BID SCHEDULE
Multi-Use Path Maintenance | ITB No. 26-24 (Re-Advertisement) Mileages corrected 8/21/26 for re-advertisement
INSTRUCTIONS TO BIDDERS:
Enter the TDC Monthly Cost and BCC Monthly Cost for each location. Bid all items within each section. Actual maintenance limits are defined in Attachment A – Maintenance Map.
Road length values stated below represent the actual linear length of each roadway segment (not a down-and-back or two-directional measurement). The Contractor is responsible for maintenance of both sides of the roadway within the stated linear length, as depicted on the corresponding maintenance maps in Attachment A.
A. BASE BID ITEMS
| Location |
| TDC — Full Service |
| TDC — Limited Service |
| TDC Monthly Cost |
| BCC |
| BCC Monthly Cost |
| # Miles |
| Unit Price ($/mi) |
| # Miles |
| Unit Price ($/mi) |
| # Miles |
| Unit Price ($/mi) |
| Scenic Gulf Drive |
| 0.63 |
| $_______ |
| 0.67 |
| $_______ |
| $_______ |
| 1.64 |
| $_______ |
| $_______ |
| CR 30A |
| 6.36 |
| $_______ |
| 6.64 |
| $_______ |
| $_______ |
| 4.97 |
| $_______ |
| $_______ |
| Allen Loop Drive |
| 1.20 |
| $_______ |
| — |
| Thompson Road |
| 1.22 |
| $_______ |
| — |
| Oyster Lake Causeway |
| 0.015 |
| $_______ |
| — |
| CR 83 South |
| 0.44 |
| $_______ |
| — |
| $_______ |
| 0.09 |
| $_______ |
| $_______ |
| CR 393 South |
| 1.83 |
| $_______ |
| — |
| CR 283 South |
| 1.66 |
| $_______ |
| — |
| CR 395 South |
| 2.93 |
| $_______ |
| — |
| Lakewood Drive |
| 0.20 |
| $_______ |
| — |
| TDC Section Total Monthly Cost: |
| $__________ |
| BCC Section Total Monthly Cost: |
| $__________ |
Combined Base Bid Monthly Total (TDC + BCC): $________________ Base Bid Annual Total (Monthly Total × 12): $________________
ENTER THIS ANNUAL TOTAL — AND ONLY THIS AMOUNT — INTO THE OPENGOV BID FORM.
Do NOT include Alternate Group 1 or Alternate Group 2 totals in this figure. Alternates are for planning purposes only and are not part of the Base Bid amount used for award. If the amount entered in OpenGov does not match this Base Bid Annual Total, the Base Bid Annual Total as calculated from this Attachment C shall control.
B. ALTERNATE BID ITEMS — GROUP 1 — Paths under construction; award contingent on substantial completion. For planning purposes only — not used for award determination.
| Location |
| TDC Miles |
| BCC Miles |
| TDC Monthly Cost |
| BCC Monthly Cost |
| CR 393 North (Under construction) |
| 1.01 |
| 1.01 |
| $_______ |
| $_______ |
| CR 283 North |
| 1.34 |
| 1.35 |
| $_______ |
| $_______ |
| CR 395 North (Under construction) |
| 1.1 |
| 1.09 |
| $_______ |
| $_______ |
| Section Total Monthly Cost: |
| $_______ |
| $_______ |
C. ALTERNATE BID ITEMS — GROUP 2 — Paths under construction; award contingent on substantial completion. For planning purposes only — not used for award determination.
| Location |
| TDC Miles |
| BCC Miles |
| TDC Monthly Cost |
| BCC Monthly Cost |
| Chat Holley Road |
| 3.23 |
| 3.22 |
| $_______ |
| $_______ |
| JD Miller Road |
| 1.4 |
| 1.4 |
| $_______ |
| $_______ |
| Ellis Road (Under construction) |
| 0.47 |
| 0.47 |
| $_______ |
| $_______ |
| Driftwood Road (Under construction) |
| 0.46 |
| 0.45 |
| $_______ |
| $_______ |
| So. Holiday Road (Under construction) |
| 0.54 |
| 0.46 |
| $_______ |
| $_______ |
| Section Total Monthly Cost: |
| $_______ |
| $_______ |
Actual limits shall be identified in Attachment A – Maintenance Map.