ITB_26-24_Bid_Schedule_(Attachment_C).docx

DOCX document 18 KB Posted

Attached to
Maintaining Multi-Use Path and Rights of Way: Phase 2
Solicitation number
26-24
Issued by
Walton County, Florida

About this file

This is a Bid Schedule (Attachment C) for ITB 26-24, issued by a Florida county government for the Maintaining Multi-Use Path and Rights of Way: Phase 2 contract opportunity. The contract involves providing multi-use path maintenance and landscape maintenance services in accordance with specified terms and conditions at designated locations shown in attachment maps. The contract term is two years from the date of complete execution, with the option to renew for up to two additional one-year periods at the sole discretion of the County. The bid schedule document establishes the framework for contractor submission of pricing and line items corresponding to the maintenance services and deliverables required under this solicitation.

The bid schedule serves as the pricing and payment structure document that bidders must complete and submit as part of their proposal response. This attachment outlines the specific line items, quantities, and unit pricing that contractors must provide to be considered for award. The schedule enables the County to standardize bid evaluation and compare proposals on a consistent basis across all submitted bids for the maintenance services contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

Multi-Use Path Maintenance | ITB No. 26-24 (Re-Advertisement) Mileages corrected 8/21/26 for re-advertisement

INSTRUCTIONS TO BIDDERS:

Enter the TDC Monthly Cost and BCC Monthly Cost for each location. Bid all items within each section. Actual maintenance limits are defined in Attachment A – Maintenance Map.

Road length values stated below represent the actual linear length of each roadway segment (not a down-and-back or two-directional measurement). The Contractor is responsible for maintenance of both sides of the roadway within the stated linear length, as depicted on the corresponding maintenance maps in Attachment A.

A. BASE BID ITEMS

Location
TDC — Full Service
TDC — Limited Service
TDC Monthly Cost
BCC
BCC Monthly Cost
# Miles
Unit Price ($/mi)
# Miles
Unit Price ($/mi)
# Miles
Unit Price ($/mi)
Scenic Gulf Drive
0.63
$_______
0.67
$_______
$_______
1.64
$_______
$_______
CR 30A
6.36
$_______
6.64
$_______
$_______
4.97
$_______
$_______
Allen Loop Drive
1.20
$_______
—
$_______
—
Thompson Road
1.22
$_______
—
$_______
—
Oyster Lake Causeway
0.015
$_______
—
$_______
—
CR 83 South
0.44
$_______
—
$_______
0.09
$_______
$_______
CR 393 South
1.83
$_______
—
$_______
—
CR 283 South
1.66
$_______
—
$_______
—
CR 395 South
2.93
$_______
—
$_______
—
Lakewood Drive
0.20
$_______
—
$_______
—
TDC Section Total Monthly Cost:
$__________
BCC Section Total Monthly Cost:
$__________

Combined Base Bid Monthly Total (TDC + BCC): $________________ Base Bid Annual Total (Monthly Total × 12): $________________

ENTER THIS ANNUAL TOTAL — AND ONLY THIS AMOUNT — INTO THE OPENGOV BID FORM.

Do NOT include Alternate Group 1 or Alternate Group 2 totals in this figure. Alternates are for planning purposes only and are not part of the Base Bid amount used for award. If the amount entered in OpenGov does not match this Base Bid Annual Total, the Base Bid Annual Total as calculated from this Attachment C shall control.

B. ALTERNATE BID ITEMS — GROUP 1 — Paths under construction; award contingent on substantial completion. For planning purposes only — not used for award determination.

Location
TDC Miles
BCC Miles
TDC Monthly Cost
BCC Monthly Cost
CR 393 North (Under construction)
1.01
1.01
$_______
$_______
CR 283 North
1.34
1.35
$_______
$_______
CR 395 North (Under construction)
1.1
1.09
$_______
$_______
Section Total Monthly Cost:
$_______
$_______

C. ALTERNATE BID ITEMS — GROUP 2 — Paths under construction; award contingent on substantial completion. For planning purposes only — not used for award determination.

Location
TDC Miles
BCC Miles
TDC Monthly Cost
BCC Monthly Cost
Chat Holley Road
3.23
3.22
$_______
$_______
JD Miller Road
1.4
1.4
$_______
$_______
Ellis Road (Under construction)
0.47
0.47
$_______
$_______
Driftwood Road (Under construction)
0.46
0.45
$_______
$_______
So. Holiday Road (Under construction)
0.54
0.46
$_______
$_______
Section Total Monthly Cost:
$_______
$_______

Actual limits shall be identified in Attachment A – Maintenance Map.

File details come from the government source that posted it. Updated .