ITB 48400_RWPROPMGMT000667 P.pdf
PDF 5 MB Posted
- Attached to
- ITB 48400-RWPROPMGMT000667 Paulding PI 621720
- Solicitation number
- PE-48401-RFQ-2026-000000583
- Issued by
- Georgia
About this file
Summary
This Invitation to Bid (ITB-48400-RWPROPMGMT000667) issued by the Georgia Department of Transportation (GDOT) seeks a prequalified demolition contractor to provide complete demolition and removal services for improvements, structures, and encumbrances located in right-of-way and easement areas in Paulding County. The project encompasses three parcels requiring full demolition: Parcel 132 at 260 Powder Creek Court (two-story wood frame structure with concrete slab foundation, chain link fence, concrete driveway, and septic system); Parcel 133 at 282 Powder Creek Court (three-story wood frame structure with miscellaneous yard structures and concrete driveway); and Parcel 208 at 19 Diane Court (split-level residential structure converted to commercial use, storage structure, gazebo, steel sign frame, parking sign, wood deck, privacy fencing, and concrete paving). All debris must be properly disposed of in accordance with Georgia Comprehensive Solid Waste Management Act regulations. Bidders must be prequalified in GDOT's E-3 Demolition service class. Questions regarding the solicitation are due by May 18, 2026 at 2:00 PM EST, with sealed bid submissions required by May 21, 2026 at 2:00 PM EST to SpecialProjectsProcurement@dot.ga.gov. Work must commence within two weeks of Performance and Payment Bond approval and be completed within thirty days of the Notice to Proceed. GDOT will award the contract to the lowest responsive and responsible bidder and issue a purchase order serving as the Notice to Proceed.
The awarded contractor must provide a Performance and Payment Bond equal to 100 percent of the total bid price within ten business days of receiving the Notice of Intent to Award. Insurance requirements include Workers Compensation with statutory coverage, Commercial General Liability with $1,000,000 per occurrence and $3,000,000 general aggregate limits, and Automobile Liability with $1,000,000 combined single limit, all naming GDOT as additional insured. GDOT has removed the bid bond requirement and updated performance and payment bond requirements. Asbestos inspection reports indicate that no materials containing one percent or greater asbestos were identified at any of the three parcels, though materials historically known to contain asbestos (such as Transite panels and black roof mastic) are assumed to contain asbestos. Contractors must submit Georgia EPD Project Notification Forms through the GEOS portal immediately upon award, maintain an OSHA-qualified Competent Person on-site, provide a Blue Card holder, and maintain a copy of the asbestos inspection report on-site at all times. Failure to commence work within two weeks of bond approval or to complete work by the thirty-day deadline may result in contract termination and forfeiture of deposits; daily penalties of $500 apply for each day beyond the completion date.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB-48400-RWPROPMGMT000667
PI#: 621720
County: Paulding
Revised 11/5/2025 1
Georgia Department of Transportation
Invitation to Bid
To Provide
Demolition and Removal Services
Bids Due: May 21, 2026 by 2:00PM EST
One Georgia Center
600 West Peachtree Street, NW Atlanta, Georgia 30308
Revised 11/5/2025 2
I. INTRODUCTION:
A. Overview
The Georgia Department of Transportation (GDOT), is soliciting bids from qualified firm(s) to provide Demolition of Improvements, Structures, or other Encumbrances in the Right Of Way and/or Easement Areas.
This solicitation seeks to identify potential firms to provide Demolition of Improvements, Structures, or other Encumbrances in the Right Of Way and/or Easement Areas for the Scope of Services for the project /contract identified in Exhibit I. All respondents to this solicitation are subject to instructions communicated in this document, and are cautioned to completely review the entire solicitation and follow instructions carefully.
GDOT reserves the right to reject any or all bids and to waive technicalities and informalities at the discretion of GDOT.
B. IMPORTANT- A RESTRICTION OF COMMUNICATION IS IN EFFECT FOR THIS PROJECT.
From the advertisement date of this solicitation until successful respondents are selected and the award is made official and announced, firms are not allowed to communicate about this solicitation or scope with any staff of GDOT including the Commissioner and GDOT Board Members, except for the submission of questions as instructed in the solicitation, or with the contact designated in Invitation to Bid, Section V.B., or as provided by any existing work agreement(s). For violation of this provision, GDOT reserves the right to reject the submittal of the offending respondent.
C. Prohibition Against Collusive Bidding
Respondent shall not submit a bid that was made with a prior understanding agreement or connection with any corporation, firm, or individual submitting proposals for the same project. The Respondent shall submit a bid that is fair and made without collusion of fraud. Collusive bidding is a violation of Georgia and Federal Law and such bidding can result in fines, prison sentences, and civil damage awards.
D. Certification
This solicitation is being conducted by the Georgia Department of Transportation under its authority to procure services ancillary to the construction and maintenance of a public road (as defined in O.C.O.G.A 32-1-3 (24) as provided for in O.C.G.A 32-2-61 (c) and (d) (1) (D).
E. Conflict of Interest
The Contractor agrees that all work done as part of the awarded Agreement will comply fully with the provisions of Section 45-10-20 through 45-10-28 of the Official Code of Georgia Annotated relating to Conflicts of Interest when trading with State of Georgia employees and officials .
F. Americans with Disabilities Act Guidelines
The State of Georgia adheres to the guidelines set forth in the Americans with Disabilities Act. Suppliers should contact the Issuing Officer at least one day in advance if they require special arrangements when attending the Bidders/Offerors’ Conference (if any). The Georgia Relay Center at 1-800-255-0056 (TDD Only) or 1-800-255- 0135 (Voice) will relay messages, in strict confidence, for the speech and hearing impaired.
G. Drug-Free Workplace
GDOT, as policy, operates all facilities as a drug-free workplace, and requires that the labor force of the Bidder be drug-free. The Drug-Free Workplace Certification is attached as EXHIBIT II.
Revised 11/5/2025 3
If the Bidder is an individual, he or she hereby certifies that he or she will not engage in the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana during the performance of any contract resulting from this Invitation to Bid.
If the Bidder is an entity other than an individual, it hereby certifies that:
A drug-free workplace will be provided for the Bidder’s employees during the performance of any contract resulting from this Invitation to Bid; and
It will secure from any subcontractor hired to work in a drug-free workplace the following written certification:
"As a part of the subcontracting agreement with (contractor's name, subcontractor's name) certifies to the contractor that a drug-free workplace will be provided for the subcontractor's employees during the performance of this contract pursuant to paragraph 7 of subsection B of Code Section 50-24-3."
The Bidder hereby acknowledges this requirement, and asserts that the organization of the Bidder adheres to such policy and practice. The Bidder acknowledges that it may be required to produce certificates affirming its compliance of these requirements of drug-free workplace for duration of agreement term, at execution, or at any time during the term of the agreement.
The Bidder may be suspended, terminated, or debarred if it is determined that:
1. The Bidder has made false certification hereinabove; or
2. The Bidder has violated such certification by failure to carry out the requirements of Official Code of
Georgia Section 50-24.
H. Small and Minority Business Enterprise
It is the policy of the State of Georgia that small businesses, female-owned businesses and minority businesses have a fair and equal opportunity to participate in the State purchasing process. Therefore, the Department encourages all small businesses, female-owned businesses and minority-owned businesses to compete for contracts to provide services, and encourages consultant to solicit female-owned businesses and minority-owned businesses in procuring sub-providers and suppliers. This desire on the part of the Department is not intended to restrict or limit competitive bidding or to increase the cost of the work. The Department supports a healthy free market system that seeks to include responsible businesses and provides ample opportunity for business growth and development. Consultants and sub-providers who utilize qualified minority sub-providers may qualify for a Georgia state income tax credits for qualified payments made to minority sub-providers. See Official Code of Georgia Annotated (O.C.G.A.) O.C.G.A. Section 48-7-38.
The Georgia Department of Transportation has adopted a 15% overall annual goal for DBE participation on all projects. This goal is not to be considered as a fixed quota, set aside or preference. The DBE goal can be met by prime contracting, sub-contracting, joint venture or mentor/ protégé relationship.
For more information on the GDOT DBE Program please contact:
Equal Opportunity Division
One Georgia Center, Floor 7 600 West Peachtree NW Atlanta, Georgia 30308 Phone: (404) 631-1972
I. Project Requirements and Scope of Services
Under the terms of the resulting contract, the selected contractor will provide services for the GDOT Project identified. The anticipated scope of work for the project/contract is included in Exhibit I. Compliance with all pertinent regulations (State/Federal/Local/Industry) is required. It is the responsibility of the respondent to obtain knowledge of rules and regulations relevant to the Scope of Work identified herein.
Revised 11/5/2025 4
J. Contract Term and Type
GDOT anticipates one (1) award to one (1) firm, for the project/contract identified. GDOT will issue a purchase order contract to the lowest, responsive, and responsible bidding firm. The purchase order will serve as the official Notice to Proceed. It is GDOT’s intention that the contract will remain in effect for thirty (30) days unless modified in writing by GDOT with a purchase change order.
II. Selection Information
A. Selection Process
Once the deadline for bids has passed, all bids will be opened and reviewed to determine all mandatory requirements have been addressed correctly. All bids which are identified as correctly addressing all mandatory requirements will be reviewed and the total amount of the bid will be evaluated. The award will be made to the bid deemed to be the lowest responsive and responsible bid.
B. Cost/Pricing
In the event of discrepancy(ies) between any unit prices and total bid prices, unit pricing shall prevail and total bid price shall be adjusted to reflect the sum total of all unit prices.
C. Bonding Requirements
The winning firm will be notified in writing via email and must provide the required Performance and Payment Bond within ten (10) business days of receiving the Notice of Intent to Award (NOIA). The Performance and Payment Bond shall be provided to the Department in the amount of 100 percent (%) of the total bid price, utilizing the Department’s form, GDOT Form-SP404, Performance and Payment Bonds, effectively securing the Contractor’s obligations to perform the Services hereunder and to ensure that payments owed to subcontractors approved by the Department are made with respect to performance of portions of the services.
If the Contractor does not provide the required Performance and Payment Bond form by the deadline, the Contractor may be deemed “non-responsive” and the Department may rescind the award and purchaser order.
At that point, the next lowest bidder will be notified via e-mail of the Department’s intent to accept the next lowest bid and the ten (10) business day requirement to provide the Performance and Payment Bond will be upheld.
D. Insurance Coverage Requirements
The winning firm will be required to provide a Certificate of Insurance from insurers rated at least A- by A. M.
Best’s and registered to do business in the State of Georgia. The Contractor shall provide the following kinds of insurance in the minimum amount of coverage set forth below, to cover all loss and liability for damages on account of bodily injury, including death therefrom, and injury to or destruction of property caused by or arising from any and all operations carried on and any and all work performed by the Contractor to this project, the Contractor shall maintain liability insurance as follows: Workers Compensation (WC): Statutory coverage shall be maintained for Worker’s Compensation as required by the laws of the State of Georgia.
Bodily injury by Accident – each employee $100,000 Bodily injury by Disease – each employee $100,000 Bodily injury by Disease – policy limit $500,000
Commercial General Liability (CGL):
Each Occurrence Limit $1,000,000 Personal & Aggregate Limit $1,000,000 General Aggregate Limit $3,000,000 Products/Completed Ops. Aggregate Limit $1,000,000
Automobile Liability Combined Single Limit: $1,000,000 To cover vehicles, owned, leased or rented by the Contractor
Revised 11/5/2025 5
The Contractor shall require its sub-contractors to maintain Commercial General Liability insurance with business automobile liability coverage with companies and limits as stated above. GDOT shall be named as an additional insured and a copy of the policy endorsement shall be provided with the insurance certificate.
The Contractor shall procure the insurance policies at the Contractor’s own expense and shall furnish GDOT an insurance certificate listing the agency (GDOT) as the certificate holder. The insurance certificate must be provided within ten (10) business days of receiving the purchase order from GDOT.
The insurance certificate must document that the liability coverage purchased by the Contractor includes contractual liability coverage to insure the indemnity agreement as stated. In addition, the insurance certificate must provide the following:
a. Name, address, signature and telephone number of authorized agents.
b. Name and address of insured.
c. Name of Insurance Company.
d. Description of coverage in standard terminology.
e. Policy number, policy period and limits of liability.
f. Name and address of State Agency as certificate holder.
g. Thirty (30) day notice of cancellation.
h. Details of any special policy exclusions.
Excess liability coverage may be used in combination with the base policy to obtain these limits.
E. Method of Communication
All general communication of relevant information regarding this solicitation will be made via the Georgia Procurement Registry (GPR). All firms are responsible for checking the GPR on a regular basis for updates, clarifications, bid tabulation, and announcements. GDOT reserves the right to communicate via electronic-mail with the primary contact listed in the bid response document. Other specific communications will be made as indicated in this solicitation.
F. Award
Lowest, Responsive and Responsible: Any award resulting from this solicitation will be made to the lowest, responsive, and responsible bidding firm meeting all requirements.
G. Award Conditions
This solicitation and any bid submitted in response, regardless of whether the bid is determined to be the lowest cost, is not binding upon GDOT and does not obligate GDOT to procure or contract for any services. Neither GDOT nor any party submitting a bid will be bound unless and until the bid is mutually accepted by both parties.
GDOT will issue a Notice of Award announcing the awarded bidding firm. GDOT will issue a purchase order to the awarded firm which will represent GDOT’s acceptance of the selected Contractor.
III. Schedule of Events
The following Schedule of Events represents GDOT’s best estimate of the Schedule that will be followed. All times indicated are prevailing times in Atlanta, Georgia. GDOT reserves the right to adjust the Schedule as GDOT deems necessary.
DATE TIME
a. GDOT issues public advertisement 5/14/2026
Revised 11/5/2025 6
IV. Criteria for Evaluation of Bids
The bidding firm must be prequalified in the indicated Right of Way Property Management service class(es) identified in Exhibit I in order to be evaluated and considered. All bid submittals will be pre-screened to verify that the bidding firm is prequalified in the required service class(es) and that the subcontractor(s) is prequalified in the required service class(es). GDOT’s Right of Way Property Management prequalification listing will be utilized to pre-screen the prequalification status of each bidding firm. Any bid submittal in which the bidding firm or the subcontractor(s) prequalification requirements are not met will be disqualified from further evaluation and consideration.
V. Instructions for Submittal of Bids
A. There is one (1) electronic bid submittal required. Bid submittal must include all completed and signed exhibits in their entirety that are identified in Section VII and all completed and signed addenda. The completed and signed bid documents must be legible. Bid submittal must be submitted in a PDF document attached to an e-mail.
The bid submittal email subject line must follow the naming convention for electronic records as follows:
Bidding firm’s full legal name Solicitation number (ITB number)
Bids are to be e-mailed to SpecialProjectsProcurement@dot.ga.gov
No bid submittals will be accepted after the time and date set for receipt.
All expenses for preparing and submitting responses are the sole cost of the bidder submitting the response.
GDOT is not obligated to any party to reimburse such expenses. All submittals upon receipt become the property of GDOT. Labeling information provided in submittals “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until final award.
GDOT reserves the right, in its sole discretion, to waive any technicalities associated with this submittal if deemed in the best interest of the State.
A public bid opening will not be held by GDOT. A bid tabulation will be posted to the GPR once bid evaluations have been completed.
B. Questions and Requests for Clarification
Questions about any aspect of this solicitation, or the project, shall be submitted in writing via e-mail to Mckenzie Mathison, email MMathison@dot.ga.gov . The deadline for submission of questions relating to this solicitation is the time and date shown in the (Schedule of Events- Section III above). From the issue date of this
b. Questions due to GDOT 5/18/2026 2:00 PM
c. Deadline for submission of Bid Response 5/21/2026 2:00 PM
d. GDOT completes evaluation and issues notification to winning firm TBD mailto:SpecialProjectsProcurement@dot.ga.gov mailto:MMathison@dot.ga.gov
Revised 11/5/2025 7 solicitation until a successful bidder is selected and the award is made official and announced, respondents are subject to the Restriction of Communication in Section I.B (above).
VI. GDOT Terms and Conditions
A. Statement of Agreement
With the submission of a bid, the respondent agrees that he/she has carefully examined the solicitation and agrees that it is the respondent’s responsibility to request clarification on any issues in any section of the solicitation with which the respondent disagrees or needs clarified. The respondent also understands that failure to mention these items during the question period will be interpreted to mean that the respondent is in full agreement with the terms, conditions, specifications and requirements therein. With submission of a bid, the respondent hereby certifies: (a) that this bid is genuine and is not made in the interest or on behalf of any undisclosed person, firm, or corporation; (b) that respondent has not directly or indirectly included or solicited any other respondent to put in a false or insincere bid; (c) that respondent has not solicited or induced any person, firm, or corporation to refrain from sending a bid.
The respondent also understands that failure to provide required information may result in disqualification.
Failure to provide administrative information may not result in disqualification. At the Department’s discretion, the Department may notify the respondent that administrative information is not provided or there was an error in the information provided, and the Department will allow a respondent to provide an update to the administrative information. However, the exception to this is the provision of the required GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT, which by Georgia Law requires disqualification of the response. The above changes mentioned to administrative information would be considered allowable as these would be limited to changes which do not affect the information which will be used in the evaluation process.
Failure of a respondent to provide the specific exhibits will result in disqualification. Any respondent who provides changes in addition to the information requested in the notice shall be subject to disqualification.
B. Sub-Contractors
Sub-Contractors shall generally be considered any team member which is performing any service which typically requires prequalification. Sub-Contractor must be listed in the Bid Summary Form and is subject to all terms and conditions in the Agreement.
C. Non-Discrimination
The Georgia Department of Transportation in accordance with Title VI of the Civil Rights Act of 1964 and 78 Stat. 252, 42 USC 2000d--42 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, part 21, Nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all proposers that it will affirmatively ensure that any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award.
D. Submittal Costs and Confidentiality
All expenses for preparing and submitting responses are the sole cost of the respondent submitting the response. The Department is not obligated to any respondent to reimburse such expenses. All submittals upon receipt become the property of the Department. Labeling information provided in submittals as “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until a final award.
E. Right to Cancel or Change Solicitation
Revised 11/5/2025 8
GDOT reserves the right to cancel any solicitations where it is determined to be in the best interest of the Department to do so. GDOT reserves the right to increase, reduce, add, or delete any item in this solicitation as deemed necessary.
It is the responsibility of all firms interested in submitting a bid for this solicitation to routinely check the posting on the Georgia Procurement Registry for any revisions to this solicitation.
F. Substitutions, Alternates, Exceptions, and Extensions
No substitutions or alternates will be accepted for this solicitation. Any respondent submitting substitutions or alternates will be considered non-responsive and will not be considered for award.
Revised 11/5/2025 9
VII. Post Bid Submittal Documents
The intended awardee will receive a Notice of Intent to Award with instructions via e-mail of the Department’s intent accept the Contractor’s bid. The preferred method for returning this documentation is by email however, hard copies of the documentation are required sent to the issuing officer at the address listed on page one. The intended awardee must submit copies of the documents listed below to the Issuing Officer referenced in Table 1, with original signatures and applicable required notary seals. The final award is contingent on post bid submittals being received within 10 calendar days and sufficiently meeting the Department’s needs.
A. Required Insurance Coverage and Certificates of Insurance:
The Contractor shall, prior to the issuance of the PO, procure and maintain the insurance coverage listed in Section II, Selection Information, Subsection D Insurance Coverage Requitements, which shall protect the Contractor and GDOT (as an additional insured) from any claims for bodily injury, property damage, or personal injury throughout the duration of the work, at the Contractor’s own expense. The Contractor will not be permitted to commence any work prior to the Department acceptance of insurance coverage. Failure to retain insurance for the term of the performance of the Services will result in a cease of work and may be grounds for termination.
B. Performance and Payment Bonds:
As required in Section II, Selection Information, Subsection C Bonding Requitements.
VIII. Solicitation Exhibits
The following list of Exhibits apply to this solicitation and must be submitted with the bid, with the exception of Exhibit I, Scope of Work. All information provided on the exhibits must be legible. Failure to complete an submit the required Exhibits with bid will result in disqualification of bid response:
EXHIBIT I – Scope of Services.
EXHIBIT II – Drug-Free Workplace Certification (Complete and return with bid).
EXHIBIT III – Bid Form (Complete and return).
EXHIBIT IV– Bid Summary Form (Complete and return with bid).
EXHIBIT V – Lien Waiver and Release (Complete and return with bid).
EXHIBIT VI - Georgia Security and Immigration Compliance Act Affidavit (Complete and return with bid).
EXHIBIT VII - Scrutinized Company (Complete and return).
EXHIBIT VIII - Performance and Payment Bond Form
Revised 11/5/2025 10
EXHIBIT I
Scope of Services
1. Required Prequalification Service Classes
Prime Contractors are defined as the firm submitting the bid response and the firm with whom GDOT will contract.
The Team is defined as the Prime Contractor and their sub-contractor(s), who are considered team members. The Prime Contractor must be prequalified in the Right of Way Property Management service class (es) identified below in Section 5.A. The Prime Contractor or sub-contractor team members must be prequalified in the Right of Way Property Management service classes identified below in Section 5.B. A copy of the prequalification form must be provided for both the Prime as well as the Team at the time of bid submittal.
A. The Prime Contractor MUST be prequalified by GDOT in either of the service classes listed below:
Service Class Number
Service Class Name
E-3 Demolition
B. The Team (either the Prime Contractor and/or one or more of their sub-contractor team members) MUST be prequalified by GDOT in the service classes listed below:
Service Class Number
Service Class Name
E-3 Demolition
NOTE: The team must include team members, either prime or sub, which are prequalified in both service classes.
If a Prime or Sub-Contractor’s prequalification will expire prior to the due date of this bid or if a firm has not been prequalified by GDOT, documentation must be provided which shows that the firm has submitted its application for prequalification prior to the bid due date. A copy of the prequalification form must be provided for both the Prime as well as the Team at the time of bid submittal.
For Prequalification information visit http://www.dot.ga.gov/PS/Business/Prequalification/SpecialtyServices .
The work consists of the equipment, supervision, and all other services required for the complete demolition of the structures identified and described in the Asbestos Inspection Reports. All improvements must be completely demolished and removed from their present site. All demolition debris must be removed and disposed of properly in an appropriate landfill or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4. The work will be completed in strict accordance with the Technical Specifications.
The Georgia Environmental Protection Division (EPD) Project Notification Forms are required to be submitted by the Contractor immediately once the Notice of Award is received. Work shall commence as soon as possible following issuance of the Notice to Proceed. All work must be completed thirty (30) days following the Notice to Proceed unless modified in writing by GDOT with a purchase change order. The EPD Notification filing is included in the thirty (30) day period.
The work shall be completed as noted in the Demolition requirements within the Asbestos Inspection Report.
PENALTIES
As the construction schedule is critical for these project/parcel, the Contractor must begin work as soon as the Performance and Payment Bond is provided to GDOT contract officer. If the work on a specific project has not commenced within two (2) weeks providing the Performance and Payment Bond and the State Property Manager deems that the work remaining cannot be completed by the completion date as established for that project, the Department may terminate the contract.
http://www.dot.ga.gov/PS/Business/Prequalification/SpecialtyServices
Revised 11/5/2025 11
Any citation given to the Contractor by the GA EPD or the US EPA shall be forwarded to the State Property Manager.
The Department may terminate the contract for the Contractor based on the severity or frequency of citations or non-performance and may remove the Contractor from the pre-qualified Contractors list for a period of one year.
The state of Georgia may cancel, terminate, or suspend the contract in whole or in part wherein it is determined by the state that the Contractor is in violation of the contract.
Items remaining inside the structure, ranging from trash/debris to inventory to building materials to furnishings, are considered abandoned and shall be removed under this contract.
Asbestos Inspection Reports and/or PM-10A Reports, for each parcel, are attached with detailed Scope of Work and is a part of Exhibit I.
I hereby agree to all the above provisions and respectfully submit the bids as indicated in Exhibit “III”- Bid Form for such demolition of improvements, structures, or other encumbrances in the right of way and/or easement areas of the Project.
I further agree to accept all of the above units for which I am the successful bidder, and agree to remove the above in the manner heretofore prescribed within the thirty (30) days required. I further agree to a continuance of this contract until such time as the Department accepts same not to exceed thirty (30) days from the Notice to Proceed.
In the event that I am unable to fulfill any or all of the conditions of this contract, I understand and agree that any and all monies on deposit with the Department relative to this contract are subject to forfeiture by the Department as liquidated damages and that a penalty of $500.00 will be imposed for each day beyond the thirty (30) day limit on this project. Further, such unsatisfactory performance shall vest title to all improvements upon which deposits forfeited in said Department.
Further, I understand and agree to the forfeiture of any and all deposits in the event that I am unable to deliver the required bonding or insurance certificates to the Department within five (5) business days of notice to proceed.
The undersigned, as Bidder, hereby declares that each person, including but not limited to Contractor, Firm, Corporation, Principals or Individuals, interested in this Bid as a principal is named herein and that no other party has any interest in this Bid; that this Bid is made without connection with any other person making a Bid; and that this Bid is made without collusion on the part of any person, firm, or corporation. The undersigned further certifies that he is authorized to make this Bid, individually or as an authorized official of the indicated company or firm and agrees to accept this proposal as a binding contract for the demolition of improvements, structures or other encumbrances that will be executed by the Department after award of the Bid and receipt of the required Performance and Payment Bond and Insurance Certificate.
Summary: Asbestos Inspection and Pre-Demolition Report
Project No. STP00-0186-01(025) Paulding County
PI No. 621720
Parcel 132 260 Powder Creek Court
Dallas, GA 30157
Date of Inspection:
March 22, 2026 Asbestos Inspector:
Donna B. Folkner Certificate No. 20393, expiration 3/25/2026 PenPoint LLC Facilities Environmental Consultants 350 Briarwood Court, Marietta, GA 30068
(404) 285-3922
Structure 1
Summary: Asbestos Inspection Report
Project No.: STP00-0186-01(025) Paulding County PI No.: 621720 Parcel No.: 132, Str 1
Street Address: 260 Powder Creek Court City: Dallas State: GA Zip Code: 30157
Building Description: Wood frame two-story structure on concrete slab/reinforced concrete wall foundation with wood frame entrance deck and wood frame back deck
Nearest Major Intersection: Hiram Acworth Highway (SR 92) and Powder Creek Court
DOT Contact: Nicole Legall Phone: 404- 347-0172
Prior Building Use: Residential Age of Building: 30 yrs Number of Floors in Building: 2
Present Building Use: Vacant Size of Building: Main level: 1,697SF with 100 SF wood frame deck Basement: 1,600 SF
ASBESTOS CONTAINING MATERIALS
Location of Material Description of Material % Asbestos Quantity (SF or LF)
Note: Information provided on quantities of ACM reflects field observations and the condition of the structure and material at the time of the asbestos inspection. Quantities and conditions may change due to vandalism, exposure to weather/climate, or for other unknown circumstances. The Abatement Contractor should visit the site to verify quantities and condition of ACM prior to preparing and submitting a bid and should notify the Contracting Officer to report any significant discrepancies.
GPS Coordinates:
Latitude: 33°54'51.65"N Longitude: 84°44'47.90"W
No materials containing ≥ 1 percent asbestos were identified at this structure. Refer to Attachment 1 for a summary of materials sampled and corresponding analytical results.
ATTACHMENT 1 - BULK SAMPLE SUMMARY
Parcel Number: 132 Address: 260 Powder Creek Court
PI Number: 621720 County: Paulding County
Sample ID Type of Material Material Description Sample Location Sample Results
2358-132-1A Ceiling Texture Trowel applied ceiling finish, popcorn pattern, over drywall substrate
Kitchen NAO
2358-132-1B Ceiling Texture Trowel applied ceiling finish, popcorn pattern, over drywall substrate
Hall Bathroom NAO
2358-132-1C Ceiling Texture Trowel applied ceiling finish, popcorn pattern, over drywall substrate
Primary Bedroom NAO
2358-132 -2A Drywall Gypsum board/joint compound Kitchen NAO – gypsum board NAO - joint compound
2358-132 -2B Drywall Gypsum board/joint compound Hall Bathroom NAO – gypsum board NAO - joint compound
2358-132 -2C Drywall Gypsum board/joint compound Primary Bedroom NAO – gypsum board NAO - joint compound
2358-132-3A Resilient Flooring Sheet, brown, single layer over plywood subfloor
Primary Bath NAO
2358-132-3B Resilient Flooring Sheet, brown, single layer over plywood subfloor
Primary Bath NAO
2358-132 -4A Resilient Flooring Sheet, cream, single layer over plywood subfloor
Laundry NAO
2358-132 -4B Resilient Flooring Sheet, cream, single layer over plywood subfloor
Laundry NAO
2358-132- 5A Ceiling Tile 2’ x 4’ suspended acoustical ceiling tile
Basement NAO
2358-132 -5B Ceiling Tile 2’ x 4’ suspended acoustical ceiling tile
Basement NAO
2358-132-6A Roofing Shingles and base layer Roof NAO
2358-132-6B Roofing Shingles and base layer Roof NAO
NAO = No Asbestos Observed
General Notes:
Survey Protocol. The asbestos survey and sample collection efforts utilized to identify and delineate the extent of asbestos-containing materials within the structures on these parcels meet existing Environmental Protection Agency (EPA) NESHAPs regulatory requirements. The corresponding bulk sampling of suspect materials complies with current OSHA (AHERA/ASHARA) requirements for the identification of asbestos-containing materials in buildings, (i.e., referenced AHERA protocol). Materials historically known to have used asbestos in their manufacture, such as, Transite panels, cement asbestos board and pipes, and black roof mastic were not sampled and are assumed to contain asbestos.
Definition of ACM. Current NESHAPs regulations define asbestos-containing materials (ACM) as those materials containing ≥ 1 percent asbestos. NESHAPs notification and disposal requirements, enforced in the State of Georgia by the Georgia EPD, are “triggered” by materials containing ≥ 1 percent asbestos. Though existing OSHA regulations define ACM as those materials containing
≥ 1 percent asbestos, the regulations also apply to all materials identified to contain asbestos, no matter how minute the quantity, (i.e., < 1 percent).
Wallboard and Joint Compound. Existing EPA regulations address wallboard and joint compound as a composite system, and allow composite sampling to determine the asbestos content of the combined wall system. However, OSHA does not allow composite sampling of wallboard and joint compound; Rather, OSHA’s asbestos regulations require individual sampling of each wall system component. While existing NESHAPs regulatory requirements for notification and disposal do not apply for composite wallboard systems containing < 1 percent asbestos, OSHA’s Asbestos Construction Industry Standard (49CFR5816.5801) does apply. OSHA’s regulatory requirements include but are not limited to worker training; engineering controls and work practices, communication of hazards, and waste disposal do apply to wallboard systems with any identified asbestos content.
Limitations. Suspect materials previously concealed which are uncovered by the demolition efforts (such as Transite panels, cement asbestos flues, pipe insulation, etc.) should be assumed to contain asbestos or properly sampled by an AHERA-accredited Asbestos Inspector to verify otherwise. Provide, as necessary, appropriate notifications or amendments to prior GA EPD notification regarding the increase in asbestos-containing material.
Pre-Demolition Report Demolition Requirements
Project No.: Paulding County PI No.: 621720 Parcel No.: 132
Requirement No. 1 The scope of this contract is for the demolition, and proper disposal of the structures and other site improvements including:
1. Structure 1 – Wood frame two-story structure on concrete slab/reinforced concrete wall foundation with wood frame entrance deck and wood frame back deck;
2. 4’ Chain Link Fence, posts, and associated footings, approximately 265
LF;
3. Wooden Swing Frame;
4. Concrete driveway and walks, approximately 1900 SF; and,
5. Septic system, Refer to Requirement No. 6.
All improvements must be completely demolished and removed from their present site.
All demolition debris must be removed and disposed of properly in an appropriate landfill or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4. The work will be completed in strict accordance with the DEMOLITION TECHNICAL SPECIFICATIONS, Office of Right of Way, Property Management, dated April 2018. (DEMOLITION TECHNICAL SPECIFICATIONS).
Requirement No. 2 This acquisition is a total take. See ROW plan attached.
Requirement No. 3 The GA EPD Project Notification Form must be submitted through the GEOS portal. A screen shot of the GEOS portal confirming the date of submittal of forms to the GA EPD or a PDF copy of the submittal shall be kept as part of the project records. A copy of the GA EPD Project Notification Form shall be submitted to the Site Inspector when it is submitted to GA EPD through the GEOS portal. Any updated forms shall be submitted to the Site Inspector.
Requirement No. 4 At all times during demolition: an OSHA qualified Competent Person shall be on site; a copy of the GAEPD GEOS notification shall be on site; a Blue Card holder shall be on site; and a full copy of the GDOT Asbestos Inspection and Pre-Demolition Report shall be on site.
Requirement No. 5 Trash/debris/discarded items remaining within the structure or demolition easement or required right of way are assumed to be abandoned and shall be removed and disposed of properly under this contract.
Requirement No. 6 The septic tank/lines are outside of the construction limits. Properly close septic tanks/lines in place in strict accordance with the DEMOLITION TECHNICAL
SPECIFICATIONS.
Requirement No. 7
All concrete foundations, slabs, and walks will be removed from the site and disposed of properly. Do not push demolition debris into the soil.
Requirement No. 8 All vegetation, shrubbery, brush, etc. required to be removed to facilitate the demolition of the structures shall be removed from the site and disposed of properly.
Requirement No. 9 Provide, as necessary, fill dirt in strict accordance with the DEMOLITION TECHNICAL SPECIFICATIONS to properly slope the site after the foundation of the structure has been removed. The area from which the structures have been removed and the site disturbed shall be sloped and graded to provide positive drainage (no ponding).
Requirement No. 10 The final grade shall be prepared for landscaping by smoothing or raking the surface to remove all debris from the surface. Surface debris includes large dirt clods, rocks, debris from demolition, trash, etc. The soil surface shall be smoothed such that ruts and treads from the excavation equipment are not visible. The final grade shall be in a condition that it can be maintained by a residential lawn mower.
Requirement No. 11 The Site Inspector will review and approve the final grade prior to applying seed and straw. Coordinate with the Site Inspector three business days in advance to allow sufficient review of the final grade so as to not impede the progress of completing the site restoration. DO NOT APPLY SEED AND STRAW UNTIL THE SITE INSPECTOR
HAS REVIEWED AND APPROVED THE FINAL GRADE.
Requirement No. 12 Once the new grade has been prepared and approved, the Contractor shall apply temporary seeding and straw cover to stabilize the demolition area and assist in erosion control, as prescribed in the GESA Handbook, 2" - 4" of dry straw covering (Ds1, Ds2) grass seed mixtures based on the season of the year and the geographic area.
Requirement No. 13 The escape of sediment from the site shall be prevented by the installation of erosion and sediment control measures and practices prior to, or concurrent with, land disturbing activities. The Contractor is required to follow all erosion, runoff, and sediment control practices, including erecting of silt fencing or other measures as necessary, as required by local, state, and federal regulations. All erosions control measures shall comply with TITLE 12. Conservation and Natural Resources Chapter 7.
Control of Soil Erosion and Sedimentation. The design of the erosion control measures will be provided by NPDES trained and certified personnel.
Photo 1: Structure 1, Existing condition – View of Kitchen.
Photo 2: Structure 1, Existing condition – View of Living Room.
Photo 3: Structure 1, Existing condition - View of finished upstairs bedroom.
Photo 4: Existing condition, Structure 1 –View of finished portion of basement.
Photo 5: Existing condition, Structure 1 – View of Basement
Photo 6: Existing condition, Structure 1 – View of driveway which will be removed in this under this contract.
Photo 7: Existing condition, Structure 1 – View of wood frame deck.
Photo 8: Remove chain link fence, posts, and associated footings as well as swing frame.
DonnaFolkner Polygon
DonnaFolkner Polygon
DonnaFolkner Polygon
DonnaFolkner PolyLine
DonnaFolkner Text Box Str 1
DonnaFolkner Callout Remove fence
DonnaFolkner Callout Remove concrete drive
DonnaFolkner Polygon
DonnaFolkner Callout Remove concrete drive
DonnaFolkner Text Box
PI No. 621720
Parcel 133 282 Powder Creek Court
Donna B. Folkner Certificate No. 20393, expiration 3/25/2026 PenPoint LLC Facilities Environmental Consultants
Project No.: STP00-0186-01(025) Paulding County PI No.: 621720 Parcel No.: 133, Str 1
Street Address: 282 Powder Creek Court City: Dallas State: GA Zip Code: 30157
Building Description: Wood frame multileveled structure on concrete slab/CMU foundation with wood frame entrance deck and covered wood frame back deck
Nearest Major Intersection: Hiram Acworth Highway (SR 92) and Powder Creek Court
Prior Building Use: Residential Age of Building: 30 yrs Number of Floors in Building: 3
Present Building Use: Vacant Size of Building: Main level: 2,200 SF, Upper level: 800 SF, Basement:
1,400 SF
ASBESTOS CONTAINING MATERIALS
Note: Information provided on quantities of ACM reflects field observations and the condition of the structure and material at the time of the asbestos inspection. Quantities and conditions may change due to vandalism, exposure to weather/climate, or for other unknown circumstances. The Abatement Contractor should visit the site to verify quantities and condition of ACM prior to preparing and submitting a bid and should notify the Contracting Officer to report any significant discrepancies.
Latitude: 33°54'51.65"N Longitude: 84°44'47.90"W
Parcel Number: 133 Address: 282 Powder Creek Court
2358-133-1A Resilient Flooring Sheet, gray/cream, single layer over plywood subfloor
Primary Bath NAO
2358-133-1B Resilient Flooring Sheet, gray/cream, single layer over plywood subfloor
Primary Bath NAO
2358-133 -2A Resilient Flooring Sheet, cream, single layer over plywood subfloor
Upstairs Bathroom NAO
2358-133 -2B Resilient Flooring Sheet, cream, single layer over plywood subfloor
Upstairs Bathroom NAO
2358-133-3A Ceiling Texture Trowel applied ceiling finish, crow’s foot pattern, over drywall substrate
Kitchen NAO
2358-133-3B Ceiling Texture Trowel applied ceiling finish, crow’s foot pattern, over drywall substrate
Primary Bedroom NAO
2358-133-3C Ceiling Texture Trowel applied ceiling finish, crow’s foot pattern, over drywall substrate
Primary Bathroom NAO
2358-133 -4A Drywall Gypsum board/joint compound Kitchen NAO – gypsum board NAO - joint compound
2358-133 -4B Drywall Gypsum board/joint compound Living Room NAO – gypsum board NAO - joint compound
2358-133 -4C Drywall Gypsum board/joint compound Primary Bedroom NAO – gypsum board NAO - joint compound
2358-133- 5A Roof Shingles and base layer Roof NAO
2358-133 -5B Roof Shingles and base layer Roof NAO
Survey Protocol. The asbestos survey and sample collection efforts utilized to identify and delineate the extent of asbestos-containing materials within the structures on these parcels meet existing Environmental Protection Agency (EPA) NESHAPs regulatory requirements. The corresponding bulk sampling of suspect materials complies with current OSHA (AHERA/ASHARA) requirements for the identification of asbestos-containing materials in buildings, (i.e., referenced AHERA protocol). Materials historically known to have used asbestos in their manufacture, such as, Transite panels, cement asbestos board and pipes, and black roof mastic were not sampled and are assumed to contain asbestos.
Definition of ACM. Current NESHAPs regulations define asbestos-containing materials (ACM) as those materials containing ≥ 1 percent asbestos. NESHAPs notification and disposal requirements, enforced in the State of Georgia by the Georgia EPD, are “triggered” by materials containing ≥ 1 percent asbestos. Though existing OSHA regulations define ACM as those materials containing ≥ 1 percent asbestos, the regulations also apply to all materials identified to contain asbestos, no matter how minute the quantity, (i.e., < 1 percent).
Wallboard and Joint Compound. Existing EPA regulations address wallboard and joint compound as a composite system, and allow composite sampling to determine the asbestos content of the combined wall system. However, OSHA does not allow composite sampling of wallboard and joint compound; Rather, OSHA’s asbestos regulations require individual sampling of each wall system component. While existing NESHAPs regulatory requirements for notification and disposal do not apply for composite wallboard systems containing < 1 percent asbestos, OSHA’s Asbestos Construction Industry Standard (49CFR5816.5801) does apply. OSHA’s regulatory requirements include but are not limited to worker training; engineering controls and work practices, communication of hazards, and waste disposal do apply to wallboard systems with any identified asbestos content.
Limitations. Suspect materials previously concealed which are uncovered by the demolition efforts (such as Transite panels, cement asbestos flues, pipe insulation, etc.) should be assumed to contain asbestos or properly sampled by an AHERA-accredited Asbestos Inspector to verify otherwise. Provide, as necessary, appropriate notifications or amendments to prior GA EPD notification regarding
Project No.: Paulding County PI No.: 621720 Parcel No.: 133
Requirement No. 1 The scope of this contract is for the demolition, and proper disposal of the structures
1. Structure 1 – Wood frame multileveled structure on concrete slab/CMU foundation with wood frame entrance deck and covered wood frame back deck
2. Miscellaneous yard structures including, but not limited to, bird feeder/associated footing, planting beds, trellis, bell post, and fence frame;
3. Concrete driveway, approximately 1900 SF; and,
4. Septic system, Refer to Requirement No. 6.
or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4. The work will be completed in strict accordance with the DEMOLITION or a PDF copy of the submittal shall be kept as part of the project records. A copy of the GA EPD Project Notification Form shall be submitted to the Site Inspector when it is
Requirement No. 4 At all times during demolition: an OSHA qualified Competent Person shall be on site; a
Requirement No. 5 Trash/debris/discarded items remaining within the structure or demolition easement or
Requirement No. 6 The septic tank/lines are outside of the construction limits. Properly close septic
Requirement No. 8 All vegetation, shrubbery, brush, etc. required to be removed to facilitate the demolition
Requirement No. 9 Provide, as necessary, fill dirt in strict accordance with the DEMOLITION TECHNICAL
Requirement No. 10 The final grade shall be prepared for landscaping by smoothing or raking the surface to from demolition, trash, etc. The soil surface shall be smoothed such that ruts and treads from the excavation equipment are not visible. The final grade shall be in a condition that it can be maintained by a residential lawn mower.
Requirement No. 11 The Site Inspector will review and approve the final grade prior to applying seed and straw. Coordinate with the Site Inspector three business days in advance to allow sufficient review of the final grade so as to not impede the progress of completing the site restoration. DO NOT APPLY SEED AND STRAW UNTIL THE SITE INSPECTOR
HAS REVIEWED AND APPROVED THE FINAL GRADE.
Requirement No. 12 Once the new grade has been prepared and approved, the Contractor shall apply temporary seeding and straw cover to stabilize the demolition area and assist in erosion control, as prescribed in the GESA Handbook, 2" - 4" of dry straw covering (Ds1, Ds2) grass seed mixtures based on the season of the year and the geographic area.
Requirement No. 13 The escape of sediment from the site shall be prevented by the installation of erosion and sediment control measures and practices prior to, or concurrent with, land disturbing activities. The Contractor is required to follow all erosion, runoff, and sediment control practices, including erecting of silt fencing or other measures as necessary, as required by local, state, and federal regulations. All erosions control measures shall comply with TITLE 12. Conservation and Natural Resources Chapter 7.
Photo 1: Structure 1, Existing condition – View of Kitchen.
Photo 2: Structure 1, Existing condition – View of Living Room.
Photo 3: Structure 1, Existing condition - View of unfinished attic area.
Photo 4: Existing condition, Structure 1 –View of unfinished basement.
Photo 5: Existing condition, Structure 1 – View of east exterior elevation. Remove covered deck, as well as, bell post and associated footing.
Photo 6: Remove miscellaneous yard structures including bird feeder/associated footing, planting…
This is the start of the file's text. The full file is on GovTribe.