This is a bid tabulation document for ITB 19-50TM (Rebid) from the City of Portsmouth, Virginia, showing comparative pricing from three vendors: WB&E Construction Inc., Tidewater Utility Construction Inc., and Inlet Construction Inc. The document details 132 line items for sewer construction services, with a bid closing date of October 9, 2019 at 2:00 p.m. ET. The scope includes various sizes of fittings, pipe materials, manholes, and related infrastructure components for sanitary sewer construction and maintenance work.
The total bid amounts were $1,022,050.00 from WB&E Construction Inc., $1,842,673.50 from Tidewater Utility Construction Inc., and $2,379,650.00 from Inlet Construction Inc. All vendors included a 0.25 emergency markup rate. Major cost items included gravity sanitary sewer installations ranging from 6" to 18" diameter in various materials (PVC SDR 26, PVC C900 DR18, and ductile iron), manhole installations, force main components, and associated road restoration work including concrete and asphalt repairs. The quantities requested varied significantly, with some items requiring up to 1,500 units while others needed as few as 1-2 units.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 19-50TM (Rebid)
Buyer: Tammy Martin
Closing Date: October 9, 2019 @ 2:00 p.m. et.
NO Size Item Quantity Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price
1 Mobilization 15 $1,000.00 $15,000.00 $3,500.00 $52,500.00 $5,000.00 $75,000.00
2 4"
Fitting, Bends, Reducer, Plug or cap, MJ Restrained 5 $185.00 $925.00 $100.00 $500.00 $500.00 $2,500.00
3 6"
Fitting, Bends, Reducer, Plug or cap, MJ Restrained 5 $195.00 $975.00 $100.00 $500.00 $500.00 $2,500.00
4 8"
Fitting, Bends, Reducer, Plug or cap, MJ Restrained 5 $200.00 $1,000.00 $100.00 $500.00 $600.00 $3,000.00
5 10"
Fitting, Bends, Reducer, Plug or cap, MJ Restrained 5 $205.00 $1,025.00 $100.00 $500.00 $800.00 $4,000.00
6 12"
Fitting, Bends, Reducer, Plug or cap, MJ Restrained 5 $225.00 $1,125.00 $100.00 $500.00 $900.00 $4,500.00
7 8" Joint Restraint (New Pipe) 5 $125.00 $625.00 $100.00 $500.00 $500.00 $2,500.00
8 8" Joint Restraint (Existing Pipe) 5 $450.00 $2,250.00 $3,500.00 $17,500.00 $800.00 $4,000.00
9 1" Air Vent Assembly 5 $750.00 $3,750.00 $1,800.00 $9,000.00 $2,500.00 $12,500.00
10 Adjustment of Existing Valve Box 5 $350.00 $1,750.00 $300.00 $1,500.00 $1,250.00 $6,250.00
11 6" Gravity Sanitary Sewer - PVC SDR 26 1000 $60.00 $60,000.00 $80.00 $80,000.00 $90.00 $90,000.00
12 8" Gravity Sanitary Sewer - PVC SDR 26 1000 $75.00 $75,000.00 $100.00 $100,000.00 $135.00 $135,000.00
13 10" Gravity Sanitary Sewer - PVC SDR 26 100 $100.00 $10,000.00 $125.00 $12,500.00 $185.00 $18,500.00
14 12" Gravity Sanitary Sewer - PVC SDR 26 100 $125.00 $12,500.00 $150.00 $15,000.00 $225.00 $22,500.00
15 14" Gravity Sanitary Sewer - PVC SDR 26 100 $25.00 $2,500.00 $125.00 $12,500.00 $235.00 $23,500.00
16 16" Gravity Sanitary Sewer - PVC SDR 26 100 $100.00 $10,000.00 $200.00 $20,000.00 $285.00 $28,500.00
17 18" Gravity Sanitary Sewer - PVC SDR 26 100 $100.00 $10,000.00 $200.00 $20,000.00 $350.00 $35,000.00
18 6"
Gravity Sanitary Sewer - PVC C900
DR18 1000 $65.00 $65,000.00 $70.00 $70,000.00 $95.00 $95,000.00
19 8"
Gravity Sanitary Sewer - PVC C900
DR18 1000 $80.00 $80,000.00 $80.00 $80,000.00 $150.00 $150,000.00
20 10"
Gravity Sanitary Sewer - PVC C900
DR18 100 $115.00 $11,500.00 $125.00 $12,500.00 $205.00 $20,500.00
21 12"
Gravity Sanitary Sewer - PVC C900
DR18 100 $120.00 $12,000.00 $150.00 $15,000.00 $245.00 $24,500.00
22 14"
Gravity Sanitary Sewer - PVC C905
DR25 100 $50.00 $5,000.00 $125.00 $12,500.00 $255.00 $25,500.00
23 16"
Gravity Sanitary Sewer - PVC C905
DR25 50 $145.00 $7,250.00 $250.00 $12,500.00 $305.00 $15,250.00
24 18"
Gravity Sanitary Sewer - PVC C905
DR25 50 $155.00 $7,750.00 $300.00 $15,000.00 $370.00 $18,500.00
25 6"
Gravity Sanitary Sewer - D.I. lined w/Protecto 401, Class 52 100 $120.00 $12,000.00 $150.00 $15,000.00 $145.00 $14,500.00
26 8"
Gravity Sanitary Sewer - D.I. lined w/Protecto 401, Class 52 100 $130.00 $13,000.00 $175.00 $17,500.00 $165.00 $16,500.00
27 10"
Gravity Sanitary Sewer - D.I. lined w/Protecto 401, Class 52 50 $140.00 $7,000.00 $200.00 $10,000.00 $215.00 $10,750.00
28 12"
Gravity Sanitary Sewer - D.I. lined w/Protecto 401, Class 52 50 $125.00 $6,250.00 $250.00 $12,500.00 $270.00 $13,500.00
29 14"
Gravity Sanitary Sewer - D.I. lined w/Protecto 401, Class 52 100 $100.00 $10,000.00 $300.00 $30,000.00 $280.00 $28,000.00
30 16"
Gravity Sanitary Sewer - D.I. lined w/Protecto 401, Class 52 50 $200.00 $10,000.00 $375.00 $18,750.00 $320.00 $16,000.00
31 18"
Gravity Sanitary Sewer - D.I. lined w/Protecto 401, Class 52 50 $275.00 $13,750.00 $400.00 $20,000.00 $395.00 $19,750.00
32 2" Force Main - PVC Sch. 80 200 $10.00 $2,000.00 $90.00 $18,000.00 $95.00 $19,000.00
Vendors
WB&E Construction Inc. Tidewater Utility Construction Inc. Inlet Construction Inc.
33 4"
Force Main - D.I. lined w/Protecto
401, Class 52 200 $125.00 $25,000.00 $150.00 $30,000.00 $90.00 $18,000.00
34 6"
Force Main - D.I. lined w/Protecto
401, Class 52 100 $135.00 $13,500.00 $150.00 $15,000.00 $95.00 $9,500.00
35 8"
Force Main - D.I. lined w/Protecto
401, Class 52 100 $150.00 $15,000.00 $150.00 $15,000.00 $150.00 $15,000.00
36 10"
Force Main - D.I. lined w/Protecto
401, Class 52 50 $160.00 $8,000.00 $150.00 $7,500.00 $220.00 $11,000.00
37 12"
Force Main - D.I. lined w/Protecto
401, Class 52 50 $175.00 $8,750.00 $200.00 $10,000.00 $350.00 $17,500.00
38 14"
Force Main - D.I. lined w/Protecto
401, Class 52 50 $100.00 $5,000.00 $200.00 $10,000.00 $400.00 $20,000.00
39 4" Force Main - PVC C900 DR 18 200 $75.00 $15,000.00 $100.00 $20,000.00 $85.00 $17,000.00
40 6" Force Main - PVC C900 DR 18 100 $105.00 $10,500.00 $125.00 $12,500.00 $150.00 $15,000.00
41 8 Force Main - PVC C900 DR 18 100 $125.00 $12,500.00 $150.00 $15,000.00 $175.00 $17,500.00
42 Force Main - PVC C900 DR 18 50 $135.00 $6,750.00 $150.00 $7,500.00 $185.00 $9,250.00
43 10" Force Main - PVC C900 DR 18 50 $155.00 $7,750.00 $150.00 $7,500.00 $195.00 $9,750.00
44 12" Force Main - PVC C900 DR 18 50 $100.00 $5,000.00 $150.00 $7,500.00 $200.00 $10,000.00
45 14"
Additional Cost for Trench Depth
(added to any pipelines & point repairs at this depth 100 $100.00 $10,000.00 $185.00 $18,500.00 $100.00 $10,000.00
Additional Cost for Trench Depth
(added to any pipelines & point repairs at this depth 50 $150.00 $7,500.00 $350.00 $17,500.00 $200.00 $10,000.00
Additional Cost for Trench Depth
(added to any pipelines & point repairs at this depth 25 $200.00 $5,000.00 $500.00 $12,500.00 $500.00 $12,500.00
48 2" Ball Valve (Brass) 10 $100.00 $1,000.00 $500.00 $5,000.00 $250.00 $2,500.00
49 4" Gate Valve 2 $1,105.00 $2,210.00 $1,250.00 $2,500.00 $2,500.00 $5,000.00
50 6" Gate Valve 2 $1,315.00 $2,630.00 $1,500.00 $3,000.00 $4,000.00 $8,000.00
51 8" Gate Valve 2 $1,810.00 $3,620.00 $1,800.00 $3,600.00 $6,500.00 $13,000.00
52 10" Gate Valve 1 $2,875.00 $2,875.00 $2,500.00 $2,500.00 $8,500.00 $8,500.00
53 12" Gate Valve 1 $3,465.00 $3,465.00 $3,000.00 $3,000.00 $1,000.00 $1,000.00
54 Emergency or Bypass Pumping 5 $750.00 $3,750.00 $6,200.00 $31,000.00 $3,000.00 $15,000.00
55 4"
Lateral Service Connection w/C.O. -
PVC SDR 26, 25 LF 5 $2,500.00 $12,500.00 $3,750.00 $18,750.00 $6,500.00 $32,500.00
56 6"
Lateral Service Connection w/C.O. -
PVC SDR 26, 25 LF 2 $2,000.00 $4,000.00 $3,750.00 $7,500.00 $7,000.00 $14,000.00
57 4"
Lateral Service Connection w/C.O. -
PVC SDR 26, 25 LF 2 $2,500.00 $5,000.00 $3,750.00 $7,500.00 $8,000.00 $16,000.00
58 6"
Lateral Service Connection w/C.O. -
PVC C900, 25 LF 2 $2,750.00 $5,500.00 $3,750.00 $7,500.00 $8,500.00 $17,000.00
59 4"
Lateral Service Connection w/C.O. -
D.I. lined w/Protecto 401, 25 LF 2 $2,750.00 $5,500.00 $4,200.00 $8,400.00 $8,500.00 $17,000.00
60 6"
Lateral Service Connection w/C.O. -
D.I. lined w/Protecto 401, 25 LF 2 $3,000.00 $6,000.00 $4,200.00 $8,400.00 $9,500.00 $19,000.00
61 4"
Lateral per foot over 25 feet, PVC
SDR 26 25 $60.00 $1,500.00 $125.00 $3,125.00 $100.00 $2,500.00
62 6"
Lateral per foot over 25 feet, PVC
SDR 26 25 $84.00 $2,100.00 $125.00 $3,125.00 $100.00 $2,500.00
63 4"
Lateral per foot over 25 feet, PVC
C900 DR 18 25 $100.00 $2,500.00 $125.00 $3,125.00 $100.00 $2,500.00
64 6"
Lateral per foot over 25 feet, PVC
C900 DR 18 25 $110.00 $2,750.00 $125.00 $3,125.00 $100.00 $2,500.00
65 4"
Lateral per foot over 25 feet, D.I.
lined w/Protecto 401, CL 52 25 $110.00 $2,750.00 $125.00 $3,125.00 $100.00 $2,500.00
66 6"
Lateral per foot over 25 feet, D.I.
lined w/Protecto 401, CL 52 25 $120.00 $3,000.00 $125.00 $3,125.00 $100.00 $2,500.00
67 4"x8" Inserta-Tee 25 $250.00 $6,250.00 $500.00 $12,500.00 $500.00 $12,500.00
68 4" dia Manhole 20 $350.00 $7,000.00 $1,250.00 $25,000.00 $1,500.00 $30,000.00
69 5' dia Manhole 10 $380.00 $3,800.00 $2,500.00 $25,000.00 $1,950.00 $19,500.00
70 5' dia
Manhole (additional cost for this depth) 5 $650.00 $3,250.00 $2,500.00 $12,500.00 $1,950.00 $9,750.00
71 Manhole, Shallow 10 $225.00 $2,250.00 $1,250.00 $12,500.00 $2,250.00 $22,500.00
72 5" dia Manhold, Drop 5 $380.00 $1,900.00 $2,500.00 $12,500.00 $650.00 $3,250.00
Manhole Frame & Cover (New manhole) 10 $300.00 $3,000.00 $800.00 $8,000.00 $1,200.00 $12,000.00
Manhole Watertight Frame & Cover
(New manhole) 10 $550.00 $5,500.00 $1,000.00 $10,000.00 $2,500.00 $25,000.00
Replace Manhole Frame & Cover (In
Pavement) 5 $750.00 $3,750.00 $2,500.00 $12,500.00 $2,100.00 $10,500.00
Replace Manhole Frame & Cover
(Outside of Pavement) 5 $550.00 $2,750.00 $1,800.00 $9,000.00 $1,850.00 $9,250.00
Rainstopper Manhole Insert, 24"
Plastic 50 $75.00 $3,750.00 $250.00 $12,500.00 $250.00 $12,500.00
Manhole Connection (core drill for 4" or 6" lateral) 10 $500.00 $5,000.00 $125.00 $1,250.00 $2,000.00 $20,000.00
Rebuild Bench & Invert (Existing
Manhole) 20 $250.00 $5,000.00 $625.00 $12,500.00 $1,250.00 $25,000.00
80 6"
Abandon Sanitary Sewer w/Flowable
Fill 1500 $2.00 $3,000.00 $5.00 $7,500.00 $25.00 $37,500.00
81 8"
Abandon Sanitary Sewer w/Flowable
Fill 900 $4.00 $3,600.00 $15.00 $13,500.00 $25.00 $22,500.00
82 10"
Abandon Sanitary Sewer w/Flowable
Fill 300 $5.00 $1,500.00 $15.00 $4,500.00 $25.00 $7,500.00
83 6"-12"
Removal of Existing sanitary Sewer
Main 300 $6.00 $1,800.00 $125.00 $37,500.00 $200.00 $60,000.00
84 4' dia
Abandon Existing Sanitary Sewer
Manhole 25 $80.00 $2,000.00 $312.50 $7,812.50 $950.00 $23,750.00
85 6"
Sewer Line Point Repair - PVC SDR
26, <20 lf, 50 $125.00 $6,250.00 $350.00 $17,500.00 $300.00 $15,000.00
86 8"
Sewer Line Point Repair - PVC SDR
26, <20 lf, 50 $175.00 $8,750.00 $350.00 $17,500.00 $325.00 $16,250.00
87 6"
Sewer Line Point Repair - PVC C900
DR 18, <20 lf, 30 $125.00 $3,750.00 $350.00 $10,500.00 $300.00 $9,000.00
88 8"
Sewer Line Point Repair - PVC C900
DR 18, <20 lf, 30 $200.00 $6,000.00 $350.00 $10,500.00 $325.00 $9,750.00
89 6"
Sewer Line Point Repair - D.I. Cl 52 w/Protecto 401 lining <20' 30 $150.00 $4,500.00 $350.00 $10,500.00 $550.00 $16,500.00
90 8"
Sewer Line Point Repair - D.I. Cl 52 w/Protecto 401 lining <20' 30 $225.00 $6,750.00 $350.00 $10,500.00 $600.00 $18,000.00
91 Select Material (Granular Fill) 200 $100.00 $20,000.00 $125.00 $25,000.00 $50.00 $10,000.00
92 Pipe Bedding (VDOT #57 Stone) 200 $30.00 $6,000.00 $125.00 $25,000.00 $75.00 $15,000.00
93 21A Course Aggregate 200 $80.00 $16,000.00 $125.00 $25,000.00 $125.00 $25,000.00
94 Base Material, BM-25 200 $80.00 $16,000.00 $125.00 $25,000.00 $130.00 $26,000.00
95 Asphalt Patch Type II 100 $45.00 $4,500.00 $250.00 $25,000.00 $175.00 $17,500.00
96 Asphalt Patch Type III 100 $95.00 $9,500.00 $250.00 $25,000.00 $200.00 $20,000.00
97 Concrete Patch 10 $250.00 $2,500.00 $900.00 $9,000.00 $1,000.00 $10,000.00
Saw cut, Remove and Dispose of
Asphalt Pavement 1200 $10.00 $12,000.00 $20.00 $24,000.00 $20.00 $24,000.00
Saw cut, Remove and Dispose of
Concrete Pavement 100 $250.00 $2,500.00 $50.00 $5,000.00 $100.00 $10,000.00
100 2" Asphalt Mill 2000 $10.00 $20,000.00 $12.00 $24,000.00 $20.00 $40,000.00
101 Asphalt Pavement, SM-9.5A 250 $78.00 $19,500.00 $150.00 $37,500.00 $155.00 $38,750.00
102 Topsoil and Seed 1 $1,500.00 $1,500.00 $1.00 $1.00 $1,000.00 $1,000.00
103 Inlet Protection 20 $75.00 $1,500.00 $50.00 $1,000.00 $100.00 $2,000.00
104 6"-12"
CCTV Sanitary Sewer (Existing and
New) 300 $1.00 $300.00 $4.00 $1,200.00 $10.00 $3,000.00
105 CCTV Sanitary Laterals (4") 250 $2.50 $625.00 $8.00 $2,000.00 $10.00 $2,500.00
106 6"-12" Sewer Line Cleaning 900 $1.00 $900.00 $4.00 $3,600.00 $10.00 $9,000.00
Locate/install under main or lateral
(Material: PVC, D.I., C.I.) 10 $25.00 $250.00 $1,250.00 $12,500.00 $1,000.00 $10,000.00
108 6"-12"
CCTV Sanitary Sewer (Existing and
New) 300 $1.00 $300.00 $3.00 $900.00 $15.00 $4,500.00
109 Locate/install under service 10 $25.00 $250.00 $1.00 $10.00 $1,000.00 $10,000.00
Dewatering (Manhole, lateral or point repair) 5 $1,850.00 $9,250.00 $4,200.00 $21,000.00 $2,500.00 $12,500.00
111 Dewatering Trench (per 100 ft) 3 $1,850.00 $5,550.00 $4,200.00 $12,600.00 $2,000.00 $6,000.00
112 Remove Curb & Gutter (CG-6) 200 $1.00 $200.00 $15.00 $3,000.00 $45.00 $9,000.00
113 Install Curb & Gutter (GG-6) 200 $55.00 $11,000.00 $50.00 $10,000.00 $55.00 $11,000.00
114 4" Remove Concrete Sidewalk 200 $1.00 $200.00 $15.00 $3,000.00 $100.00 $20,000.00
115 4" Install Concrete Sidewalk, 4" thick 200 $35.00 $7,000.00 $75.00 $15,000.00 $50.00 $10,000.00
116 .4" Remove Concrete Sidewalk 200 $1.00 $100.00 $15.00 $1,500.00 $100.00 $10,000.00
117 >4' Install Concrete Sidewalk, 4" thick 100 $20.00 $2,000.00 $80.00 $8,000.00 $125.00 $12,500.00
118 4' Remove Concrete Sidewalk 200 $1.00 $200.00 $15.00 $3,000.00 $100.00 $20,000.00
Remove Concrete Apron/Drive, 7" thick 100 $1.00 $100.00 $30.00 $3,000.00 $195.00 $19,500.00
120 Install Concrete Apron/Drive, 7" thick 100 $100.00 $10,000.00 $150.00 $15,000.00 $185.00 $18,500.00
121 Safety Fencing (Orange Plastic HI-VIS) 300 $3.00 $900.00 $1.00 $300.00 $25.00 $7,500.00
122 Utility Test Pit 5 $250.00 $1,250.00 $1,000.00 $5,000.00 $950.00 $4,750.00
123 Portable Toilet 10 $75.00 $750.00 $1,000.00 $10,000.00 $65.00 $650.00
Remove/Replace Storm Drain Pipe
(Up to 24") 25 $150.00 $3,750.00 $200.00 $5,000.00 $250.00 $6,250.00
Light Tower with self-contained power supply 20 $50.00 $1,000.00 $30.00 $600.00 $100.00 $2,000.00
Extra cost for night work (one 5-man crew, 8 hours) 5 $1,500.00 $7,500.00 $5,000.00 $25,000.00 $5,000.00 $25,000.00
127 Arrow Board 100 $50.00 $5,000.00 $25.00 $2,500.00 $100.00 $10,000.00
128 Truck Mounted Attenuator 20 $250.00 $5,000.00 $125.00 $2,500.00 $2,500.00 $50,000.00
129 Flagger Service 100 $35.00 $3,500.00 $500.00 $50,000.00 $400.00 $40,000.00
130 Electronic Message Board 50 $75.00 $3,750.00 $150.00 $7,500.00 $100.00 $5,000.00
131 Barriers 50 $75.00 $3,750.00 $125.00 $6,250.00 $25.00 $1,250.00
132 Stationary Crash Cushions 50 $125.00 $6,250.00 $250.00 $12,500.00 $200.00 $10,000.00
Grand Total $1,022,050.00 $1,842,673.50 $2,379,650.00
Emergency Mark Up 0.25$0.25 $0.25