About this file

This document is an addendum to the Invitation to Bid (ITB) for the Tuluksak Generator #02 Replacement Project, Solicitation No. ITB 25001, issued by the State of Alaska. The addendum clarifies and modifies the timeline for the non-owner supplied equipment, stating that the equipment should be factory stock and readily available, and any changes to the timeline would be made under the contract.

The related state and local contract opportunity is for the installation of a new owner-furnished engine-generator in an existing power plant in the community of Tuluksak, Alaska, along with modifications to the existing mechanical and electrical systems. The contract is funded by a State of Alaska appropriation. A non-mandatory pre-bid meeting is scheduled for August 8, 2024, at 10:00 AM, and the bid opening will be held on August 20, 2024, at 2:00 PM, both conducted telephonically. Bids will be accepted for furnishing all labor, equipment, and materials required to complete the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 1 Printed on 08/08/2024

Date: August 8, 2024 Project: Tuluksak Generator #02 Replacement Project Solicitation No.: ITB 25001 Addendum No.: 1

TO ALL PLAN HOLDERS:

The following changes, additions, clarifications, and/or deletions are hereby made a part of the ITB Documents for the above noted project, fully and completely as if the same were fully contained therein. All other terms, conditions, and specifications of the original Invitation to Bid, remain unchanged.

This addendum must be acknowledged by email.

The modifications directed by this Addendum One are described on this page and the following attachments:

CHANGES TO DOCUMENTS:

The ITB is hereby clarified, changed or modified by the following:

Clarification and Contract Documents:

1. Question: “The timeline for the non-owner supplied equipment seems short. Is there any chance to adjust the timeline?”

Response: The non-owner supplied equipment should be factory stock equipment and should be readily available. Any changes to the timeline would be made under contract.

END OF ADDENDUM #1