ITB 27-01TM Plans.pdf
PDF 25 MB Posted
- Solicitation number
- IFB-122988
- Issued by
- Buena Vista City, Hampton City, Virginia
About this file
This document is a comprehensive set of construction plans for the Pine Chapel Road Corridor Improvements project in Hampton, Virginia, prepared by ATCS (Advanced Traffic Control Systems) under VDOT Project No. U000-114-382. The project involves significant roadway modifications to Pine Chapel Road between Coliseum Drive and Saville Row, including the addition of a 5-foot sidewalk on the south side to fill a gap in the pedestrian network. The primary work includes converting the existing 4-lane undivided roadway into a 3-lane configuration with one travel lane in each direction and a center two-way left turn lane. The project encompasses intersection improvements at Coliseum Drive and Saville Row, installation of raised medians, ADA-compliant ramps and crosswalks, pedestrian signal modifications, utility infrastructure adjustments, and traffic signal modifications. The total area of disturbance is 0.928 acres, with an adjusted disturbance area of 0.530 acres after accounting for routine maintenance. Construction sequencing details indicate that the contractor must obtain plan approval, secure all applicable permits including land disturbance permits, submit a temporary traffic control plan compliant with Virginia standards, and hold a pre-construction meeting at least two weeks prior to starting work.
The project requires compliance with the Virginia Stormwater Management Handbook and includes comprehensive erosion and sediment control (E&SC) measures such as silt fence installation, inlet protection, temporary and permanent seeding, tree protection fencing, and dewatering devices. The contractor must maintain a minimum of 10 feet horizontal separation between water and sanitary sewer mains and 18 inches vertical separation where crossings occur, with ductile iron piping required in certain conditions. All work within the City right-of-way requires a separate permit from the Community Development Department, and work on restricted streets is limited to 8:30 AM to 4:00 PM and 6:00 PM to 6:00 AM with lane closures restricted to one lane while maintaining two-way traffic. The contractor is responsible for all concrete testing through an independent laboratory, submittal of three complete record drawing sets including AutoCAD files, coordination with private utility companies and Newport News Waterworks, and maintaining safe pedestrian access throughout construction. The project requires a Responsible Land Disturber for both plan review and construction phases, with the contractor responsible for submitting the name of the certified Responsible Land Disturber upon contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 27-01TM Bid Document.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COM
M
ERCE DRIVE
COLISEUM DRIVEPINE CHAPEL ROAD
SITE
IN
TE
RS
TA
TE
INTERSTATE 64
SAVILLE RO
W
MERCURY BOULEVARD
N
. AR
M
ISTEAD
AVENUE
COLISEUM
DRIVE
INTERSTATE 64POWER PLANT PKWY
CUNNINGHAM DRIVE
W. QUEEN STREET
STATISTICAL DATA
TOTAL AREA OF DISTURBANCE: 40,403 SQFT OR 0.928 AC
WITHIN OVERALL DISTURBED AREA:
EXISTING IMPERVIOUS AREA: 31,417 SQFT OR 0.721 AC, 77.8%
EXISTING PERVIOUS AREA (MANAGED TURF): 8,986 SQFT OR 0.206 AC, 22.2%
EXISTING PERVIOUS AREA (FOREST/OPEN SPACE): 0 SQFT OR 0 AC, 0%
PROPOSED IMPERVIOUS AREA: 26,791 SQFT OR 0.615 AC, 66.3%
PROPOSED PERVIOUS AREA (MANAGED TURF): 13,612 SQFT OR 0.313 AC, 33.7%
PROPOSED PERVIOUS AREA (FOREST/OPEN SPACE): 0 SQFT OR 0 AC, 0%
EXISTING IMPERVIOUS AREA CONSIDERED MAINTENANCE: 17,320 SQFT OR 0.398 AC
ADJUSTED AREA OF DISTURBANCE (OVERALL DISTURBED MINUS MAINTENANCE AREA): 23,083 SQFT OR 0.530 AC
EXISTING IMPERVIOUS AREA: 14,097 SQFT OR 0.324 AC, 61.1%
EXISTING PERVIOUS AREA (MANAGED TURF): 8,986 SQFT OR 0.206 AC, 38.9%
EXISTING PERVIOUS AREA (FOREST/OPEN SPACE): 0 SQFT OR 0 AC, 0%
PROPOSED IMPERVIOUS AREA: 9,471 SQFT OR 0.217 AC, 41.0%
PROPOSED PERVIOUS AREA (MANAGED TURF): 13,612 SQFT OR 0.313 AC, 59.0%
PROPOSED PERVIOUS AREA (FOREST/OPEN SPACE): 0 SQFT OR 0 AC, 0%
VICINITY MAP SCALE: 1"=1000'
PREPARED FOR:
CITY OF HAMPTON, VIRGINIA
22 LINCOLN STREET, 4TH FLOOR
HAMPTON, VA 23669
BY:
Kristin Kaszyca
X
THE PROFESSIONAL WHOSE SEAL IS AFFIXED TO THIS PLAN SHALL ACT
ON BEHALF OF THE OWNER AS "RESPONSIBLE LAND DISTURBER" FOR
THE PURPOSES OF PLAN REVIEW AND APPROVAL ONLY. PRIOR TO THE
ISSUANCE OF A LAND DISTURBING PERMIT, THE OWNER/DEVELOPER OR
CONTRACTOR SHALL PROVIDE A "CERTIFIED RESPONSIBLE LAND
DISTURBER" FOR THE CONSTRUCTION PHASE OF THE PROJECT AND
SHALL PROVIDE WRITTEN NOTIFICATION SHOULD THE "RESPONSIBLE
LAND DISTURBER" CHANGE DURING CONSTRUCTION.
The following person ________________ (print), is identified as the Responsible Land Disturber who will be in charge of and responsible for carrying out the land disturbing activity. This person meets the applicable requirements of Virginia Code Section 62.1-44.15:52 and 62.1-44.15:55 by virtue of the following (check the category that applies):
Responsible land disturber certificate DCR / DEQ certification for combined administrator, administrator reviewer, inspector or contractor VA professional engineer, land surveyor, landscape architect, or architect.
Award of the contract will relieve the above signer of all responsibility.
PROPERTY SHOWN ON THIS PLAN IS NOT LOCATED WITHIN THE
CHESAPEAKE BAY PRESERVATION AREA (CBPA)
FLOOD ZONE
PROPERTY SHOWN ON THIS PLAN APPEARS TO LIE WITHIN FLOOD ZONE
"X" AS SHOWN ON THE FEMA FLOOD BOUNDARY MAP 5155270017H, DATED
MAY 16, 2016
SPECIAL FLOOD HAZARD AREAS - N/A
AREA OF MINIMUM PAVEMENT MARKING ERADICATION AND
REPLACEMENT APPEARS TO LIE WITHIN FLOOD ZONE "AE" AS SHOWN ON
THE FEMA FLOOD BOUNDARY MAP 5155270017H DATED MAY 16, 2016
PINE CHAPEL ROAD CORRIDOR
IMPROVEMENTS UPC 120901
OWNER
CITY OF HAMPTON VIRGINIA
ENGINEERING SERVICES
22 LINCOLN STREET 4TH FLOOR
HAMPTON, VA 23669
PHONE 757-727-6346
FAX 757-726-2829
CIVIL ENGINEER
ATCS
KRISTIN KASZYCA, PE
690 TOWN CENTER DR, SUITE 201
NEWPORT NEWS, VA 23606
PHONE 757-504-2976
FAX 757-637-0276
690 TOWN CENTER DRIVE, SUITE 201
NEWPORT NEWS, VIRGINIA 23606
(757) 504-2976 FAX (757) 637-0276 WWW.ATCS.COM
CLIENT - EMPLOYEE - COMPANY - COMMUNITY
SU
R
VE
YE
D B
Y, D
AT
E
D
ES
IG
N
B Y
SU
BS
U R
FA
C
E U
TI
LI
TY
B
Y, D
AT
E
PR
O
JE
C
T M
AN
AG
ER
100% SUBMISSION
MAY 26, 2026
OF01GI001 77
TRAFFIC DESIGN INFORMATION AND VOLUMES BASED ON VDOT TRAFFIC VOLUMES.
THE VEHICLE CLASSIFICATION ESTIMATES WERE OBTAINED FROM AVAILABLE VDOT
TRAFFIC DATA.
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
6-2-26
Suheir Diyab6-2-26
COLISEUM DRIVE
PIN
E C
HA
PE
L R
OAD
PINE CHAPEL ROAD
COMMERCE DRIVE
COLISEUM DRIVE
SAVILLE ROW
VF
CD
CP
CM
CU
VF102
CD102
CP102
CM102
CU102
VF104
CD104
CP104
CM104
CU104
VF103
CD103
CP103
CM103
CU103
VF105
CD105
CP105
CM105
CU105
VF106
CD106
CP106
CM106
CU106
VF107
CD107
CP107
CM107
CU107
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
SH
EE
T
IN
D
EX
A N
D L
AY
O
U T
GI002
05/26/2026 004364.001
KMK
AUTHOR
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
SHEET LIST TABLE
SHEET
NUMBER SHEET TITLE SHEET DESCRIPTION
01 GI001 COVER SHEET
02 GI002 SHEET INDEX AND LAYOUT
03 GI003 LEGEND AND ABBREVIATIONS
04 GI004 GENERAL NOTES
05 GI005 SEQUENCE OF CONSTRUCTION
06 GI006 EROSION AND SEDIMENT CONTROL NOTES
07 GI007 EROSION AND SEDIMENT CONTROL NARRATIVE
08 VF101 EXISTING CONDITIONS PLAN
09 VF102 EXISTING CONDITIONS PLAN
10 VF103 EXISTING CONDITIONS PLAN
11 VF104 EXISTING CONDITIONS PLAN
12 VF105 EXISTING CONDITIONS PLAN
13 VF106 EXISTING CONDITIONS PLAN
14 VF107 EXISTING CONDITIONS PLAN
15 VF600 EXISTING CONDITIONS INVENTORY
16 CD101 DEMOLITION AND EROSION CONTROL PLAN
17 CD102 DEMOLITION AND EROSION CONTROL PLAN
18 CD103 DEMOLITION AND EROSION CONTROL PLAN
19 CD104 DEMOLITION AND EROSION CONTROL PLAN
20 CD105 DEMOLITION AND EROSION CONTROL PLAN
21 CD106 DEMOLITION AND EROSION CONTROL PLAN
22 CD107 DEMOLITION AND EROSION CONTROL PLAN
23 CD501 DEMOLITION AND EROSION CONTROL DETAILS
24 CP101 ROADWAY PLAN
25 CP102 ROADWAY PLAN
26 CP103 ROADWAY PLAN
27 CP104 ROADWAY PLAN
28 CP105 ROADWAY PLAN
29 CP106 ROADWAY PLAN
30 CP107 ROADWAY PLAN
31 CP201 ENTRANCE PROFILES
32 CP301 TYPICAL SECTIONS
33 CP302 TYPICAL SECTIONS
34 CP303 TYPICAL SECTIONS
SHEET LIST TABLE
SHEET
NUMBER SHEET TITLE SHEET DESCRIPTION
35-46 CP304-CP315 CROSS SECTIONS - PINE CHAPEL ROAD
47 CP410 CURB RAMP GRADING DETAILS
48 CP411 CURB RAMP GRADING DETAILS
49 CP412 CURB RAMP GRADING DETAILS
50 CP413 CURB RAMP GRADING DETAILS
51 CP414 CURB RAMP GRADING DETAILS
52 CP501 ROADWAY PLAN DETAILS
53 CP601 VEHICLE TURNING MOVEMENTS
54 CP602 VEHICLE TURNING MOVEMENTS
55 CM101 PAVEMENT MARKING AND SIGNAGE PLAN
56 CM102 PAVEMENT MARKING AND SIGNAGE PLAN
57 CM103 PAVEMENT MARKING AND SIGNAGE PLAN
58 CM104 PAVEMENT MARKING AND SIGNAGE PLAN
59 CM105 PAVEMENT MARKING AND SIGNAGE PLAN
60 CM106 PAVEMENT MARKING AND SIGNAGE PLAN
61 CM107 PAVEMENT MARKING AND SIGNAGE PLAN
62 CM501 PAVEMENT MARKING AND SIGNAGE DETAILS
63 CM502 TRAFFIC CONTROL NOTES AND DETAILS
64 CM503 TRAFFIC CONTROL NOTES AND DETAILS
65 CM504 TRAFFIC CONTROL NOTES AND DETAILS
66 CM505 TRAFFIC CONTROL NOTES AND DETAILS
67 CU101 UTILITY PLAN - STORM
68 CU102 UTILITY PLAN - STORM
69 CU103 UTILITY PLAN - STORM
70 CU104 UTILITY PLAN - STORM
71 CU105 UTILITY PLAN - STORM
72 CU106 UTILITY PLAN - STORM
73 CU107 UTILITY PLAN - STORM
74 CU501 UTILITY PLAN DETAILS
75 SG101 SIGNAL PLAN - PINE CHAPEL AND COLISEUM
76 SG102 SIGNAL NOTES, SIGNAL POLE & CONTROLLER
LEGEND, AND CABLE & CONDUIT LEGEND
77 SG201 SIGNAL PLAN - PINE CHAPEL AND SAVILLE ROW
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
GI003
05/26/2026 004364.001
KMK
AUTHOR
LE
G
EN
D
A N
D A
BB
R
EV
IA
TI
O
N S
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
LEGEND ABBREVIATIONS
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
GI004
05/26/2026 004364.001
KMK
AUTHOR
G
EN
ER
AL
N O
TE
S
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
1. CONTRACTOR TO CONTROL EROSION AND SEDIMENTATION IN
ACCORDANCE WITH THE VIRGINIA STORMWATER MANAGEMENT
HANDBOOK AND HAVE A COPY ON-SITE AT ALL TIMES. THE MINIMUM
E&SC MEASURES ARE SHOWN ON THESE PLANS. DUE TO THE NATURE
OF THIS PROJECT IT WILL BE LEFT UP TO THE JUDGEMENT OF THE
CITY E&SC INSPECTOR WHERE AND WHEN ADDITIONAL SILT FENCE
AND OTHER E&S MEASURES NOT SHOWN ON THE CONSTRUCTION
DOCUMENTS SHALL BE PLACED AND REMOVED DURING THIS PROJECT.
PHASE ONE EROSION AND SEDIMENT CONTROL MEASURES ARE
LOCATED ON THE DEMOLITION PLAN SHEETS. CONTRACTOR TO
PROVIDE APPROPRIATE INLET PROTECTION ON ALL EXISTING AND
PROPOSED STORM STRUCTURES UNTIL SITE IS ESTABLISHED.
2. THE RESPONSIBLE LAND DISTURBER SHOWN ON THE COVER SHEET
SHALL ONLY SERVE AS THE LAND DISTURBER DURING PLAN REVIEW.
UPON AWARD OF THE CONTRACT, THE CONTRACTOR SHALL SUBMIT
THE NAME OF THE RESPONSIBLE LAND DISTURBER.
3. CONTRACTOR TO DISPOSE OF ALL CONSTRUCTION DEBRIS AND
MATERIAL IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL
REGULATIONS.
4. ALL SITE CONCRETE SHALL CONFORM TO VDOT CLASS A3 WITH A
MAXIMUM 5%-7% AIR ENTRAINMENT UNLESS OTHERWISE SHOWN ON
PLANS.
5. ALL SIGNAGE THAT IS TO BE REMOVED AND SAVED FOR RELOCATION
SHALL BE MAINTAINED ON SITE. CONTRACTOR SHALL BE
RESPONSIBLE FOR REPLACEMENT COSTS IF DAMAGED. ALL SIGNAGE
THAT IS TO BE REMOVED PERMANENTLY IS TO BE RETURNED TO
TRAFFIC ENGINEERING AND OPERATIONS DIVISION.
6. THE INCLUDED PAVEMENT MARKING PLAN IS AN OVERALL
"CONCEPTUAL" PAVEMENT MARKING PLAN. EXISTING PAVEMENT
MARKINGS SHALL BE FIELD VERIFIED AND MODIFIED ACCORDINGLY TO
ACCOMMODATE PROPOSED IMPROVEMENTS AND SUPPORTING
PAVEMENT MARKINGS IN RELATIONSHIP TO THIS "CONCEPTUAL" PLAN.
ANY EXISTING MARKINGS THAT ARE REQUIRED TO BE ADJUSTED DUE
TO CONSTRUCTION ACTIVITIES SHALL BE COMPLETELY ERADICATED
PRIOR TO PLACEMENT OF NEW MARKINGS.
7. CONTRACTOR SHALL NOT RUN CONSTRUCTION TRAFFIC ON
SUBGRADE EXCEPT IN DESIGNATED LOCATIONS. ON-SITE HAUL
ROUTES SHALL BE APPROVED BY DEPARTMENT OF PUBLIC WORKS.
SELECT MATERIAL AND CRUSHED STONE SHALL BE END-DUMPED AND
PUSHED INTO PLACE. RUBBER MOUNTED EQUIPMENT SHALL NOT BE
USED. TRACK MOUNTED EQUIPMENT SHALL BE REQUIRED. PUMPING
OF SUBGRADE DUE TO CONTRACTOR'S POOR CONSTRUCTION
OPERATIONS SHALL BE UNDERCUT AND BACKFILLED WITH SELECT
MATERIAL BY THE CONTRACTOR AT HIS OWN EXPENSE.
8. ALL STORM DRAIN PIPE SHALL BE REINFORCED CONCRETE PIPE (RCP)
CONFORMING TO ASTM C 76 CLASS III STORM DRAIN PIPE. ALL PIPES
WITH LESS THAN 2' COVER SHALL BE CLASS IV STORM DRAIN PIPE.
9. ANY EXISTING OR PROPOSED DOMINION ENERGY INFRASTRUCTURE
(I.E. STREET LIGHTS AND ASSOCIATED ELECTRICAL CONDUIT, WIRING,
ETC.) TO BE MODIFIED OR INSTALLED DURING THIS PROJECT ARE TO
BE PERFORMED BY DOMINION ENERGY WITH COORDINATION
THROUGH THE DEPARTMENT OF PUBLIC WORKS, TRAFFIC AND
OPERATIONS DIVISION. CONTRACTOR SHALL COORDINATE WITH THE
CITY OF HAMPTON AND DOMINION ENERGY DURING CONSTRUCTION
FOR ANY SCHEDULING CONFLICTS. EXISTING STREET LIGHTING
LEVELS SHALL BE MAINTAINED DURING CONSTRUCTION.
CONTRACTOR SHALL INSTALL TEMPORARY LIGHTING AS NECESSARY
TO MAINTAIN LIGHTING LEVELS.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED PORTLAND
CEMENT CONCRETE MATERIALS TESTING PERFORMED BY AN
INDEPENDENT TESTING LAB. CONTRACTOR SHALL FURNISH ALL
CONCRETE TESTING DATA TO THE CITY FOR APPROVAL.
11. CONTRACTOR MUST COORDINATE WITH CITY ENGINEER AND ANY
OTHER CONTRACTOR PERFORMING WORK ON OTHER PROJECTS
WITHIN THIS PROJECT AREA.
12. AS PART OF THIS CONTRACT, THE CONTRACTOR SHALL FURNISH 3
COMPLETE SETS OF RECORD DRAWINGS, INCLUDING AUTOCAD FILES,
TO THE CITY OF HAMPTON, DEPARTMENT OF PUBLIC WORKS,
ENGINEERING SERVICES DIVISION PRIOR TO PROJECT COMPLETION.
13. METHODS OF CONSTRUCTION: UNLESS OTHERWISE NOTED OR
SHOWN, THESE DRAWINGS AND SPECIFICATIONS DO NOT INDICATE
MEANS AND METHODS OF CONSTRUCTION. THE CONTRACTOR SHALL
SUPERVISE AND DIRECT THE WORK, AND BE SOLELY RESPONSIBLE
FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES,
SEQUENCES, PROCEDURES AND SAFE WORK PRACTICES.
14. ALL ENTRANCES AFFECTED BY THIS PROJECT MUST HAVE TRAFFIC
CONTROL DEVICES IN PLACE AND CITIZENS MUST HAVE SAFE ACCESS
TO PRIVATE PROPERTY AT ALL TIMES THROUGHOUT THE DURATION
OF THIS PROJECT.
15. THE CITY ENGINEER OR THEIR AUTHORIZED REPRESENTATIVE SHALL
STOP ALL SITE CONSTRUCTION, IMPROVEMENTS AND/OR
ALTERATIONS IN THE EVENT OF ANY DEVIATION FROM THE APPROVED
PLAN OR ON THE DISCOVERY OF UNEXPECTED ADVERSE IMPACTS OF
THE DEVELOPMENT ACTIVITY ON ADJACENT PROPERTY OR PUBLIC
FACILITIES.
16. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AS APPLICABLE TO
THE CITY ENGINEER FOR REVIEW.
17. ALL WATER MAIN CONSTRUCTION SHALL BE PERFORMED BY A
CONTRACTOR ON NEWPORT NEWS WATERWORKS APPROVED
CONTRACTORS LIST. THE CONTRACTOR SHALL FIELD LOCATE THE
NEW WATER MAINS BEFORE COVERING THE TRENCH AND PROVIDE
THIS AS-BUILT INFORMATION TO WATERWORKS. AS-BUILT DRAWINGS
SHALL DETAIL THE WATER LINE AS REQUIRED BY WATERWORKS.
PAYMENT FOR WATERLINE INSTALLATION WILL NOT BE RECEIVED
UNTIL ALL TESTING AND INFORMATION IS SATISFACTORILY PROVIDED
BY THE CONTRACTOR TO WATERWORKS. 2-YEAR BONDS ARE ALSO
REQUIRED BY WATERWORKS.
18. AS-BUILT SANITARY SEWER, STORM SEWER AND ROADWAY DRAWINGS
ARE TO BE SUBMITTED TO THE CITY OF HAMPTON, DEPARTMENT OF
PUBLIC WORKS, ENGINEERING SERVICES DIVISION FOR APPROVAL.
19. CONTRACTOR SHALL CONTACT NEWPORT NEWS WATERWORKS TO
OBTAIN THE APPROVED WORKING DRAWINGS FOR THE
CONSTRUCTION OF NEW WATER LINES AND/OR PLACEMENT OF NEW
WATER LINES. WATERLINES SHOWN ON THESE PLANS ARE FOR
REFERENCE PURPOSE ONLY.
20. PRIVATE FRANCHISE UTILITIES THAT NEED TO BE RELOCATED WILL BE
PERFORMED BY THE INDIVIDUAL UTILITY COMPANIES. CONTRACTOR
SHALL COORDINATE WITH THESE PRIVATE FRANCHISE UTILITIES
DURING CONSTRUCTION FOR ANY SCHEDULING CONFLICTS.
21. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL SEPARATION BETWEEN
WATER AND SANITARY SEWER MAINS. IF THE 10 FEET OF HORIZONTAL
SEPARATION CANNOT BE OBTAINED THE SANITARY SEWER LINE SHALL
BE DUCTILE IRON, IN ACCORDANCE WITH THE NNWW DISTRIBUTION
STANDARDS.
22. MAINTAIN 18" VERTICAL SEPARATION BETWEEN THE OUTSIDE OF THE
WATER MAIN AND THE OUTSIDE OF ANY SANITARY SEWER CROSSING.
THE WATER MAIN SHALL CROSS ABOVE THE SANITARY SEWER. WHEN
IT IS IMPOSSIBLE TO OBTAIN THE MINIMUM SPECIFIED SEPARATION
DISTANCES, THE CITY OF NEWPORT NEWS MUST SPECIFICALLY
APPROVE THE VARIANCE FROM THE REQUIREMENTS. ANY CROSSING
LESS THAN 18" VERTICAL SEPARATION SHALL BE DUCTILE IRON.
23. ALL WATER VALVES, METER BOXES, METERS, FIRE HYDRANTS AND
OTHER WATER SYSTEM FITTINGS REMOVED SHALL BE TURNED OVER
TO NNWW.
24. ALL PVC SANITARY SEWER PIPE AND FITTINGS SHALL BE ASTM 3034
SDR 26. ALL DUCTILE IRON SANITARY SEWER PIPE SHALL BE MINIMUM
THICKNESS CLASS 52.
25. ALL SANITARY SEWER PIPES PLACED BELOW 10 FEET IN COVER OR
LESS THAN 3 FEET IN COVER SHALL BE DUCTILE IRON.
26. THERE SHALL BE NO STORM SEWER CONNECTION TO THE SANITARY
SEWER SYSTEM.
27. CONTRACTOR TO BACKFILL ALL UTILITY TRENCHES (WATER, STORM,
SANITARY) WITHIN THE ROADWAY WITH SELECT BACKFILL. (MIN CBR
20)
28. STOCKPILES ARE NOT ANTICIPATED FOR THIS PROJECT. IF THE
CONTRACTOR DEEMS A STOCKPILE NECESSARY, THEN ERODIBLE
STOCKPILED MATERIAL SHALL BE PROTECTED WITH PERIMETER
CONTROLS. AS PER MINIMUM STANDARD 1, APPLY TEMPORARY
STABILIZATION TO STOCKPILES WITHIN 7 DAYS IF IT WILL REMAIN
DORMANT FOR MORE THAN 14 DAYS.
29. THE PERMITTEE OR QUALIFIED REPRESENTATIVE SHALL MONITOR
AND TAKE PRECAUTIONS TO CONTROL DUST AND OTHER AIR
POLLUTANTS, SUCH AS BY LIMITING THE NUMBER OF VEHICLES
ALLOWED ONSITE, MINIMIZING THE OPERATING SPEED OF ALL
VEHICLES, ETC.
30. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD
SURFACE, THE ROAD SURFACE WILL BE CLEANED THOROUGHLY AT
THE END OF EACH DAY, AT A MINIMUM. SEDIMENT IS TO BE REMOVED
FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED
TO A SEDIMENT CONTROL DISPOSAL AREA ON-SITE. STREET WASHING
WILL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS
MANNER.
31. THE CONTRACTOR SHALL RESTORE ALL PUBLIC RIGHTS OF WAY AND
DISTURBED AREAS TO PRE-CONSTRUCTION CONDITION OR BETTER.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE
INCURRED DURING THE PROJECT AT NO ADDITIONAL COST TO THE
OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE
TO PROPERTY, PUBLIC OR PRIVATE, DURING CONSTRUCTION. REPAIR
AND REPLACE WITH MATCHING MATERIALS OF WALKS, DRIVEWAYS,
DITCHES, LANDSCAPING, ETC. THAT ARE DAMAGED AS A RESULT OF
CONSTRUCTION ACTIVITIES.
PROJECT SPECIFIC NOTESCITY OF HAMPTON GENERAL CONSTRUCTION NOTES
1. ALL WORK ON CITY RIGHT-OF-WAY WILL REQUIRE A SEPARATE PERMIT
FROM THE COMMUNITY DEVELOPMENT DEPARTMENT - DEVELOPMENT
SERVICES CENTER. ALL CONSTRUCTION WITHIN PUBLIC
RIGHTS-OF-WAY AND IMPROVEMENTS THAT ARE TO BE PUBLIC OR
PRIVATE INFRASTRUCTURE SHALL CONFORM TO CITY OF HAMPTON
SPECIFICATIONS AS SET FORTH IN THE PUBLIC WORKS DESIGN &
CONSTRUCTION STANDARDS AND THE DEPARTMENT OF PUBLIC WORKS
UTILITY POLICY IN EFFECT AT THE TIME OF PLAN APPROVAL.
2. PER THE CITY OF HAMPTON UTILITY POLICY WORK WILL BE PERFORMED
ON RESTRICTED STREETS BETWEEN THE HOURS OF 8:30AM - 4:00PM
AND 6:00PM - 6:00AM. LANE CLOSURES WILL BE RESTRICTED TO ONE
LANE AND TWO-WAY TRAFFIC WILL BE MAINTAINED AT ALL TIMES. SEE
THE CITY OF HAMPTON UTILITY POLICY FOR THE LIST OF RESTRICTED
STREETS.
3. PRIVATE SIGN STRUCTURES DEPICTED ON THIS PLAN ARE NOT
APPROVED AS TO DESIGN OR LOCATION. ALL PROPOSED PRIVATE
SIGNS AND THEIR LOCATIONS ARE SUBJECT TO A PERMITTING AND
INSPECTIONS PROCESS ADMINISTERED BY THE CITY OF HAMPTON
COMMUNITY DEVELOPMENT DEPARTMENT. FOR MORE INFORMATION
CALL (757)728-2444.
4. A LAND DISTURBING PERMIT MUST BE ISSUED BEFORE CONSTRUCTION
MAY BEGIN. CONTACT THE COMMUNITY DEVELOPMENT DEPARTMENT -
DEVELOPMENT SERVICES CENTER TO OBTAIN THIS PERMIT. EROSION
AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED,
INSPECTED AND APPROVED PRIOR TO THE ISSUANCE OF THE BUILDING
PERMIT. INSPECTIONS SHALL BE COORDINATED THROUGH THE CITY OF
HAMPTON DEPARTMENT OF PUBLIC WORKS. FOR INFORMATION OR TO
SCHEDULE AN INSPECTION CALL (757)727-8311.
5. A RESPONSIBLE LAND DISTURBER IS REQUIRED TO OBTAIN LAND
DISTURBING PERMITS.
6. A VSMP PERMIT SHALL BE OBTAINED WHEN LAND DISTURBED IS
GREATER THAN 2500 SQUARE FEET IF THE PROJECT IS LOCATED IN THE
CHESAPEAKE BAY PRESERVATION DISTRICT (CBPD) OR 1 ACRE OUTSIDE
OF CBPD.
7. PRIOR TO THE FINAL EROSION AND SEDIMENT CONTROL INSPECTION,
THE DEVELOPER SHALL PROVIDE A CERTIFIED AS-BUILT FOR THE
PROPOSED BMP.
8. ALL UNDERGROUND PIPE SYSTEMS (I.E., STORM, SANITARY, WATER
DISTRIBUTION) ON PRIVATE PROPERTY, OUTSIDE OF UTILITY
EASEMENTS, SHALL BE INSTALLED IN CONFORMANCE WITH THE
INTERNATIONAL PLUMBING CODE, AS AMENDED.
9. ALL PUBLIC SANITARY SEWER FACILITIES SHOWN ON THIS PLAN ARE
DESIGNED IN ACCORDANCE WITH THE REGIONAL DESIGN GUIDELINES.
10. SITE LIGHTING SHALL BE A MINIMUM OF ½ FOOT-CANDLE POWER,
MEASURED AT GRADE. ANY SITE LIGHTING STRUCTURE IN EXCESS OF
FOURTEEN FEET (14') IN HEIGHT SHALL BE BUILT UPON AN ENGINEERED
FOUNDATION SYSTEM IN ACCORDANCE WITH A VALID CITY OF HAMPTON
BUILDING PERMIT.
11. THIS SITE MAY BE SUBJECT TO THE VIRGINIA OVERHEAD HIGH-VOLTAGE
LINE SAFETY ACT. CONTRACTORS MUST CALL THE UTILITY TO MAKE
SAFETY ARRANGEMENTS (DOMINION'S NUMBER IS 1-888-667-3000)
BEFORE WORKING WITHIN THE 10 -FOOT SAFETY ZONE. NO WORK CAN
BE STARTED UNTIL APPROPRIATE SAFETY MEASURES ARE COMPLETED.
12. WATER SERVICE AND SEWER LATERALS MUST HAVE A MINIMUM
SEPARATION OF TEN FEET (10'). SANITARY SEWER CLEANOUTS MUST
BE LOCATED OUTSIDE OF THE DRIVEWAY APRONS AND SIDEWALK. ANY
CLEANOUTS FOUND IN SUCH LOCATIONS SHALL BE RELOCATED BY THE
DEVELOPER PRIOR TO ACCEPTANCE OF THE IMPROVEMENTS BY THE
CITY. METER BOXES CANNOT BE LOCATED IN DRIVEWAYS APRONS OR
SIDEWALKS.
13. GREEN AREAS SHALL CONSIST OF EARTH CAPABLE OF SUSTAINING
PLANT MATERIALS AND PROVIDING NATURAL PERCOLATION OF WATER.
GREEN AREAS SHALL NOT BE USED TO STORE MATERIALS, PRODUCTS
OR EQUIPMENT.
14. ALL REQUIRED LANDSCAPE ELEMENTS (EXISTING TO BE RETAINED
AND/OR PROPOSED), AS SPECIFIED ON THE APPROVED LANDSCAPE
PLAN, SHALL BE PROVIDED BY THE DEVELOPER AND ACCEPTED BY THE
CITY OF HAMPTON'S LANDSCAPE SERVICES COORDINATOR OR BONDED
FOR INSTALLATION BY THE DEVELOPER PRIOR TO CITY ISSUANCE OF
ANY BUILDING OCCUPANCY CERTIFICATE. FOR MORE INFORMATION
CONTACT (757) 728-2444 OR (757)727-6075 TO SCHEDULE A
LANDSCAPING INSTALLATION INSPECTION.
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
GI005
05/26/2026 004364.001
KMK
AUTHOR
SE
Q
U
EN
C E
O F
C O
N
ST
R U
C
TI
O N
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
ANTICIPATED SEQUENCE OF CONSTRUCTION
THE FOLLOWING SEQUENCE OF CONSTRUCTION IS GENERAL IN NATURE AND INTENDED
ONLY TO GIVE THE CONTRACTOR GENERAL GUIDANCE ON OVERALL CONSTRUCTION AND
MILESTONES. ACTUAL SEQUENCE OF CONSTRUCTION WILL BE SUBJECT TO THE
CONTRACTORS SCHEDULE, PHASING, LEAD TIMES, AND SPECIFIC MEANS AND METHODS
OF CONSTRUCTION. ANY DISCREPANCIES BETWEEN THIS OVERALL SEQUENCE OF
CONSTRUCTION AND THE CONTRACTOR'S ACTUAL SEQUENCE OF CONSTRUCTION SHALL
BE SUBMITTED TO AND APPROVED BY THE CITY OF HAMPTON PROJECT MANAGER. THIS
SEQUENCE OF CONSTRUCTION DOES NOT SUPERCEDE ANY OTHER SPECIFIC DIRECTION
OR REQUIREMENTS TO THE CONTRACTOR IN THE CONSTRUCTION PLANS OR BID
DOCUMENTS:
1. CONTRACTOR SHALL OBTAIN PLAN APPROVAL AND ALL APPLICABLE PERMITS,
INCLUDING, BUT NOT LIMITED TO, LAND DISTURBANCE PERMITS, AND RIGHT OF
WAY PERMITS. CONTRACTOR SHALL SUBMIT A TEMPORARY TRAFFIC CONTROL
PLAN IN COMPLIANCE WITH THE CURRENT EDITIONS OF THE VA WORK AREA
PROTECTION MANUAL AND THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
FOR REVIEW AND APPROVAL.
2. HOLD A PRE-CONSTRUCTION MEETING WITH DEPARTMENT OF ENGINEERING AND
CITY PROJECT MANAGER AT LEAST TWO WEEKS PRIOR TO STARTING
CONSTRUCTION. THE LOCATION OF THE CONSTRUCTION LAYDOWN AREA WILL BE
ESTABLISHED DURING THIS PRE-CONSTRUCTION MEETING. IF THE CONSTRUCTION
LAYDOWN AREA IS LOCATED OUTSIDE THE PROJECT LIMITS OF DISTURBANCE
SHOWN ON THIS PLAN AND BE USED TO STORE ERODIBLE MATERIALS, THE
CONTRACTOR WILL BE REQUIRED TO SUBMIT A SEPARATE PLAN AND APPLICATION
FOR A LAND DISTURBANCE PERMIT. EROSION AND SEDIMENT CONTROL MEASURES
WILL BE NECESSARY TO PROTECT THIS LAYDOWN AREA. EXISTING UTILITIES SHALL
BE MARKED AND LIMITS OF DISTURBANCE STAKED PRIOR TO THE
PRE-CONSTRUCTION MEETING.
3. SUBMIT HAUL ROUTE MAP AND PLAN TO CITY OF HAMPTON FOR REMOVAL OF ALL
DEBRIS AND SPOILS AND FOR ALL NEEDED MATERIALS.
4. CONTACT THE HAMPTON CUSTOMER CALL CENTER TO REQUEST ALL INSPECTIONS.
WHEN CALLING FROM A LANDLINE INSIDE HAMPTON, DIAL 311. WHEN CALLING
FROM A CELL PHONE OR A NUMBER OUTSIDE HAMPTON, CALL 757-717-8311.
CONTRACTOR SHALL HAVE THE FOLLOWING INFORMATION WHEN CALLING:
- PERMIT NUMBER
- SITE LOCATION ADDRESS
- TYPE OF INSPECTION
- CONTACT INFORMATION
- DATE/TIME OF INSPECTION
THE CONTRACTOR, OR THEIR REPRESENTATIVE SHALL BE PRESENT DURING ALL
INSPECTIONS. TYPICAL RESPONSE TIMES TO REQUEST FOR INSPECTIONS ARE
24-48 HOURS.
5. SUBMIT ALL SHOP DRAWINGS TO CITY PROJECT MANAGER FOR REVIEW AND
APPROVAL IN ACCORDANCE WITH THE BID DOCUMENTS
6. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH
THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK, LATEST EDITION PRIOR TO
ANY SITE DISTURBANCE. MAINTAIN COPY OF LAND DISTURBANCE PERMIT AND
APPROVED EROSION AND SEDIMENT CONTROL PLANS ON SITE AT ALL TIMES.
7. CONTACT THE CITY OF HAMPTON TO HAVE AN ENVIRONMENTAL SPECIALIST
INSPECT INSTALLED E&SC MEASURES AND TO SIGN LAND DISTURBANCE PERMIT
PRIOR TO COMMENCING ANY LAND DISTURBANCE ACTIVITIES.
8. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT A
MINIMUM FREQUENCY OF (I) AT LEAST ONCE EVERY FOUR BUSINESS DAYS OR (II)
AT LEAST ONCE EVERY FIVE BUSINESS DAYS AND NO LATER THAN 24 HOURS
FOLLOWING A MEASURABLE STORM EVENT. NEEDED REPAIRS SHALL BE DONE
IMMEDIATELY.
9. INSTALL ALL TEMPORARY TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH
THESE PLANS AND ALL APPLICABLE TRAFFIC CONTROL REQUIREMENTS.
10. CONSTRUCT PROPOSED WATER INFRASTRUCTURE, AND STORM SEWER
INFRASTRUCTURE WITH APPROPRIATE INLET & OUTLET PROTECTION. ALL UTILITY
TRENCHES IN THE ROADWAY SHALL BE PATCHED WITH AN ASPHALT PATCH IN
ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS. ANY UTILITY TRENCHES IN
THE SIDEWALK CAN BE TEMPORARILY PATCHED WITH GRAVEL DURING
CONSTRUCTION AND APPROPRIATE SIGNAGE INSTALLED DENOTING CLOSED
SIDEWALKS.
11. NO MORE THAN ONE ADJACENT FIRE HYDRANT SHALL BE OUT OF SERVICE AT ANY
GIVEN TIME.
12. REMOVE OR ABANDON THOSE PIPES OR SEWERLINES DENOTED IN THE
CONSTRUCTION DOCUMENTS AS NECESSARY DURING UTILITY CONSTRUCTION.
13. CONTRACTOR TO COORDINATE WITH ALL PRIVATE UTILITY COMPANY CONTACTS
ON INSTALLATION OR RELOCATION OF PRIVATE UTILITIES.
14. EXISTING STREET LIGHTS WITH OVERHEAD POWER SHALL BE MAINTAINED DURING
CONSTRUCTION. ANY CONFLICTS BETWEEN THE EXISTING OVERHEAD LIGHTS AND
THE PROPOSED CONSTRUCTION SHALL BE COORDINATED BETWEEN THE
CONTRACTOR, CITY TRANSPORTATION DIVISION, AND DOMINION ENERGY.
REQUESTS TO DISCONNECT OR REMOVE THE EXISTING OVERHEAD LIGHTS SHALL
BE MADE BY THE CITY TRANSPORTATION DIVISION AS COORDINATED WITH THE
CONTRACTOR.
15. ALL NEW LIGHT POLE FOUNDATIONS, HANDHOLES, JUNCTION BOXES, OR OTHER
SURFACE FEATURES SHALL BE INSTALLED AT THE APPROPRIATE GRADES TO BE
FLUSH WITH THE PROPOSED FINAL GRADE DEPICTED IN THE CONSTRUCTION
DOCUMENTS.
16. PERFORM ALL DEMOLITION, CLEARING, AND GRUBBING AS SHOWN ON THE
APPROVED PLANS. COORDINATE THESE ACTIVITIES WITH THE CITY PROJECT
MANAGER. THE CONTRACTOR SHALL MAINTAIN AN ACTIVE AND SAFE PEDESTRIAN
PATH ON SIDEWALK (AT LEAST ONE SIDE OF PINE CHAPEL ROAD AND COLISEUM
DRIVE) FOR ENTIRE CORRIDOR. WHEN A SECTION OF SIDEWALK IS TO BE CLOSED,
CONTRACTOR SHALL INSTALL APPROPRIATE "SIDEWALK CLOSED" SIGNS ALERTING
PEDESTRIANS. PEDESTRIAN ACCESS SHALL BE MAINTAINED AT ALL TIMES TO
ACTIVE COMMERCIAL AND RESIDENTIAL PROPERTIES INCLUDING THE HAMPTON
CONVENTION CENTER.
17. APPLY TEMPORARY SEEDING WITHIN 7 DAYS TO DENUDED AREAS WHICH WILL NOT
BE BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 14 DAYS.
18. PHASE INSTALLATION OF ANY/ALL NEW UTILITY CONDUITS, JUNCTION BOXES, AND
HANDHOLES APPROPRIATELY WITH THE RECONSTRUCTION OF THE NEW
ROADWAY CURB, SIDEWALK, AND ENTRANCES.
19. CONSTRUCT ALL NEW SITEWORK, INCLUDING: SIDEWALK, RAISED MEDIAN,
TRUNCATED DOMES, CURB AND GUTTER, ENTRANCES, RELOCATED STORM SEWER
AND INLETS, AND PEDESTRIAN POLE FOUNDATIONS.
20. INSTALL TRAFFIC SIGNAL MODIFICATIONS AND CONDUIT ROUTING AS SHOWN ON
THE APPROVED PLANS.
21. ONCE ALL UTILITY CONSTRUCTION IS COMPLETE IN THE ROADWAY, REMOVE AND
REPLACE ASPHALT PAVEMENT IN ACCORDANCE WITH CONSTRUCTION
DOCUMENTS.
22. PLACE ALL FINAL PAVEMENT MARKINGS.
23. COMPLETE FINAL GRADING WITH TOPSOIL AND PLANTING MIX FOR PERMANENT
SEEDING.
i. SOIL STABILIZATION SHALL BE APPLIED WITHIN 7 DAYS AFTER FINAL GRADE
IS REACHED
ii. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED
AREAS NOT OTHERWISE STABILIZED.
24. INSTALL ALL STREET FURNITURE (INCLUDING BENCHES AND TRASH RECEPTACLES
WHERE APPLICABLE) AND SIGNAGE. COORDINATE SIGNAGE INSTALLATION WITH
CITY OF HAMPTON, TRAFFIC ENGINEERING AND OPERATIONS.
25. PLANT NEW LANDSCAPING AND SOD IN ACCORDANCE WITH THE CONSTRUCTION
DOCUMENTS.
26. WITHIN 30 DAYS OF THE SITE BEING FULLY STABILIZED, AND AFTER APPROVAL IS
OBTAINED FROM THE CITY INSPECTOR, REMOVE ALL TEMPORARY EROSION AND
SEDIMENT CONTROL MEASURES INCLUDING INLET PROTECTION. REESTABLISH
ANY REMAINING DISTURBED AREAS INCLUDING LAYDOWN AREAS OR STOCKPILE
AREAS.
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
GI006
05/26/2026 004364.001
KMK
AUTHOR
ER
O
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L N
O
TE
S
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
P
N/A
P
P
P
P
P
P
P
N/A
N/A
N/A
P
P
N/A
P
P
N/A
N/A
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
GI007
05/26/2026 004364.001
KMK
AUTHOR
ER
O
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L N
AR
R
AT
IV
E
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
PROJECT DESCRIPTION
THIS PROJECT WILL ADD SIDEWALK AND PEDESTRIAN ACCOMMODATIONS TO THE SOUTH SIDE OF PINE CHAPEL ROAD BETWEEN COLISEUM DRIVE AND SAVILLE ROW TO FILL A GAP IN THE CURRENT SIDEWALK NETWORK. TO ACCOMPLISH THIS, A ROAD DIET WILL BE PERFORMED, AND THE PINE CHAPEL ROAD TYPICAL SECTION WILL BE MODIFIED FROM A 4-LANE UNDIVIDED ROADWAY SECTION TO A 3 LANE ROADWAY SECTION WITH 1 TRAVEL LANE IN EACH DIRECTION AND A TWO-WAY LEFT TURN LANE IN THE CENTER. INTERSECTION IMPROVEMENTS AND TURN LANE MODIFICATIONS WILL BE PROVIDED TO BOTH THE COLISEUM DRIVE AND SAVILLE ROW INTERSECTIONS. THE PROJECT WILL INCLUDE RAISED MEDIANS ON PINE CHAPEL ROAD, ADA COMPLIANT RAMPS, DECORATIVE CROSSWALKS, AND ACCOMMODATING PEDESTRIAN SIGNALS AT THE INTERSECTION OF PINE CHAPEL ROAD AND COLISEUM DRIVE; ADA COMPLIANT COMMERCIAL ENTRANCE CROSSINGS ON THE SOUTH SIDE OF PINE CHAPEL ROAD; AS WELL AS ADA RAMPS, CROSSWALKS, AND PEDESTRIAN SIGNALS AT THE INTERSECTION OF PINE CHAPEL ROAD AND SAVILLE ROW. MODIFICATIONS TO THE EXISTING UTILITY INFRASTRUCTURE AND EXISTING STORM SEWER SYSTEM WILL BE KEPT TO A MINIMUM. THE PROJECT AREA IS DEFINED AS THE PINE CHAPEL ROAD FROM APPROXIMATELY 200 LINEAR FEET WEST OF COMMERCE DRIVE TO THE BACK ENTRANCE TO THE HAMPTON ROADS CONVENTION CENTER PARKING LOT (APPROXIMATELY 400 LINEAR FEET EAST OF SAVILLE ROW). THE WORK WILL BE CONTAINED TO CITY RIGHT-OF-WAY OR PROPERTY AND CURRENT CITY EASEMENTS. THE TOTAL AREA OF DISTURBANCE FOR THIS PROJECT IS 0.9275 ACRES. OF THIS 0.9275 AC TOTAL AREA, 0.3976 AC IS EXISTING IMPERVIOUS AREA THAT IS CONSIDERED MAINTENANCE.
THE ADJUSTED AREA OF DISTURBANCE (MINUS THE AREA CONSIDERED MAINTENANCE) IS 0.5299 AC.
EXISTING CONDITIONS
PINE CHAPEL ROAD IS CURRENTLY A 4-LANE UNDIVIDED ROADWAY SECTION WITH A VARIABLE RIGHT-OF-WAY.
AT THE INTERSECTION OF COLISEUM DRIVE, PINE CHAPEL ROAD EASTBOUND HAS DUAL LEFT TURN LANES TO COLISEUM DRIVE NORTHBOUND, A RIGHT TURN LANE TO COLISEUM DRIVE SOUTHBOUND, AND WESTBOUND HAS A SINGLE LEFT TURN LANE TO COLISEUM DRIVE SOUTHBOUND. PINE CHAPEL ROAD CURRENTLY HAS A SIDEWALK ON THE NORTH SIDE WITH A SIDEWALK GAP ON THE SOUTH SIDE FROM THE INTERSECTION OF COLISEUM DRIVE TO THE ENTRANCE OF THE HAMPTON ROADS CONVENTION CENTER PARKING LOT EAST OF SAVILLE ROW. EXISTING DRAINAGE SHEET FLOWS ACROSS THE PAVEMENT TO THE GUTTER PAN AND IS COLLECTED VIA TWO EXISTING STORM SEWER SYSTEMS. ONE SYSTEM RUNS WEST, WEST DOWN PINE CHAPEL ROAD AND OUTFALLS INTO A DITCH THAT FLOWS TOWARD COLISEUM LAKE AND INTO THE SOUTHWEST BRANCH BACK RIVER. THE SECOND STORM SYSTEM FLOWS EAST DOWN PINE CHAPEL FROM THE INTERSECTION OF
SAVILLE ROW TOWARD NORTH ARMISTEAD AVENUE.
THE ENTIRE PROJECT AREA IS WITHIN THE SOUTHWEST BRANCH BACK RIVER DRAINAGE BASIN LOCATED IN THE
CITY OF HAMPTON.
SOIL INFORMATION
BASED ON THE USDA NRCS WEB SOIL SURVEY, THE EXISTING SOILS WITHIN THE LIMITS OF DISTURBANCE
CONSIST OF:
SOIL TYPE HYDROLOGIC SOIL GROUP PERCENT OF LOD
CHICKAHOMINY-URBAN LAND COMPLEX, 0-2% SLOPES D 58.4%
TOMOTLEY-URBAN LAND COMPLEX, 0-2% SLOPES B/D 35.8%
URBAN LAND UNRANKED 5.7%
ADJACENT PROPERTIES
THE ADJACENT PROPERTIES ALONG PINE CHAPEL ROAD AND COLISEUM DRIVE ARE ALL ZONED LIMITED COMMERCIAL (C2) EXCEPT FOR THE PARCEL TO THE WEST OF COMMERCE DRIVE ZONED AS MULTIPLE FAMILY RESIDENCE (MD-4), COLISEUM GARDEN APARTMENTS, LOCATED AT135 PINE CHAPEL ROAD, ZONED AS MULTIPLE RESIDENCE (R-M), AND THE THREE PARCELS LOCATED AT 179, 181 AND 183 PINE CHAPEL ROAD, ZONED AS ONE
FAMILY RESIDENCE (R-9).
OFF-SITE AREAS
THERE WILL BE NO OFF-SITE DISTURBED AREAS.
CRITICAL AREAS
THERE ARE NO CRITICAL AREAS AS THE PROJECT IS OUTSIDE OF THE CHESAPEAKE BAY PRESERVATION AREA
(CBPA)
EROSION AND SEDIMENT CONTROL MEASURES
THE CONTRACTOR SHALL CONSTRUCT AND MAINTAIN ALL MEASURES NECESSARY TO PREVENT SEDIMENT LADEN WATER FROM EXITING THE PROJECT AREA OR BEING TRACKED ONTO ADJACENT PROPERTIES OR
STREETS.
ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE LATEST EDITION OF THE "VDOT ROAD AND BRIDGE STANDARDS" AND THE "VIRGINIA STORMWATER MANAGEMENT HANDBOOK", LATEST
EDITION.
SILT FENCE (VDOT EC-5 & C-PCM-04) - SILT FENCE SEDIMENT BARRIERS WILL BE INSTALLED DOWNSLOPE OF DISTURBED AREAS TO FILTER SEDIMENT LADEN RUNOFF FROM SHEET FLOW. ANY ADDITIONAL SILT FENCE NOT SHOWN ON CONSTRUCTION DOCUMENTS REQUIRED MAY BE ADDED AT THE DISCRETION OF THE CITY EROSION AND SEDIMENT CONTROL INSPECTOR. SILT FENCE PLACED WITHIN RPA LIMITS SHALL BE WIRE
REINFORCED SILT FENCE.
INLET PROTECTION (VDOT EC-6) - INLET PROTECTION SHALL BE INSTALLED TO PREVENT SEDIMENT FROM
ENTERING STORM DRAINS OR STRUCTURES.
TEMPORARY SEEDING (C-SSM-09) - EXPOSED SOIL SURFACES THAT WILL NOT BE AT FINAL GRADE FOR MORE
THAN 14 DAYS SHALL BE STABILIZED WITH TEMPORARY SEEDING.
PERMANENT SEEDING (C-SCM-10) - ALL DISTURBED AREAS NOT OTHERWISE STABILIZED SHALL BE
STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINAL GRADING.
DEWATERING (C-SCM-10) - DEWATERING DEVICES WILL BE INSTALLED TO FILTER SEDIMENT-LADEN WATER
PRIOR TO THE WATER BEING DISCHARGED OFF-SITE.
TREE PROTECTION (C-SSM-01) - TREE PROTECTION FENCING WILL BE INSTALLED TO PROTECT DESIRABLE TREES FROM MECHANICAL AND OTHER INJURY DURING LAND DISTURBING AND CONSTRUCTION ACTIVITIES.
FENCING WILL BE INSTALLED AT THE DRIP LINE OF EXISTING TREES/TREELINE ANY ADDITIONAL TREE PROTECTION NOT SHOWN ON CONSTRUCTION DOCUMENTS MAY BE ADDED AT THE DISCRETION OF THE CITY.
MANAGEMENT STRATEGIES
1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AS A FIRST STEP, BEFORE ANY
LAND DISTURBING OPERATIONS.
2. CONTACT THE CITY OF HAMPTON TO HAVE AN ENVIRONMENTAL SPECIALIST INSPECT INSTALLED ESC
MEASURES AND TO SIGN THE LAND DISTURBANCE PERMIT PRIOR TO COMMENCING ANY LAND
DISTURBING ACTIVITIES.
3. CONSTRUCTION SHALL BE EXECUTED SO THAT GRADING OPERATIONS CAN BEGIN AND END AS QUICKLY
AS POSSIBLE.
4. THE CONTRACTOR'S PROJECT SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND
MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES.
5. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED IN ACCORDANCE WITH THE VAR10 AND AT A MINIMUM FREQUENCY OF (I) AT LEAST ONCE EVERY FOUR BUSINESS DAYS OR (II) AT LEAST ONCE EVERY FIVE BUSINESS DAYS AND NO LATER THAN 24 HOURS FOLLOWING A MEASURABLE
STORM EVENT.
6. WHERE CONSTRUCTION VEHICLES ACCESS PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO
MINIMIZE THE TRANSPORT OF SEDIMENT ONTO THE PAVED SURFACE. WHERE SEDIMENT IS
TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY
AFTER SEDIMENT IS REMOVED IN THIS MANNER.
SPECIFIC EROSION AND SEDIMENT CONTROL MEASURE MAINTENANCE AND REPAIRS:
SILT FENCE :
1. SILT FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING
PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
2. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING FROM END
RUNS AND UNDERCUTTING.
3. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED
PROMPTLY.
4. SEDIMENT DEPOSITS, TRASH, AND FLOATABLES SHOULD BE REMOVED AFTER EACH STORM EVENT.
THEY MAY BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE
BARRIER.
5. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED SHALL
BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED.
INLET PROTECTION:
1. THE STRUCTURE SHALL BE INSPECTED AT LEAST TWICE WEEKLY AND AFTER EACH SIGNIFICANT
RAINFALL EVENT AND REPAIRS MADE AS NEEDED.
2. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE.
3. CLEAN STORM DRAINAGE SYSTEM OF SEDIMENT AND DEBRIS BEFORE FINAL INSPECTION. STRUCTURES SHALL BE REMOVED, AND THE AREA STABILIZED WHEN THE REMAINING DRAINAGE AREA HAS BEEN
PROPERLY STABILIZED.
TEMPORARY SEEDING:
1. AREAS WHICH FAIL TO ESTABLISH VEGETATIVE COVER ADEQUATE TO PREVENT RILL EROSION WILL BE
RESEEDED AS SOON AS SUCH AREAS ARE IDENTIFIED.
PERMANENT SEEDING:
1. WHEN IT IS CLEAR THAT PLANTS HAVE NOT GERMINATED ON AN AREA OR HAVE DIED, THESE AREAS
MUST BE RESEEDED IMMEDIATELY TO PREVENT EROSION DAMAGE. PRIOR TO RESEEDING THE AREA, DETERMINE THE REASON GERMINATION DID NOT TAKE PLACE AND MAKE ANY CORRECTIVE ACTION
NECESSARY.
DEWATERING:
1. DEWATERING FILTERING DEVICES MUST BE INSPECTED FREQUENTLY AND REPAIRED OR REPLACED
ONCE THE SEDIMENT BUILD-UP PREVENTS THE STRUCTURE FROM FUNCTIONING AS DESIGNED. THE ACCUMULATED SEDIMENT WHICH IS REMOVED FROM A DEWATERING DEVICE MUST BE SPREAD ON-SITE AND STABILIZED OR DISPOSED OF AT AN APPROVED DISPOSAL SITE AS PER THE APPROVED PLAN.
TREE PROTECTION:
1. SOIL THAT HAS BECOME COMPACTED OVER THE ROOT ZONE OF ANY TREE SHALL HAVE THE GROUND
AERATED ACCORDING TO C-SSM-01 OF THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK, LATEST EDITION. ANY DAMAGE TO THE CROWN, TRUNK, OR ROOT SYSTEM OF ANY TREE RETAINED ON SITE
SHALL BE REPAIRED IMMEDIATELY.
EROSION AND SEDIMENT CONTROL NARRATIVE
PROJECT DECRIPTION
THE PINE CHAPEL ROAD CORRIDOR IMPROVEMENTS PROJECT ENCOMPASSES MODIFICATIONS TO ENHANCE THE MULTIPLE USERS OF THE PINE CHAPEL ROAD CORRIDOR. THE PROJECT BEGINS ALONG PINE CHAPEL WEST OF THE INTERSECTION WITH COLISEUM DRIVE AND RUNS APPROXIMATELY 1500 FT EAST TO JUST PAST SAVILLE ROW.
PROJECT ALSO RUNS SOUTH ALONG COLISEUM DRIVE. THE CORRIDOR IMPROVEMENT MODIFICATIONS INCLUDE THE REMOVAL OF ONE LANE BETWEEN COLISEUM AND SAVILLE TO PROVIDE SPACE FOR THE INCLUSION OF A 5' SIDEWALK ON THE SOUTH SIDE OF PINE CHAPEL. THIS WILL FILL A GAP IN THE EIXISTING CITY PEDESTRIAN NETWORK. THE PINE CHAPEL TYPICAL SECTION WILL BE RECONFIGURED TO INCLUDE ONE LANE IN EACH DIRECTION WITH A TWO WAY LEFT TURN CENTER LANE. INTERSECTION MODIFICATIONS, THE INCLUSION OF RAISED LANDSCAPE MEDIANS, COMPLIANT DIRECTIONAL ADA RAMPS, AND PEDESTRIAN SIGNAL IMPROVEMENTS ARE ALSO INCLUDED. SOME DRAINAGE MODIFICATIONS ARE NECESSARY DUE TO THE RELOCATION OF THE PINE CHAPEL
EXISTING CURB LINE. ALL WORK WILL BE COMPLETED WITHIN THE EXISTING RIGHT-OF-WAY.
EXISTING DRAINAGE PATTERNS
PINE CHAPEL ROAD CONSISTS OF TWO THROUGH LANES IN EACH DIRECTION AND HAS A VARIABLE WIDTH
RIGHT-OF-WAY.
PINE CHAPEL ROAD FROM WEST OF THE COLISEUM INTERSECTION TO APPROXIMATELY THE END OF THE CONVENTION CENTER PROPERTY SLOPES TO THE WEST WITH EXISTING DRAINAGE BEING COLLECTED IN THE EXISTING CURB & GUTTER AND CURB INLETS AND FLOWING WEST EVENTUALLY OUTFALLING TO AN EXISTING DITCH VIA A LARGE 58"X91" ELLIPTICAL PIPE. ROADWAY DRAINAGE IN FROM OF THE CONVENTION CENTER PROPERTY FLOWS TO THE EAST AND IS ALSO COLLECTED VIA EXISTING CURB & GUTTER AND CURB INLETS, PRIOR TO CONTINUING EAST ALONG PINE CHAPEL TO AN EXISTING OUTFALL NEAR N. ARMISTEAD AVENUE.
PROPOSED CONDITIONS
PROPOSED GRADING HAS BEEN DESIGNED TO FOLLOW THE SAME DRAINAGE PATTERNS AS EXISTING. ROADWAY HIGH AND LOW POINT LOCATIONS REMAIN THE SAME. EXISTING INLET STRUCTURES THAT WILL BE AFFECTED DUE TO THE CURB LINE SHIFT WILL BE REPLACED WITH MANHOLES OR YARD INLETS BEHIND THE PROPOSED SIDEWALK.
NEW CURB INLETS OR NEW SIDEWALK DRAINS (DUE TO THE PROXIMITY OF EXISTING WATER AND GAS MAINS ) WILL BE PLACED IN THE PROPOSED LOW SPOT LOCATIONS TO REPLACE THE COLLECTION POINT AND WILL CONNECT TO THE EXISTING STORM SEWER PIPE THAT WILL REMAIN IN PLACE. EXISTING OUTFALL LOCATIONS WILL REMAIN AS IS.
AT THE INTERSECTION OF PINE CHAPEL AND SAVILLE, THE ROADWAY DESIGN WILL REMOVE THE EXISTING VALLEY GUTTER TO PROVIDE A SMOOTHER APPROACH FOR VEHICULAR TRAFFIC. A NEW CURB INLET HAS BEEN PROVIDED
TO COLLECT THE SURFACE DRAINAGE ON THE UPSTREAM SIDE OF THE INTERSECTION.
STORMWATER QUALITY
A PORTION OF THIS PROJECT AREA QUALIFIES AS ROUTINE MAINTENANCE; PER VIRGINIA CODE §62.1-44.15:34 G.2, “ROUTINE MAINTENANCE THAT IS PERFORMED TO MAINTAIN THE ORIGINAL LINE AND GRADE, HYDRAULIC CAPACITY, OR ORIGINAL CONSTRUCTION OF THE PROJECT.” OVERALL AREAS, INCLUDING IMPERVIOUS/PERVIOUS BREAKDOWNS WERE CALCULATED FOR THE ENTIRE PROJECT AREA. THE AREA THAT QUALIFIES FOR MAINTENANCE WAS THEN REMOVED TO DETERMINE THE OVERALL ADJUSTED AREAS TO BE USED IN THE VSMP CALCULATIONS.
THE ADJUSTED PROJECT AREAS ARE INCLUDED IN THE STATISTICAL DATA SECTION ON THE COVER SHEET, GI001.
AS SHOWN ON SHEET GI001, THE ADJUSTED PROJECT AREA IS 0.53AC.
STORMWATER QUALITY COMPLIANCE IS NOT REQUIRED FOR LAND DISTURBANCE LESS THAN 1 ACRE OUTSIDE THE CHESAPEAKE BAY PRESERVATION DISTRICT (CBPD) AND LESS THAN 2,500 SQ FT WITHIN THE CBPA.
STORMWATER QUANTITY
THIS PROJECT AREA ULTIMATELY DRAINS TO THE SOUTHWEST BRANCH OF THE BACK RIVER.
CHANNEL PROTECTION: PROJECT WAS ANALYZED UTILIZING THE ENERGY BALANCE EQUATION:
Qdev = I.F. x [(Qpre x RVpre)/RVdev]
= 0.90 x [(1.502 x 1.068)/0.894] = 1.615 cfs ALLOWABLE
Qpost = 1.257 cfs < 1.615 cfs = CRITERIA MET
FLOOD PROTECTION: THE OUTFALL DOES NOT EXPERIENCE PRE-DEVELOPMENT LOCALIZED FLOODING DURING THE 10YR, 24 HR STORM AND THE PROPOSED DEVELOPMENT REDUCES THE POST DEVELOPMENT PEAK FLOW
THEREFORE SATISFYING THIS PROVISION.
SHEET FLOW: SINCE THIS PROJECT INCLUDES THE REMOVAL OF A VEHICLE LANE AND THE ADDITION OF SIDEWALK WHICH DRAINS TOWARDS THE ROADWAY GUTTER, THE RESULTING SHEET FLOW THAT WILL DRAIN OFFSITE REMAINS UNCHANGED AND IS ULTIMATELY VERY MINIMAL. EVERYTHING DRAINING TOWARDS THE ROADWAY WILL BE COLLECTED IN CURB AND GUTTER AND DIRECTED TO PROPOSED OR EXISTING STORM INLETS. THEREFORE, THIS
PROJECT WILL NOT IMPACT DOWN-GRADIENT PROPERTIES OR RESOURCES.
PROJECT STORMWATER SUMMARY
NOTES
LEGEND
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
VF101
05/26/2026 004364.001
KMK
AUTHOR
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
PL
AN
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
NOTES
LEGEND
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T
VF
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
VF102
05/26/2026 004364.001
KMK
AUTHOR
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
PL
AN
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T
VF
M
ATCHLINE - SEE SHEET VF101
NOTES
LEGEND
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
VF103
05/26/2026 004364.001
KMK
AUTHOR
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
PL
AN
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
M
ATC
H
LIN
E - SEE SH
EET VF102
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T
VF
MATCHLINE - SEE SHEET VF107
NOTES
LEGEND
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
VF104
05/26/2026 004364.001
KMK
AUTHOR
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
PL
AN
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
M
ATC
H
LIN
E - SEE SH
EET VF103
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T
VF
NOTES
LEGEND
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
VF105
05/26/2026 004364.001
KMK
AUTHOR
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
PL
AN
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T
VF
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T
VF
NOTES
LEGEND
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
VF106
05/26/2026 004364.001
KMK
AUTHOR
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
PL
AN
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T
VF
NOTES
LEGEND
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
VF107
05/26/2026 004364.001
KMK
AUTHOR
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
PL
AN
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T
VF
NOTES
LEGEND
EXISTING SIGN INVENTORY
EXISTING STORM STRUCTURES ADJACENT PROPERTY OWNERS
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
VF600
05/26/2026 004364.001
KMK
AUTHOR
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
IN
VE
N
TO
R
Y
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
NOTES
KEYNOTES
LEGEND
1. ALL PHASE 2 E&SC MEASURES (INLET
PROTECTION, SILT FENCE, TREE PROTECTION,
ETC) SHALL BE FULLY MAINTAINED UNTIL SITE
IS FULLY STABILIZED.
2. ELEMENTS TO BE DEMOLISHED OR REMOVED
SHOWN DARKENED.
3. ALL SIGNAGE THAT IS REMOVED AND SAVED
FOR RELOCATION SHALL BE MAINTAINED ON
SITE. CONTRACTOR SHALL BE RESPONSIBLE
FOR REPLACEMENT COSTS IF DAMAGED. ALL
SIGNAGE TO BE REMOVED PERMANENTLY
SHALL BE RETURNED TO CITY OF HAMPTON,
TRAFFIC ENGINEERING AND OPERATIONS.
4. APPLY TEMPORARY SEEDING WITHIN 7 DAYS
TO DENUDED AREAS WHICH WILL NOT BE
BROUGHT TO FINAL GRADE FOR A PERIOD OF
MORE THAN 14 DAYS. SEE DETAIL 5, SHEET
CD501 FOR TEMPORARY SEEDING SCHEDULE.
5. APPLY PERMANENT SEEDING TO AREAS
DISTURBED BY CONSTRUCTION FOLLOWING
FINISH GRADING. SEE DETAIL 6, SHEET CD501
FOR PERMANENT SEEDING SCHEDULE.
6. SEE THE EXISTING SIGN INVENTORY ON
SHEET VF600 FOR DESCRIPTION OF EACH
SIGN ASSEMBLY.
SILT FENCE
TREE PROTECTION
LIMITS OF DISTURBANCE
SAWCUT LINE
CURB AND GUTTER TO REMAIN
REMOVE EXISTING CURB AND
GUTTER
INLET PROTECTION
REMOVE EXISTING TREE
MILL 2.0" OF ASPHALT PAVEMENT
REMOVE FULL DEPTH ASPHALT
PAVEMENT
REMOVE VARIABLE DEPTH
ASPHALT PAVEMENT (SEE CP413)
REMOVE CONCRETE
SIDEWALK/PAVEMENT
IP
TP TP
1. INSTALL TREE PROTECTION
2. INSTALL SILT FENCE
3. SAWCUT AND REMOVE CURB AND GUTTER
4. SAWCUT AND REMOVE CONCRETE
SIDEWALK / CURB RAMP
5. SAWCUT AND REMOVE FULL DEPTH
ASPHALT / CONCRETE
6. SAWCUT AND REMOVE EXISTING CONCRETE
PAVERS AND CROSSWALK
7. REMOVE EXISTING COMMERCIAL ENTRANCE
8. ERADICATE EXISTING PAVEMENT MARKINGS
9. REMOVE CURB DRAIN INLET
10. REMOVE, STORE AND PROTECT SIGN FOR
RELOCATION DURING CONSTRUCTION, SEE
CM SHEETS FOR NEW LOCATIONS (SEE
NOTE 3)
11. EXISTING BUS STOP SHELTER AND
SIDEWALK TO REMAIN
12. EXISTING PAVEMENT MARKING TO REMAIN
13. REMOVE EXISTING VALLEY GUTTER
14. ADJUST WATER VALVE TO GRADE. SEE CU
SHEETS
15. REMOVE TREE
16. REMOVE EXISTING SIGN AND RETURN TO
TRAFFIC ENGINEERING AND OPERATIONS
17. CONTRACTOR TO DEMOLISH AND REMOVE
CONCRETE APRON AROUND EXISTING
JUNCTION BOXES AS NECESSARY FOR NEW
ADA RAMP CURBING
18. MODIFY EXISTING STORM STRUCTURE, SEE
CU SHEETS
3&4
CD501
CD501
CD501
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
E
- C O
M
PA
N Y
- C O
M M
U N
IT
Y
MISS UTILITY
NOTIFY "MISS UTILITY" AT 811 or
(800) 552-3120 or va811.com
BEFORE COMMENCING
CONSTRUCTION.
LO
C
AT
IO
N
CD101
05/26/2026 004364.001
KMK
AUTHOR
D
EM
O
LI
TI
O
N A
N D
E R
O
SI
O N
C O
N
TR
O L
PL
AN
PI
N
E C
H
AP
EL
R
O
AD
C O
R R
ID
O
R
IM
PR
O
VE
M
EN
TS
(U
PC
1)
H
AM
PT
O
N , V
IR
G
IN
IA
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T C
D
NOTES
KEYNOTES
LEGEND
1. ALL PHASE 2 E&SC MEASURES (INLET
PROTECTION, SILT FENCE, TREE PROTECTION,
ETC) SHALL BE FULLY MAINTAINED UNTIL SITE
IS FULLY STABILIZED.
2. ELEMENTS TO BE DEMOLISHED OR REMOVED
SHOWN DARKENED.
3. ALL SIGNAGE THAT IS REMOVED AND SAVED
FOR RELOCATION SHALL BE MAINTAINED ON
SITE. CONTRACTOR SHALL BE RESPONSIBLE
FOR REPLACEMENT COSTS IF DAMAGED. ALL
SIGNAGE TO BE REMOVED PERMANENTLY
SHALL BE RETURNED TO CITY OF HAMPTON,
TRAFFIC ENGINEERING AND OPERATIONS.
4. APPLY TEMPORARY SEEDING WITHIN 7 DAYS
TO DENUDED AREAS WHICH WILL NOT BE
BROUGHT TO FINAL GRADE FOR A PERIOD OF
MORE THAN 14 DAYS. SEE DETAIL 5, SHEET
CD501 FOR TEMPORARY SEEDING SCHEDULE.
5. APPLY PERMANENT SEEDING TO AREAS
DISTURBED BY CONSTRUCTION FOLLOWING
FINISH GRADING. SEE DETAIL 6, SHEET CD501
FOR PERMANENT SEEDING SCHEDULE.
6. SEE THE EXISTING SIGN INVENTORY ON
SHEET VF600 FOR DESCRIPTION OF EACH
SIGN ASSEMBLY.
SILT FENCE
TREE PROTECTION
LIMITS OF DISTURBANCE
SAWCUT LINE
CURB AND GUTTER TO REMAIN
REMOVE EXISTING CURB AND
GUTTER
INLET PROTECTION
REMOVE EXISTING TREE
MILL 2.0" OF ASPHALT PAVEMENT
REMOVE FULL DEPTH ASPHALT
PAVEMENT
REMOVE VARIABLE DEPTH
ASPHALT PAVEMENT (SEE CP413)
REMOVE CONCRETE
SIDEWALK/PAVEMENT
IP
TP TP
1. INSTALL TREE PROTECTION
2. INSTALL SILT FENCE
3. SAWCUT AND REMOVE CURB AND GUTTER
4. SAWCUT AND REMOVE CONCRETE
SIDEWALK / CURB RAMP
5. SAWCUT AND REMOVE FULL DEPTH
ASPHALT / CONCRETE
6. SAWCUT AND REMOVE EXISTING CONCRETE
PAVERS AND CROSSWALK
7. REMOVE EXISTING COMMERCIAL ENTRANCE
8. ERADICATE EXISTING PAVEMENT MARKINGS
9. REMOVE CURB DRAIN INLET
10. REMOVE, STORE AND PROTECT SIGN FOR
RELOCATION DURING CONSTRUCTION, SEE
CM SHEETS FOR NEW LOCATIONS (SEE
NOTE 3)
11. EXISTING BUS STOP SHELTER AND
SIDEWALK TO REMAIN
12. EXISTING PAVEMENT MARKING TO REMAIN
13. REMOVE EXISTING VALLEY GUTTER
14. ADJUST WATER VALVE TO GRADE. SEE CU
SHEETS
15. REMOVE TREE
16. REMOVE EXISTING SIGN AND RETURN TO
TRAFFIC ENGINEERING AND OPERATIONS
17. CONTRACTOR TO DEMOLISH AND REMOVE
CONCRETE APRON AROUND EXISTING
JUNCTION BOXES AS NECESSARY FOR NEW
ADA RAMP CURBING
18. MODIFY EXISTING STORM STRUCTURE, SEE
CU SHEETS
3&4
CD501
CD501
CD501
TO
W
N C
EN
TE
R D
R
IV
E, S
U
IT
E
N
EW
PO
R T
N
EW
S, V
IR
G
IN
IA
(7
) 5
-2
F
AX
(7
) 6
-0
W
W W
.A
TC
S.
C
O M
D
AT
E D
ES
C
R
IP
TI
O
N N
O
R
EV
IS
IO
N
AUTHOR:
CHECK:
PROJ.#:
DATE:
SHEET: OF
SHEET
C
LI
EN
T
- E M
PL
O
YE
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .