREA WAS OBSERVED TO BE EIGHT TO TEN

INCHES THICK, ON AVERAGE.

4. MULTIPLE CONCRETE PARTITION WALLS, SUPPORTS, AND OTHER FEATURES WERE

OBSERVED BENEATH THE TAN SHADED ELEVATED SLAB AREA.

5. A SECOND CONCRETE SLAB WAS OBSERVED APPROXIMATELY NINE FEET BENEATH

MOST OF THE TAN SHADED ELEVATED SLAB AREA. THE TOP OF THE SECOND SLAB

WAS IDENTIFIED AT THE SAME APPROXIMATE ELEVATION AS THE GREEN SHADED

BASEMENT AREA. THIS SECOND SLAB WAS NOT IDENTIFIED BENEATH THE

BUILDING 3 BASEMENT.

6. THE VOID SPACE BETWEEN THE ELEVATED SLAB AND THE LOWER SLAB WAS

OBSERVED TO BE FILLED WITH SANDY FILL MATERIAL INTERMIXED WITH

VARIOUS DEBRIS. SOME SPACES / FORMER ROOMS MAY REMAIN AS OPEN

UN-FILLED VOID SPACES.

7. FOOTINGS WERE OBSERVED AT THE BASE OF PERIMETER AND INTERIOR WALLS.

THESE FOOTINGS WERE OBSERVED TO BE VARIOUS SIZES AND EXTENDING FROM

12 INCHES TO FOUR FEET BENEATH THE WALLS.

PROTECT

EXISTING STORM

DRAINAGE LINE

CUT AND CAP EXISTING WATER SERVICES CJC

PROTECT EXISTING STORM

DRAINAGE THAT MAY RUN

BENEATH THE FOUNDATION,

TO REMAIN (TYP.)

SHEET 3 OF 8

ABANDON ELECTRICAL VAULT

N

SLAB AND FOUNDATION DEMOLITION LEGEND

PROJECT LIMIT LINE

REMOVE STRUCTURE

ABANDON SERVICE LINE

CUT AND CAP PIPE

STORM SEWER

STORM SEWER LATERAL

CATCH BASIN

STORM MANHOLE

SANITARY SEWER

SANITARY MANHOLE

WATER MAIN

WATER VALVE

WATER MANHOLE

HYDRANT

GAS MAIN

GAS MANHOLE

ELECTRIC - BURIED

ELECTRICAL MANHOLE

LIGHT POLE

DEMOLISH BASEMENT SLABS AND

FOUNDATION WALLS AND FOOTINGS

AND DISPOSE IN ACCORDANCE WITH

THE WASTE DISPOSAL PLANS SHOWN

ON DRAWING REM-1 AND AS

DESCRIBED IN THE DIVISION 2 AND 13

SPECIFICATIONS

DEMOLISH ABOVE-GRADE SLABS,

FOUNDATION WALLS AND FOOTINGS

AND POTENTIAL BASEMENT SLABS AND

DISPOSE IN ACCORDANCE WITH THE

WASTE DISPOSAL PLANS SHOWN ON

DRAWING REM-1 AND AS DESCRIBED

IN THE DIVISION 2 AND 13

SPECIFICATIONS

DEMOLISH SLABS AND DISPOSE IN

ACCORDANCE WITH THE WASTE

DISPOSAL PLANS SHOWN ON DRAWING

REM-1 AND AS DESCRIBED IN THE

DIVISION 2 AND 13 SPECIFICATIONS

PROJECT LIMIT LINE

PROTECT EXISTING

WATER/FIRE

PROTECTION PIPING

(TYP.)

PROTECT EXISTING

WATER/FIRE

PROTECTION PIPING

(TYP.)

PROTECT EXISTING

WATER/FIRE PROTECTION PIPING

(TYP.)

DISASSEMBLE AND SALVAGE

FOR POTENTIAL REUSE CHAIN

LINK FENCE SURROUNDING THE

PROJECT AREA.

FORMER BUILDING 1 AREA

FORMER BUILDING 3 AREA

FORMER BUILDING 2 AREA

PROTECT EXISTING

STORM DRAINAGE

INFRASTRUCTURE

(TYP.)

CONCRETE PITS (FORMERLY FILLED

WITH SAND AND DEBRIS)

TRENCH

B-4/MW-3

B-5

B-6/MW-4

TB-CS-46

TB-CS-44

TB-CS-23

TB-CS-45

TB-CS-40

TB-CS-32

TB-CS-33 TB-CS-34

TB-CS-28

TB-CS-24

CLEAN SAND

TB-CS-21

TB-CS-48

TB-CS-42

TB-CS-43

TB-CS-20

TB-CS-47

TB-CS-38

TB-CS-36 TB-CS-35

TB-CS-29

TB-CS-27

TB-SB-60

NO BASEMENT AREA

TB-CS-22

TB-CS-15

TB-CS-14

TB-CS-13

TB-CS-11

TB-CS-10

TB-CS-12

TB-CS-09

TB-CS-44

TB-CS-49

TB-CS-39

TB-CS-41

TB-CS-50

TB-CS-100

TB-CS-101

TB-CS-103

TB-CS-105

TB-CS-106

TB-CS-107

TB-CS-108

TB-CS-109

TB-CS-111

TB-CS-112

TB-CS-113

TB-CS-114

TB-CS-115

TB-CS-116

TB-CS-117

TB-CS-119

TB-CS-120

TB-CS-121

TB-CS-122

TB-CS-123

TB-CS-125

TB-CS-124

TB-CS-127

TB-CS-128

TB-CS-129

TB-CS-131

TB-CS-132

TB-CS-133

TB-CS-134

TB-CS-135

TB-CS-136 TB-CS-137

TB-CS-139

TB-CS-140

TB-CS-141

TB-CS-31

TB-CS-30

TB-CS-37

TB-CS-130

TB-CS-25

TB-CS-26

TB-CS-126

TB-CS-138

BASEMENT

ACCESS

TB-CS-01

TB-CS-02TB-CS-04

TB-CS-03

TB-CS-05

TB-CS-06

LEGEND

APPROXIMATE PROPERTY BOUNDARY

EDGE OF PAVEMENT/ROADWAY

SIDEWALK/CONCRETE

BUILDING

FORMER BUILDING

INTERIOR BUILDING FEATURES

RAILROAD TRACK

CONCRETE SAMPLE LOCATION

TIGHE & BOND SAMPLE LOCATIONS

CONCRETE SAMPLE WITH PCBs >1 PPM

BROKEN CONCRETE SLAB

APPROXIMATE CATCH BASIN LOCATION]

CONCRETE DISPOSAL LEGEND

CONCRETE WASTE STREAM No. 1- PCB

CONTAMINATED CONCRETE - MANAGE AND

DISPOSE OF CONCRETE AS NON-TSCA CT DEEP

REGULATED <50 PPM PCB WASTE IN ACCORDANCE

WITH STATE AND FEDERAL REGULATIONS AND

REQUIREMENTS SPECIFIED IN THE CONTRACT

DOCUMENTS. WASTE CHARACTERIZATION SAMPLES

CS-5-COMP AND CS-5-GRAB ARE REPRESENTATIVE

OF THIS WASTE STREAM.

CONCRETE WASTE STREAM No. 2 - PCB AND

PETROLEUM CONTAMINATED CONCRETE - MANAGE

AND DISPOSE OF CONCRETE AS MIXED EPA

REGULATED >50 PPM PCB REMEDIATION WASTE

WITH PETROLEUM CONTAMINATION IN

ACCORDANCE WITH STATE AND FEDERAL

REGULATIONS AND REQUIREMENTS SPECIFIED IN

THE CONTRACT DOCUMENTS. WASTE

CHARACTERIZATION SAMPLES CS-1-COMP AND

CS-1-GRAB ARE REPRESENTATIVE OF THIS WASTE

STREAM.

CONCRETE WASTE STREAM No. 3 - PETROLEUM

AND/OR METALS CONTAMINATED CONCRETE -

MANAGE AND DISPOSE OF CONCRETE IN

ACCORDANCE WITH STATE AND FEDERAL

REGULATIONS AND REQUIREMENTS SPECIFIED IN

THE CONTRACT DOCUMENTS. WASTE

CHARACTERIZATION SAMPLES CS-6-COMP AND

CS-6-GRAB ARE REPRESENTATIVE OF THIS WASTE

STREAM.

CONCRETE WASTE STREAM No. 4 - PITS A AND B -

PCB, VOC, AND METALS CONTAMINATED CONCRETE

- MANAGE AND DISPOSE OF CONCRETE AS MIXED

EPA REGULATED >50 PPM PCB REMEDIATION

WASTE, VOC AND METALS CONTAMINATED WASTE

IN ACCORDANCE WITH STATE AND FEDERAL

REGULATIONS AND REQUIREMENTS SPECIFIED IN

THE CONTRACT DOCUMENTS

CONCRETE WASTE STREAM No. 5 - PCB, PETROLEUM, AND METALS CONTAMINATED

CONCRETE - MANAGE AND DISPOSE OF CONCRETE

AS EPA REGULATED >50 PPM PCB REMEDIATION

WASTE, AND PETROLEUM AND METALS

CONTAMINATED WASTE IN ACCORDANCE WITH

STATE AND FEDERAL REGULATIONS AND

REQUIREMENTS SPECIFIED IN THE CONTRACT

DOCUMENTS. WASTE CHARACTERIZATION SAMPLES

CS-2 AND 4-COMP AND CS-2 AND 4-GRAB ARE

REPRESENTATIVE OF THIS WASTE STREAM.

CONCRETE DEMOLITION AND DISPOSAL NOTES

1. THE EXTENT OF CONTAMINATED CONCRETE REMOVAL WILL BE

DETERMINED BY THE ENGINEER THROUGH ANALYTICAL

TESTING AFTER REMOVAL OF MATERIAL TO THE LIMITS SHOWN

ON THIS DRAWING. ADDITIONAL REMOVAL MAY BE REQUIRED

BASED ON ANALYTICAL RESULTS REPORTED FOR

POST-REMOVAL SAMPLES.

2. ALL CONTAMINATED CONCRETE AND SOIL SHOWN ON

DRAWINGS REM-1 AND REM-2 MUST BE REMOVED PRIOR TO

STARTING DEMOLITION AND PROCESSING OF NON-REGULATED

MASONRY DEBRIS. ENGINEER WILL NOTIFY CONTRACTOR ONCE

ALL CONTAMINATED MATERIAL IS REMOVED.

3. AREAS NOT DESIGNATED FOR DISPOSAL AS REGULATED

WASTE WILL BE MANAGED AND DISPOSED OF AS

NON-REGULATED MASONRY DEBRIS UNDER THE BASE

CONTRACT OR CRUSHED AND USED AS BACKFILL AS AN

ALTERNATE BID ITEM.

4. PITS A AND B ACCUMULATE SEVERAL FEET OF STANDING

WATER THAT MUST BE PUMPED OUT AND DISPOSED OF PRIOR

TO DEMOLISHING THE PITS. WATER PREVIOUSLY

ACCUMULATED IN THE PITS WAS CHARACTERIZED AS D AND F

LISTED HAZARDOUS WASTE.WASTE CHARACTERIZATON

SAMPLES PIT-A/B-WC, PIT-A-WC, AND PIT-B-WC ARE

REPRESENTATIVE OF THIS WASTE STREAM.

5. LABORATORY ANALYTICAL REPORTS FOR THE WASTE

CHARACTERIZATION SAMPLES REFERENCED ABOVE ARE

INCLUDED WITH SECTION 02222 SLAB AND FOUNDATION

DEMOLITION. REM-1

CONCRETE SLAB SAMPLE

LOCATIONS & DISPOSAL

AREAS

N

00 30' 60'

SCALE: 1" = 30'

DESIGNED/CHECKED BY:

DRAWN BY:

FILE:

APPROVED BY:

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

W-1222-053-B-SP - QAPP Figures.dwg

10/14/2025

SCALE:

ISSUED FOR

CONSTRUCTION

Pl ot te d

O n:

O ct

9, 5-

:3 2a m B y:

Z

Le po re La st S av ed

9/

/2

Ti gh e

B on d:

J:

\W \W

\0

-1

F re ig ht

S tr ee t

Ph as e

II

H

B M

A \D ra w in gs

_F ig ur es

\A ut oC A D

\W -1

2-

3-

B -S

P

Q A

PP

F ig ur es

.d w g

HAL

JTO

ZJL

Waterbury, Connecticut

Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street

Waterbury Development Corporation

6X6 OPENING

FLOOR DRAIN

MANHOLE

TRENCH

CLEAN SAND

PIT D

PIT E

PIT C

TRENCH

CONCRETE WALL

FORMER CHIMNEYS

BROKEN CONCRETE SLAB

RAMP

3x3 TRENCH

FORMER TRANSFORMER ROOM

(CONCRETE FLOOR REMOVED)

VAULT

CONCRETE CURB

FLOOR DRAIN

400 SF

400 SF

400 SF

400 SF

400 SF

4,500 SF

400 SF

400 SF

750 SF

400 SF

1,150 SF

2,100 SF

400 SF

4,000 SF

16,100 SF

PIT A PIT B

W-1222-074A

W-1222-074A-HM-001.dwg

SHEET 4 OF 8

POTENTIAL SEQUENCE FOR SLAB, FOUNDATION, AND SOIL REMOVAL. CONTRACTOR MUST INCLUDE THESE STEPS IN THE CONSTRUCTION SCHEDULE SUBMITTAL SPECIFIED IN SECTION 01325 SCHEDULING OF CONSTRUCTION.

CONTRACTOR MAY SUGGEST AN ALTERNATIVE SEQUENCE IN THE SCHEDULE SUBMITTAL. IT IS EXPECTED THAT

SOME TASKS WILL OVERLAP FOR EFFICIENCY PURPOSES.

1. REMOVE CONTAMINATED CONCRETE FROM AREAS AND LIMITS IDENTIFIED ON DRAWING REM-1. ENGINEER WILL COLLECT POST REMOVAL CONCRETE SAMPLES TO DETERMINE IF THE REMEDIAL OBJECTIVE HAS BEEN MET. ADDITIONAL

REMOVAL MAY BE REQUIRED BASED ON RESULTS OF THESE SAMPLES.

2. REMOVE CONTAMINATED SOIL FROM AREAS AND LIMITS IDENTIFIED ON DRAWING REM-2. ENGINEER WILL COLLECT POST REMOVAL CONCRETE SAMPLES TO DETERMINE IF THE REMEDIAL OBJECTIVE HAS BEEN MET. ADDITIONAL

REMOVAL MAY BE REQUIRED BASED ON RESULTS OF THESE SAMPLES.

3. REMOVE NON-CONTAMINATED ELEVATED CONCRETE SLAB TO EXPOSE UNDERLYING FILL MATERIAL LOCATED BETWEEN THE ELEVATED SLAB AND UNDERLYING SECONDARY SLAB. EXCAVATE TEST PITS AS DIRECTED BY ENGINEER TO ASSESS FILL MATERIAL FOR POTENTIAL ON-SITE REUSE AND/OR DISPOSAL REQUIREMENTS. ENGINEER WILL IDENTIFY AREAS

OF FILL MATERIAL FOR ON-SITE REUSE AND/OR DISPOSAL.

4. REMOVE AND SEGREGATE FILL MATERIAL FROM BENEATH THE ELEVATED SLAB AS DIRECTED BY ENGINEER.

NON-CONTAMINATED FILL MATERIAL MAY BE USED TO BACKFILL SOIL EXCAVATION AREAS. CONTAMINATED FILL

MATERIAL MAY BE STOCKPILED AND/OR LIVE LOADED FOR DISPOSAL.

5. DEMOLISH AND REMOVE CONCRETE PARTITION WALLS FROM BETWEEN THE ELEVATED AND SECONDARY SLAB AREAS.

ENGINEER WILL ASSESS CONCRETE FOR POTENTIAL CONTAMINATION AND IDENTIFY WHAT CONCRETE CAN BE SET

ASIDE FOR POTENTIAL CRUSHING AND ON-SITE REUSE AND WHAT WILL BE DISPOSED.

6. ENGINEER WILL ASSESS SECONDARY CONCRETE SLAB FOR POTENTIAL CONTAMINATION AND IDENTIFY WHAT CONCRETE CAN BE SET ASIDE FOR POTENTIAL CRUSHING AND ON-SITE REUSE AND WHAT WILL BE DISPOSED.

CONTRACTOR MAY BE DIRECTED TO CRACK SLAB TO PROMOTE DRAINAGE AND LEAVE SOME OR ALL SLAB IN PLACE.

7. DEMOLISH, MANAGE, REMOVE, AND CRUSH FOR ON-SITE REUSE OR DISPOSE OF REMAINING NON-CONTAMINATED

SLABS AND FOUNDATIONS.

8. BACKFILL FOUNDATION OPENINGS.

CONCRETE PITS (FORMERLY FILLED

WITH SAND AND DEBRIS)

TRENCH

CLEAN SANDTB-SB-53

NO BASEMENT AREA

TB-SB-68

TB-SB-65

TB-SB-64

TB-SB-63

TB-SB-62

TB-SB-57

TB-SB-59

TB-SB-56

TB-SB-49

TB-SB-53

TB-SB-55

TB-SB-61

TB-SB-60

TB-SB-48

TB-SB-46

TB-SB-44

TB-SB-42

TB-SB-41

TB-SB-45TB-SB-47

TB-SB-66

TB-SB-02

TB-SB-03

TB-SB-04

TB-SB-05

TB-SB-06

TB-SB-07

TB-SB-08

TB-SB-09

TB-SB-10

TB-SB-11

TB-SB-12

TB-SB-13TB-SB-14

TB-SB-15

TB-SB-39

TB-SB-40

TB-SB-38

TB-SB-37

TB-SB-18

TB-SB-19

TB-SB-20

TB-SB-21

TB-SB-22

TB-SB-23

TB-SB-24

TB-SB-25

TB-SB-26

TB-SB-27

TB-SB-28

TB-SB-29

TB-SB-30

TB-SB-31

TB-SB-32

TB-SB-33

TB-SB-35

TB-SB-36

TB-SB-34

TB-SB-76

TB-SB-77

TB-SB-75

TB-SB-116 TB-SB-117 TB-SB-118 TB-SB-119

TB-SB-72

TB-SB-79

TB-SB-80

TB-SB-115

TB-SB-114

TB-SB-89

TB-SB-102

TB-SB-103

TB-SB-100

TB-SB-101

TB-SB-104

TB-SB-105

TB-SB-106

TB-SB-94

TB-SB-96

TB-SB-95

TB-SB-97

TB-SB-81 TB-SB-82

TB-SB-121

TB-SB-109

TB-SB-98TB-SB-99

TB-SB-113

TB-SB-111

TB-SB-110

TB-SB-107

TB-SB-108

TB-SB-112

TB-SB-83

TB-SB-84

TB-SB-85

TB-SB-87

TB-SB-86

TB-SB-70

TB-SB-120TB-SB-91

TB-SB-92

TB-SB-93

TB-SB-71

TB-SB-73

TB-SB-74

TB-SB-78

TB-SB-01

BASEMENT

ACCESS

TP-9

TP-23

TP-24

TP-25

TP-21

TP-20

TP-19

TP-22

TP-1 TP-2

TP-18

TP-17

TP-3

TP-16 TP-4

TP-15

TP-14

TP-5

TP-6

TP-7

TP-13

TP-12

TP-8

TP-10

TP-11

TB-SB-50

TB-SB-16

TB-SB-17

TB-SB-90

TB-SB-88

TB-SB-52TB-SB-54

LEGEND

APPROXIMATE PROPERTY BOUNDARY

EDGE OF PAVEMENT/ROADWAY

SIDEWALK/CONCRETE

BUILDING

FORMER BUILDING

INTERIOR BUILDING FEATURES

RAILROAD TRACK

BROKEN CONCRETE SLAB

APPROXIMATE CATCH BASIN LOCATION]

SOIL REMEDIATION LEGEND

SOIL WASTE STREAM No. 1 - PCB

CONTAMINATED SOIL - MANAGE AND DISPOSE

OF SOIL AS NON-TSCA CT DEEP REGULATED <50

PPM PCB WASTE IN ACCORDANCE WITH STATE

AND FEDERAL REGULATIONS AND

REQUIREMENTS SPECIFIED IN THE CONTRACTS

DOCUMENTS. WASTE CHARACTERIZATION

SAMPLES WC-COMP-4 AND WC-GRAB-4 ARE

REPRESENTATIVE OF THIS WASTE STREAM.

SOIL WASTE STREAM No. 2 - PCB

CONTAMINATED SOIL - MANAGE AND DISPOSE

OF SOIL AS EPA REGULATED >50 PPM PCB

REMEDIATION WASTE IN ACCORDANCE WITH

STATE AND FEDERAL REGULATIONS AND

REQUIREMENTS SPECIFIED IN THE CONTRACT

DOCUMENTS.

WASTE CHARACTERIZATION SAMPLES

WC-COMP-1 AND WC-GRAB-1 ARE

REPRESENTATIVE OF THIS WASTE STREAM THAT

WILL BE GENERATED FROM THE SOIL

REMEDIATION OUTSIDE THE NORTHWEST

CORNER OF THE BUILDING FOOTPRINT.

WASTE CHARACTERIZATION SAMPLES

WC-COMP-3 AND WC-GRAB-3 ARE

REPRESENTATIVE OF THIS WASTE STREAM THAT

WILL BE GENERATED FROM THE SOIL

REMEDIATION AT THE FORMER TRANSFORMER

ROOM.

WASTE CHARACTERIZATION SAMPLES

WC-COMP-2 AND WC-GRAB-2 ARE

REPRESENTATIVE OF THE WASTE STREAM THAT

WILL BE GENERATED FROM SOIL AROUND PITS A

AND B.

SOIL WASTE STREAM No. 3 - PCB, VOC, AND

METALS CONTAMINATED SOIL - MANAGE AND

DISPOSE OF SOIL AS MIXED EPA REGULATED

>50 PPM PCB REMEDIATION WASTE,

VOC AND METALS CONTAMINATED WASTE IN

ACCORDANCE WITH STATE AND FEDERAL

REGULATIONS AND REQUIREMENTS SPECIFIED

IN THE CONTRACT DOCUMENTS.

WASTE CHARACTERIZATION SAMPLES

WC-COMP-3 AND WC-GRAB-3 ARE

REPRESENTATIVE OF THIS WASTE STREAM. SOIL

DIRECTLY NEXT TO AND BENEATH THE PITS MAY

HAVE HIGHER CONTAMINANT CONCENTRATIONS.

SOIL DISPOSAL NOTES

1. CONTAMINATED SOIL WILL BE EXCAVATED TO THE INITIAL

DEPTHS IDENTIFIED FOR EACH AREA, TO THE TOP OF THE

GROUNDWATER TABLE, OR OTHER DEPTHS AS DIRECTED BY

ENGINEER. USE OF EXCAVATION SUPPORTS OTHER THAN

POTENTIALLY A TRENCH BOX IS NOT ANTICIPATED.

EXCAVATION DEWATERING IS NOT ANTICIPATED.

2. THE EXTENT OF CONTAMINATED SOIL REMOVAL WILL BE

DETERMINED BY THE ENGINEER THROUGH ANALYTICAL

TESTING AFTER REMOVAL OF MATERIAL TO THE LIMITS

SHOWN ON THIS DRAWING. ADDITIONAL REMOVAL MAY BE

REQUIRED BASED ON ANALYTICAL RESULTS REPORTED FOR

POST-REMOVAL SAMPLES.

3. ALL CONTAMINATED CONCRETE SHOWN ON DRAWING

HM-001 MUST BE REMOVED PRIOR TO STARTING

CONTAMINATED SOIL EXCAVATION WITHIN A GIVEN

REMEDIATION AREA. ENGINEER WILL NOTIFY CONTRACTOR

ONCE ALL CONTAMINATED MATERIAL IS REMOVED.

4. BACKFILL EXCAVATION AREAS TO PRE-EXISTING GRADE

PRIOR TO DEMOLISHING NON-REGULATED SLABS AND

FOUNDATION COMPONENTS.

TIGHE & BOND SAMPLE LOCATIONS

SOIL BORING LOCATION

TEST PIT LOCATION

REM-2

SOIL REMEDIATION AREAS

N

00 30' 60'

SCALE: 1" = 30'

DESIGNED/CHECKED BY:

DRAWN BY:

FILE:

APPROVED BY:

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

W-1222-053-B-SP - QAPP Figures.dwg

10/14/2025

SCALE:

ISSUED FOR

CONSTRUCTION

Pl ot te d

O n:

O ct

9, 5-

:3 3a m B y:

Z

Le po re La st S av ed

9/

/2

Ti gh e

B on d:

J:

\W \W

\0

-1

F re ig ht

S tr ee t

Ph as e

II

H

B M

A \D ra w in gs

_F ig ur es

\A ut oC A D

\W -1

2-

3-

B -S

P

Q A

PP

F ig ur es

.d w g

HAL

JTO

ZJL

Waterbury, Connecticut

Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street

Waterbury Development Corporation

6X6 OPENING

FLOOR DRAIN

MANHOLE

TRENCH

CLEAN SAND

PIT D

PIT E

PIT C

TRENCH

CONCRETE WALL

FORMER CHIMNEYS

BROKEN CONCRETE SLAB

RAMP

3x3 TRENCH

PIT A PIT B

FORMER TRANSFORMER ROOM

(CONCRETE FLOOR REMOVED)

VAULT

CONCRETE CURB

FLOOR DRAIN

REMOVE MATERIAL FROM AROUND AND

BENEATH PITS A AND B. EXCAVATION IS

ANTICIPATED TO BE 8 TO 10 FEET BENEATH

SLAB OR AS DEEP AS IS REASONABLE

WITHOUT DEWATERING.

REMOVE 8 FEET OF MATERIAL FROM

EXISTING BASEMENT FLOOR LEVEL

OR AS DEEP AS IS REASONABLE

WITHOUT DEWATERING.

REMOVE 6 INCHES OF MATERIAL

FROM BENEATH SLAB.

REMOVE 6 INCHES OF

MATERIAL FROM BENEATH

SLAB.

REMOVE 6 INCHES OF

MATERIAL FROM BENEATH

FIRST FLOOR CONCRETE.

REMOVE 4 FEET OF

MATERIAL FROM

BENEATH ASPHALT

GROUND SURFACE.

REMOVE 6 INCHES

OF MATERIAL FROM

BENEATH ASPHALT

AND CONCRETE.

W-1222-074A

W-1222-074A-REM-2.dwg

SHEET 5 OF 8

REMOVE 6 INCHES

OF MATERIAL FROM

BENEATH SLAB.

FILE:

APPROVED BY:

Waterbury, Connecticut

Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street

Waterbury Development Corporation

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

W1222-074A-C-201-SEC.dwg

W-1222-074A

SCALE:

ISSUED FOR

CONSTRUCTION

Pl ot te d

O n:

O ct

9, 5-

:3 5a m B y:

Z

Le po re La st S av ed

9/

/2

Ti gh e

B on d:

J:

\W \W

\0

A

Fr ei gh t

S la b R em ov al

\D ra w in gs \A ut oC

A D

\W

-0

A -C

-2

-S

EC

.d w g

ZJL

HAL

JTO

10/14/2025

00 40' 80'

SCALE: 1" = 40' C-201

SITE GRADING, DRAINAGE,

AND SEDIMENTATION AND

EROSION CONTROL PLAN

SHEET 6 OF 8

AS SHOWN

N

SEDIMENTATION AND SOIL EROSION CONTROL PLAN NOTES

1. UNDERGROUND UTILITIES, STRUCTURES AND FACILITY LOCATIONS DEPICTED HEREON HAVE

BEEN COMPILED, IN PART, FROM RECORD MAPPING AND OTHER DATA SUPPLIED BY THE

RESPECTIVE UTILITY COMPANIES, GOVERNMENTAL AGENCIES AND/OR OTHER SOURCES.

THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE IN NATURE. ADDITIONALLY,

OTHER SUCH DATA MAY EXIST ON SITE, THE EXISTENCE OF WHICH ARE UNKNOWN TO

TIGHE & BOND. THE EXISTENCE, SIZE AND LOCATION OF ALL SUCH FEATURES MUST BE

DETERMINED AND VERIFIED IN THE FIELD BY APPROPRIATE AUTHORITIES PRIOR TO

CONSTRUCTION @ CALL-BEFORE-YOU-DIG 1-800-922-4455.

2. ALL SEDIMENTATION AND EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH

THE STANDARDS AND SPECIFICATIONS OF THE "2002 CONNECTICUT GUIDELINES FOR SOIL

EROSION AND SEDIMENT CONTROL" DEP BULLETIN NO 34, AND ALL AMENDMENTS AND

ADDENDA THERETO AS PUBLISHED BY THE CONNECTICUT DEPARTMENT OF ENVIRONMENTAL

PROTECTION.

3. LAND DISTURBANCE SHALL BE KEPT TO THE MINIMUM NECESSARY FOR CONSTRUCTION.

4. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AS SHOWN ON THE PLANS AND

ELSEWHERE AS ORDERED BY THE OWNER'S REPRESENTATIVE, THE CITY OF WATERBURY OR

THE OWNER.

5. ALL CATCH BASINS SHALL BE PROTECTED WITH SILT SACKS, HAYBALE RING, SILT FENCE OR

BLOCK AND STONE INLET PROTECTION THROUGHOUT THE CONSTRUCTION PERIOD AND

UNTIL ALL DISTURBED AREAS ARE THOROUGHLY STABILIZED.

6. WHEREVER POSSIBLE, EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED

PRIOR TO CONSTRUCTION.

7. ADDITIONAL CONTROL MEASURES SHALL BE INSTALLED DURING CONSTRUCTION PERIOD AS

ORDERED BY THE OWNER'S REPRESENTATIVE, THE CITY OF WATERBURY, OR THE OWNER.

8. ALL SEDIMENTATION AND EROSION CONTROL MEASURES SHALL BE MAINTAINED IN

EFFECTIVE CONDITION THROUGHOUT THE CONSTRUCTION PERIOD.

9. SEDIMENT REMOVED SHALL BE DISPOSED OF LEGALLY OFFSITE.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION AND MAINTENANCE OF ALL

EROSION CONTROL MEASURES THROUGHOUT THE CONSTRUCTION PERIOD.

11. THE CONTRACTOR SHALL MAINTAIN A SUPPLY OF SILT FENCE/HAYBALES AND

ANTI-TRACKING CRUSHED STONE ON-SITE FOR EMERGENCY REPAIRS.

12. THE CONTRACTOR SHALL UTILIZE APPROVED METHODS/MATERIALS FOR PREVENTING THE

BLOWING AND MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND DEMOLITION

DEBRIS ONTO ADJACENT PROPERTIES AND SITE AREAS.

13. ALL DRAINAGE STRUCTURES SHALL BE INSPECTED WEEKLY BY THE CONTRACTOR AND

CLEANED TO PREVENT THE BUILD-UP OF SILT.

14. THE CONTRACTOR SHALL CAREFULLY COORDINATE THE PLACEMENT OF EROSION CONTROL

MEASURES WITH THE PHASING OF CONSTRUCTION.

15. KEEP ALL PAVED ROADWAYS CLEAN. SWEEP BEFORE FORECASTED STORMS OR WEEKLY AS

NECESSARY.

16. ALL TRUCKS LEAVING THE SITE MUST BE COVERED.

17. ALL SEDIMENTATION AND EROSION CONTROLS SHALL BE CHECKED WEEKLY AND AFTER

EACH RAINFALL EVENT. NECESSARY REPAIRS SHALL BE MADE WITHOUT DELAY.

18. PRIOR TO ANY FORECASTED RAINFALL, EROSION AND SEDIMENT CONTROLS SHALL BE

INSPECTED AND REPAIRED AS NECESSARY.

19. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, EROSION CONTROLS MAY BE

REMOVED ONCE AUTHORIZATION TO DO SO HAS BEEN SECURED FROM THE OWNER'S

REPRESENTATIVE AND CITY OF WATERBURY.

20. TRUCK TRAFFIC MUST BE LIMITED TO PAVED SURFACES TO THE EXTENTS POSSIBLE. IF

TRUCKS DRIVE OVER UNPAVED SURFACES OR IF TRACKING IS OBSERVED OUTSIDE OF THE

WORK AREA, ANTI-TRACKING PADS MUST BE INSTALLED AT THE LOCATIONS SHOWN ON

THIS DRAWING OR OTHER AREAS AS APPROPRIATE AND APPROVED BY ENGINEER.

21. BACKFILL FOUNDATION OPENING TO MATCH EXISTING NEARBY ELEVATIONS. MAINTAIN AT

LEAST A ONE PERCENT SLOPE TO PROMOTE DRAINAGE TOWARDS EXISTING ON-SITE

DRAINAGE STRUCTURES AND AWAY FROM JACKSON AND FREIGHT STREET.

22. PROVIDE AND INSTALL CLEAN CRUSHED CONCRETE FOR BACKFILL OF THE EXCAVATIONS

AND/OR FOUNDATION CAVITY IF ALTERNATE ITEM NUMBER 1 IS AWARDED. PROVIDE AND

INSTALL CLEAN ORDINARY BORROW MATERIAL AS NEEDED TO SUPPLEMENT THE CRUSHED

CONCRETE.

23. PROVIDE AND INSTALL No. 3 CRUSHED STONE AS DEFINED IN SECTION 02320 BORROW

MATERIAL FOR BACKFILL OF THE TOP SIX INCHES OF THE FOUNDATION CAVITY.

24. RECLAIMED MATERIAL OR MATERIAL WITH A HIGH MICA CONTENT WILL NOT BE ALLOWED

FOR USE ON THIS SITE.

S.S. S.S.

S.S. S.S. S.S. S.S.

S.S.

S.S.

S.S.

S.S.

S.S. S.S.

S.S.

S.S.

S.S.

S.S.

S.S.

S.S.

S.S.

S.S.

S.S. S.S.

S.S.

S.S.

SEDIMENTATION AND SOIL EROSION CONTROL PLAN LEGEND

PROJECT LIMIT LINE

SILT SACK

SILT FENCE

HAYBALE BARRIER/STRAW WATTLE

ANTI-TRACKING PAD

CONSTRUCTION FENCE

CONSTRUCTION GATE

X X X X

CFCF

XXXXXXXXXXXX

X

ANTI-TRACKING

PAD

ANTI-TRACKING PAD

HAYBALE BARRIER/STRAW WATTLE

(TYP)

HAYBALE BARRIER/

STRAW WATTLE

(TYP)

SILT FENCE

S.S.

CJC

HAYBALE BARRIER/

STRAW WATTLE

(TYP)

FORMER BUILDING SLABS / FOUNDATIONS

BACKFILL FOUNDATION OPENING

TO MATCH EXISTING NEARBY

ELEVATIONS. MAINTAIN AT LEAST A

ONE PERCENT SLOPE TOWARDS

EXISTING ON-SITE DRAINAGE

STRUCTURES AND AWAY FROM

JACKSON AND FREIGHT STREET.

FILE:

APPROVED BY:

Waterbury, Connecticut

Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street

Waterbury Development Corporation

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

W1222-074A-C-202-SEC-DETL.dwg

W-1222-074A

SCALE:

ISSUED FOR

CONSTRUCTION

Pl ot te d

O n:

O ct

9, 5-

:3 6a m B y:

Z

Le po re La st S av ed

9/

/2

Ti gh e

B on d:

J:

\W \W

\0

A

Fr ei gh t

S la b R em ov al

\D ra w in gs \A ut oC

A D

\W

-0

A -C

-2

-S

EC

-D

ET

L.

dw g

ZJL

HAL

JTO

10/14/2025

C-202

SEDIMENTATION AND

EROSION CONTROL DETAILS

SHEET 7 OF 8

NO SCALE

CONSTRUCTION ENTRANCE

NO SCALE

50' MIN.

(100' MIN IF TRACKED

SEDIMENT < 80% SAND)

CONSTRUCTION

ENTRANCE

ACCESS ROAD

TO WORK AREA

RADIUS TO ACCOMMODATE

TURNING MOVEMENTS

OF CONSTRUCTION

VEHICLES, AS NEEDED.

PA

V

ED

R O

A D

PAVED ROAD

6" CRUSHED STONE

CTDOT GRADING NO. 3

GEOTEXTILE, MIRAFI 600X OR APPROVED EQUAL

STRIPPED GROUND LINE

(REMOVE TOPSOIL AND ORGANICS)

ELEVATION

PLAN

MINIMUM 12' OR

WIDTH OF ACCESS ROAD

WHICHEVER IS GREATER

SESC NARRATIVE

THE CITY OF WATERBURY IS PROPOSING TO REMOVE THE CONCRETE SLAB AND BUILDING FOUNDATIONS LOCATED AT 170

FREIGHT STREET IN WATERBURY, CT.

THE PROJECT WILL INCLUDE THE DEMOLITION AND REMOVAL OF THE EXISTING SLABS AND FOUNDATIONS, EXCAVATION OF

CONTAMINATED SOIL, AND ABANDONING ANY FORMER BUILDING UTILITY SERVICES.

THE DISTURBED AREAS ARE PROPOSED TO BE RESTORED WITH BACKFILL AND GRADED TO DRAIN SIMILAR TO EXISTING

DRAINAGE PATTERNS.

THE PROJECT IS PROPOSED TO BE PERFORMED IN A SINGLE PHASE, IT IS ANTICIPATED THAT APPROXIMATELY 3.13 ACRES

WILL BE DISTURBED.

ANTICIPATED PROJECT CONSTRUCTION START: FALL 2025

ANTICIPATED PROJECT CONSTRUCTION END: SPRING 2026

SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL CONFORM TO THE STANDARDS OUTLINED IN THE CONNECTICUT DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION (CTDEEP), "2002 CONNECTICUT GUIDELINES FOR

SOIL EROSION AND SEDIMENT CONTROL", LATEST REVISION.

CONSTRUCTION SEQUENCE

1. FLAG THE LIMITS OF CONSTRUCTION NECESSARY TO FACILITATE THE PRECONSTRUCTION MEETING.

2. HOLD PRECONSTRUCTION MEETING. (NOTIFY CALL BEFORE YOU DIG 1-800-922-4455).

3. FLAG REMAINDER OF THE LIMITS OF CONSTRUCTION.

4. INSTALL THE CONSTRUCTION ENTRANCES.

5. INSTALL CONSTRUCTION FENCE GATES AND TEMPORARY 6' HIGH CHAIN LINK FENCE TO SECURE THE WORK AREA(S).

6. INSTALL PERIMETER EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE SESC PLAN.

7. ESTABLISH CONTRACTOR'S STAGING AREA.

8. DISCONNECT UTILITIES/COORDINATE WITH CITY AND RESPECTIVE UTILITY COMPANIES. CONTRACTOR TO OBTAIN ALL

NECESSARY PERMITS.

9. REMOVE EXISTING CONCRETE SLAB, FOUNDATIONS, AND ASSOCIATED FEATURES (E.G. CHIMNEYS, STEPS, LOADING

DOCKS, PITS, ETC.)

10. REMOVE AND/OR ABANDON SURFACE FEATURES AND UTILITIES AS IDENTIFIED IN THE CONTRACT DOCUMENTS.

11. EXCAVATE AND REMOVE SOIL AS IDENTIFIED IN THE CONTRACT DOCUMENTS.

12. BACKFILL AND GRADE AREAS OF THE SITE AS IDENTIFIED IN THE CONTRACT DOCUMENTS.

13. AFTER SITE IS STABILIZED, INCLUDING CLEARING OF CONTRACTOR STAGING/STORAGE AREA AND ANY OTHER REQUIRED RESTORATIONS, REMOVE TEMPORARY EROSION AND SEDIMENT CONTROLS (E.G. GEOTEXTILE SILT FENCES).

PROVIDE CRUSHED STONE,

CTDOT GRADING NO. 3

FORM 818, M.01.01, AS

REQUIRED TO PREVENT

MOVEMENT OF WATTLE

STRAW WATTLE

(12" TYPICAL)

EXISTING PAVEMENT OR

NON-NATIVE SOILS

STRAW WATTLE FOR USE IN PAVED AREAS

AND NON-NATIVE SOILS

NO SCALE

SILT FENCE

FLOW

GEOTEX 2130 OR EQUIVALENT

GEOTEXTILE SECURED TO

POSTS WITH METAL CLIPS

@ 4" O.C., ALTERNATING

ORIENTATION

ANCHOR FABRIC WITH

CRUSHED STONE OR

SOIL

1.5" SQUARE HARD WOOD

POSTS 8'-0" O.C.

MAXIMUM

6"

6"

DEPTH=2'

WIDTH=1.83'

LENGTH=2.73'

SILTSACK MANUFACTURED BY:

ACF ENFIRONMENTAL

2831 CARDWELL ROAD

RICHMOND, VIRGINIA 23237

DUMP STRAP

DUMP STRAP

1" REBAR FOR BAG

REMOVAL FROM INLET

SILTSACK ® OR

APPROVED EQUAL

SILTSACK

NO SCALE

2' M

IN

PLACEMENT AND CONSTRUCTION

OF HAYBALE BARRIER

1. EXCAVATE A TRENCH 4" DEEP AND

THE WIDTH OF THE HAYBALE

2. PLACE AND STAKE HAYBALES

TWO STAKES PER BALE

3. WEDGE LOOSE STRAW BETWEEN

BALES TO CREATE A CONTINUOUS

BARRIER

4. BACKFILL AND COMPACT EXCAVATED

SOIL ON THE UPHILL SIDE OF THE

BARRIER TO PREVENT PIPING

HAYBALESTAKE

BINDING WIRE

OR TWINE

COMPACTED BACKFILL

PACKED STRAW

TRENCH, WIDTH

OF BALE

CJC

FILE:

APPROVED BY:

Waterbury, Connecticut

Building Slab and Foundation Removal and Soil Remediation of 170 Freight Street

Waterbury Development Corporation

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

W1222-074A-C-301-DETL.dwg

W-1222-074A

SCALE:

ISSUED FOR

CONSTRUCTION

Pl ot te d

O n:

O ct

9, 5-

:3 7a m B y:

Z

Le po re La st S av ed

9/

/2

Ti gh e

B on d:

J:

\W \W

\0

A

Fr ei gh t

S la b R em ov al

\D ra w in gs \A ut oC

A D

\W

-0

A -C

-3

-D

ET

L.

dw g

ZJL

HAL

JTO

10/14/2025

C-301

SITE RESTORATION

DETAILS

SHEET 8 OF 8

AS SHOWN

1/

O F

EX

PO

S

ED

P O

S T

H

EI

G H

T (M

IN

CHAIN LINK FENCE

NO SCALE

10'-0" (MAXIMUM)

BRACE TUBE AT

CORNER &

TERMINAL POSTS

(TYP)

TENSION BAR (TYP)

TERMINAL

STRAPS AT 12"

INTERVALS

CORNER POST OR

TERMINAL POST (3"

DIA)

TOP RAIL (XX" DIA)

TOP OF CHAIN LINK

EXPANSION SLEEVE

(TYP)

ALUMINUM ALLOY STEEL

TIE WIRES AT 15"

INTERVALS (TYP)

FABRIC 2.0" DIAMOND MESH

INTERWOVEN WIRE 9 GAUGE TOP

& BOTTOM SELVAGE TWISTED

SLOPE TOP OF

FOOTING TO DRAIN

(TYP)

LINE POST (2.5" DIA)

10'-0" (MAXIMUM)

A R O

U N

D F

O U

N D

A

TI

O N

4'

-0

M

IN

S

IT

E

PE

R

IM

ET

ER

6'

-0

(M

IN

2" (M

A X

BOTTOM

RAIL (1.66"

DIA)

GATE PLAN

NOTES:

1. GATES MAY BE MANUALLY OPERATED.

GATE POST

TENSION BAR (TYP)

WELD ALL JOINTS

CHAIN LINK FABRIC

GATE LATCH WITH

PROVISION FOR

PADLOCK

GATE POST

2"

(MAX)

18'-0" OPENING FACE TO FACE

3" 2 1/4" TYP

2 1/2"

POST TOP

DOUBLE SWING GATE

NO SCALE

CJC

CT66305 - CT66307

Thursday, July 10, 2025

Sample ID#s:

Attn: Harley Langford Tighe & Bond 213 Court St, Suite 1100 Middletown, CT 06457

SDG ID: GCT66305

Project ID: 3212220074A

Sincerely yours, Laboratory Director Phyllis Shiller

The contents of this report cannot be discussed with anyone other than the client listed above without their written consent.

NELAC - #NY11301

CT Lab Registration #PH-0618 MA Lab Registration #M-CT007 ME Lab Registration #CT-007 NH Lab Registration #213693-A,B

NJ Lab Registration #CT-003 NY Lab Registration #11301 PA Lab Registration #68-03530 RI Lab Registration #63 VT Lab Registration #VT11301

This laboratory is in compliance with the NELAC requirements of procedures used except where indicated.

This report contains results for the parameters tested, under the sampling conditions described on the Chain Of Custody, as received by the laboratory. This report is incomplete unless all pages indicated in the pagination at the bottom of the page are included.

A scanned version of the COC form accompanies the analytical report and is an exact duplicate of the original.

587 East Middle Turnpike, P.O. Box 370, Manchester, CT 06040

SDG Comments July 10, 2025

587 East Middle Turnpike, P.O.Box 370, Manchester, CT 06045 Tel. (860) 645-1102 Fax (860) 645-0823

Environmental Laboratories, Inc.

SDG I.D.: GCT66305

Vo…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .