ITB 26-195-PW Shasta Pump Station Access Improvements - Drawings.pdf
PDF 7 MB Posted
- Solicitation number
- S-P00140-00018344
- Issued by
- Oregon
About this file
This file comprises construction documents, specifically architectural and engineering drawings, for the Shasta 800 Pump Station Access Improvements project undertaken by the Eugene Water & Electric Board (EWEB) in Eugene, Oregon. The project, identified as ITB 26-195-PW and EWEB Work Order 2403186, involves comprehensive site improvements at 3545 Potter Street, Eugene, OR 97405 (Map 18030842, Tax Lot 4300), located on a 0.24-acre parcel zoned R-1 (low-density residential). The scope of work includes demolition of existing asphalt and concrete surfaces totaling approximately 490 square feet; reconstruction of the driveway and apron with new concrete; installation of concrete stairs with handrails providing access to the pump station; construction of a variable-height poured-in-place concrete retaining wall (up to 6 feet maximum); re-stacking of an existing rock wall; and installation of storm drainage improvements including 73 linear feet of 4-inch PVC storm drain pipe, trench drains, and associated drainage infrastructure. Additional work includes installation of 3-inch PVC electrical conduit and coordination with existing utilities including a 12-inch water line, natural gas line, and sewer manhole.
The construction documents are prepared by Ausland Group (civil engineer: Charlie Kroning, P.E.; structural engineer: Scott Metzler, P.E.) with EWEB project principal engineer Laura Farthing, P.E. The drawings indicate an October 2026 construction document milestone phase and specify that construction shall proceed in accordance with City of Eugene Standard Specifications and Standard Drawings, current Oregon Structural Specialty Code (OSSC), and ODOT/APWA standards. The project requires multiple permits including City of Eugene encroachment permit for work in Potter Street right-of-way, grading and fill permit from City Building Division, traffic control plan approval (minimum five working days prior to work commencement), and electrical permit with inspection services. Concrete specifications require 3,000 PSI minimum compressive strength for structural elements and 2,500 PSI for yard concrete. The project mandates contractor responsibility for sediment and erosion control measures, maintenance of access to the existing pump station during construction, coordination with adjacent property owners, and compliance with Oregon utility notification requirements (Oregon Utility Notification Center, 1-800-332-2344). The documents do not specify contract pricing, set-asides, funding sources, or bid response deadlines within the provided drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 26-195-PW Shasta Pump Station Access Improvements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XX
X
X
X
X
X
X X
X
X
X
XXXXXXX
23%30%36%30%
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(545)
(540)(535)(530)
(527)
(526)
(547)
(5
(548)
C0.0
TITLE
SHEET
SHEET NUMBER
COPYRIGHT © 2026. THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF AUSLAND GROUP AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF AUSLAND GROUP
Eugene Grants Pass
541.345.1094 541.476.3788
DESCRIPTIONREV
DRAWN BY:
CHECKED BY:
APPROVED BY:
DESIGNED BY:
ISSUE DATE:
PHASE:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
PROJECT #
D ra w in g N am e:
V :\P ro je ct s
- C ur re nt
\E W
EB
Eu ge ne W at er a nd
E le ct ric
B oa rd \2
5-
E
W
EB
-S ha st a
Pu m p St at io n\
W or ki ng
D ra w in gs \C iv il\
M as te r\E
SP
S
C iv il Ba se .d w g
La st S av e:
O ct ob er
, 2
4:
P M lo t D at e:
O ct ob er
, 2
5:
B y:
J on at ha n
G ol ds tie n
EW
EB
SH
A
ST
A
P U
M P
ST
A
TI
O
N
P
O
TT
ER
S
T.
EU
G
EN
E, O
R
M A
P
T
A X
LO
T
2 OCT 2026
25-0705
CONSTRUCTION
DOCUMENTS
MILESTONE:
www.AuslandGroup.com
JSG
JSG
CLK
CLK
W A
TE
R
S
YS
TE
M
S
EWEB
EUGENE WATER & ELECTRIC BOARD
EUGENE, OREGON
SHASTA DRIVEWAY REBUILD - SHASTA 800 PUMP STATION
EWEB WORK ORDER: 2403186
PROPERTY INFORMATION
SITE ADDRESS:
EUGENE, OR 97402
MAP & TAX LOT: MAP 18030842, TAX LOT 4300
PROPERTY SIZE:
ZONING DISTRICT:
SURROUNDING USES:
LAND USE:
PROPOSED: NO CHANGE
UTILITIES:
below.
R
Know what's Call before you dig.
CIVIL ENGINEER
CHARLIE KRONING, P.E.
3935 HIGHLAND AVENUE
GRANTS PASS, OR 97526
tel: (541) 476-3788 email: ckroning@auslandgroup.com
AUSLAND GROUP
CITY OF EUGENE
APPROVAL BY:
TITLE DATE
SHEET INDEX
C0.0 TITLE SHEET
C0.1 GENERAL NOTES
C1.0 EXISTING CONDITIONS
C2.0 DEMOLITION PLAN
C3.0 HORIZONTAL CONTROL PLAN
C4.0 GRADING PLAN
C5.0 UTILITY AND DRAINAGE PLAN
C6.0 EROSION CONTROL PLAN
C7.0 CIVIL DETAILS
C7.1 CIVIL DETAILS
C7.2 CIVIL DETAILS
C7.3 STRUCTURAL DETAILS
1 2 3 4
AGENCY APPROVED BY (IF REQ'D) DATE
POWER
TELEPHONE
GAS
CABLE TV
IRRIGATION
DOMESTIC WATER
SANITARY SEWER
STORM DRAINAGE
STREETS - City
CONSTRUCTION AUTHORIZED TO PROCEED IN ACCORDANCE WITH APPROVED PLANS WHEN ALL PERMITS HAVE
BEEN ISSUED AND PRE-CONSTRUCTION MEETING HAS CONCLUDED
PLANNING
EWEB
CENTURYLINK
AVISTA
CHARTER
EWEB
EWEB
CITY OF EUGENE
CITY OF EUGENE
CITY OF EUGENE
CITY OF EUGENE
STRUCTURAL ENGINEER
SCOTT METZLER, P.E.
1717 W 7TH AVENUE
EUGENE, OR 97401
tel: (541) 450-0905 email: smetzler@auslandgroup.com
STREETS - State ODOT
WATER:
SEWER:
STORM:
EWEB
CITY OF EUGENE
CITY OF EUGENE
3545 POTTER STREET
±0.24 AC (±10,524 SF) ±90' x ±119'
R-1 (LOW-DENSITY RESIDENTIAL)
EXISTING: ±450 SF EWEB PUMP STATION
/ APPLICANT
LAURA FARTHING, P.E. | PRINCIPAL ENGINEER WATER
4200 ROOSEVELT BLVD
EUGENE, OR 97402
tel: (541) 685-7464 email: laura.farthing@eweb.org
OWNEREWEB
ENGINEERING
R-1 (LOW-DENSITY RESIDENTIAL)
GAS: NW NATURAL
POWER: EWEB
SCALE: NTS
LOCATION MAP
N
SCALE: NTS
VICINITY MAP
N
SCALE: NTS
INDEX MAP
N
PROPOSED STAIRCASE
RE
CO
NS
TR
UC
TE
D
DR
IV
EW
AY
A
PR
ON
RECONSTRUCTED
DRAINAGE APRON
& TRENCH DRAIN
EXISTING
SHASTA 800
PUMP STATION
EXISTING DRIVEWAY
AutoCAD SHX Text
36TH
AutoCAD SHX Text
36TH PL
AutoCAD SHX Text
STAFFORD
AutoCAD SHX Text
CANNON
AutoCAD SHX Text
AVE
AutoCAD SHX Text
32ND
AutoCAD SHX Text
31ST
AutoCAD SHX Text
PARKER
AutoCAD SHX Text
E. AMAZON
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
STONY
AutoCAD SHX Text
HILYARD
AutoCAD SHX Text
NOB
AutoCAD SHX Text
OPAL
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
STONY
AutoCAD SHX Text
CAMEO
AutoCAD SHX Text
PL.
AutoCAD SHX Text
ST.
AutoCAD SHX Text
PL.
AutoCAD SHX Text
ST.
AutoCAD SHX Text
EMERALD
AutoCAD SHX Text
BEECH
AutoCAD SHX Text
AGATE
AutoCAD SHX Text
OAKS
AutoCAD SHX Text
BLACK
AutoCAD SHX Text
UNIVERSITY
AutoCAD SHX Text
36TH AVE.
AutoCAD SHX Text
AVE.
AutoCAD SHX Text
35TH
AutoCAD SHX Text
PL.
AutoCAD SHX Text
ST.
AutoCAD SHX Text
ONYX
AutoCAD SHX Text
ONYX
AutoCAD SHX Text
POTTER
AutoCAD SHX Text
HARRIS
AutoCAD SHX Text
KINCAID
AutoCAD SHX Text
ALDER
AutoCAD SHX Text
CT.
AutoCAD SHX Text
39TH AVE.
AutoCAD SHX Text
38TH AVE.
AutoCAD SHX Text
ELLIS
AutoCAD SHX Text
37TH
AutoCAD SHX Text
KINCAID
AutoCAD SHX Text
38TH
AutoCAD SHX Text
EMERALD
AutoCAD SHX Text
CANYON
AutoCAD SHX Text
PINE
AutoCAD SHX Text
VINE
AutoCAD SHX Text
90694PE
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
EXPIRES: 06/30/27
AutoCAD SHX Text
SPRINGFIELD
AutoCAD SHX Text
WALTERVILLE
AutoCAD SHX Text
WILLAMETTE RIVER
AutoCAD SHX Text
EUGENE
AutoCAD SHX Text
LEABURG
AutoCAD SHX Text
VIDA
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text
POTTER ST
AutoCAD SHX Text
JOB SITE
C0.1
GENERAL
NOTES
SHEET NUMBER
COPYRIGHT © 2026. THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF AUSLAND GROUP AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF AUSLAND GROUP
Eugene Grants Pass
541.345.1094 541.476.3788
DESCRIPTIONREV
DRAWN BY:
CHECKED BY:
APPROVED BY:
DESIGNED BY:
ISSUE DATE:
PHASE:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
PROJECT #
D ra w in g N am e:
V :\P ro je ct s
- C ur re nt
\E W
EB
Eu ge ne W at er a nd
E le ct ric
B oa rd \2
5-
E
W
EB
-S ha st a
Pu m p St at io n\
W or ki ng
D ra w in gs \C iv il\
M as te r\E
SP
S
C iv il Ba se .d
S av e:
O ct ob er
, 2
4:
t D at e:
O ct ob er
, 2
5:
J on at ha n
G ol ds tie n
EW
EB
SH
A
ST
A
P U
M P
ST
A
TI
O
N
P
O
TT
ER
S
T.
EU
G
EN
E, O
R
M A
P
T
A X
LO
T
2 OCT 2026
25-0705
CONSTRUCTION
DOCUMENTS
MILESTONE:
www.AuslandGroup.com
JSG
JSG
CLK
CLK
W A
TE
R
S
YS
TE
M
S
EWEB
1. CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL COMPLY WITH THE CURRENT CITY’S STANDARD
SPECIFICATIONS, STANDARD DRAWINGS AND SUPPLEMENTAL SPECIFICATIONS.
2. A GRADING AND/OR FILL PERMIT FROM THE CITY BUILDING DIVISION MAY BE REQUIRED FOR ANY
CONSTRUCTION ACTIVITY OUTSIDE OF THE RIGHTS-OF-WAY AND PUBLIC EASEMENTS.
3. ITEMS OF WORK NOT SHOWN ON THE PLAN BUT NECESSARY FOR SUCCESSFUL COMPLETION OF THIS
PROJECT WILL BE REQUIRED BY THE CITY.
4. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN AND SECURE APPROVAL OF THE PLAN FROM THE CITY
AT LEAST FIVE (5) WORKING DAYS PRIOR TO STARTING WORK.
5. THE CONTRACTOR SHALL NOT PERFORM WORK WITHOUT CITY INSPECTIONS.
6. BEFORE BACK-FILLING THE END OF A MAINLINE PIPE NOT ENDING AT A MANHOLE OR CLEANOUT, THE CONTRACTOR SHALL PERFORM THE TV INSPECTION AS REQUIRED BY THE STANDARD SPECIFICATIONS AND ALLOW THE CONSULTING ENGINEER TO DETERMINE THE EXACT LOCATION AND ELEVATION OF THE END OF THE PIPE.
7. WHERE CONNECTING TO AN EXISTING PIPE, THE CONTRACTOR SHALL EXPOSE THE END OF THE EXISTING PIPE AND ALLOW THE CONSULTING ENGINEER TO VERIFY EXACT LOCATION AND ELEVATION BEFORE LAYING ANY NEW PIPE
ON THAT SYSTEM.
8. WHERE THE CONTRACTOR IS UNABLE TO ACHIEVE SUB-GRADE COMPACTION AND DEFLECTION STANDARDS REQUIRED BY THE SPECIFICATIONS, AS DETERMINED BY FIELD INSPECTION AND TESTING, THE SUB-GRADE SURFACE SHALL BE LOWERED AT LEAST 6 INCHES, FABRIC SHALL BE PLACED, AND THE MATERIAL REMOVED SHALL BE REPLACED WITH 1½”-0 CRUSHED ROCK AND COMPACTED ACCORDING TO THE SPECIFICATIONS. IF THE SUB-GRADE STILL DOES NOT MEET SPECIFICATIONS OVER-EXCAVATE TO A DEEPER SUBBASE DEPTH AS DIRECTED BY PROJECT
ENGINEER AND REPEAT THE PROCESS UNTIL THE SUB-GRADE MEETS SPECIFICATIONS.
9. ASPHALT SHALL BE FORMULATED FOR THIS PROJECT IN ACCORDANCE WITH SECTION 744 OF THE CITY’S STANDARD
SPECIFICATIONS.
10. THE CONTRACTOR SHALL NOTIFY LANE COUNTY DEPARTMENT OF PUBLIC WORKS PERMIT SECTION 24 HOURS
BEFORE BEGINNING WORK IN THE COUNTY RIGHT-OF-WAY.
11. THE CONTRACTOR SHALL PROTECT THE WORK AREA IN THE COUNTY ROAD IN ACCORDANCE WITH “LANE COUNTY
TRAFFIC CONTROL AND SAFETY PROCEDURES.”
12. REQUESTS BY THE CONTRACTOR FOR CHANGES TO THE PLANS MUST BE APPROVED BY THE CONSULTING
ENGINEER AND THE CITY BEFORE THE CHANGES ARE IMPLEMENTED.
13. ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THESE RULES FROM THE CENTER BY CALLING 1-800-332-2344. IF YOU HAVE ANY QUESTIONS ABOUT THESE
RULES, YOU MAY CONTACT THE CALL CENTER.
14. AT EACH INTERSECTION AT LEAST ONE POST SHALL BE PLACED DISPLAYING STREET NAME SIGNS FOR BOTH INTERSECTING STREETS. A “SIGN SCHEDULE” INDICATING NAMES AND LOCATIONS OF ALL SIGNS TO BE INSTALLED SHALL BE SUBMITTED TO THE PROJECT INSPECTOR WITHIN 15 DAYS OF THE PUBLIC IMPROVEMENT PERMIT DATE.
15. PLACEMENT OR STORAGE OF SPOILS FROM TRENCH CONSTRUCTION IS NOT PERMITTED ON HARD SURFACE STREETS WITHIN PUBLIC RIGHT-OF-WAY. SPOILS STORED IN OTHER RIGHT OF WAY AREAS SHALL BE COVERED TO
PREVENT EROSION.
16. FORMS OF ADEQUATE SIZE AND CONFIGURATION TO MEET CONCRETE THICKNESS REQUIREMENTS SHALL BE USED
AROUND OUTSIDES OF OUTSIDE-DROP MANHOLES.
17. CONSTRUCTION SITE SHALL BE MANAGED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION SITE MANAGEMENT PLAN (CSMP). CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING AND MAINTAINING COMPONENTS
OF THE CSMP UNTIL PROJECT FINAL ACCEPTANCE IS ISSUED.
18. THE CITY INSPECTOR SHALL NOT BE REQUIRED TO LAY OUT ADA RAMPS FOR PRIVATELY-ENGINEERED PROJECTS.
THE DEVELOPER/OWNER OR THEIR AGENT SHALL BE RESPONSIBLE FOR RAMP LAYOUT AND SHALL ENSURE
COMPLIANCE WITH ADA STANDARDS.
19. LOCATIONS OF STREET LIGHTING, SIGNS, AND MARKINGS, ETC. ARE APPROXIMATE. ACTUAL LOCATIONS SHALL BE
AS DIRECTED BY THE CITY INSPECTOR IN THE FIELD.
20. WORK REQUIRES THE ELECTRICAL CONTRACTOR TO SECURE AN ELECTRIC PERMIT AS WELL AS INSPECTION SERVICES FROM THE BUILDING PERMIT SERVICES DIVISION TO ASSURE NATIONAL ELECTRIC CODE COMPLIANCE. IN ADDITION, CONTRACT INSPECTION SERVICES SHALL BE OBTAINED FROM THE PUBLIC WORKS ENGINEERING DIVISION
24 HOURS IN ADVANCE OF WORK COMMENCEMENT BY CALLING 541-682-5560.
21. TRENCH REPAIR AND OTHER WORK IN THE RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS IN THE CITY OF
EUGENE'S "PUBLIC WORKS UTILITY AND RIGHT OF WAY PERMITS MANUAL"
1. WORK AND MATERIALS SHALL CONFORM TO THE PROVISIONS OF THE CURRENT "STANDARD
SPECIFICATIONS FOR CONSTRUCTION", ODOT/AMERICAN PUBLIC WORKS ASSOCIATION
(APWA), UNLESS OTHERWISE COVERED BY THE SPECIFICATIONS WRITTEN FOR THIS PROJECT
OR THE "STANDARD SPECIFICATIONS FOR CONSTRUCTION", OR THE "STANDARD DRAWINGS"
OF THE CITY OF EUGENE.
2. ALL WORK PERTAINING TO THIS PROJECT SHALL BE SUBJECT TO INSPECTION BY THE CIVIL
ENGINEER AND/OR CITY ENGINEER. PRIOR TO ANY SITE WORK, THE CONTRACTOR SHALL
CONTACT THE CITY AND CIVIL ENGINEER TO SCHEDULE A PRE-CONSTRUCTION CONFERENCE.
3. PRIOR TO ANY SITE DISTURBING ACTIVITY INCLUDING CLEARING, LOGGING OR GRADING, THE
SITE BOUNDARIES & CLEARING LIMITS AS SHOWN ON THESE PLANS SHALL BE LOCATED AND
FIELD IDENTIFIED BY THE PROJECT SURVEYOR AND ALL ESC MEASURES SHALL BE INSTALLED
AS IDENTIFIED ON SHEET C6.0.
4. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION
IS IN PROGRESS.
5. ALL SITE WORK IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THESE
APPROVED PLANS. ANY DEVIATION FROM THESE PLANS WILL REQUIRE PRIOR APPROVAL
FROM THE OWNER, CIVIL ENGINEER AND APPROPRIATE PUBLIC AGENCIES PRIOR TO
PERFORMING THE CHANGES IN THE FIELD.
6. ALL LOCATIONS OF EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD
SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE
CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL
UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES
NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE
CONTRACTOR SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (DIAL 811)
AT LEAST TWO BUSINESS DAYS PRIOR TO CONSTRUCTION. THE APPLICANT OR HIS
REPRESENTATIVE AND THE CIVIL ENGINEER SHALL BE CONTACTED IMMEDIATELY IF
CONFLICTS EXIST.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS,
SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS
TO PROTECT THE LIFE, HEALTH AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN
CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACT.
8. THE CONTRACTOR SHALL KEEP OFF-SITE STREETS CLEAN AT ALL TIMES BY SWEEPING.
STREET WASHING WILL NOT BE ALLOWED WITHOUT PRIOR CITY APPROVAL.
9. THE CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS PRIOR TO INITIATING WORK. THE
CONTRACTOR SHALL NOTIFY THE CIVIL ENGINEER WHEN CONFLICTS OCCUR BETWEEN THE
PLANS AND FIELD CONDITIONS. CONFLICTS SHALL BE RESOLVED PRIOR TO PROCEEDING
WITH CONSTRUCTION. REVISIONS SHALL BE FORMALLY APPROVED BY THE APPLICANT AND
CIVIL ENGINEER PRIOR TO MAKING CHANGES IN THE FIELD.
10. UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
ANY UTILITY RELOCATIONS WITH UTILITY COMPANIES.
11. ALL NEW UTILITIES SHALL BE INSTALLED UNDERGROUND.
12. CONTRACTOR SHALL DOCUMENT AND RECORD FIELD CHANGES, PIPE INVERT, PIPE SLOPE,
AND ANY OTHER CRITICAL AS-CONSTRUCT DATA. AS-BUILT DRAWINGS AND FINAL REPORTS
WILL BE REQUIRED BEFORE FINAL APPROVAL.
13. WORK IN CITY RIGHT-OF-WAY (POTTER STREET) REQUIRES AN ENCROACHMENT PERMIT FROM
THE CITY OF EUGENE.
14. WORK IN THE STATE RIGHT-OF-WAY (N/A) REQUIRES A MISCELLANEOUS PERMIT FROM
OREGON DEPARTMENT OF TRANSPORTATION.
15. APPROVED PERMANENT TRAFFIC CONTROL SIGNS AND MARKINGS WITHIN THE PUBLIC
RIGHT-OF-WAY SHALL BE INSTALLED PRIOR TO FINAL APPROVAL.
16. DURING PROJECT CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL
TEMPORARY CONSTRUCTION SIGNS, TRAFFIC CONTROL SIGNS, DELINEATORS AND
TEMPORARY MARKINGS AS REQUIRED.
17. ACCESS BY EMERGENCY VEHICLES SHALL BE MAINTAINED AT ALL TIMES DURING
CONSTRUCTION.
18. ALL CLEARED AND GRUBBED MATERIAL SHALL BE REMOVED FROM THE CONSTRUCTION SITE
AND DISPOSED AT AN APPROVED LOCATION.
19. ALL AREAS WITH ABANDONED UTILITY LINES, STORM DRAINS, UNDERGROUND TANKS, ETC.
WHICH MAY PROVIDE VOID SPACE BENEATH THE SURFACE SHALL BE REMOVED. WHEN
APPROVED BY THE CIVIL ENGINEER THE VOID SPACE MAY BE FILLED WITH APPROVED
MATERIAL. ALL TANKS OR HAZARDOUS MATERIALS SHALL BE DEALT WITH IN ACCORDANCE
TO ALL LOCAL, STATE AND FEDERAL LAWS.
20. PRIOR TO START OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY GRADES AT SAWCUT
LOCATIONS AND MATCHING OF EXISTING GRADE LOCATIONS.
21. CONTRACTOR IS RESPONSIBLE FOR ANY ASPHALT GRINDING, OVERLAY AND SEAL COATING.
ALL SPECIFICATIONS SHALL COMPLY WITH ALL CITY OF EUGENE REQUIREMENTS.
1. ALL STORM SEWER PIPE SHALL CONFORM WITH CITY OF EUGENE AND DIVISION 7 OF THE
ODOT/APWA SPECIFICATIONS.
2. ALL PIPE SHALL BE PLACED ON MINIMUM 4" THICK COMPACTED BEDDING.
3. THE BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A
LOOSE AVERAGE DEPTH OF 6", MAXIMUM DEPTH 8"-9", THOROUGHLY TAMPING EACH LAYER.
THESE COMPACTED LAYERS MUST EXTEND FOR ONE DIAMETER ON EACH SIDE OF THE PIPE OR
TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THIS FILL OVER PIPE SHALL BE THE
SAME AS DESCRIBED.
4. ALL PIPES SHALL HAVE A MINIMUM OF 12" COVER AT THE TOP OF THE BELL, OR SHALL HAVE
MINIMUM COVER PER THE MANUFACTURER'S SPECIFICATIONS, WHICHEVER IS GREATER.
5. ALL CATCH BASINS SHALL BE TYPE G PER CITY STANDARD DRAWING CRD376-1 EXCEPT AS
OTHERWISE NOTED.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING ALL MANHOLE, INLET AND CATCH
BASIN FRAMES AND GRATES TO GRADE JUST PRIOR TO PAVING.
7. UNLESS OTHERWISE NOTED, ALL STORM DRAIN PIPE SHALL BE CORRUGATED HIGH-DENSITY
POLYETHYLENE (HDPE) SMOOTH INTERIOR PIPE, MANUFACTURED IN CONFORMANCE WITH THE
LATEST AASHTO SPECIFICATIONS. COUPLERS SHALL COVER NOT LESS THAN ONE FULL
CORRUGATION ON EACH ANNULAR SECTION OF PIPE.
NOTE: HDPE PIPE IS NOT APPROVED FOR USE IN THE CITY RIGHT-OF-WAY.
8. UNDERGROUND STORM WATER RETENTION/DETENTION FACILITIES, STORM DRAINAGE PIPE AND CATCH BASINS SHALL BE CLEANED AND ALL FOREIGN MATERIAL REMOVED PRIOR TO BEING PUT
INTO SERVICE.
CITY GENERAL NOTES FOR PUBLIC R/W ONSITE GENERAL NOTES
ONSITE STORM DRAINAGE NOTES
AC ASPHALT
AD AREA DRAIN
BOW BOTTOM OF WALL
BOF BOTTOM OF FOOTING
BTF BOTTOM FACE OF CURB
C CURVE
CB CATCH BASIN
CL CENTERLINE
CP CONTROL POINT
DS DOWNSPOUT
DW DRIVEWAY
EC EDGE OF CONCRETE
EP EDGE OF ASPHALT
EOG EDGE OF GRAVEL
EG EXISTING GROUND
EX EXISTING
(E) EXISTING
FD FRENCH DRAIN
WATER LINE
SANITARY SEWER LINE
STORM DRAIN LINE
GAS LINE
OVERHEAD UTILITY
UNDERGROUND ELECTRIC
CABLE TELEVISION LINE
FENCE
EXISTING
CENTERLINE
PROPOSED
PROPERTY LINE
EASEMENT BOUNDARY
EDGE OF PAVEMENT/CONC.
EXISTING PROPOSEDSYMBOLS
WATER METER
WATER VALVE
FIRE HYDRANT
AIR/VACUUM RELEASE
SEWER MANHOLE
CLEAN OUT
STORM MANHOLE
STORM INLETS
LIGHT POLE
FIBER OPTIC LINE
TELEPHONE LINE
AV
DY
H
UTILITY POLE
CONCRETE
ASPHALT
GRAVEL
GRASS / LANDSCAPING
EXISTING PROPOSEDTYPE
SIGN
LINE LEGENDSYMBOL LEGEND
MATERIAL LEGEND
ABBREVIATIONS
FG FINISHED GRADE
FH FIRE HYDRANT
FL FLOWLINE
FS FINISHED SURFACE
GB GRADE BREAK
GTR GUTTER
INV INVERT ELEVATION
L LINE
ME MATCH EXISTING
MON MONUMENT
PAV EDGE OF PAVERS
R RADIUS
RE RIM ELEVATION
R/W RIGHT-OF-WAY
S SLOPE
SD STORM DRAIN
SDCO STORM DRAIN CLEANOUT
SDMH STORM DRAIN MANHOLE
SS SANITARY SEWER
SSCO SANITARY SEWER CLEANOUT
SSMH SANITARY SEWER MANHOLE
STA STATION
SW SIDEWALK
TBM TEMPORARY BENCH MARK
TBR TO BE REMOVED
TC TOP OF CURB
TFC TOP FACE OF CURB
TG TOP OF GRATE
TOF TOP OF FOOTING
TOP TOP OF SLOPE
TOE TOE OF SLOPE
TOW TOP OF WALL
TYP TYPICAL
W WATER
EWEB GENERAL CONSTRUCTION NOTES
1. OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER SET
FORTH IN OAR 925-001-0090. CALL 1-800-322-2349 TO NOTIFY THE CENTER AT LEAST 2 BUSINESS DAYS, BUT NOT
MORE THAN 10 BUSINESS DAYS, BEFORE COMMENCING AN EXCAVATION TO COMPLY.
2. THE LOCATIONS OF ALL EXISTING UNDERGROUND FACILITIES SHOWN ON THE PLANS ARE BASED ON A FIELD SURVEY AND INFORMATION SUPPLIED BY UTILITY COMPANIES. FIELD VERIFY LOCATIONS, ELEVATIONS, TYPE AND SIZES OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTING NEW PIPING. ADJUST NEW PIPING AS REQUIRED.
POTHOLING AND TRENCH EXCAVATION SHALL PRECEDE LAYING OF PIPE TO ALLOW REQUIRED ELEVATION AND ALIGNMENT ADJUSTMENTS TO BE ACCOMPLISHED WITHOUT REWORK. DEFLECT PIPE TO ADJUST ELEVATIONS AND ALIGNMENT WHEN POSSIBLE. ADJUSTMENTS SHALL BE EXPECTED AND CONSIDERED INCIDENTAL. NOTIFY ENGINEER
IMMEDIATELY OF ANY CONFLICTS NOT SHOWN ON THE PLANS,
3. KEEP EXISTING UTILITIES IN SERVICE AND PROTECT THEM DURING CONSTRUCTION. WHERE INTERRUPTION OF EXISTING FACILITIES IS REQUIRED, PROVIDE A MINIMUM OF 72 HOURS NOTICE TO OWNER AND THE AFFECTED UTILITY. CONTRACTOR SHALL ARRANGE FOR THE RELOCATION OF ANY UTILITIES IN CONFLICT WITH THE PROPOSED CONSTRUCTION. MAXIMUM ALLOWABLE SHUTDOWN FOR WATER LINES AND SERVICES IS 4 HOURS UNLESS
OTHERWISE APPROVED.
4. NOTIFY EACH UNDERGROUND UTILITY AT LEAST 2 DAYS PRIOR TO EXCAVATING, BORING, OR POTHOLING.
5. CONTRACTOR SHALL PROTECT ALL PROPERTY CORNERS, SURVEY MONUMENTS AND CONTROL POINTS. REPLACE
DAMAGED SURVEY MONUMENTS
6. PROVIDE TEMPORARY CONNECTIONS, BLOWOFFS AND THRUST RESTRAINTS AS REQUIRED TO FACILITATE FLUSHING, TESTING AND DISINFECTION. AT COMPLETION OF DISINFECTION, REMOVE TEMPORARY TEST TAPS AND REPLACE WITH TEMPORARY PLUGS UNTIL CONNECTIONS TO EXISTING FACILITIES ARE COMPLETE.
7. PROTECT SURROUNDING AREA AND UTILITY LINES OUTSIDE THE TRENCH FROM DAMAGE. CONTRACTOR IS RESPONSIBLE FOR REPAIR OF DAMAGED UTILITY TRENCHES AND ANY ASSOCIATED PAVEMENT REPAIR.
8. CONTRACTORS STAGING AREA SHALL BE LIMITED TO THE SITES.
9. CONTRACTOR SHALL INSTALL ALL PIPELINES, PAVING, WALKWAYS, AND CURB AND GUTTERS AT A UNIFORM GRADE
BETWEEN ELEVATIONS DEPICTED ON THE DRAWINGS.
10. THE EXISTING FACILITIES SHALL REMAIN IN OPERATION THROUGHOUT THE CONSTRUCTION PERIOD.
11. FIELD VERIFY THE PRECISE LOCATION, ELEVATION, AND ARRANGEMENT OF PIPELINE CONNECTION POINTS PRIOR TO
FABRICATING NEW PIPING.
12. CONTRACTOR SHALL VERIFY LOCATIONS, DIMENSIONS, SIZES, ETC. OF ALL EXISTING FACILITIES, EQUIPMENT & PIPING PRIOR TO THE ORDERING OR FABRICATION OF NEW FACILITIES, EQUIPMENT, PIPING AND OTHER ITEMS.
13. CONTRACTOR SHALL RESTORE ANY EXISTING FACILITIES OR STRUCTURES THAT ARE DISTURBED, DAMAGED, OR
REMOVED DURING CONSTRUCTION TO PRECONSTRUCTION CONDITIONS.
14. HORIZONTAL COORDINATES ARE BASED ON NAD 83. VERTICAL ELEVATIONS ARE BASED ON NGVD 29.
15. CONTRACTOR IS RESPONSIBLE FOR SEDIMENT AND EROSION CONTROL FOR THE DURATION OF THE PROJECT IN
ACCORDANCE WITH SPECIFICATION SECTION 01560 AND CITY OF EUGENE STANDARDS.
16. MAINTAIN ACCESS TO THE EXISTING PUMP STATION DURING CONSTRUCTION.
17. SEE SPECIFICATION SECTION 01014 FOR CONSTRUCTION SEQUENCING REQUIREMENTS.
GENERAL
ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE CURRENT GOVERNING EDITION OF THE
OREGON STRUCTURAL SPECIALTY CODE (OSSC).
SUBMITTALS AND SHOP DRAWINGS FOR THE ENGINEERS REVIEW WILL BE REQUIRED AS
FOLLOWS:
· CONCRETE MIX DESIGNS;
· REINFORCING STEEL;
· STRUCTURAL STEEL AND MISCELLANEOUS METALS, MILL CERTIFICATES, WPS (PQR IF APPLICABLE), WELDER CERTIFICATIONS, FILLER METAL;
CONTRACTOR SHALL SUBMIT 3 SETS OF PRINTS FOR REVIEW. FABRICATION SHALL NOT PROCEED
UNTIL SUBMITTALS AND/OR SHOP DRAWINGS HAVE BEEN REVIEWED BY THE ENGINEER.
CONSTRUCTION LIABILITY
THE CONSTRUCTION CONTRACTOR AND SUBCONTRACTORS AGREE THAT IN ACCORDANCE WITH
GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONSTRUCTION CONTRACTOR AND
SUBCONTRACTORS WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY
AND NOT LIMITED TO NORMAL WORKING HOURS, AND THE CONSTRUCTION CONTRACTOR AND
SUBCONTRACTORS FURTHER AGREE TO DEFEND, INDEMNIFY AND HOLD THE DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE
OF WORK ON THIS PROJECT.
DIVISION 03 - CONCRETE
CONCRETE
CONCRETE SHALL BE CONSTRUCTED IN ACCORDANCE WITH ACI 301 & 318 - CURRENT EDITION.
CONCRETE SHALL BE READY-MIXED CONCRETE IN ACCORDANCE WITH ASTM C94. MAXIMUM
WATER-CEMENT RATIO, BY WEIGHT SHALL BE AS FOLLOWS:
AT THE CONTRACTOR'S OPTION, AN AIR ENTRAINING AGENT CONFORMING TO THE LATEST REVISION OF ASTM SPECIFICATION C260 MAY BE ADDED TO THE CONCRETE TO PROVIDE SPECIFIED AMOUNTS OF ENTRAINED AIR. CEMENT SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR
PORTLAND CEMENT PER ASTM DESIGNATION C150, TYPE II.
SLUMP WILL BE MEASURED AT THE TRUCK DISCHARGE. PUMPING OF CONCRETE MAY REQUIRE
ADMIXTURES TO INCREASE SLUMP BEYOND THE MAXIMUM SLUMP LISTED ABOVE. ADMIXTURES ARE SUBJECT TO THE ENGINEER'S REVIEW. THE SPECIAL INSPECTOR SHALL BE PROVIDED WITH A BATCH
TICKET AND WEIGHT TAG UPON DELIVERY OF EACH LOAD OF CONCRETE.
ALL CONCRETE SHALL BE PLACED WITH MECHANICAL VIBRATION OF CONCRETE, UNO.
ALL CONCRETE SHALL BE CURED IN ACCORDANCE WITH ACI 308.1
REINFORCING STEEL
ALL BARS SHALL BE GRADE 60 DEFORMED BARS CONFORMING TO ASTM A706 OR A615. LAP SPLICES SHALL BE IN ACCORDANCE WITH ACI 318 UNLESS NOTED OTHERWISE ON THE PLANS. BARS TO BE
WELDED OR FIELD BENT SHALL CONFORM TO ASTM A706.
SCREW ANCHORS
SCREW ANCHORS SHALL BE HILTI HUS SCREW ANCHORS, SIMPSON TITAN-HD SCREW ANCHORS OR APPROVED EQUAL. CONTRACTOR SHALL INSTALL ANCHORS IN ACCORDANCE WITH THE ICC ES-REPORT.
SPECIAL INSPECTION REQUIRED.
WATERSTOP
WATERSTOP SHALL BE SIKA GREENSTREAK RIBBED PVC WATERSTOP
28 DAY COMPRESSIVE
STRENGTH
NON-AIR
ENTRAINED AIR-ENTRAINED
3000 PSI CONCRETE 0.45 0.50
CONCRETE ELEMENT
MIN. 28 DAY
COMPRESSIVE
STRENGTH
MAX. SIZE
AGGREGATE
(INCHES)
MAX.
SLUMP
(INCHES)
TOTAL AIR
CONTENT (%)
FOOTINGS 3000 1 1/2 4 --
WALLS & SLABS 3000 1 4 4% ± 1.5%
YARD
CONCRETE
WALKS & CURBS
2500 1 4 4% ± 1.5%
STRUCTURAL SPECIFICATIONS
1. HANDRAILS
DEFERRED SUBMITTALS
1. A SOIL BEARING VALUE OF 1,500 psf WAS USED IN THE STRUCTURAL DESIGN CALCULATIONS
FOR THE RETAINING WALL
GEOTECHNICAL INFORMATION
AutoCAD SHX Text
90694PE
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
EXPIRES: 06/30/27
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
CO
AutoCAD SHX Text
AV
AutoCAD SHX Text
CO
AutoCAD SHX Text S
SD
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X X
X
X
X
XXXXXXX
23%30%36%30%
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(545)
(540)(535)(530)
(527)
(526)
(547)
(5
(548)
C1.0
EXISTING
CONDITIONS
SHEET NUMBER
COPYRIGHT © 2026. THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF AUSLAND GROUP AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF AUSLAND GROUP
Eugene Grants Pass
541.345.1094 541.476.3788
DESCRIPTIONREV
DRAWN BY:
CHECKED BY:
APPROVED BY:
DESIGNED BY:
ISSUE DATE:
PHASE:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
PROJECT #
D ra w in g N am e:
V :\P ro je ct s
- C ur re nt
\E W
EB
Eu ge ne W at er a nd
E le ct ric
B oa rd \2
5-
E
W
EB
-S ha st a
Pu m p St at io n\
W or ki ng
D ra w in gs \C iv il\
M as te r\E
SP
S
C iv il Ba se .d
S av e:
O ct ob er
, 2
4:
t D at e:
O ct ob er
, 2
5:
J on at ha n
G ol ds tie n
EW
EB
SH
A
ST
A
P U
M P
ST
A
TI
O
N
P
O
TT
ER
S
T.
EU
G
EN
E, O
R
M A
P
T
A X
LO
T
2 OCT 2026
25-0705
CONSTRUCTION
DOCUMENTS
MILESTONE:
www.AuslandGroup.com
JSG
JSG
CLK
CLK
W A
TE
R
S
YS
TE
M
S
EWEB
SCALE: 1" = 10'
EXISTING CONDITIONS
N
0 10 20
1" = 10'
PUMP STATION
S 89°59' E 20.00' N 30°10'40" W 7.81' S 70°20'47" W
14.97'
S 89°59' E 112.49'
N 10°17'30" W 134.41'
N 0°
' E
4.
S 89°59' E 117.25'
N 0°
'08
" W
.0
0'
P O
T T
E R
S
T
MAP 18030842
TL 4200 ±0.22 AC
NOT-A-PART
KOELLING TR
MAP 18030842
TL 4100 ±0.22 AC
NOT-A-PART
GARDNER
MAP 18030842
TL 3400 ±0.26 AC
NOT-A-PART
HELDING
MAP 18030842
TL 3500 ±0.21 AC
NOT-A-PART
GUENZA
MAP 18030842
TL 4400 ±0.26 AC
NOT-A-PART
HOLBROOK
±30'
MAP 18030842
TL 4300 ±0.24 AC
3545 POTTER ST.
EWEB
ZONING: R-1
R/W ±60
MAP 18030842
TL 900 ±0.19 AC
NOT-A-PART
GUILLOU
MAP 18030842
TL 800 ±0.37 AC
NOT-A-PART
HERRERA
EXISTING DRIVEWAY
EXIST. PVC DRAIN LINE
EXISTING
TRENCH DRAINS
EXISTING
EDGE OF CONC
EXISTING
EDGE OF
CONC
EXISTING
CURB DRAIN
EXISTING
12" WATER LINE
EXISTING WATER &
ELECTRIC LINES
GRAVEL SERVICE AREA
EXISTING
GATE POST EXISTING
GATE POST
EXISTING BOULDERS
AT TOP OF SLOPE
EXISTING ROCK WALL
EX
IS
TI
NG
R
OC
K W
AL
L
EXISTING
CURB & GUTTER
EXISTING
GAS LINE
EXISTING
SEWER
MANHOLE ±2
4.
6'
EX
IS
T.
D
RW
Y
AP
RO
N
NOTES
TOPOGRAPHIC SURVEY DATA PROVIDED BY EWEB
AutoCAD SHX Text
90694PE
AutoCAD SHX Text
OREGON
EXPIRES: 06/30/27
23%30%36%30%
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(545)
(540)(535)(530)
(527)
(547)
(5
(548)
PUMP STATION
C2.0
DEMOLITION
PLAN
SHEET NUMBER
COPYRIGHT © 2026. THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF AUSLAND GROUP AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF AUSLAND GROUP
Eugene Grants Pass
541.345.1094 541.476.3788
DESCRIPTIONREV
DRAWN BY:
CHECKED BY:
APPROVED BY:
DESIGNED BY:
ISSUE DATE:
PHASE:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
PROJECT #
D ra w in g N am e:
V :\P ro je ct s
- C ur re nt
\E W
EB
Eu ge ne W at er a nd
E le ct ric
B oa rd \2
5-
E
W
EB
-S ha st a
Pu m p St at io n\
W or ki ng
D ra w in gs \C iv il\
M as te r\E
SP
S
C iv il Ba se .d
S av e:
O ct ob er
, 2
4:
t D at e:
O ct ob er
, 2
5:
J on at ha n
G ol ds tie n
EW
EB
SH
A
ST
A
P U
M P
ST
A
TI
O
N
P
O
TT
ER
S
T.
EU
G
EN
E, O
R
M A
P
T
A X
LO
T
2 OCT 2026
25-0705
CONSTRUCTION
DOCUMENTS
MILESTONE:
www.AuslandGroup.com
JSG
JSG
CLK
CLK
W A
TE
R
S
YS
TE
M
S
EWEB
SCALE: 1" = 5'
DEMOLITION PLAN
N
S 89°59' E 117.25'
N 0°
0'
0 5 10
1" = 5'
±7.6'
±2 2.
3'
±10.8'
±4.3'
±5 2.3
±8.8'
±4.0'
±1 7.
1'
±7.
3'
±7.4'
±2 0.
0'
1'
±2 6.
6'
DEMOLITION NOTES
SAWCUT AND REMOVE EXISTING ASPHALT AS
REQUIRED FOR CONSTRUCTION OF NEW
CONCRETE [±27 SF]
D1
P O
T T
±60' R/W ±30'
D1
D2
SAWCUT AND REMOVE EXISTING CONCRETE
CURB, GUTTER, DRIVEWAY AND APRON [±223 SF]D2
D3
D3
SAWCUT AND REMOVE EXISTING CONCRETE
DRIVEWAY [±240 SF]D3
±8.0'
±2 4.
6'
±2'
REMOVE EXISTING TRENCH DRAIN AND PIPE.
CAP WEST END OF EXISTING PIPE FOR NEW
CONNECTION [±58 LF]
D4
D4
D4
D4
REMOVE EXISTING STUMP AND SHRUBS [2 EA]D5
D5
REMOVE EXISTING BOULDERS & ROCK WALL AND
STOCKPILE FOR FUTURE USE BY OWNER [±56 LF]D6
D6
±6' D6
±14.5'
(E) GATE
POST
±50' D4
6.75'
1'
D4
AutoCAD SHX Text
90694PE
AutoCAD SHX Text
OREGON
PUMP STATION
EXIST. PVC DRAIN LINE
C3.0
HORIZONTAL
CONTROL PLAN
SHEET NUMBER
COPYRIGHT © 2026. THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF AUSLAND GROUP AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF AUSLAND GROUP
Eugene Grants Pass
541.345.1094 541.476.3788
DESCRIPTIONREV
DRAWN BY:
CHECKED BY:
APPROVED BY:
DESIGNED BY:
ISSUE DATE:
PHASE:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
PROJECT #
D ra w in g N am e:
V :\P ro je ct s
- C ur re nt
\E W
EB
Eu ge ne W at er a nd
E le ct ric
B oa rd \2
5-
E
W
EB
-S ha st a
Pu m p St at io n\
W or ki ng
D ra w in gs \C iv il\
M as te r\E
SP
S
C iv il Ba se .d
S av e:
O ct ob er
, 2
4:
t D at e:
O ct ob er
, 2
5:
J on at ha n
G ol ds tie n
EW
EB
SH
A
ST
A
P U
M P
ST
A
TI
O
N
P
O
TT
ER
S
T.
EU
G
EN
E, O
R
M A
P
T
A X
LO
T
2 OCT 2026
25-0705
CONSTRUCTION
DOCUMENTS
MILESTONE:
www.AuslandGroup.com
JSG
JSG
CLK
CLK
W A
TE
R
S
YS
TE
M
S
EWEB
SCALE: 1" = 5'
HORIZONTAL CONTROL PLAN
N
S 89°59' E 117.25'
N 0°
0'
P O
T T
0 5 10
1" = 5'
±1 .1
2.
.9
5' M
AT
CH
E
XI
ST
D
RW
Y
W
ID
TH
2.
M
AT
CH
EX
IS
T
M
AT
CH
EX
IS
T
5.75' 2.25'MATCH
EXIST
2.0'
2.
3'
.1
4.0'
10.5' 45°
2.25' 8.25'
.6
13.5'
4.0
16.
67'
10.
5'
10.5'
90°
.0
' M
AT
CH
E
XI
ST
D
RW
Y
67.17'
±60' R/W ±30'
±1 .6
2'
8'
3.2 5'
±9.
6'
45° 3.67' 40.25'
±2.1'
4.00'
4.
8.
±4 .1
±2 .8
' ±45°
0.5'
1' 1'
1'
AutoCAD SHX Text
90694PE
AutoCAD SHX Text
OREGON
±528.45
FS/ME
±527.98 TC/ME
±527.48 FL/ME
±527.53
EP/ME
±527.49
EP/ME
527.45 TC
527.41 FL
528.17
FS
±527.17
EP/ME
±527.14
EP/ME
527.13 TC
527.09 FL
±527.58 TC/ME
±527.08 FL/ME
±528.25
FS/ME
527.96
FS
548.37
FS/ME
548.47
FS/ME
547.50
FS/ME
547.77
FS/ME
547.83
FS
548.48
FS/ME
548.33 TC
547.83 FS
547.85
FS/ME
548.10
FS/ME
547.66 TG
7.
T
G
547.16
FS/ME
H=6"
548.35 TC
547.66 FS±H=8.3"
19+79 20+00
21+0021+00
±527.33
EP/ME
527.29 TC
527.25 FL
528.36
FS
23%30%36%30%
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(545)
(540)(535)(530)
(527)
(547)
(5
(548)
±527.53
TR (E) SSMH
548.38 TC
548.38 FSH=0"
GRADE BREAK
548.38
FS/ME
RIDGE LINE
5.7
5.7
6.5%
9.0%
10.6%
9.0%
2.4
2.5
34.
0%
13.5%
548.38
FS
0+00
1+
544.54 TC
544.54 FS/ME H=0"
0+00
0+
528.54
FS
STEP STEP
528.60
FS
DA
YL
IG
HT
ON
D
RW
Y
528.94 FS
528.36 EG
529.26 EG
529.02 FS
VA
R
HT
R
ISE
R
7"
RI
SE
R
(TY
P)
7" RISER (TYP)
7" RISER (TYP)
529.02
FS 529.05
FS
542.94 FS
541.89 EG
544.55 TC
544.05 FS/ME H=6"
2:12:1
543.02 FS
542.98 EG
542.94
FS 543.02
FS
7"
RI
SE
R
(TY
P)
VA
R
HT
R
ISE
R
VAR HT RISER
548.27
FS
548.19
FS
532.44 TW
531.29 EG
532.44 TW
531.85 EG
532.44 TW
546.44 TW
531.29 EG
STA 0+57.83
OFF 0.00
3.5' HIGH CONCRETE RETAINING WALL
PUMP STATION
CONSTRUCTION NOTES
CONSTRUCT CONCRETE DRIVEWAY, APRON AND
24" CURB & GUTTER PER CITY OF EUGENE
STANDARD DRAWINGS RD700, RD740 & RD740(A).
REPLACE EXISTING ASPHALT DAMAGED OR
REMOVED AS REQUIRED FOR CONSTRUCTION OF
NEW CONCRETE PER DETAIL 1 ON SHEET C7.0
1 1 C7.0
RD700
C7.1
CONCRETE STAIRS2 5a C7.3
CONCRETE STAIRS3 5b C7.3
4" THICK CONCRETE4 4
C7.0
6t
6" THICK CONCRETE
C4.0
GRADING
PLAN
SHEET NUMBER
COPYRIGHT © 2026. THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF AUSLAND GROUP AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF AUSLAND GROUP
Eugene Grants Pass
541.345.1094 541.476.3788
DESCRIPTIONREV
DRAWN BY:
CHECKED BY:
APPROVED BY:
DESIGNED BY:
ISSUE DATE:
PHASE:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
PROJECT #
D ra w in g N am e:
V :\P ro je ct s
- C ur re nt
\E W
EB
Eu ge ne W at er a nd
E le ct ric
B oa rd \2
5-
E
W
EB
-S ha st a
Pu m p St at io n\
W or ki ng
D ra w in gs \C iv il\
M as te r\E
SP
S
C iv il Ba se .d
S av e:
O ct ob er
, 2
4:
t D at e:
O ct ob er
, 2
5:
J on at ha n
G ol ds tie n
EW
EB
SH
A
ST
A
P U
M P
ST
A
TI
O
N
P
O
TT
ER
S
T.
EU
G
EN
E, O
R
M A
P
T
A X
LO
T
2 OCT 2026
25-0705
CONSTRUCTION
DOCUMENTS
MILESTONE:
www.AuslandGroup.com
JSG
JSG
CLK
CLK
W A
TE
R
S
YS
TE
M
S
EWEB
S 89°59' E 117.25'
N 0°
0'
P O
T T
A C4.1
A C
4.
CONCRETE CURB AND PAVEMENT
B C4.1
B C4.1
SCALE: 1" = 5'
GRADING PLAN
N
0 5 10
1" = 5'
±60' R/W
25'1
±30'
RD740
C7.1
RD740(A)
C7.1
C7.0
C7.0CONCRETE CURB TAPER L=18"
RE-STACK EXISTING ±2' HIGH ROCK WALL AS
REQUIRED
6t
6t
VARIABLE HEIGHT POURED-IN-PLACE CONCRETE
RETAINING WALL WITH SURFACE MOUNTED
HANDRAIL
1-4 C7.3
547546
7 8 88
CONNECT TO
EXIST. PVC
DRAIN LINE
9 COORDINATE OFF-SITE CONSTRUCTION WITH
ADJACENT PROPERTY OWNER
8.34'9
AutoCAD SHX Text
90694PE
AutoCAD SHX Text
OREGON
Elevation El ev at ion
Station
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+33
PO
W
ER
TOP OF
WALL
EXISTING GRADE
AT TOP OF WALL
PUMP STATION
° T
UR
N
TO
PU
M P
HO
US
E 1.0'
(TYP)
ST
A.
+0
8.
PO
TT
ER
S
T.
R
/W
1.75'
(TYP)
EXISTING GRADE
AT EDGE OF DRWY
3.5'
6.0'
6.0'
6.0'
EXPANSION JOINT
FILLER
C7.3
3.76'
(TYP.)
5.44'
3.27'
EXTEND STAIR KEYWAY
FOOTING TO TOP OF
WALL FOOTING
WALL FOOTING
C7.3
C7.3
4.5'
C7.3
WALL FOOTING
CONCRETE STAIRS PER CONCRETE STAIRS PER
LANDING LANDING
5a C7.3
1.25' (TYP.)
4"Ø SD SEE
SHEET C5.0
4"Ø SD SEE
SHEET C5.0
LANDING
5b C7.3
Elevation El ev at ion
Station
19+7919+80 19+90 20+00 20+10 20+20 20+30 20+40 20+50 20+60 20+70 20+80 20+90 21+0021+00
ST
A.
9+
.7
PO
TT
ER
S T.
R /W
C L
ST
A.
0+
.0
PO
TT
ER
S T.
R /W
M
AT
CH
E
X.
D
RW
Y
8.
F
S/ M
E
ST
A.
9+
.0
M
AT
CH
E X.
P
VM
T
CO
NC
. C
G
±5
.3
EP
/M
E
ST
A.
0+
.0
7.
T C
7.
F
L
13.3%POTTER ST
ST
A.
0+
.3
M
AT
CH
E
XI
ST
7.
F S/
M E
ST
A.
0+
.6
C
T
RE
NC
H
DR
AI
N
7.
T G
L ST
A.
0+
.8
M
AT
CH
E
XI
ST
8.
F S/
M E
EXISTING CONCRETE DRIVEWAY
C4.1
GRADING
PROFILES
SHEET NUMBER
COPYRIGHT © 2026. THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF AUSLAND GROUP AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF AUSLAND GROUP
Eugene Grants Pass
541.345.1094 541.476.3788
DESCRIPTIONREV
DRAWN BY:
CHECKED BY:
APPROVED BY:
DESIGNED BY:
ISSUE DATE:
PHASE:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
PROJECT #
D ra w in g N am e:
V :\P ro je ct s
- C ur re nt
\E W
EB
Eu ge ne W at er a nd
E le ct ric
B oa rd \2
5-
E
W
EB
-S ha st a
Pu m p St at io n\
W or ki ng
D ra w in gs \C iv il\
M as te r\E
SP
S
C iv il Ba se .d
S av e:
O ct ob er
, 2
4:
t D at e:
O ct ob er
, 2
5:
J on at ha n
G ol ds tie n
EW
EB
SH
A
ST
A
P U
M P
ST
A
TI
O
N
P
O
TT
ER
S
T.
EU
G
EN
E, O
R
M A
P
T
A X
LO
T
2 OCT 2026
25-0705
CONSTRUCTION
DOCUMENTS
MILESTONE:
www.AuslandGroup.com
JSG
JSG
CLK
CLK
W A
TE
R
S
YS
TE
M
S
EWEB
C7.2
C7.02
C7.0
C7.0
±1'
C7.0
RD740
C7.1
SCALE: 1" = 5' (H & V)
DRIVEWAY PROFILEB
SCALE: 1" = 5' (H & V)
STAIR & WALL PROFILEA
AutoCAD SHX Text
90694PE
AutoCAD SHX Text
OREGON
23%30%36%30%
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(545)
(540)(535)(530)
(527)
(547)
(5
(548)
547.66 TG (DS-110)
546.73 INV (UP)
547.66 TG (DS-111)
546.70 INV (UP)
547.66 TG (DS-112)
546.68 INV (UP)
547.66 TG (DS-113)
546.65 INV (UP)
547.66 TG (DS-114)
546.62 INV (UP)
547.66 TG (DS-340)
546.59 INV 4" (IN)
546.07 INV 4" (OUT)
547.66 TG (DS-112)
546.68 INV (UP)
546.65 INV 4" (OUT)
547.66 TG (DS-111)
546.70 INV (UP)
±527.11
INV EXISTING
CURB DRAIN
±527.26
INV EXIST 4"
539.49
INV 4"
527.56 INV 4"x11.25°
VERT. BEND
34%2% 546.03 INV 4"x22.5°
34% 2%
546.62 INV 4"x45°527.27
4" SD WYE
PUMP STATION
DRAINAGE SYSTEM
MAKE CONNECTION OF NEW 4" PVC SDR 35 TO
EXISTING STORMDRAIN WITH FITTINGS AS
REQUIRED
EXIST. PVC DRAIN LINE
C5.0
DRAINAGE &
UTILITY PLAN
SHEET NUMBER
COPYRIGHT © 2026. THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF AUSLAND GROUP AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF AUSLAND GROUP
Eugene Grants Pass
541.345.1094 541.476.3788
DESCRIPTIONREV
DRAWN BY:
CHECKED BY:
APPROVED BY:
DESIGNED BY:
ISSUE DATE:
PHASE:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
PROJECT #
D ra w in g N am e:
V :\P ro je ct s
- C ur re nt
\E W
EB
Eu ge ne W at er a nd
E le ct ric
B oa rd \2
5-
E
W
EB
-S ha st a
Pu m p St at io n\
W or ki ng
D ra w in gs \C iv il\
M as te r\E
SP
S
C iv il Ba se .d
S av e:
O ct ob er
, 2
4:
t D at e:
O ct ob er
, 2
5:
J on at ha n
G ol ds tie n
EW
EB
SH
A
ST
A
P U
M P
ST
A
TI
O
N
P
O
TT
ER
S
T.
EU
G
EN
E, O
R
M A
P
T
A X
LO
T
2 OCT 2026
25-0705
CONSTRUCTION
DOCUMENTS
MILESTONE:
www.AuslandGroup.com
JSG
JSG
CLK
CLK
W A
TE
R
S
YS
TE
M
S
EWEB
S 89°59' E 117.25'
N 0°
0'
P O
T T
SCALE: 1" = 5'
DRAINAGE & UTILITY PLAN
N
0 5 10
1" = 5'
±30'
4" PVC SDR 35 AT SLOPE PER PLAN (2.0% MIN.)
WITH GASKETED PUSH-ON JOINTS MEETING
ASTM D3034 AND D3212 [±73 LF]
4"x 11.25°, 22.5° OR 45° PVC BEND AS REQ'D [3 EA]24
CAUTION: EXISTING
12" DI WATERLINE
NDS DURA SLOPE 6" WIDE TRENCH DRAIN PART
#'s DS-110 THROUGH DS-114 w/ TRAFFIC RATED
CAST IRON (OR APP'D EQUAL) GRATE. USE
UNIVERSAL END CAPS ON UPSTREAM END, AND
END OUTLET FOR 4" PIPED CONNECTION TO
CATCH BASIN WHERE REQUIRED [28 LF]
25 2 C7.2
NDS DURA SLOPE 6" WIDE CATCH BASIN PART #
DS-340 w/ TRAFFIC RATED CAST IRON (OR APP'D
EQUAL) GRATE. USE UNIVERSAL END OUTLET
FOR 4" PIPED CONNECTION TO TRENCH DRAIN,
AND UNIVERSAL OUTLET FOR 4" OUTLET ON
CATCH BASIN [1 EA]
26 3 C7.2
CAUTION: EXISTING
NATURAL GAS LINE
ELECTRIC SYSTEM NOTES
1. ALL ELECTRIC SERVICES ARE TO BE CONSTRUCTED PER PLANS BY
ELECTRICAL DESIGNER. CONDUIT LOCATIONS AND ALIGNMENTS SHOWN
HEREON ARE APPROXIMATE.
2. ADDITIONAL CONDUITS MAY BE REQUIRED (NOT SHOWN)
3. VERIFY EXISTING ELECTRIC LOCATION AND COORDINATE SERVICE
REQUIREMENTS WITH EWEB AND UTILITIES PRIOR TO CONSTRUCTION
4. SEE DETAIL 6 ON SHEET C7.0 FOR TRENCH DETAILS
ELECTRIC SYSTEM
INSTALL 3" PVC ELECTRICAL CONDUIT AND PULL
BOXES AS REQUIRED. STUB CONDUIT THROUGH
RETAINING WALL AT STREET, AND STUB INTO
PUMP HOUSE BUILDING. COORDINATE
ELECTRICAL REQUIREMENTS AND CONDUIT SIZE
WITH EWEB [±55 LF]
DRAINAGE SYSTEM NOTES
1. DRAIN PIPE AND FITTINGS:
SITE DRAINAGE PIPING (MIN. 5' OUTSIDE OF BLDGS): PVC SDR 35
WITH GASKETED PUSH-ON JOINTS MEETING D3034 AND D3212.
2. SEE DETAIL 6 ON SHEET C7.0 FOR TRENCH DETAILS
±60' R/W
INSTALL ELECTRIC PANEL ON RETAINING WALL.
COORDINATE PANEL TYPE AND SIZE WITH EWEB
[1 EA]
20 21 2123
4" SD CLEANOUT [1 EA] 7
C7.0
22 SLEEVE 4" STORMDRAIN THROUGH WALL
FOOTING AS REQUIRED [±9.5 LF]
±9.5' 22
4"Ø PERFORATED PVC RETAINING WALL
FOUNDATION DRAIN PIPE ENCASED IN WASHED
GRAVEL DRAIN ROCK WRAPPED WITH MIRAFI
140N (OR EQUIVALENT) NON-WOVEN GEOTEXTILE
FABRIC. INSTALL SOLID-WALLED PIPE
CONNECTION TO 4" STORMDRAIN PIPE AT
LOCATION AND ELEVATION PER PLAN
27 3 C7.2
27 27
AutoCAD SHX Text
90694PE
AutoCAD SHX Text
OREGON
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X X
X
X
X
XXXXXXX
23%30%36%30%
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(5
(545)
(540)(535)(530)
(527)
(526)
(547)
(5
(548)
C6.0
EROSION
CONTROL PLAN
SHEET NUMBER
COPYRIGHT © 2026. THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF AUSLAND GROUP AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF AUSLAND GROUP
Eugene Grants Pass
541.345.1094 541.476.3788
DESCRIPTIONREV
DRAWN BY:
CHECKED BY:
APPROVED BY:
DESIGNED BY:
ISSUE DATE:
PHASE:
VERIFY SCALES
IF NOT ONE INCH ON THIS
SHEET, ADJUST SCALES
ACCORDINGLY
ORIGINAL DRAWING
BAR IS ONE INCH
PROJECT #
D ra w in g N am e:
V :\P ro je ct s
- C ur re nt
\E W
EB
Eu ge ne W at er a nd
E le ct ric
B oa rd \2
5-
E
W
EB
-S ha st a
Pu m p St at io n\
W or ki ng
D ra w in gs \C iv il\
M as te r\E
SP
S
C iv il Ba se .d
S av e:
O ct ob er
, 2
4:
t D at e:
O ct ob er
, 2
5:
J on at ha n
G ol ds tie n
EW
EB
SH
A
ST
A
P U
M P
ST
A
TI
O
N
P
O
TT
ER
S
T.
EU
G
EN
E, O
R
M A
P
T
A X
LO
T
2 OCT 2026
25-0705
CONSTRUCTION
DOCUMENTS
MILESTONE:
www.AuslandGroup.com
JSG
JSG
CLK
CLK
W A
TE
R
S
YS
TE
M
S
EWEB
SCALE: 1" = 10'
EROSION CONTROL PLAN
N
0 10 20
1" = 10'
INSTALL "ECO-PAN" CONCRETE WASHOUT PAN
(OR APPROVED EQUAL) cw
LEGEND
SURFACE FLOW DIRECTION
EXISTING:
PROPOSED:
CONTAINER AND WASTE STORAGE cs
INSTALL 170± LF OF FIBER ROLL. CONTRACTOR SHALL
INSTALL PERIMETER CONTROLS AS NEEDED TO
PREVENT CONTAMINATED RUNOFF FROM ENTERING
THE STREET
RD1030
SCALE: NTS
CONCRETE WASHOUT1
INSPECTION TABLE
SITE CONDITION MINIMUM FREQUENCY
ACTIVE PERIOD
DAILY WHEN STORMWATER
RUNOFF, INCLUDING RUNOFF FROM
SNOWMENT IS OCCURING AND AT
LEAST EVERY 14 DAYS
REGARD\LESS OF WHETHER
STORMWATER RUNOFF IS
OCCURING
PRIOR TO THE SITE BECOMING
INACTIVE OR IN ANTICIPATION
OF SITE INACCESSIBILITY
ONCE TO ENSURE THAT EROSION
AND SEDIEMENT CONTROL
MEASURES ARE IN WORKING
ORDER. ANY NECESSARY
MAINTENANCE AND REPAIR MUST
BE MADE PRIOR TO LEAVING THE
SITE
INACTIVE PERIODS GREATER
THAN 14 CONSECUTIVE
CALENDAR DAYS
ONCE EVERY MONTH
PERIODS DURING WHICH THE
SITE IS INACCESSIBLE DUE TO
INCLUEMENT WEATHER
IF PRACTICAL, INSPECTIONS MUST
OCCUR DAILY AT A RELEVANT AND
ACCESSIBLE DISCHARGE POINT OR
DOWNSTREAM LOCATION
PERIODS DURING WHICH
DISCHARGE IS UNLIKELY DUE
TO FROZEN CONDITIONS
MONTHLY. RESUME MONITORING
IMMEDIATELY UPON MELT, OR
WHEN WEATHER CONDITIONS
MAKE DISCHARGES LIKELY
ESC ADDITIONAL NOTES
IT IS THE INTENT OF THIS TEMPORARY EROSION AND SEDIMENT CONTROL PLAN THAT STORM WATER RUNOFF BE CONTROLLED AT ALL TIMES TO PREVENT SOIL EROSION AND TO MAINTAIN WATER QUALITY. ANY AND ALL MEASURES
NECESSARY TO DO SO SHALL BE EMPLOYED BY THE CONTRACTOR.
1. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDITIONS, THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ENSURING THAT EROSION DOES NOT OCCUR ON THE SITE AND THAT POLLUTED OR SILT-LADEN RUNOFF DOES NOT LEAVE THE SITE OR ENTER INTO ANY CREEK, STREAM, WETLAND OR WATER
BODY ON THE SITE.
2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTING AND IMPLEMENTING APPROPRIATE METHODS, "BEST MANAGEMENT PRACTICES" (BMPS), FOR STORM WATER TREATMENT AND CONTROL THAT MEET THE REQUIREMENTS OF THE STATE AND LOCAL JURISDICTION.
3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES TO THE PROJECT ENGINEER. IN THE EVENT THAT THE INSTALLED WATER QUALITY CONTROL MEASURES ARE INEFFECTIVE AT CONTROLLING EROSION AND SEDIMENT, THE CONTRACTOR SHALL IMMEDIATELY REPORT TO AND CONSULT WITH THE PROJECT ENGINEER TO FIND AN APPROPRIATE REMEDY. ALL CONSTRUCTION ACTIVITIES, WITH THE EXCEPTION OF EROSION AND SEDIMENT CONTROL MEASURES, SHALL CEASE UNTIL SUCH TIME AS THE WATER
QUALITY IS BROUGHT UNDER CONTROL.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS AND ANTICIPATING STORM ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES IN ANTICIPATION OF THE WEATHER.
5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPS SHALL BE STORED ON SITE AND SHALL BE IMMEDIATELY AVAILABLE FOR USE. SUCH SUPPLIES AND MATERIALS SHALL INCLUDE, BUT NOT BE LIMITED TO, STRAW BALES OR OTHER MULCHING MATERIAL, SILT FENCING AND STAKES, FILTER FABRIC, ETC.
6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, CONTRACTOR SHALL MONITOR ALL EROSION CONTROL MEASURES AND SHALL PRIORITIZE IMPLEMENTATION AND MAINTENANCE OF EROSION AND SEDIMENT
CONTROL MEASURES ABOVE ALL OTHERS.
DISTURBANCE
ACTIVE STOCKPILE TO BE TEMPORARILY
COVERED AND PROTECTED WITH TEMPORARY
PERIMETER SEDIMENT BARRIER PRIOR TO THE
ONSET OF PRECIPITATION. INACTIVE STOCKPILE
TO BE PROTECTED FROM WIND AND WATER
EROSION WITH PROTECTIVE COVERING AND
PERIMETER SEDIMENT BARRIER
S
SCALE: NTS
STOCKPILE SHEETING2
SCALE: NTS
INLET PROTECTION - TYPE 73
SCALE: NTS
SEDIMENT BARRIER - TYPE 34
LIMITS OF DISTURBANCE ENCOMPASS
APPROXIMATELY 1,400 SF (0.03 ACRES) OF THE
PROJECT SITE.
PLACEMENT OF EROSION CONTROL FACILITIES IN
FIELD SHALL BE ADJUSTED FOR ACTUAL EXTENTS
OF SOIL DISTURBANCE AS DIRECTED BY ENGINEER
AND/OR OWNER. CLEARING LIMITS SHALL BE
CLEARLY MARKED IN FIELD PRIOR TO
COMMENCEMENT OF SITE WORK.
PUMP STATION
S 89°59' E 20.00' N 30°10'40" W 7.81' S 70°20'47" W
14.97'
S 89°59' E 112.49'
N 10°17'30" W 134.41'
N 0°
' E
4.
S 89°59' E 117.25'
N 0°
0'
P O
T T
MAP 18030842
TL 4200 ±0.22 AC
NOT-A-PART
KOELLING TR
MAP 18030842
TL 4100 ±0.22 AC
NOT-A-PART
GARDNER
MAP 18030842
TL 3400 ±0.26 AC
NOT-A-PART
HELDING
MAP 18030842
TL 3500 ±0.21 AC
NOT-A-PART
GUENZA
MAP 18030842
TL 4400 ±0.26 AC
NOT-A-PART
HOLBROOK
±30' ±60' R/W
MAP 18030842
TL 4300 ±0.24 AC
3545 POTTER ST.
EWEB
ZONING: R-1
cw cs
±2 0'
1. Prior to any ground disturbance on the site, a preconstruction meeting with erosion prevention staff and an initial inspection of installed measures is required.
2. The CSMP does not authorize construction activities. Grading, building, PEPI, and other permits may be required. All other necessary approvals shall be obtained.
3. Issuance of an Erosion Prevention Permit authorizes installation of approved protection measures, not construction or other ground disturbing activities. It does not relieve the permit holder and/or the contractor from other permitting requirements.
4. Construction shall conform to the current edition of the City amended Oregon Standard Specifications for Construction and City Standard Drawings (required for public improvement projects only).
5. Erosion and Sediment Control (ESC) measures, and other natural resource protection fencing and barriers, shown on the CSMP are the minimum requirements for anticipated site conditions.
6. ESC measures shall be upgraded as needed or as directed by the City inspector until all construction is completed and the Erosion Prevention Permit is closed.
7. Implementation of the CSMP, including construction, maintenance, monitoring, replacement, and/or upgrading of erosion and sediment control measures and protection fencing, is the responsibility of the permit holder until all construction is completed and vegetation/landscaping is established and approved.
8. Boundaries of the clearing and grading limits shown on this plan shall be clearly flagged in the field prior to construction. During construction, no disturbance beyond the flagged clearing and grading limits shall be permitted. The flagging shall be maintained by the permit holder and/or the contractor for the duration of construction. In addition, wetland and riparian areas shall be identified and protected with appropriate fencing as noted on CSMP prior to construction and shall not be disturbed unless the proper permits are obtained.
9. ESC measures shown on this CSMP must be constructed in conjunction with all clearing and grading activities, in such a manner as to ensure that sediment and sediment laden water does not enter the stormwater system, roadways, adjacent property or violate applicable water quality standards. When designing and implementing measures, the CSMP designer, permit holder and/or the contractor shall consider the seasonal variation of rainfall, temperature, and other climatic factors relative to the timing of land disturbance activities.
10. ESC measures on active sites shall be inspected and maintained daily and within 24 hours after any storm event greater than 0.5 inches of rain per 24-hour period.
11. Any required repairs or adjustments to installed ESC measures shall be made immediately. The erosion and sediment control measures on inactive sites shall be inspected a minimum of once every month and/or within 48 hours following storm events. Additionally, sites covered under Department of Environmental Quality (DEQ) permits (1200-C, 1200-CN) must comply with those permit monitoring and record-keeping requirements.
12. During the Wet Weather season (October 15 to April 30), all exposed soil and stockpile areas shall be covered, or otherwise protected by a facility (or combination of facilities) that result in no stormwater runoff leaving the site during a five-year storm event. For development sites over 40 acres, the design storm shall be a 10-year storm event consistent with an approved CSMP.
13. All adjacent properties, water features, and natural resource areas are to be kept free of deposits or discharges of soil, sediment or construction-related material from the construction site.
14. All erosion and sediment control measures shall be protected from damage at all times. Erosion control measures shall remain in place until vegetation has been established and the site is permanently stabilized or removal is authorized by City inspector. Any measures that are damaged or destroyed shall be repaired or replaced immediately.
15. Stabilize all disturbed areas within 50 feet of waterways, wetlands or other sensitive areas within seven days of exposure.
16. Streets adjacent to construction entrances and along haul routes shall be swept as needed or when directed by the City inspector to ensure public rights-of-way are kept clean and free of debris.
17. When trucking saturated soils to or from the site, either watertight trucks shall be used or loads shall be drained prior to transport until dripping has been reduced to no more than one gallon per hour.
Sediment-laden water must be prevented from impacting rights-of-way and/or entering the stormwater system.
18. Extracted ground water from excavated trenches shall be disposed of in a suitable manner without discharging sediment to adjacent properties, the City’s stormwater system, water features, or related natural resources. Dewatering systems shall be designed and operated so as to prevent removal of the natural soils and so that the groundwater level outside the excavation is not reduced to the extent that would damage or endanger adjacent structures or property. Dewatering system designs must be submitted and approved prior to operation. Approval of the dewatering system does not guarantee that it will meet the outcomes or be acceptable for use in all situations. Modifications to the system will be required if the outcomes cannot be met. At no time will sediment-laden water be allowed to leave the construction site.
19. A supply of ESC materials necessary to meet the outcomes and implement the CSMP or other erosion practices under all weather conditions shall be maintained at all times on the construction site.
20. No hazardous substances, such as paints, thinners, fuels and other chemicals shall be released onto the site and adjacent properties, or into water features, the City’s stormwater system, or natural resource areas.
21. No discharge of construction-related contaminants resulting from activities such as (but not limited to) concrete sawing, or cleaning or washing or maintenance of equipment, tools, or vehicles, into the City’s stormwater system or natural resource areas shall occur.
22. All work performed by utility companies for this project—including placement of appropriate erosion and sediment control measures, finished grading, seeding, mulching and clean up—is governed by the conditions and requirements of this CSMP.
CONSTRUCTION SITE MANAGEMENT PLAN (CSMP) GENERAL NOTES
IMPLEMENTATION
TABLE
BMP TIMING
PRE-CONSTRUCTION MEETING
MEET ON-SITE WITH PROJECT
CONSTRUCTION PERSONNEL AND
EROSION CONTROL INSPECTOR TO
DISCUSS ESC MEASURES AND
CONSTRUCTION LIMITS PRIOR
TO CONSTRUCTION
STRAW WATTLE
INSTALL PERIMETETER SEDIMENT
CONTROLS
PRIOR TO CONSTRUCTION, THEN
ON-SITE AS WORK PROGRESSES
INLET PROTECTION
INSTALL PERIMETETER SEDIMENT
CONTROLS
PRIOR TO CONSTRUCTION, THEN
ON-SITE AS WORK PROGRESSES
CONCRETE WASHOUT
INSTALL CONCRETE WASHOUT
AREA
PRIOR TO CONCRETE WORK
CONTAINER AND WASTE
STORAGE
INSTALL CONTAINER AND WASTE
STORAGE
PRIOR TO USE OF HAZARDOUS
MATERIALS ON-SITE
LIMITS OF
AutoCAD SHX Text
90694PE
AutoCAD SHX Text
OREGON
C7.0
CIVIL
DETAILS
SHEET NUMBER
COPYRIGHT © 2026. THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF AUSLAND GROUP AND IS NOT TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .